Method for pressing machining scrap iron into balls

By using cement as a binder, the compressive strength of the pressed balls of machined iron filings is improved, and the problems of easy breakage and high cost of iron filing balls are solved, and efficient utilization of resources and environmentally friendly use of blast furnaces are achieved.

CN118957256APending Publication Date: 2024-11-15HUNAN VALIN LIANYUAN IRON & STEEL CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410930751.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-11
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

The machined iron chips are low in strength after being pressed into balls, which are easy to break, which is inconvenient for transportation and use. The existing adhesives are costly and may pollute the environment.

Method used

Cement is used as the binder, and iron filings and cement are mixed in a specific proportion by mixing the roll ball making machine. After making the ball, it is stacked for two days to harden the cement, which increases the compressive strength of the ball, and screens and transports before entering production.

Benefits of technology

The compressive strength of the ball reaches more than 5000N/piece, meets the requirements for blast furnace use, reduces energy consumption and environmental pollution, maximizes the utilization of machined iron filing resources, and reduces production costs.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

The invention discloses a method for pressing machined scrap iron into balls, which comprises the following steps of: 1, preparing raw materials, namely preparing the quantity of the machined scrap iron and the quantity of cement according to the ball forming quantity and set process parameters; step 2, in a production process, setting the opening degree of valves mounted at the lower parts of a scrap iron charging hopper and a cement charging hopper and the rotating speed of a metering belt weigher according to the production capacity of the double-roller ball forming machine, starting a double-roller ball forming machine and a mixture conveying belt in sequence, simultaneously opening discharging valves at the lower parts of a scrap iron charging hopper and a cement charging hopper according to a set opening degree, opening an atomizing water spraying device, and starting ball forming production; 3, stacking the finished product balls for more than two days to harden the cement so as to achieve the effect of improving the strength of the finished product balls; and 4, detecting the strength of the finished product balls, screening and transferring before putting into production after the strength meets the requirement, and returning the screen underflow to a raw material storage yard of a ball making production line. The invention relates to the field of scrap iron use, in particular to a method for pressing machining scrap iron into balls.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of iron chips use, in particular to a method for pressing machined iron chips into balls. Background Art

[0002] At present, the machined iron scraps of steel materials are sold and disposed as a scrap steel resource in the market. The resource volume is large and it is a good iron-containing raw material that can be used for blast furnace smelting. Due to the particularity of its source, the shapes of machined iron scraps are mostly filaments, small blocks and granules. The filamentary material is large in size, occupies space, and is not convenient to store and use directly. There is a relatively mature briquetting process for the disposal of filamentary materials. At present, the filamentary material is used as the raw material of the steelmaking process after briquetting; the block material and the granular material are of different sizes, which are difficult to sort when used. The fine granular material is not easy to mix evenly when it is added to the sintering raw material, which affects the production process and product quality. It will also generate dust during use, pollute the environment, and cause waste of resources. At the same time, the fine granular material can be directly put into production as the raw material of the blast furnace or converter after a little processing. If it is produced through the sintering process to produce sintered ore and then enter the production process, it will inevitably cause cost increase and affect product quality. These problems of machined iron scraps limit the use of machined iron scraps in the steel and metallurgical industry.

[0003] The treatment of block and granular materials now mostly adopts the ball making process, that is, using a double-roll ball making machine to press them into balls. However, the balls obtained by directly pressing block and granular materials have low strength, are easy to break, are not convenient for transportation and storage, and cannot be directly used in blast furnaces. Although the strength of the balls is improved after the balls are pressed with a relatively expensive binder, they can be put into production, but the cost is increased, affecting their value of use. At the same time, some binders also contain alkali metal oxides that are harmful to blast furnace production and cannot be effectively promoted and applied. Summary of the invention

[0004] The technical problem to be solved by the present invention is that the iron chips processed by steel mills are pressed into balls with low strength, easy to break, and inconvenient to transport, store and use.

[0005] To solve the above problems, the technical solution adopted by the present invention is as follows: The present invention is a method for pressing machined iron chips into balls, comprising the following steps: Step 1: Raw material preparation: prepare the amount of iron chips and cement to be processed according to the ball production amount and the set process parameters; Step 2, production process, according to the production capacity of the double-roller ball making machine, set the opening of the valve installed at the bottom of the iron filing hopper and the cement loading hopper and the speed of the metering belt scale, start the double-roller ball making machine and the mixed material conveying belt in sequence, open the discharge valves at the bottom of the iron filing hopper and the cement loading hopper at the set opening, turn on the atomizing water spraying device, and start ball making production; Step 3: The finished balls are stacked for more than two days to allow the cement to harden and thus improve the strength of the finished balls; Step 4: Test the strength of the finished balls. If they meet the requirements, they will be screened and transported before being put into production. The screened materials will be returned to the raw material yard of the ball production line.

[0006] Furthermore, the cement addition amount is produced according to a ratio of 1.5-3.5% of the iron filings addition amount.

[0007] Preferably, the production line needs to be prepared in advance, including the iron filing hopper (with a discharge valve and a metering belt scale installed at the bottom), the cement loading hopper (with a discharge valve and a metering belt scale installed at the bottom), the atomizing water spray device, the conveyor belt, and the roller ball making machine. The raw material yard and the finished ball yard.

[0008] The beneficial effects achieved by the present invention using the above structure are as follows: The present invention uses relatively cheap cement as a binder. The raw material of the binder, cement, has a wide source, and the main component of cement is silicate, which is equivalent to the main component of blast furnace slag, and is compatible with the slag making of blast furnace smelting, and can effectively avoid the introduction of some harmful components that affect blast furnace production. After the block and granular processed iron filings are pressed into balls with cement as a binder, the compressive strength of the balls can reach more than 5000N / piece, which fully meets the use requirements of blast furnaces.

[0009] 1. It can fully recycle the iron chips from steel materials and directly put them into blast furnace or steelmaking process after being pressed into balls. The iron chips no longer need to go through the sintering process, which can reduce energy consumption, be environmentally friendly, and maximize the value of iron chips.

[0010] 2. Cement is used as a binder for iron chip pelletizing, which is cheap and has a wide range of raw material sources.

[0011] 3. The quality of the balls produced by the method described in the present invention fully meets the requirements of the relevant smelting process.

[0012] 4. The present invention can also be applied to the processing of other fine particles of metal materials. DETAILED DESCRIPTION

[0013] The invention relates to a method for pressing machined iron chips into balls. Example 1

[0014] The steps include: Step 1: Raw material preparation: prepare the amount of iron chips and cement according to the ball production amount and the set process parameters. The amount of cement added is 1.5% of the amount of iron chips added to organize production; Step 2, production process, according to the production capacity of the double-roller ball making machine, set the opening of the valve installed at the bottom of the iron filing hopper and the cement loading hopper and the speed of the metering belt scale, start the double-roller ball making machine and the mixed material conveying belt in sequence, open the discharge valves at the bottom of the iron filing hopper and the cement loading hopper at the set opening, turn on the atomizing water spraying device, and start ball making production; Step 3: The finished balls are stacked for more than two days to allow the cement to harden and thus improve the strength of the finished balls; Step 4: Test the strength of the finished balls. If they meet the requirements, they will be screened and transported before being put into production. The screened materials will be returned to the raw material yard of the ball production line. Example 2

[0015] The steps include: Step 1: Raw material preparation: prepare the amount of iron chips and cement according to the ball production amount and the set process parameters. The amount of cement added is 2.5% of the amount of iron chips added to organize production; Step 2, production process, according to the production capacity of the double-roller ball making machine, set the opening of the valve installed at the bottom of the iron filing hopper and the cement loading hopper and the speed of the metering belt scale, start the double-roller ball making machine and the mixed material conveying belt in sequence, open the discharge valves at the bottom of the iron filing hopper and the cement loading hopper at the set opening, turn on the atomizing water spraying device, and start ball making production; Step 3: The finished balls are stacked for more than two days to allow the cement to harden and thus improve the strength of the finished balls; Step 4: Test the strength of the finished balls. If they meet the requirements, they will be screened and transported before being put into production. The screened materials will be returned to the raw material yard of the ball production line. Example 3

[0016] The steps include: Step 1: Raw material preparation: prepare the amount of iron chips and cement for processing according to the ball production amount and the set process parameters. The amount of cement added is 3% of the amount of iron chips added to organize production; Step 2, production process, according to the production capacity of the double-roller ball making machine, set the opening of the valve installed at the bottom of the iron filing hopper and the cement loading hopper and the speed of the metering belt scale, start the double-roller ball making machine and the mixed material conveying belt in sequence, open the discharge valves at the bottom of the iron filing hopper and the cement loading hopper at the set opening, turn on the atomizing water spraying device, and start ball making production; Step 3: The finished balls are stacked for more than two days to allow the cement to harden and thus improve the strength of the finished balls; Step 4: Test the strength of the finished balls. If they meet the requirements, they will be screened and transported before being put into production. The screened materials will be returned to the raw material yard of the ball production line.

[0017] Effect detection:

[0018] 1. Organize production according to the preset plan. After being pressed into balls, the finished balls are piled up for two days. Samples are taken to test whether their compressive strength exceeds the detection limit of the testing equipment; 2. After pressing into balls, take two to three balls and soak them completely in water for three days. They still remain in their original shape. 3. In air atmosphere, it was heated from room temperature to 1000°C at a heating rate of 25°C / min without cracking; 4. In a reducing atmosphere filled with CO, the ore is heated from room temperature to 500°C, and a drum test is performed according to the test method for low-temperature reduction pulverization index of iron ore in accordance with GB / T 13242-2017. The proportion of particles larger than 3.15 mm is more than 70%.

[0019] It should be understood that although this specification is described according to implementation methods, not every implementation method contains only one independent technical solution. This narrative method of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment can also be appropriately combined to form other implementation methods that can be understood by those skilled in the art.

Claims

1. A method for pressing machined iron chips into balls, It is characterized in that The steps include: Step 1: Raw material preparation: prepare the amount of iron chips and cement to be processed according to the ball production amount and the set process parameters; Step 2, production process, according to the production capacity of the double-roller ball making machine, set the opening of the valve installed at the bottom of the iron filing hopper and the cement loading hopper and the speed of the metering belt scale, start the double-roller ball making machine and the mixed material conveying belt in sequence, open the discharge valves at the bottom of the iron filing hopper and the cement loading hopper at the set opening, turn on the atomizing water spraying device, and start ball making production; Step 3: The finished balls are stacked for more than two days to allow the cement to harden and thus improve the strength of the finished balls; Step 4: Test the strength of the finished balls. If they meet the requirements, they will be screened and transported before being put into production. The screened materials will be returned to the raw material yard of the ball production line.

2. A method for pressing machined iron chips into balls according to claim 1, Features: The amount of cement added is organized according to the production ratio of 1.5-3.5% of the amount of iron filings added.