Municipal engineering construction quality full-period tracking monitoring management platform
Through real-time quality analysis and monitoring of the full-cycle tracking, monitoring and management platform for municipal engineering construction construction, the problems of opacity and incomplete monitoring in the existing technology have been solved, and accurate assessment and real-time adjustment of municipal engineering construction process have been achieved, which has improved the Construction efficiency and durability of the engineering structure reduce maintenance costs and accident rates.
Patent Information
- Application Number
- CN202410982220.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-22
- Publication Date
- 2024-11-15
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing municipal engineering construction quality management system has problems such as opaque information, incomplete monitoring and untimely response, which leads to the accumulation of problems during the construction process, affecting the quality and safety of the project, especially in the quality inspection of roadbeds and asphalt concrete. Monitoring leads to shorter service life and increased maintenance costs.
Provide a full-cycle tracking, monitoring and management platform for municipal engineering construction quality, including roadbed quality analysis module, asphalt concrete quality analysis module, road casting judgment module, road quality judgment module and construction progress qualification judgment module, through real-time collection and analysis of roadbed leveling Measure road quality and construction progress, ensure quality in compliance with standards and timely adjustments.
It realizes accurate quality assessment and real-time monitoring of the municipal engineering construction process, promptly discover problems, avoid rework and repair, improves construction efficiency and durability of the engineering structure, and reduces maintenance costs and traffic accident rates.
Smart Images

Figure CN118967019A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of a full-cycle tracking, monitoring and management platform for construction quality, and relates to a full-cycle tracking, monitoring and management platform for municipal engineering construction quality. Background Art
[0002] With the acceleration of urbanization, the importance of municipal engineering construction in urban development has become increasingly prominent. The quality of municipal engineering is directly related to the sustainable development of the city and the quality of life of residents. Therefore, it is particularly important to conduct comprehensive and accurate management and monitoring of construction quality. However, traditional municipal engineering quality management methods often have problems such as opaque information, incomplete monitoring, and untimely response, which are difficult to meet the complex needs of modern urban construction.
[0003] Although the existing full-cycle tracking and monitoring management system for construction quality meets certain requirements, it still has limitations, which are specifically reflected in: 1. Traditional evaluation methods may not be able to detect problems in the construction process in a timely manner, resulting in the accumulation of problems and affecting the quality of the entire project. For example, if there is insufficient compaction or substandard flatness in a certain area of the roadbed, but these problems are not discovered and resolved in the early stages of construction, they may gradually deteriorate as the construction progresses, ultimately affecting the performance and safety of the road.
[0004] 2. The existing technology often obtains the mix ratio of asphalt concrete through the documents of the material party, and does not conduct real-time testing on site. This lack of real-time testing may lead to the inability to ensure the quality of asphalt concrete, resulting in problems such as cracking and peeling during use, further shortening the service life of the asphalt concrete pavement.
[0005] 3. When monitoring roads, existing technologies lack a focus on road joints, which are prone to cracks and damage after experiencing temperature changes and repeated effects of vehicle loads, thus affecting the overall performance of the road. In addition, existing technologies often ignore the detection of road sections with slopes, resulting in problems such as unevenness or sliding of roads in areas with larger slopes. Summary of the invention
[0006] In view of this, in order to solve the problems raised in the above background technology, a full-cycle tracking, monitoring and management platform for the construction quality of municipal engineering projects is proposed.
[0007] The purpose of the present invention can be achieved through the following technical solutions: The present invention provides a full-cycle tracking, monitoring and management platform for the construction quality of municipal engineering projects, including: a roadbed quality analysis module: used to divide the construction road into sections according to distance, collect the height of each monitoring point in each section of the construction road and the roadbed soil samples at each monitoring point in each section of the construction road, analyze the flatness and compaction of the roadbed respectively, and then analyze the quality compliance of the roadbed.
[0008] Asphalt concrete quality analysis module: used to collect images of asphalt concrete after it is evenly mixed to analyze the mixing uniformity P of asphalt concrete; collect the temperature value of asphalt concrete in the mixer truck to analyze the temperature compliance υ of asphalt concrete; collect the viscosity of asphalt concrete to analyze the viscosity compliance U of asphalt concrete, and then analyze the quality compliance of asphalt concrete.
[0009] Road pouring judgment module: used to determine whether to pour asphalt concrete on the road based on the quality compliance of the roadbed and the quality compliance of the asphalt concrete.
[0010] Road quality judgment module: used to divide the road sections after pouring into ordinary sections, joint sections and slope sections, collect the width of each ordinary section and the thickness of each collection point, and analyze the quality qualification coefficient φ of the ordinary section; collect the temperature value and density of the asphalt concrete at the connection of each joint section, and analyze the quality qualification coefficient λ of the joint section; collect the three-dimensional model and density of the ramp transition of each slope section, analyze the quality qualification coefficient τ of the slope section, and then analyze the quality qualification index of the construction road after pouring, and determine whether the quality qualification index of the construction road after pouring is qualified.
[0011] Construction progress qualification judgment module: used to extract the construction progress corresponding to each construction time from the database, draw the construction progress change curve over time, and then judge whether the construction progress is qualified.
[0012] Database: used to store the construction progress corresponding to each construction time.
[0013] Compared with the prior art, the beneficial effects of the present invention are as follows: (1) The present invention collects the height of each monitoring point in each section of the construction road and the roadbed soil samples at each monitoring point in each section of the construction road, respectively analyzes the flatness and compaction of the roadbed, and then analyzes the quality compliance of the roadbed. The roadbed quality of each area can be accurately evaluated, avoiding the errors that may be caused by traditional global evaluation. The flatness and compaction of the roadbed can fully evaluate the quality compliance of the roadbed, and problems in the construction process can be discovered and adjusted in time, avoiding rework and repair caused by quality problems in the later stage, thereby improving construction efficiency and reducing costs.
[0014] (2) The present invention uses image analysis to analyze the mixing uniformity of asphalt concrete, ensures the uniform distribution of various components in the concrete, thereby improving the strength and durability of asphalt concrete, and helps to avoid performance instability problems caused by material unevenness. By real-time collection and analysis of the temperature and viscosity of asphalt concrete, precise control can be achieved during the production and construction process, and it helps to ensure that the asphalt concrete is used in the best working state, thereby improving construction efficiency and quality consistency. By comprehensively considering the mixing uniformity, temperature and viscosity compliance, it is ensured that the overall quality of the asphalt concrete meets the standards, which not only improves the durability of roads and engineering structures, but also reduces future maintenance costs and frequency.
[0015] (3) The present invention determines whether to pour asphalt concrete on the road based on the quality compliance of the roadbed and the quality compliance of the asphalt concrete, thereby ensuring that the asphalt concrete is poured under appropriate conditions, which helps to improve the structural strength and durability of the road and reduce the need for future repair and maintenance, thereby saving material and labor costs and avoiding future increases in maintenance costs due to quality problems.
[0016] (4) The module of the present invention can accurately evaluate the quality qualification coefficient of each part of the road by collecting and analyzing various indicators such as thickness, temperature, density, etc. of ordinary road sections, joint sections and slope sections, which helps to identify and locate road quality problems, carry out repairs and improvements in a timely manner, and ensure that the road quality meets the standards. By analyzing the thickness and width of ordinary road sections, the stability and durability of the road structure can be improved; the temperature and density analysis of joint sections can effectively prevent road cracks and damage and extend the service life of the road; the taper and density analysis of slope sections can ensure the stability and driving safety of the road, improve driving comfort and vehicle stability, and reduce the incidence of traffic accidents.
[0017] (5) The present invention extracts the construction progress corresponding to each construction time from the database, draws a curve of the construction progress changing with time, and then determines whether the construction progress is qualified. It can quickly obtain intuitive information on the construction progress without manually collating and analyzing a large amount of data, thereby improving decision-making efficiency and accurately reflecting the changing trend of the construction progress. Compared with manual evaluation, this method is more objective and accurate, and helps to reduce the influence of subjective factors on the judgment results. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for describing the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.
[0019] Figure 1 It is a schematic diagram of the connection of each module of the system of the present invention. DETAILED DESCRIPTION
[0020] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0021] See also Figure 1 As shown, the present invention provides a full-cycle tracking, monitoring and management platform for the construction quality of municipal engineering projects, including: a roadbed quality analysis module, an asphalt concrete quality analysis module, a road pouring determination module, a road quality determination module, a construction progress qualification determination module and a database.
[0022] The road pouring determination module is respectively connected to the roadbed quality analysis module and the asphalt concrete quality analysis module, the road quality determination module is respectively connected to the road pouring determination module and the construction progress qualified determination module, and the construction progress qualified determination module is respectively connected to the road quality determination module and the database.
[0023] The roadbed quality analysis module is used to divide the construction road into sections according to distance, collect the height of each monitoring point in each section of the construction road and the roadbed soil samples at each monitoring point in each section of the construction road, analyze the flatness and compaction of the roadbed respectively, and then analyze the quality compliance of the roadbed.
[0024] Furthermore, the flatness of the roadbed is analyzed by: setting up monitoring points on each section of the road under construction, and measuring the height of each monitoring point on each section of the road under construction by a level, which is recorded as a dj , where d represents the number corresponding to the d-th road section, d=1,2,3,...D, j represents the number corresponding to the j-th monitoring point, j=1,2,3,...J.
[0025] According to the calculation model The variance of the height of each section of the construction road is obtained, where J represents the total number of monitoring points.
[0026] Analyze the flatness of the roadbed, D represents the total number of road sections, and a0 represents the reference height of the construction road.
[0027] Furthermore, the analysis of the quality compliance of the roadbed includes: collecting roadbed soil samples at each monitoring point in each section of the construction road by using a soil sample collection tool.
[0028] The roadbed soil samples at each monitoring point of each section of the construction road are processed and analyzed to obtain the compaction value of the roadbed soil samples of each section of the construction road, which is recorded as Y d .
[0029] As a preferred embodiment, the specific process of obtaining the compaction value of the roadbed soil samples of each section of the construction road is: compacting the roadbed soil samples of each monitoring point in each section of the construction road by the ring knife method to obtain the dry density of the roadbed soil samples of each monitoring point in each section of the construction road.
[0030] The dry density of the roadbed soil samples at each monitoring point of each section of the road under construction is compared with the preset standard dry density of the roadbed soil samples under construction, and the ratio of the dry density of the roadbed soil samples at each monitoring point of each section of the road under construction to the preset standard dry density of the roadbed soil samples under construction is obtained, and the ratio is used as the compaction value of the roadbed soil samples at each monitoring point of each section of the road under construction;
[0031] Substitute the compaction values of the roadbed soil samples at each monitoring point in each section of the construction road into the average formula to obtain the compaction values of the roadbed soil samples in each section of the construction road, recorded as Y d .
[0032] Analyze the compaction degree ψ of the roadbed, Where Y0 represents the standard compaction value of the roadbed to be constructed.
[0033] Analyze the quality compliance of the roadbed ξ, Wherein ζ0 represents the reference flatness of the set roadbed, φ1 represents the weight factor corresponding to the set flatness of the roadbed, φ2 represents the weight factor corresponding to the set compaction degree of the roadbed, and φ1+φ2=1.
[0034] As a preferred embodiment, φ1 can be set to 0.6, and φ2 can be set to 0.4. The flatness of the roadbed directly affects the driving comfort and safety of the road. The uneven road surface will not only increase the wear and tear of the vehicle, but may also pose a threat to driving safety. The compaction of the roadbed affects the bearing capacity and service life of the road. Good compaction can ensure that the road can still maintain good stability and durability when facing heavy traffic. Therefore, the weight factor corresponding to the flatness of the roadbed is greater than the weight factor corresponding to the compaction of the roadbed.
[0035] The present invention collects the height of each monitoring point in each section of the construction road and the roadbed soil samples at each monitoring point in each section of the construction road, respectively analyzes the flatness and compaction of the roadbed, and then analyzes the quality compliance of the roadbed. The roadbed quality of each area can be accurately evaluated, avoiding the errors that may be caused by traditional global evaluation. The flatness and compaction of the roadbed can fully evaluate the quality compliance of the roadbed, and problems in the construction process can be discovered and adjusted in time, avoiding rework and repair caused by quality problems in the later stage, thereby improving construction efficiency and reducing costs.
[0036] The asphalt concrete quality analysis module is used to collect images of asphalt concrete after it is evenly mixed to analyze the mixing uniformity P of the asphalt concrete; collect the temperature value of the asphalt concrete in the mixer truck to analyze the temperature compliance υ of the asphalt concrete; collect the viscosity of the asphalt concrete to analyze the viscosity compliance U of the asphalt concrete, and then analyze the quality compliance of the asphalt concrete.
[0037] Furthermore, the analysis of the quality compliance of asphalt concrete includes: collecting an image of the asphalt concrete after it is evenly mixed through a camera, and performing color threshold segmentation processing technology on it to obtain the grayscale value of each pixel in the image after the asphalt concrete is evenly mixed, and comparing the grayscale value of each pixel with the preset allowable range of the color threshold of each raw material. If the grayscale value of a pixel falls within the preset allowable range of the color threshold of a raw material, the pixel is marked as the pixel of the raw material, and the number of pixels of the raw material is screened and counted, thereby obtaining the number of pixels of each raw material.
[0038] The number of pixels of each raw material is divided by the area of the image after the asphalt concrete is evenly mixed, and the ratio of the number of pixels of each raw material to the area of the image after the asphalt concrete is evenly mixed is obtained, which is used as the distribution density of each raw material and is recorded as S i , where i represents the number corresponding to the i-th raw material, i=1,2,3,...I.
[0039] Analysis of mixing uniformity of asphalt concrete P, Where S i ′ represents the standard distribution density of the i-th raw material of asphalt concrete, where I represents the total number of raw materials of asphalt concrete.
[0040] The temperature value of the asphalt concrete in the mixer truck is collected by the temperature sensor and recorded as T.
[0041] Analyze the temperature compliance of asphalt concrete, T0 sets the standard temperature value of asphalt concrete in the mixer truck.
[0042] The viscosity of asphalt concrete was collected by a digital viscometer.
[0043] According to the analysis method of the temperature compliance of asphalt concrete, the viscosity compliance U of asphalt concrete can be obtained by similar analysis.
[0044] Analyze the quality compliance M of asphalt concrete, M = P*α1+υ*α2+U*α3, where α1, α2 and α3 represent the weights corresponding to the set mixing uniformity, temperature compliance and viscosity compliance of the asphalt concrete, respectively, and α1+α2+α3=1.
[0045] As a preferred embodiment, α1 can be set to 0.4, α2 can be set to 0.3, and α3 can be set to 0.3. Mixing uniformity is the key to ensuring the stable performance of asphalt concrete. Uneven mixing may lead to uneven distribution of components in asphalt concrete, thereby affecting its strength, durability and other properties. Temperature is an important factor affecting the performance of asphalt concrete. During the production and construction process, the temperature of asphalt concrete needs to be strictly controlled to ensure that it reaches the best working state. Viscosity is one of the important indicators for evaluating the performance of asphalt concrete, which reflects the fluidity and workability of asphalt concrete. Therefore, the weight corresponding to the mixing uniformity of asphalt concrete is greater than the weights corresponding to the temperature compliance and viscosity compliance.
[0046] The specific process of collecting the viscosity of asphalt concrete by using a digital viscometer includes: first, loading the preheated asphalt concrete sample into the test slot of the digital viscometer, and ensuring that the sample fills the test slot to avoid bubbles or gaps, then setting the test parameters, such as rotation speed and temperature, and then starting the digital viscometer for testing. The device will rotate the viscosity rod at the set speed and measure the viscosity of the asphalt concrete at a preset temperature. During the test, the digital viscometer will record the changes in the viscosity value in real time and display the final measurement results after the viscosity value reaches a stable state.
[0047] The present invention uses image analysis to analyze the mixing uniformity of asphalt concrete, ensures the uniform distribution of various components in the concrete, thereby improving the strength and durability of asphalt concrete, and helps to avoid performance instability problems caused by material unevenness. By real-time collection and analysis of the temperature and viscosity of asphalt concrete, precise control can be achieved during the production and construction process, and it helps to ensure that the asphalt concrete is used in the best working state, improving construction efficiency and quality consistency. Comprehensive consideration of mixing uniformity, temperature and viscosity compliance ensures that the overall quality of asphalt concrete meets the standards, which not only improves the durability of roads and engineering structures, but also reduces future maintenance costs and frequency.
[0048] The road pouring determination module is used to determine whether to pour asphalt concrete on the road according to the quality compliance of the roadbed and the quality compliance of the asphalt concrete.
[0049] Furthermore, the determination of whether to pour asphalt concrete on the road includes: comparing the quality compliance of the roadbed with a preset quality compliance threshold of the roadbed, and comparing the quality compliance of the asphalt concrete with a preset quality compliance threshold of the asphalt concrete; if the quality compliance of the roadbed is greater than or equal to the preset quality compliance threshold of the roadbed, and the quality compliance of the asphalt concrete is greater than or equal to the preset quality compliance threshold of the asphalt concrete, pouring asphalt concrete on the road is performed; otherwise, an early warning is issued.
[0050] Specifically, when the quality compliance of the roadbed is less than the preset quality compliance threshold of the roadbed, the roadbed is filled; when the quality compliance of the asphalt concrete is less than the preset quality compliance threshold of the asphalt concrete, the asphalt concrete continues to be heated and stirred.
[0051] The present invention determines whether to pour asphalt concrete on the road based on the quality compliance of the roadbed and the quality compliance of the asphalt concrete, thereby ensuring that the asphalt concrete is poured under appropriate conditions, which helps to improve the structural strength and durability of the road and reduce the need for future repair and maintenance, thereby saving material and labor costs and avoiding increased maintenance costs due to quality problems in the future.
[0052] The road quality determination module is used to divide the road sections after pouring into ordinary sections, joint sections and slope sections, collect the width of each ordinary section and the thickness of each collection point, and analyze the quality qualification coefficient of the ordinary section. The temperature value and density of the asphalt concrete at the connection of each joint section are collected, and the quality qualification coefficient λ of the joint section is analyzed; the three-dimensional model and density of the ramp transition of each slope section are collected, and the quality qualification coefficient τ of the slope section is analyzed, and then the quality qualification index of the construction road after pouring is analyzed to determine whether the quality qualification index of the construction road after pouring is qualified.
[0053] As a preferred embodiment, the specific process of dividing the poured road sections into ordinary sections, joint sections and slope sections is: divide the sections with slopes into slope sections, divide the sections with joints into joint sections, and use the remaining parts as ordinary sections, and count the slope sections and joint sections.
[0054] Furthermore, the quality qualification coefficient of the ordinary road section of the road under construction is analyzed, including: collecting the width of each ordinary road section through a distance meter, recorded as C p .
[0055] The thickness of each collection point of each ordinary road section is collected by ultrasonic detection, and the thickness of each collection point of each ordinary road section is substituted into the average formula to obtain the average thickness of each ordinary road section, which is taken as the thickness of each ordinary road section and recorded as H p, where p represents the number corresponding to the p-th ordinary road section, p = 1, 2, 3, ... A;
[0056] Analyze the quality qualification coefficient of ordinary road sections Wherein H0 represents the standard thickness of the set ordinary road section, and C0 represents the standard width of the set ordinary road section.
[0057] Furthermore, the analysis of the quality qualification coefficient of the joint sections of the road under construction includes: collecting the temperature value of the asphalt concrete at the connection of each joint section through a temperature sensor.
[0058] The temperature value of the asphalt concrete at the connection of each joint section is compared with the temperature value of the asphalt concrete of its adjacent section, and the difference between the temperature value of the asphalt concrete at the connection of each joint section and the temperature value of the asphalt concrete of its adjacent section is obtained, which is used as the temperature difference of the asphalt concrete at the connection of each joint section and recorded as Wherein t represents the number corresponding to the t-th joint section, t=1, 2, 3, ...V.
[0059] The density of each target collection point of the asphalt concrete at each joint section is collected by a non-nuclear density meter, and the density is substituted into the average formula to obtain the average density of the asphalt concrete at each joint section, which is taken as the density of the asphalt concrete at each joint section, recorded as Q t .
[0060] Analyze the quality qualification coefficient λ of the joint section, in It represents the allowable temperature difference of the asphalt concrete at the connection of the set joint section, and Q0 represents the standard density of the asphalt concrete at the connection of the set joint section.
[0061] Furthermore, the quality qualification coefficient of the slope section of the road under construction includes: generating a three-dimensional model of the ramp transition of each slope section by scanning the ramp transition of each slope section with a laser scanner, and determining the starting point and ending point of the ramp transition of each slope section therefrom.
[0062] As a preferred embodiment, the specific process of determining the starting point and the ending point of the ramp transition of each slope section is as follows: first, the original point cloud data acquired by the laser scanner is preprocessed to remove noise and non-critical information to ensure data quality; then, the elevation information in the point cloud data is used to analyze the change in elevation to roughly identify the range of the slope section; further, a detailed elevation analysis is performed on the point cloud data at the ramp transition, and the increase and decrease trend of the elevation can be clearly observed by calculating the elevation value of each point and drawing an elevation change curve; on the elevation change curve, the points where the elevation value begins to rise significantly and begins to fall significantly are found, and these two key points correspond to the starting point and the ending point of the ramp transition, respectively.
[0063] The three-dimensional coordinates of the starting point and the ending point of the ramp transition of each slope section are extracted and recorded as and Wherein, e represents the number corresponding to the e-th slope section, e=1,2,3,...E.
[0064] Analyze the taper Z at the ramp transition of each slope section e ,
[0065] According to the analysis method of the density of asphalt concrete at the joints of each joint section, the density of the ramp transition of each slope section is obtained in the same way, which is recorded as
[0066] Analyze the quality qualification coefficient τ of the slope section, Wherein Z0 represents the allowable taper at the ramp transition of the preset slope section, and ζ0 represents the allowable density at the ramp transition of the preset slope section.
[0067] Further, determining whether the quality index of the construction road after pouring is qualified includes: analyzing the quality index of the construction road after pouring Among them, σ1 represents the weight corresponding to the quality qualification coefficient of the set ordinary road section, σ2 represents the weight corresponding to the quality qualification coefficient of the set joint section, σ3 represents the weight corresponding to the quality qualification coefficient of the set slope section, and σ1+σ2+σ3=1.
[0068] The quality qualification index of the construction road after pouring is compared with the preset quality threshold of the construction road. If the quality qualification index of the construction road after pouring is less than the preset quality threshold of the construction road, the quality qualification index of the construction road after pouring is unqualified and an early warning is issued.
[0069] As a preferred embodiment, σ1 can be set to 0.5, σ2 can be set to 0.3, and σ3 can be set to 0.2. Ordinary road sections are the most common parts of roads and occupy the vast majority of the total length of roads. Therefore, the quality of ordinary road sections has a vital impact on the quality of the entire road network. Joint sections are the connecting parts between different sections, and their quality directly affects the continuity of the road and driving safety. Slope sections are relatively rare in the road network, but have an important impact on driving safety and comfort.
[0070] The specific process of collecting the density of asphalt concrete at each joint section by using a non-nuclear density meter is as follows: the non-nuclear density meter is placed on each collection point of the asphalt concrete at each joint section, and after pressing the button to start the measurement, the device will emit electromagnetic waves and receive the reflected signals. By analyzing the changes in these signals, such as propagation time and amplitude attenuation, the device can calculate the dielectric constant of the asphalt concrete material. Since the dielectric constant is related to the density of the material, the density of the asphalt concrete can be inferred from the dielectric constant.
[0071] The module of the present invention can accurately evaluate the quality qualification coefficient of each part of the road by collecting and analyzing various indicators such as thickness, temperature, density, etc. of ordinary sections, joint sections and slope sections, which is helpful to identify and locate road quality problems, carry out repairs and improvements in time, and ensure that the road quality meets the standards. By analyzing the thickness and width of ordinary sections, the stability and durability of the road structure can be improved; the temperature and density analysis of joint sections can effectively prevent road cracks and damage and extend the service life of the road; the taper and density analysis of slope sections can ensure the stability and driving safety of the road, improve driving comfort and vehicle stability, and reduce the incidence of traffic accidents.
[0072] The construction progress qualification judgment module is used to extract the construction progress corresponding to each construction time from the database, draw a curve of the construction progress changing with time, and then judge whether the construction progress is qualified.
[0073] Furthermore, the specific process of judging whether the construction progress is qualified includes: establishing a coordinate system with the construction time as the horizontal coordinate and the construction progress as the vertical coordinate, marking the corresponding data points in the coordinate system according to the construction progress corresponding to each construction time, and using a mathematical model establishment method to draw a curve of the construction progress changing over time.
[0074] Substitute the planned construction time into the construction progress versus time curve to obtain the construction progress corresponding to the planned construction time.
[0075] The construction progress corresponding to the planned construction time is compared with the set construction progress. If the construction progress corresponding to the planned construction time is less than the set construction progress, the construction progress is unqualified and an early warning is issued.
[0076] The present invention extracts the construction progress corresponding to each construction time from the database, draws a curve of the construction progress changing with time, and then judges whether the construction progress is qualified. It can quickly obtain intuitive information on the construction progress without manually collating and analyzing a large amount of data, thereby improving decision-making efficiency and being able to accurately reflect the changing trend of the construction progress. Compared with manual evaluation, this method is more objective and accurate, and helps to reduce the influence of subjective factors on the judgment results.
[0077] Database: used to store the construction progress corresponding to each construction time.
[0078] The above contents are merely examples and explanations of the concept of the present invention. Those skilled in the art may make various modifications or additions to the specific embodiments described or replace them in a similar manner. As long as they do not deviate from the concept of the invention or exceed the scope defined by the present invention, they shall all fall within the protection scope of the present invention.
Claims
1. A full-cycle tracking, monitoring and management platform for the construction quality of municipal engineering projects, characterized by: include: Roadbed quality analysis module: used to divide the construction road into sections according to the distance, collect the height of each monitoring point in each section of the construction road and the roadbed soil samples at each monitoring point in each section of the construction road, analyze the flatness and compaction of the roadbed respectively, and then analyze the quality compliance of the roadbed; Asphalt concrete quality analysis module: used to collect images of asphalt concrete after mixing to analyze the mixing uniformity P of asphalt concrete; collect the temperature value of asphalt concrete in the mixer to analyze the temperature compliance υ of asphalt concrete; collect the viscosity of asphalt concrete to analyze the viscosity compliance U of asphalt concrete, and then analyze the quality compliance of asphalt concrete; Road pouring judgment module: used to judge whether to pour asphalt concrete on the road according to the quality compliance of the roadbed and the quality compliance of the asphalt concrete; Road quality determination module: used to divide the road sections after pouring into ordinary sections, joint sections and slope sections, collect the width of each ordinary section and the thickness of each collection point, and analyze the quality qualification coefficient of the ordinary section The temperature value and density of the asphalt concrete at the joints of each joint section are collected, and the quality qualification coefficient λ of the joint section is analyzed; the three-dimensional model and density of the ramp transition of each slope section are collected, and the quality qualification coefficient τ of the slope section is analyzed, and then the quality qualification index of the construction road after pouring is analyzed to determine whether the quality qualification index of the construction road after pouring is qualified; Construction progress qualification judgment module: used to extract the construction progress corresponding to each construction time from the database, draw the construction progress change curve over time, and then judge whether the construction progress is qualified; Database: used to store the construction progress corresponding to each construction time.
2. A full-cycle tracking, monitoring and management platform for construction quality of municipal engineering projects according to claim 1, characterized in that: The analysis of the flatness of the roadbed includes: Monitoring points are set up on each section of the construction road, and the height of each monitoring point on each section of the construction road is measured by a level, which is recorded as a dj , where d represents the number corresponding to the d-th road section, d = 1, 2, 3, ... D, j represents the number corresponding to the j-th monitoring point, j = 1, 2, 3, ... J; According to the calculation model The variance of the height of each section of the construction road is obtained, where J represents the total number of monitoring points; Analyze the flatness of the roadbed, D represents the total number of road sections, and a0 represents the reference height of the construction road.
3. A full-cycle tracking, monitoring and management platform for construction quality of municipal engineering projects according to claim 2, characterized in that: The quality compliance of the roadbed analysis includes: Use soil sample collection tools to collect roadbed soil samples at each monitoring point on each section of the construction road; The roadbed soil samples at each monitoring point of each section of the construction road are processed and analyzed to obtain the compaction value of the roadbed soil samples of each section of the construction road, which is recorded as Y d ; Analyze the compaction degree ψ of the roadbed, Where Y0 represents the standard compaction value of the roadbed to be constructed; Analyze the quality compliance of the roadbed ξ, Wherein ζ0 represents the reference flatness of the set roadbed, φ1 represents the weight factor corresponding to the set flatness of the roadbed, φ2 represents the weight factor corresponding to the set compaction degree of the roadbed, and φ1+φ2=1.
4. A full-cycle tracking, monitoring and management platform for construction quality of municipal engineering projects according to claim 1, characterized in that: The analysis of the quality compliance of asphalt concrete includes: The image of the asphalt concrete after being evenly mixed is collected by a camera, and a color threshold segmentation processing technique is performed on it to obtain the grayscale value of each pixel in the image after the asphalt concrete is evenly mixed, and the grayscale value of each pixel is compared with the preset allowable range of the color threshold of each raw material. If the grayscale value of a pixel falls within the preset allowable range of the color threshold of a certain raw material, the pixel is marked as the pixel of the raw material, and the number of pixels of the raw material is screened and counted, thereby obtaining the number of pixels of each raw material; The number of pixels of each raw material is divided by the area of the image after the asphalt concrete is evenly mixed, and the ratio of the number of pixels of each raw material to the area of the image after the asphalt concrete is evenly mixed is obtained, which is used as the distribution density of each raw material and is recorded as S i , where i represents the number corresponding to the i-th raw material, i=1,2,3,...I; Analysis of mixing uniformity of asphalt concrete P, where S′ i represents the standard distribution density of the i-th raw material of the set asphalt concrete, where I represents the total number of raw materials of the asphalt concrete; The temperature value of the asphalt concrete in the mixer truck is collected by the temperature sensor, which is recorded as T; Analyze the temperature compliance of asphalt concrete, Where T0 represents the standard temperature value of asphalt concrete in the mixer truck; The viscosity of asphalt concrete was collected by a digital viscometer; According to the analysis method of the temperature compliance of asphalt concrete, the viscosity compliance U of asphalt concrete is obtained by the same analysis; Analyze the quality compliance M of asphalt concrete, M = P*α1+υ*α2+U*α3, where α1, α2 and α3 represent the weights corresponding to the set mixing uniformity, temperature compliance and viscosity compliance of the asphalt concrete, respectively, and α1+α2+α3=1.
5. A full-cycle tracking, monitoring and management platform for construction quality of municipal engineering projects according to claim 1, characterized in that: The step of determining whether to pour asphalt concrete on the road comprises: The quality compliance of the roadbed is compared with the preset quality compliance threshold of the roadbed, and the quality compliance of the asphalt concrete is compared with the preset quality compliance threshold of the asphalt concrete. If the quality compliance of the roadbed is greater than or equal to the preset quality compliance threshold of the roadbed, and the quality compliance of the asphalt concrete is greater than or equal to the preset quality compliance threshold of the asphalt concrete, asphalt concrete is poured on the road; otherwise, an early warning is issued.
6. A full-cycle tracking, monitoring and management platform for construction quality of municipal engineering projects according to claim 1, characterized in that: The quality qualification coefficient of the ordinary road section of the road under construction is analyzed, including: The width of each common road section is collected by the distance meter and recorded as C p ; The thickness of each collection point of each ordinary road section is collected by ultrasonic detection, and the thickness of each collection point of each ordinary road section is substituted into the average formula to obtain the average thickness of each ordinary road section, which is taken as the thickness of each ordinary road section and recorded as H p , where p represents the number corresponding to the p-th ordinary road section, p = 1, 2, 3, ... A Analyze the quality qualification coefficient of ordinary road sections Wherein H0 represents the standard thickness of the set ordinary road section, and C0 represents the standard width of the set ordinary road section.
7. A full-cycle tracking, monitoring and management platform for construction quality of municipal engineering projects according to claim 1, characterized in that: The quality qualification coefficient of the joint section of the road under construction is analyzed, including: The temperature value of the asphalt concrete at the connection of each joint section is collected by a temperature sensor; The temperature value of the asphalt concrete at the connection of each joint section is compared with the temperature value of the asphalt concrete of its adjacent section, and the difference between the temperature value of the asphalt concrete at the connection of each joint section and the temperature value of the asphalt concrete of its adjacent section is obtained, which is used as the temperature difference of the asphalt concrete at the connection of each joint section and recorded as Where t represents the number corresponding to the t-th joint section, t = 1, 2, 3, ... V; The density of each target collection point of the asphalt concrete at each joint section is collected by a non-nuclear density meter, and the density is substituted into the average formula to obtain the average density of the asphalt concrete at each joint section, which is taken as the density of the asphalt concrete at each joint section, recorded as Q t ; Analyze the quality qualification coefficient λ of the joint section, in It represents the allowable temperature difference of the asphalt concrete at the connection of the set joint section, and Q0 represents the standard density of the asphalt concrete at the connection of the set joint section.
8. A full-cycle tracking, monitoring and management platform for construction quality of municipal engineering projects according to claim 1, characterized in that: The quality qualification coefficient of the slope section of the construction road includes: Scanning the ramp transition of each slope section with a laser scanner to generate a three-dimensional model of the ramp transition of each slope section, and determining the starting point and the ending point of the ramp transition of each slope section; The three-dimensional coordinates of the starting point and the ending point of the ramp transition of each slope section are extracted and recorded as and Where e represents the number corresponding to the e-th slope section, e = 1, 2, 3, ... E; Analyze the taper Z at the ramp transition of each slope section e , According to the analysis method of the density of asphalt concrete at the joints of each joint section, the density of the ramp transition of each slope section is obtained in the same way, which is recorded as Analyze the quality qualification coefficient τ of the slope section, Where Z0 represents the allowable taper at the ramp transition of the preset slope section, Indicates the allowable compactness at the ramp transition of a preset slope section.
9. A full-cycle tracking, monitoring and management platform for construction quality of municipal engineering projects according to claim 1, characterized in that: Determine whether the quality index of the construction road after pouring is qualified, including: Analyze the quality index of the construction road after pouring Wherein σ1 represents the weight corresponding to the quality qualification coefficient of the set ordinary road section, σ2 represents the weight corresponding to the quality qualification coefficient of the set joint road section, σ3 represents the weight corresponding to the quality qualification coefficient of the set slope road section, and σ1+σ2+σ3=1; The quality qualification index of the construction road after pouring is compared with the preset quality threshold of the construction road. If the quality qualification index of the construction road after pouring is less than the preset quality threshold of the construction road, the quality qualification index of the construction road after pouring is unqualified and an early warning is issued.
10. A full-cycle tracking, monitoring and management platform for construction quality of municipal engineering projects according to claim 1, characterized in that: The specific process of judging whether the construction progress is qualified includes: A coordinate system is established with construction time as the horizontal axis and construction progress as the vertical axis. According to the construction progress corresponding to each construction time, the corresponding data points are marked in the coordinate system, and a curve of construction progress changing with time is drawn using a mathematical model establishment method; Substitute the planned construction time into the construction progress versus time curve to obtain the construction progress corresponding to the planned construction time; The construction progress corresponding to the planned construction time is compared with the set construction progress. If the construction progress corresponding to the planned construction time is less than the set construction progress, the construction progress is unqualified and an early warning is issued.
Citation Information
Cited By
Asphalt road engineering construction quality real-time monitoring method
CN119809457A