Design method for cast-in-situ inverted arch block of TBM tunnel

By using legs and beams to connect the steel frame in the TBM tunnel, building the steel frame and pouring concrete, the problems of difficulty in using conventional arch blocks in narrow spaces and insufficient load-bearing capacity are solved, and efficient and stable tunnel construction is achieved.

CN118979763APending Publication Date: 2024-11-19CHINA RAILWAY ERYUAN ENGINEERING GROUP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411086745.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-08
Publication Date
2024-11-19

AI Technical Summary

Technical Problem

During the construction of TBM tunnels, conventional prefabricated arch blocks cannot be used in narrow spaces. The existing cast-in-place arch blocks have weak load-bearing capacity and low construction efficiency, especially under weak and broken geological conditions, causing construction difficulties.

Method used

A cast-in-place arch block method for TBM tunnel was designed. By installing legs and beams on the inner surface of the steel frame, building a steel skeleton, and pouring concrete below the beam to form a rail line to facilitate TBM walking, the overall stability of the structure is achieved. and efficient construction.

Benefits of technology

This method can quickly complete concrete pouring without dismantling the rails, which improves construction efficiency, enhances the load-bearing capacity and stability of the structure, and is suitable for TBM tunnel construction in weak and broken areas.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118979763A_ABST
    Figure CN118979763A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of TBM tunnel construction, in particular to a TBM tunnel cast-in-situ inverted arch block design method which comprises the following steps that S1, at least two supporting legs are fixedly installed on the inner surface of a steel frame, and cross beams are installed at the ends, away from the steel frame, of the supporting legs; s2, a steel reinforcement framework of a to-be-poured inverted arch is built in the range below the cross beam and above the inner surface of the steel frame; s3, a track is laid on the cross beam, and the track is used for TBM walking; and a formwork of the inverted arch to be poured is built, concrete is poured, the height of the concrete is not higher than the upper surface of the cross beam, and the formwork is dismantled after the strength of the concrete reaches the standard. According to the method, concrete pouring can be rapidly completed without disassembling the track panel, and the construction time is greatly shortened; the steel frame and the cross beam are connected through the supporting legs, the track panel and the reinforced concrete can be stressed together, and integration of the tunnel bottom structure is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of TBM tunnel construction, and in particular to a design method for a cast-in-place invert block of a TBM tunnel. Background Art

[0002] The inverted arch is a reverse arch structure set at the bottom of the tunnel to improve the stress conditions of the upper support structure. It is one of the main components of the tunnel structure. At present, some tunnel construction uses prefabricated inverted arch blocks for construction. For example, the Chinese invention patent with publication number CN116498342A discloses a prefabricated assembled inverted arch structure for preventing bottom heave in deep soft rock tunnels and its construction method. The prefabricated inverted arch blocks can be prefabricated in advance, which can greatly improve the construction efficiency.

[0003] With the promotion of TBM (tunnel boring machine), TBM has the advantages of high mechanization, fast construction speed and little disturbance to surrounding rock, and is increasingly used in tunnels in my country. However, tunnels constructed by TBM are generally long and buried deep. When the construction encounters complex geological conditions such as soft and broken, the conventional prefabricated invert blocks cannot be used in narrow spaces due to the density of steel frames. The existing cast-in-place invert block method has weak bearing capacity and low construction efficiency, which causes great difficulties for tunnel construction. Summary of the invention

[0004] The purpose of the present invention is to overcome the problem that conventional prefabricated invert blocks cannot be constructed in TBM tunnels, and the existing cast-in-place invert block method has weak bearing capacity and low construction efficiency, and provide a TBM tunnel cast-in-place invert block design method.

[0005] In a first aspect, the present invention provides a method for designing a cast-in-place invert block of a TBM tunnel, comprising the following steps:

[0006] S1. At least two legs are fixedly installed on the inner surface of the steel frame, and a beam is installed at one end of the leg away from the steel frame;

[0007] S2. A steel frame for casting the inverted arch below the beam and above the inner surface of the steel frame;

[0008] S3. Lay tracks on the beams, which are used for TBM travel; build templates for the invert to be cast, and cast concrete. The height of the concrete is not higher than the upper surface of the beams. After the concrete strength reaches the standard, remove the templates.

[0009] The method for designing a cast-in-place invert block for a TBM tunnel provided by the present invention can first construct a crossbeam to form a rail for laying a track, then build a steel frame for the invert to be cast, and finally cast concrete and construct the track within the range below the crossbeam, above the inner surface of the steel frame, and within the template. Compared with the traditional method for casting a cast-in-place invert block for a TBM tunnel, the present design method can quickly complete the pouring of concrete without disassembling the rail, greatly shortening the construction time and facilitating the construction organization.

[0010] The steel frame and the crossbeam are connected by outriggers, and the force of the crossbeam can be transmitted to the steel frame through the outriggers, ensuring the overall stability of the structure. The track formed by the crossbeam can bear the force together with the reinforced concrete, realizing the integration of the tunnel bottom structure.

[0011] Arranging a steel skeleton below the crossbeam and above the inner surface of the steel frame enables the cast invert blocks to evenly bear the main upper load, ensuring the strength required for TBM travel in soft and broken areas and the base stability during operation.

[0012] Preferably, the distance between two adjacent steel frames is 40 cm to 80 cm.

[0013] With this setting, the distance between two adjacent steel frames is optimized to 40cm to 80cm, providing the optimal support density. It can ensure that the distance between the steel frames is not too large, which may cause deformation of the initial tunnel support structure such as the steel frames, resulting in quality defects and safety hazards; it can also ensure that the distance between the steel frames is not too small, which may cause excessively high project costs and reduced work efficiency, affecting economic rationality.

[0014] Preferably, four legs are mounted on the same steel frame.

[0015] With this setup, the four legs can more evenly distribute the load from the superstructure and reduce stress concentration; the four-point support forms a stable geometric structure, greatly enhancing the overall stability.

[0016] Preferably, the connection position between the supporting leg and the cross beam corresponds to the connection position between the track and the cross beam.

[0017] The position of the outrigger is set to correspond to the position of the track. The load borne by the track can be better transferred to the lower outrigger through the crossbeam, and then transferred to the steel frame and other supporting structures through the outrigger, thereby improving the bearing capacity of the entire structure.

[0018] Preferably, the spacing between the legs installed on the same steel frame is 90 cm to 100 cm.

[0019] With this setting, the preferred distance between the outriggers is 90cm to 100cm, providing the optimal support density. Too much is uneconomical, and too little is unsafe. This ensures the safety and reliability of the overall structure, the strength required for TBM travel in soft and broken areas, and the stability of the base during operation.

[0020] Preferably, the steel bar skeleton includes a first steel bar, a second steel bar and stirrups, the first steel bar and the second steel bar are arranged crosswise with each other, and the stirrups are connected to the second steel bar and / or the first steel bar.

[0021] The first steel bar, the second steel bar and the stirrups are connected to form a steel skeleton, which significantly improves the overall strength and rigidity of the invert block.

[0022] Preferably, the diameter of the first steel bar is 18mm-22mm, and the distance between two adjacent first steel bars in the longitudinal direction is 10cm-35cm; the diameter of the second steel bar is 16mm-20mm, and the distance between two adjacent second steel bars in the transverse direction is 7cm-28cm; the diameter of the stirrup is 8mm-14mm.

[0023] The spacing and diameter of the steel bars are the result of comprehensive consideration of factors such as the gap between the rails and the minimum reinforcement ratio. The steel bars should be set within the gap between the rails. If the spacing is too large and the diameter is too small, the minimum reinforcement ratio requirements of the specification will not be met; if the spacing is too small and the diameter is too large, it will be uneconomical and not conducive to construction.

[0024] Preferably, when pouring the concrete in S3, the length of the concrete poured in one go in the longitudinal direction is 2m to 6m.

[0025] The preferred length of one-time concrete pouring is 2m to 6m. This length takes into account factors such as the TBM excavation speed and the time it takes for concrete to reach strength. If the one-time concrete pouring length is too short, the total construction time will be extended, the number of concrete pouring times will increase, the number of gaps will increase, and the economy will be poor. If the one-time concrete pouring length is too long, for example, exceeding the length of two formworks, the operating space will be limited, and it will be more difficult to control the concrete pouring standards, which is not conducive to construction.

[0026] Preferably, the distance between the end of the beam and the nearest track is 30 cm to 50 cm.

[0027] With this setting, sufficient margin is left between the end of the beam and the nearest track, which effectively ensures the safety of TBM passage and maintains a certain safety distance from the initial support to prevent affecting construction.

[0028] Preferably, waterproof grooves are formed on the edges of the concrete poured twice in the longitudinal direction, the grade of the concrete is C35 or C40, and the steel frame is a full-ring steel frame.

[0029] The waterproof groove can be used for the subsequent installation of water-swellable waterstop strips or elastic rubber sealing pads to achieve waterproofing of the construction joint.

[0030] Compared with the prior art, the present invention has the following beneficial effects:

[0031] 1. The method for designing cast-in-place invert blocks for TBM tunnels provided by the present invention can first construct a crossbeam to form a track for laying tracks, then build a steel frame for the invert to be cast, and finally pour concrete and construct tracks within the range below the crossbeam, above the inner surface of the steel frame, and within the template. Compared with the traditional method for casting in-place invert blocks for TBM tunnels, this design method can quickly complete the pouring of concrete without disassembling the track, greatly shortening the construction time and facilitating construction organization;

[0032] 2. The cast-in-place invert block design method for a TBM tunnel provided by the present invention connects the steel frame and the crossbeam through the legs, and the force of the crossbeam can be transmitted to the steel frame through the legs, thereby ensuring the overall stability of the structure. In addition, the rail formed by the crossbeam can bear force together with the reinforced concrete, thereby realizing the integration of the tunnel bottom structure.

[0033] 3. The method for designing cast-in-place invert blocks for TBM tunnels provided by the present invention configures a steel skeleton below the crossbeam and above the inner surface of the steel frame, which enables the cast invert blocks to evenly bear the main upper load, thereby ensuring the strength required for TBM travel in soft and broken areas and the base stability during operation. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] Figure 1 A schematic diagram of the track cross section.

[0035] Figure 2 for Figure 1 AA cross-section diagram of .

[0036] Figure 3 This is a schematic diagram of the reinforcement section of the invert block.

[0037] Figure 4 for Figure 3 Schematic diagram of the BB cross section.

[0038] Markings in the figure:

[0039] 1- steel frame, 2- legs, 3- beam, 4- track, 5- first steel bar, 6- second steel bar, 7- stirrups, 8- center ditch, 100- concrete. DETAILED DESCRIPTION

[0040] The present invention is further described in detail below in conjunction with specific embodiments. However, this should not be understood as the scope of the above subject matter of the present invention being limited to the following embodiments, and all technologies realized based on the content of the present invention belong to the scope of the present invention.

[0041] Unless otherwise specified, in the description of the specific embodiments of the present invention, the terms indicating the orientation or position relationship such as "up", "down", "left", "right", "center", "inside", "outside", etc. are all based on the expression of the orientation or position relationship shown in the drawings, or are the orientation or position relationship when the invented product / equipment / device is usually used. These terms of orientation or position relationship are only for the convenience of describing the scheme of the present invention or simplifying the description in the specific embodiments, so as to facilitate the technicians to quickly understand the scheme, and do not indicate or imply that a specific device / component / element must have a specific orientation, or be constructed and operated in a specific position relationship, and therefore cannot be understood as a limitation on the present invention.

[0042] In addition, if the terms "horizontal", "vertical", "overhanging", "parallel" and the like appear, it does not mean that the corresponding devices / components / elements are required to be absolutely horizontal or vertical or overhanging or parallel, but may be slightly tilted or have deviations. For example, "horizontal" only means that its direction is more horizontal than "vertical", and does not mean that the structure must be completely horizontal, but may be slightly tilted. Alternatively, it can be simplified to mean that the corresponding devices / components / elements are set in directions such as "horizontal", "vertical", "overhanging", "parallel", etc., and can have an error / deviation of ±10% relative to the corresponding direction setting, more preferably an error / deviation within ±8%, more preferably an error / deviation within ±6%, more preferably an error / deviation within ±5%, and more preferably an error / deviation within ±4%. As long as the corresponding device / component / element is within the error / deviation range, it can still achieve its role in the scheme of the present invention.

[0043] In addition, the expressions “first”, “second”, “third”, etc., which appear in the terms, are merely used to distinguish the description of the same or similar components and should not be understood as emphasizing or implying the relative importance of specific components.

[0044] In addition, in the description of the embodiments of the present invention, "several", "plurality" and "a number" represent at least 2. It can be any number such as 2, 3, 4, 5, 6, 7, 8, 9, and even more than 9.

[0045] In addition, in the description of the technical solution of the present invention, unless otherwise clearly specified / defined / restricted, the terms "set", "install", "connect", "connected", "provided with", "laid", and "arranged" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection, and can be welding, riveting, bolting, threading, and other commonly used connection means in the field. This connection can be a mechanical connection, an electrical connection, or a communication connection; it can be a direct connection, or an indirect connection through an intermediate medium, and it can be the internal connection of two elements.

[0046] Example 1

[0047] This embodiment provides a method for designing a cast-in-place invert block of a TBM tunnel, comprising the following steps:

[0048] S1. At least two legs 2 are fixedly installed on the inner surface of the steel frame 1, and the legs 2 and the steel frame 1 can be welded.

[0049] Specific, for example Figure 1 , Figure 2 As shown, a full-ring steel frame can be used in this embodiment. The full-ring steel frame is an annular support structure made of steel and installed around the inner wall of the tunnel to prevent rock collapse, maintain the shape and strength of the tunnel, and withstand ground pressure and other external loads.

[0050] Four legs 2 can be welded on the same steel frame 1. The legs 2 are parallel to each other. The length of the legs 2 is determined according to the curvature of the inner surface of the steel frame 1, ensuring that the heights of the legs 2 away from the end of the steel frame 1 are the same. The four legs 2 can more evenly disperse the load from the upper structure and reduce stress concentration; the four-point support forms a stable geometric structure, greatly enhancing the overall stability.

[0051] like Figure 2 As shown, considering geological conditions, excavation diameter, monitoring and measurement data and other factors, the distance D between two adjacent steel frames 1 in the longitudinal direction is set to 40cm to 80cm. Since the cross beam 3 is fixedly connected to the steel frame 1 through the support leg 2, the distance between two adjacent cross beams 3 in the longitudinal direction is also D, and the cross beams 3 are arranged at intervals in the longitudinal direction to form a track row.

[0052] By adopting this setting method, the distance between two adjacent steel frames 1 is preferably set to 40 cm to 80 cm, providing the optimal support density, which can ensure that the distance between the steel frames 1 is not too large, resulting in deformation of the initial tunnel support structure such as the steel frame 1, resulting in quality defects and causing safety hazards; and ensure that the distance between the steel frames 1 is not too small, resulting in excessively high project costs and reduced work efficiency, affecting economic rationality.

[0053] A crossbeam 3 is installed at the end of the leg 2 away from the steel frame 1. The crossbeam 3 can be welded to the leg 2. Since the height of the end of the leg 2 away from the steel frame 1 is the same, the crossbeam 3 is kept in a horizontal state after being connected to the leg 2. The extension direction of the crossbeam 3 can be as follows: Figure 1 Shown extending in the transverse direction.

[0054] S2. Figure 3 , Figure 4 As shown, a steel skeleton for the invert to be cast is built below the lower surface of the cross beam 3 and above the inner surface of the steel frame 1;

[0055] Specifically, the steel bar skeleton of this embodiment includes a first steel bar 5, a second steel bar 6 and stirrups 7, wherein the first steel bar 5 can extend in the transverse direction, the first steel bar 5 can also extend in the circumferential direction along the steel frame 1, and the first steel bar 5 can be used as a main bar. The diameter of the first steel bar 5 can be 18 mm to 22 mm, and the distance between two adjacent first steel bars 5 in the longitudinal direction is 10 cm to 35 cm;

[0056] In this embodiment, the second steel bar 6 can extend in the longitudinal direction, and the second steel bar 6 can be used as a longitudinal bar. In this embodiment, the first steel bar 5 and the second steel bar 6 are perpendicular to each other. The first steel bar 5 and the second steel bar 6 can also be arranged crosswise, that is, the projections of the first steel bar 5 and the second steel bar 6 on the horizontal plane intersect. The diameter of the second steel bar 6 can be 16mm to 20mm, and the distance between two adjacent second steel bars 6 in the transverse direction is 7cm to 28cm;

[0057] The stirrup 7 of this embodiment can be set to a diameter of 8 mm to 14 mm, and the stirrup 7 adopts a semicircular hook type. The stirrup 7 is connected to the second steel bar 6. Of course, the stirrup 7 can also be connected to the first steel bar 5. The stirrup 7 can be perpendicular to the first steel bar 5 and the second steel bar 6, and the stirrup 7 can also be oblique to the first steel bar 5 and the second steel bar 6.

[0058] In this embodiment, when constructing the steel frame, attention should be paid to avoiding the legs 2. When the center groove 8 is set, the steel frame should avoid the position of the center groove 8.

[0059] The first steel bar 5, the second steel bar 6, and the stirrup 7 are connected to form a steel skeleton, which significantly improves the overall strength and rigidity of the invert block. The spacing and diameter of the steel bars are the result of comprehensive consideration of factors such as the gap between the rails and the minimum reinforcement ratio. The steel bars should be set in the gap between the rails. If the spacing is too large and the diameter is too small, the minimum reinforcement ratio requirements of the specification will not be met; if the spacing is too small and the diameter is too large, it will be uneconomical and not conducive to construction.

[0060] S3. Figure 1 , Figure 3 As shown, a track 4 is laid above the crossbeam 3 , and the track 4 is used for TBM travel.

[0061] Furthermore, the connection position between the leg 2 and the beam 3 corresponds to the connection position between the track 4 and the beam 3, that is, the track 4 is laid above the beam 3, and the leg 2 is welded at the corresponding position below the beam 3. The position of the leg 2 is set to correspond to the position of the track 4, and the load carried by the track 4 can be better transmitted to the lower leg 2 through the beam 3, and then transmitted to the supporting structure such as the steel frame 1 through the leg 2, thereby improving the bearing capacity of the entire structure.

[0062] Furthermore, the spacing between the legs 2 installed on the same steel frame 1 is 90 cm to 100 cm. The preferred distance between the legs 2 is 90 cm to 100 cm, which provides the optimal support density. Too much is uneconomical, and too little is unsafe, ensuring the safety and reliability of the overall structure, and ensuring the strength required for TBM walking in soft and broken areas and the stability of the base during operation.

[0063] Further, such as Figure 1 As shown in the figure, when installing the track 4, the distance L between the end of the beam 3 and the nearest track 4 can be reserved as 30cm to 50cm, and the distance between the left and right ends of the beam 3 and the nearest track 4 is L. A sufficient margin is left between the end of the beam 3 and the nearest track 4, which effectively ensures the safety of TBM passage and maintains a certain safety distance from the initial support to prevent affecting the construction.

[0064] Build a template for the invert to be cast, the template is below the lower surface of the beam 3 and above the inner surface of the steel frame 1 to form a casting space, use concrete casting equipment to cast concrete 100 into the casting space, the height of the cast concrete 100 is not higher than the upper surface of the beam 3, the grade of the concrete 100 can be C35 or C40, and the template is removed after the strength of the concrete 100 reaches the standard;

[0065] Furthermore, when pouring concrete 100, the length of the concrete 100 poured in one time along the longitudinal direction is 2m to 6m, and a waterproof groove is applied to the edge of the concrete 100 poured twice along the longitudinal direction. The waterproof groove can be used to subsequently set a water-expandable water stop strip or an elastic rubber sealing pad to achieve waterproofing of the construction joint.

[0066] The preferred length of the one-time pouring of concrete 100 is 2m to 6m. This length comprehensively considers factors such as the TBM excavation speed and the time it takes for the concrete 100 to reach strength. If the one-time pouring length of the concrete 100 is too short, the total construction time will be prolonged, the number of pouring times of the concrete 100 will increase, the number of gaps will increase, and the economy will be poor. If the one-time pouring length of the concrete 100 is too long, for example, exceeding the length of two templates, the operating space will be limited, and it will be more difficult to control the pouring standard of the concrete 100, which is not conducive to construction.

[0067] The method for designing cast-in-place invert blocks for TBM tunnels provided in this embodiment can first construct the cross beam 3 to form a track row for laying the track 4, then reinforce the invert to be cast (build a steel skeleton), and finally lay the track 4 and pour concrete 100 (there is no limitation on the order of laying the track 4 and pouring the concrete 100).

[0068] Compared with the traditional method of casting invert blocks in TBM tunnels, this design method can quickly complete the pouring of 100% concrete without dismantling the rails, which not only meets the traffic requirements of TBM, but also greatly shortens the construction time and facilitates construction organization. This method solves the problem of casting invert blocks in soft and broken surrounding rock, with safe structure, high construction efficiency and excellent project investment.

[0069] The steel frame 1 and the cross beam 3 are connected by the legs 2, and the force of the cross beam 3 can be transmitted to the steel frame 1 through the legs 2, thereby ensuring the stability of the foundation. In addition, the track formed by the cross beam 3 can bear the force together with the reinforced concrete, thus realizing the integration of the tunnel bottom structure.

[0070] The steel skeleton is arranged below the cross beam 3 and above the inner surface of the steel frame 1, so that the cast invert block can evenly bear the main upper load, ensuring the strength required for TBM walking in the soft and broken area and the stability of the base during operation. This method provides clear guidance for the configuration of steel bars, and provides an effective reference range for their diameter and spacing. On the basis of operability, it meets the requirements of construction specifications.

[0071] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A method for designing cast-in-place invert blocks for TBM tunnels, characterized in that: The following steps are involved: S1. At least two legs (2) are fixedly mounted on the inner surface of the steel frame (1), and a crossbeam (3) is mounted on one end of the legs (2) away from the steel frame (1); S2. Building a steel frame for the invert to be cast in the range below the beam (3) and above the inner surface of the steel frame (1); S3. The crossbeam (3) is used to lay a track (4), and the track (4) is used for TBM travel; a template for the invert arch to be cast is built, and concrete (100) is cast. The height of the concrete (100) is not higher than the upper surface of the crossbeam (3). After the strength of the concrete (100) reaches the standard, the template is removed.

2. A TBM tunnel cast-in-situ invert block design method according to claim 1, characterized in that: The distance between two adjacent steel frames (1) is 40 cm to 80 cm.

3. A TBM tunnel cast-in-place invert block design method according to claim 1, characterized in that: The four supporting legs (2) are mounted on the same steel frame (1).

4. A TBM tunnel cast-in-situ invert block design method according to claim 1, characterized in that: The connection position between the supporting leg (2) and the cross beam (3) corresponds to the connection position between the track (4) and the cross beam (3).

5. The method for designing a cast-in-place invert block for a TBM tunnel according to claim 1, characterized in that: The distance between the legs (2) installed on the same steel frame (1) is 90 cm to 100 cm.

6. A TBM tunnel cast-in-situ invert block design method according to claim 1, characterized in that: The steel bar skeleton comprises a first steel bar (5), a second steel bar (6) and stirrups (7); the first steel bar (5) and the second steel bar (6) are arranged to cross each other; and the stirrups (7) are connected to the second steel bar (6) and / or the first steel bar (5).

7. A method for designing cast-in-situ invert blocks for TBM tunnels according to claim 6, characterized in that: The diameter of the first steel bar (5) is 18 mm to 22 mm, and the distance between two adjacent first steel bars (5) in the longitudinal direction is 10 cm to 35 cm; the diameter of the second steel bar (6) is 16 mm to 20 mm, and the distance between two adjacent second steel bars (6) in the transverse direction is 7 cm to 28 cm; the diameter of the stirrup (7) is 8 mm to 14 mm.

8. The method for designing a cast-in-situ invert block for a TBM tunnel according to claim 1, characterized in that: When pouring the concrete (100) in S3, the length of the concrete (100) poured in the longitudinal direction at one time is 2m to 6m.

9. A method for designing cast-in-situ invert blocks for TBM tunnels according to claim 1, characterized in that: The distance between the end of the crossbeam (3) and the nearest track (4) is 30 cm to 50 cm.

10. A method for designing cast-in-situ invert blocks for TBM tunnels according to any one of claims 1 to 9, characterized in that: A waterproof groove is formed on the edge of the concrete (100) poured twice in the longitudinal direction. The grade of the concrete (100) is C35 or C40. The steel frame (1) is a full-ring steel frame.