Gel extrusion granulation equipment of green bamboo rice and processing method of green bamboo rice

By controlling the pressure and chamfering treatment in the extrusion box in the Green Zhumi gel extrusion granulation equipment, the unevenness of the material during the extrusion process is solved, and the uniformity of the particle size and efficient operation of the equipment are achieved. .

CN118988152APending Publication Date: 2024-11-22SHANGHAI ROYAL NEW MATERIALS TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411277702.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-12
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

The existing gel extrusion and granulation equipment has uneven pressure in the extrusion chamber, resulting in uneven speed of the material when extruded, and the size of the material particles formed by shear is uneven, which reduces the processing effect.

Method used

A green bamboo rice gel extrusion granulation equipment including a spiral extrusion mechanism, an extrusion box, an automatic granulation mechanism and a cooling mechanism is designed. The inside of the extrusion box is controlled between the extrusion box and the automatic granulation mechanism. The pressure value ensures the stability of the material during extrusion, and uses chamfering treatment and hydraulic system to achieve flexible control of the shear mechanism to prevent clogging and uneven size problems.

Benefits of technology

The particle size of green bamboo rice gel is achieved more uniform, avoiding uneven accumulation and blockage of materials during the extrusion process, and improving the processing effect of granulation equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118988152A_ABST
    Figure CN118988152A_ABST
Patent Text Reader

Abstract

The invention discloses gel extrusion granulation equipment of green bamboo rice and a processing method of the green bamboo rice, and relates to the technical field of extrusion granulation, the gel extrusion granulation equipment comprises an extrusion granulation mechanism, the extrusion granulation mechanism comprises a spiral extrusion mechanism, the output end of the spiral extrusion mechanism is connected with an extrusion box, and the bottom of the extrusion box is slidably connected with an automatic granulation mechanism; a cooling mechanism is arranged at the bottom of the automatic granulation mechanism, a conveying belt is arranged at one end of the cooling mechanism, and the extrusion granulation mechanism controls the pressure value of green bamboo rice gel in the extrusion box based on the distance between the extrusion box and the automatic granulation mechanism; the extrusion granulation mechanism controls the pressure value of the green bamboo rice gel in the extrusion box based on the distance between the extrusion box and the automatic granulation mechanism, so that the pressure value of the green bamboo rice gel in the extrusion box can be stabilized in a certain range, and the size of the green bamboo rice processed by the automatic granulation mechanism is more uniform.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of extrusion granulation, in particular to gel extrusion granulation equipment for green bamboo rice and a processing method for the green bamboo rice. Background Art

[0002] Green bamboo rice is an artificial rice made by mixing bamboo leaf powder and rice powder in a certain proportion. The added bamboo leaf powder can increase the plant fiber content in the green bamboo rice, reduce the sugar content of the rice, and help control sugar diet. The processing of green bamboo rice requires that the bamboo leaf powder and rice powder are mixed and steamed, and then extruded to form the green bamboo rice. Existing gel extrusion granulation equipment, such as a hydraulic extrusion activated carbon granulator disclosed in Chinese patent publication number CN113617289A and an extrusion granulator for manufacturing microbial environmentally friendly fertilizer disclosed in Chinese patent publication number CN118045527A, when such granulation equipment extrude materials for granulation, due to the uneven pressure of the materials in the extrusion chamber, the speed of the materials when being extruded is uneven, and the shear frequency of the granulation equipment is fixed, which leads to uneven particle size of the materials formed by shearing, thereby reducing the processing effect of the granulation equipment. Summary of the invention

[0003] In order to overcome the above-mentioned technical problems, the purpose of the present invention is to provide a gel extrusion granulation device for green bamboo rice and a processing method for green bamboo rice, so as to solve the problem in the prior art that when the granulation device extrudes the material for granulation, the pressure of the material in the extrusion chamber is uneven, and the speed of the material when being extruded is also uneven, while the shear frequency of the granulation device is fixed, resulting in uneven size of material particles formed by shearing.

[0004] The purpose of the present invention can be achieved through the following technical solutions: The first aspect of the present invention is to provide a gel extrusion granulation device for green bamboo rice, including an extrusion granulation mechanism, which includes a spiral extrusion mechanism, the output end of the spiral extrusion mechanism is connected to an extrusion box, the bottom of the extrusion box is slidably connected to an automatic granulation mechanism, a cooling mechanism is arranged at the bottom of the automatic granulation mechanism, and a conveyor belt is arranged at one end of the cooling mechanism. The extrusion granulation mechanism controls the pressure value of the green bamboo rice gel inside the extrusion box based on the distance between the extrusion box and the automatic granulation mechanism.

[0005] As a further solution of the present invention: the spiral extrusion mechanism includes an extrusion cylinder, one end of the extrusion cylinder is bolted to a driving motor, a feed pipe is fixedly connected to the top of the side of the extrusion cylinder close to one end of the driving motor, and the output end of the driving motor is connected to a spiral rod through a coupling.

[0006] As a further solution of the present invention: the extrusion box includes a docking box body, one end of which is connected to the extrusion cylinder, and the other end of which is fixedly connected to the adjustment box body.

[0007] As a further solution of the present invention: the automatic granulation mechanism includes a mechanism shell, a plurality of extrusion channels are arranged inside the mechanism shell, the rectangle formed by the plurality of extrusion channels matches the inner wall of the adjustment box, and the inner wall of the mechanism shell matches the outer surface of the adjustment box.

[0008] As a further solution of the present invention: a first hydraulic cylinder is fixedly connected to the middle position of both sides of the mechanism housing, the output end of the first hydraulic cylinder is connected to a push block through a hydraulic rod, and the side of the push block is fixedly connected to the side of the docking box.

[0009] As a further solution of the present invention: an end of the mechanism housing away from the regulating box is fixedly connected to an end plate, and a shear mechanism is installed on the bottom surface of the end plate.

[0010] As a further solution of the present invention: the shearing mechanism includes a driving plate, and a second hydraulic cylinder is fixedly connected to the centers of both sides of the end plate, the output end of the second hydraulic cylinder is fixedly connected to the surface of the driving plate through a hydraulic rod, and a plurality of shearing strips are fixedly connected to the inner side of the driving plate, and a plurality of shearing ports are passed through the surfaces of the plurality of shearing strips.

[0011] As a further solution of the present invention: the extrusion channel includes a first channel, one end of the first channel is fixedly connected to the second channel, the end of the second channel away from the first channel is fixedly connected to the discharge port, a through hole matching the discharge port is opened on the surface of the end plate near the discharge port, and the shear port matches the discharge port, and the positions correspond one to one.

[0012] As a further solution of the present invention: the cooling mechanism includes a water circulation pipeline, a regulating chamber is opened in the middle of the water circulation pipeline near the mechanism shell, the regulating chamber matches the mechanism shell, a leakage groove is opened at one end of the water circulation pipeline near the conveyor belt, and a water pump is installed at the bottom end of the water circulation pipeline.

[0013] The second aspect of the present invention is to provide a method for processing green bamboo rice, which is implemented based on a gel extrusion granulation device for green bamboo rice, comprising the following steps: S1: putting raw materials into a screw extrusion mechanism, and the screw extrusion mechanism extrudes the raw materials into the interior of an extrusion box, wherein the raw materials include bamboo leaf powder and rice powder; S2: Install a pressure sensor and a temperature sensor inside the extrusion box, and the pressure sensor and the temperature sensor respectively collect pressure data and temperature data of the material in the extrusion box; S3: Control the distance between the extrusion box and the automatic granulation mechanism based on the collected pressure data and temperature data of the material in the extrusion box; S4: The material is processed into granules by an automatic granulation mechanism and transported to a cooling mechanism; S5: The cooling mechanism forms the granular material through water cooling and conveys the granular material to the conveyor belt; S5: The granular material and cooling water are separated on the conveyor belt, and the conveyor belt transports the granular material to the air drying box for air drying.

[0014] Beneficial effects of the present invention: 1. In the present invention, the extrusion box can transport the green bamboo rice gel to the automatic granulation mechanism, and the automatic granulation mechanism processes the green bamboo rice gel into granules. After entering the cooling mechanism, the granular raw materials will be quickly cooled and shaped to form green bamboo rice. Since the extrusion granulation mechanism controls the pressure value of the green bamboo rice gel inside the extrusion box based on the distance between the extrusion box and the automatic granulation mechanism, the pressure value of the green bamboo rice gel in the extrusion box will be stable within a certain range, ensuring that the size of the green bamboo rice processed by the automatic granulation mechanism is more uniform.

[0015] 2. In the present invention, the end face of the first channel away from the second channel is chamfered, so that when several first channels are in contact, the contact edges will form a sharp triangle. In this way, when the green bamboo rice gel is squeezed into the first channel by the docking box, the green bamboo rice gel will not accumulate and condense at the edge of the end face of the first channel, thereby preventing the green bamboo rice gel in the first channel from being blocked.

[0016] 3. In the present invention, since the regulating chamber matches the mechanism shell, the mechanism shell will be embedded in the regulating chamber and can slide freely in the regulating chamber in the vertical direction. When the cooling water flows to the position of the mechanism shell, the mechanism shell is stuck in the regulating chamber, which reduces the cross-sectional area of ​​the water circulation pipeline. Therefore, the flow rate of the cooling water on the bottom surface of the mechanism shell will be accelerated. In this way, when the mechanism shell produces green bamboo rice particles, they will be quickly washed away by the cooling water and will not accumulate in the regulating chamber, causing blockage in the regulating chamber. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] The present invention will be further described below in conjunction with the accompanying drawings.

[0018] Figure 1 It is a schematic structural diagram of the gel extrusion granulation equipment of green bamboo rice of the present invention; Figure 2 It is a front view of the gel extrusion granulation device of green bamboo rice of the present invention; Figure 3 is a cross-sectional view of a gel extrusion granulation device for green bamboo rice of the present invention; Figure 4 It is a structural schematic diagram of the extrusion granulation mechanism in the present invention; Figure 5 It is a front view of the spiral extrusion mechanism in the present invention; Figure 6 It is a schematic diagram of the structure of the extrusion box and the automatic granulation mechanism in the present invention; Figure 7 It is a schematic diagram of the structure of the extrusion box in the present invention; Figure 8 It is a structural schematic diagram of the automatic granulation mechanism of the present invention; Fig. 9 It is a schematic diagram of the bottom structure of the automatic granulation mechanism in the present invention; Fig.10 It is a structural schematic diagram of the shearing mechanism in the present invention; Fig.11 It is a schematic diagram of the local structure of the shear strip in the present invention; Fig.12 It is a schematic diagram of the structure of the extrusion channel in the present invention; Fig.13 It is a structural schematic diagram of the cooling mechanism in the present invention; Fig.14 It is a cross-sectional view of the first channel in the present invention.

[0019] In the figure: 1. extrusion granulation mechanism; 11. spiral extrusion mechanism; 111. extrusion cylinder; 112. driving motor; 113. feeding pipe; 114. screw rod; 12. extrusion box; 121. docking box; 122. adjustment box; 13. automatic granulation mechanism; 131. mechanism shell; 132. extrusion channel; 1321. first channel; 1322. second channel; 1323. discharge port; 133. first hydraulic cylinder; 134. push block; 135. end plate; 136. second hydraulic cylinder; 137. shearing mechanism; 1371. driving plate; 1372. slider; 1373. mounting strip; 1374. shearing strip; 13741. shearing port; 2. cooling mechanism; 21. water circulation pipeline; 22. adjustment chamber; 23. leakage tank; 24. water pump; 3. conveyor belt. DETAILED DESCRIPTION

[0020] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0021] Example 1 like Figure 1 - Fig.13As shown, the present invention discloses a gel extrusion granulation device for green bamboo rice, comprising an extrusion granulation mechanism 1, which comprises a spiral extrusion mechanism 11, the output end of the spiral extrusion mechanism 11 is connected to an extrusion box 12, the bottom of the extrusion box 12 is slidably connected to an automatic granulation mechanism 13, a cooling mechanism 2 is arranged at the bottom of the automatic granulation mechanism 13, and a conveyor belt 3 is arranged at one end of the cooling mechanism 2. The extrusion granulation mechanism 1 controls the pressure value of the green bamboo rice gel inside the extrusion box 12 based on the distance between the extrusion box 12 and the automatic granulation mechanism 13. It should be noted that when processing green bamboo rice, the raw materials of green bamboo rice are first crushed, stirred and mixed, and then added to the spiral extrusion mechanism 11, and an electric heater is arranged inside the spiral extrusion mechanism 11 to provide a pressure relief for the spiral extruder. The green bamboo rice raw material inside the structure 11 provides heat energy to make the green bamboo rice raw material become gel-like, and then the spiral extrusion mechanism 11 can push the green bamboo rice gel into the extrusion box 12, and the extrusion box 12 can transport the green bamboo rice gel to the automatic granulation mechanism 13, and the automatic granulation mechanism 13 processes the green bamboo rice gel into granules. The granular raw material will be quickly cooled and shaped to form green bamboo rice after entering the cooling mechanism 2. Since the extrusion granulation mechanism 1 controls the pressure value of the green bamboo rice gel inside the extrusion box 12 based on the distance between the extrusion box 12 and the automatic granulation mechanism 13, the pressure value of the green bamboo rice gel in the extrusion box 12 will be stable within a certain range, ensuring that the size of the green bamboo rice processed by the automatic granulation mechanism 13 is more uniform.

[0022] like Figure 5 As shown, the spiral extrusion mechanism 11 includes an extrusion barrel 111, one end of the extrusion barrel 111 is bolted to a driving motor 112, a feeding pipe 113 is fixedly connected to the top of the side of the extrusion barrel 111 near one end of the driving motor 112, and the output end of the driving motor 112 is connected to a screw rod 114 through a coupling. It should be noted that the feeding pipe 113 is used to transport the raw material of green bamboo rice into the extrusion barrel 111. When in use, the driving motor 112 is turned on, and the output shaft of the driving motor 112 will drive the screw rod 114 through the coupling to rotate the screw rod 114, and the rotating screw rod 114 will push the green bamboo rice gel in the extrusion barrel 111. An electric heater is installed inside the extrusion barrel 111. The specifications and type of the electric heater are adaptively selected by technical personnel in this field according to the required temperature of the green bamboo rice. The extrusion barrel 111 will directly heat the incoming green bamboo rice raw material to form a green bamboo rice gel.

[0023] like Figure 7As shown, the extrusion box 12 includes a docking box body 121, one end of the docking box body 121 is connected to the extrusion cylinder 111, and the other end of the docking box body 121 is fixedly connected to the adjustment box body 122. It should be noted that the end of the docking box body 121 away from the adjustment box body 122 is sealed and connected to the output end of the extrusion cylinder 111. When in use, turn on the drive motor 112, and the output shaft of the drive motor 112 will drive the screw rod 114 through the coupling to rotate the screw rod 114. The rotating screw rod 114 will push the green bamboo rice gel in the extrusion cylinder 111, so that the green bamboo rice gel enters the docking box body 121, and the docking box body 121 then transports the green bamboo rice gel to the adjustment box body 122.

[0024] like Figure 7 and Figure 8 As shown, the automatic granulation mechanism 13 includes a mechanism shell 131, and a plurality of extrusion channels 132 are arranged inside the mechanism shell 131. The rectangle formed by the plurality of extrusion channels 132 matches the inner wall of the adjustment box 122, and the inner wall of the mechanism shell 131 matches the outer surface of the adjustment box 122. It should be noted that the extrusion channels 132 will slide on the inner side of the adjustment box 122, and the mechanism shell 131 will slide on the outer side of the adjustment box 122. Since the rectangle formed by the plurality of extrusion channels 132 is directly embedded in the adjustment box 122, the green bamboo rice gel in the adjustment box 122 will directly enter the plurality of extrusion channels 132 at the same time under pressure. Since the rectangle formed by the plurality of extrusion channels 132 matches the inner wall of the adjustment box 122, the green bamboo rice gel in the adjustment box 122 will not leak under pressure.

[0025] like Figure 7 and Figure 8 As shown, the middle positions on both sides of the mechanism housing 131 are fixedly connected with the first hydraulic cylinder 133, and the output end of the first hydraulic cylinder 133 is connected with the pushing block 134 through the hydraulic rod, and the side of the pushing block 134 is fixedly connected to the side of the docking box 121. When in use, the first hydraulic cylinder 133 is opened, and the output end of the first hydraulic cylinder 133 will drive the pushing block 134 through the hydraulic rod. Since the side of the pushing block 134 is fixedly connected to the side of the docking box 121, and the extrusion box 12 needs to be fixed on the production ground through a bracket (not shown in the figure), the first hydraulic cylinder 133 will drive the mechanism housing 131 to move outside the adjustment box 122. When the mechanism housing 131 moves, the mechanism housing 131 will drive a plurality of extrusion channels 132 to move at the same time, so that the plurality of extrusion channels 132 can squeeze the green bamboo rice gel inside the adjustment box 122, thereby realizing the control of the pressure value of the green bamboo rice gel inside the adjustment box 122.

[0026] A pressure sensor can be installed at any position inside the adjustment box 122. The pressure sensor is used to collect the pressure value of the green bamboo rice gel inside the adjustment box 122. The technical personnel in this field preset the standard pressure value of the green bamboo rice gel. The standard pressure value is determined according to the size of the green bamboo rice particles. When the standard pressure value of the green bamboo rice gel is larger, the extrusion channel 132 outputs the green bamboo rice gel faster, and under the same frequency of shearing, the green bamboo rice particles are larger. When the standard pressure value of the green bamboo rice gel is smaller, the extrusion channel 132 outputs the green bamboo rice gel slower, and under the same frequency of shearing, the green bamboo rice particles are smaller. Therefore, the technical personnel in this field preset the standard pressure value of the green bamboo rice gel so that the speed at which the extrusion channel 132 outputs the green bamboo rice gel can shear out green bamboo rice particles of appropriate size.

[0027] When the pressure value of the green bamboo rice gel inside the regulating box 122 collected by the pressure sensor is greater than the preset pressure standard value of the green bamboo rice gel, it means that the extrusion channel 132 outputs the green bamboo rice gel at a fast speed. If no adjustment is made, the final green bamboo rice particles will be larger. At this time, the first hydraulic cylinder 133 can be opened to increase the distance between the mechanism housing 131 and the regulating box 122, that is, to reduce the pressure value of the green bamboo rice gel inside the regulating box 122, and ensure that the pressure value of the green bamboo rice gel inside the regulating box 122 is equal to the preset pressure standard value of the green bamboo rice gel, so that the final green bamboo rice particles are uniform and of appropriate size.

[0028] When the pressure value of the green bamboo rice gel inside the regulating box 122 collected by the pressure sensor is less than the preset pressure standard value of the green bamboo rice gel, it means that the speed of outputting the green bamboo rice gel from the extrusion channel 132 is slow. If no adjustment is made, the final green bamboo rice particles will be smaller. At this time, the first hydraulic cylinder 133 can be opened to reduce the distance between the mechanism housing 131 and the regulating box 122, that is, to increase the pressure value of the green bamboo rice gel inside the regulating box 122, and ensure that the pressure value of the green bamboo rice gel inside the regulating box 122 is equal to the preset pressure standard value of the green bamboo rice gel, so that the final green bamboo rice particles are uniform and of appropriate size.

[0029] The relationship between the change in the distance between the mechanism housing 131 and the regulating box 122 and the change in the pressure value of the green bamboo rice gel inside the regulating box 122 can be determined by a person skilled in the art using a regression model.

[0030] Example 2 like Figure 8 , Fig. 9 and Fig.10As shown, one end of the mechanism housing 131 away from the regulating box 122 is fixedly connected to an end plate 135, and a shearing mechanism 137 is installed on the bottom surface of the end plate 135. It should be noted that the shearing mechanism 137 is used to shear the green bamboo rice gel output by the extrusion channel 132, so that the green bamboo rice gel forms green bamboo rice particles of uniform size.

[0031] like Figure 8 , Fig. 9 and Fig.10 As shown, the shearing mechanism 137 includes a driving plate 1371, and the centers of both sides of the end plate 135 are fixedly connected with a second hydraulic cylinder 136. The output end of the second hydraulic cylinder 136 is fixedly connected to the surface of the driving plate 1371 through a hydraulic rod. The inner side of the driving plate 1371 is fixedly connected with a plurality of shearing strips 1374, and the surfaces of the plurality of shearing strips 1374 are penetrated with a plurality of shearing ports 13741. It should be noted that when in use, the second hydraulic cylinder 136 is opened, and the output end of the second hydraulic cylinder 136 will push the driving plate 1371 through the hydraulic rod. Since the inner side of the driving plate 1371 is fixedly connected with a plurality of shearing strips 1374, the moving driving plate 1371 is Plate 1371 will drive several shear strips 1374 to move at the same time. Slide blocks 1372 are fixedly connected to both sides of the driving plate 1371. Slide grooves matching the slide blocks 1372 are provided on both sides of the end plate 135 near the slide blocks 1372. In this way, when the driving plate 1371 moves, the cooperation between the slide blocks 1372 and the slide grooves can enable several shear strips 1374 to slide stably on the surface of the end plate 135. The end of the slide block 1372 away from the driving plate 1371 is fixedly connected to the mounting strip 1373. The mounting strip 1373 also fixes one end of several shear strips 1374 away from the driving plate 1371, thereby increasing the emphasis between several shear strips 1374.

[0032] like Figure 7 , Figure 8 , Fig. 9 , Fig.10 , Fig.11 and Fig.12As shown, the extrusion channel 132 includes a first channel 1321, one end of the first channel 1321 is fixedly connected to the second channel 1322, and the end of the second channel 1322 away from the first channel 1321 is fixedly connected to the discharge port 1323, and a through hole matching the discharge port 1323 is opened on the surface of the end plate 135 near the discharge port 1323, and the shear port 13741 matches the discharge port 1323, and the positions correspond one to one. It should be noted that the cross-sectional shape of the first channel 1321 is a square, so that a plurality of first channels 1321 are evenly contacted together to form a larger rectangle, which fits the inner wall of the docking box 121, so the side length of the inner wall of the docking box 121 is an integer multiple of the side length of the cross-sectional side of the first channel 1321. It should also be noted that the end face of the first channel 1321 away from the second channel 1322 is chamfered, so that when a plurality of first channels 1321 are in contact, the contact edges will form a sharp triangle, such as Fig.14 As shown, when the docking box 121 squeezes the green bamboo rice gel into the first channel 1321, the green bamboo rice gel will not accumulate and condense at the edge of the end surface of the first channel 1321, thereby preventing the green bamboo rice gel in the first channel 1321 from being blocked.

[0033] The first channel 1321 will transport the green bamboo rice gel to the second channel 1322, and the second channel 1322 will then extrude the green bamboo rice gel from the discharge port 1323. Since a through hole matching the discharge port 1323 is provided on the surface of the end plate 135 near the discharge port 1323, the discharge port 1323 can be inserted into the through hole. It should be noted that the end face of the outer end of the discharge port 1323 is flush with the surface of the end plate 135.

[0034] Since the shear port 13741 matches the discharge port 1323 and the positions correspond one to one, when the shear bar 1374 moves, when the shear port 13741 coincides with the discharge port 1323, the discharge port 1323 will extrude the green bamboo rice gel with the maximum diameter, and along one end of the shear port 13741, the shear port 13741 will gradually cut off the green bamboo rice gel, and the shape of the shear port 13741 is circular, so the incision of the green bamboo rice gel will form an elliptical shape, making the cut green bamboo rice particles closer to the shape of rice, and as the shear bar 1374 continues to move back and forth, the cooperation between the shear port 13741 and the discharge port 1323 can continuously shear out green bamboo rice particles.

[0035] like Figure 3 , Figure 6 and Fig.13As shown, the cooling mechanism 2 includes a water circulation pipe 21, a regulating chamber 22 is provided in the middle of the water circulation pipe 21 near the mechanism housing 131, the regulating chamber 22 matches the mechanism housing 131, a leakage groove 23 is provided at one end of the water circulation pipe 21 near the conveyor belt 3, and a water pump 24 is installed at the bottom end of the water circulation pipe 21. It should be noted that since the regulating chamber 22 matches the mechanism housing 131, the mechanism housing 131 will be embedded in the regulating chamber 22 and can slide freely in the vertical direction in the regulating chamber 22. When in use, turn on the water pump 24, and the water pump 24 will drive the cooling water in the water circulation pipe 21 to Fig.13 For example, the cooling water in the water circulation pipe 21 flows in the counterclockwise direction of the water circulation pipe 21. When the cooling water flows to the position of the mechanism shell 131, since the mechanism shell 131 is stuck in the regulating chamber 22, the cross-sectional area of ​​the water circulation pipe 21 is reduced, so the flow rate of the cooling water at the bottom of the mechanism shell 131 will be accelerated. In this way, when the mechanism shell 131 produces green bamboo rice particles, they will be quickly washed away by the cooling water and will not accumulate in the regulating chamber 22. The subsequent pipe cross-section of the water circulation pipe 21 will increase, which will reduce the flow rate of the cooling water, which will help the cooling treatment of the green bamboo rice particles, resulting in blockage in the regulating chamber 22. After the green bamboo rice particles enter the cooling water, the temperature will quickly increase. The green bamboo rice is lowered, thereby being shaped into green bamboo rice. The green bamboo rice will come to the position of the conveyor belt 3 with the flow of cooling water. A number of mesh holes are evenly opened on the surface of the conveyor belt 3. The diameter of the mesh holes is smaller than the diameter of the green bamboo rice. In this way, the green bamboo rice will stay on the surface of the conveyor belt 3, and the cooling water can fall into the leakage groove 23 at the bottom of the conveyor belt 3 through the mesh holes, and return to the water circulation pipeline 21, so that the cooling water can be recycled. The conveyor belt 3 can transport the green bamboo rice to the air dryer for air drying to obtain the finished green bamboo rice. The size and type of the air dryer can be adaptively adjusted by technical personnel in this field according to the specifications of the conveyor belt 3 and the output of the green bamboo rice to ensure that the air dryer can air dry the green bamboo rice.

[0036] Example 3 like Figure 1 - Fig.14 As shown, the present invention discloses a method for processing green bamboo rice, comprising the following steps: S1: The raw material is put into the screw extrusion mechanism 11 , and the screw extrusion mechanism 11 screw-extrudes the raw material into the interior of the extrusion box 12 .

[0037] It should be noted that the raw materials include bamboo leaf powder and rice flour. The adding ratio of bamboo leaf powder and rice flour is selected by technical personnel in this field according to the set ratio. An electric heater is installed inside the extrusion cylinder 111. The extrusion cylinder 111 will directly heat the incoming green bamboo rice raw materials to form green bamboo rice gel. When the drive motor 112 is turned on, the output shaft of the drive motor 112 will drive the screw rod 114 through the coupling to rotate the screw rod 114. The rotating screw rod 114 will push the green bamboo rice gel in the extrusion cylinder 111, so that the green bamboo rice gel enters the docking box 121, and the docking box 121 then transports the green bamboo rice gel to the adjustment box 122.

[0038] S2: A pressure sensor and a temperature sensor are installed inside the extrusion box 12 , and the pressure sensor and the temperature sensor collect pressure data and temperature data of the material in the extrusion box 12 respectively.

[0039] It should be noted that a pressure sensor and a temperature sensor can be installed at any position inside the regulating box 122. The pressure sensor is used to collect the pressure value of the green bamboo rice gel inside the regulating box 122, and the temperature sensor is used to collect the temperature value of the green bamboo rice gel inside the regulating box 122. The technical personnel in this field preset the pressure standard value of the green bamboo rice gel, and the pressure standard value is determined according to the size of the green bamboo rice particles. When the pressure standard value of the green bamboo rice gel is larger, the extrusion channel 132 outputs the green bamboo rice gel faster, and under the same frequency of shear, the green bamboo rice particles are larger. When the pressure standard value of the green bamboo rice gel is smaller, the extrusion channel 132 outputs the green bamboo rice gel slower, and under the same frequency of shear, the green bamboo rice particles are smaller. Therefore, the technical personnel in this field preset the pressure standard value of the green bamboo rice gel so that the speed at which the extrusion channel 132 outputs the green bamboo rice gel can shear out green bamboo rice particles of appropriate size.

[0040] When the pressure value of the green bamboo rice gel inside the regulating box 122 collected by the pressure sensor is greater than the preset pressure standard value of the green bamboo rice gel, it means that the extrusion channel 132 outputs the green bamboo rice gel at a fast speed. If no adjustment is made, the final green bamboo rice particles will be larger. At this time, the first hydraulic cylinder 133 can be opened to increase the distance between the mechanism housing 131 and the regulating box 122, that is, to reduce the pressure value of the green bamboo rice gel inside the regulating box 122, and ensure that the pressure value of the green bamboo rice gel inside the regulating box 122 is equal to the preset pressure standard value of the green bamboo rice gel, so that the final green bamboo rice particles are uniform and of appropriate size.

[0041] When the pressure value of the green bamboo rice gel inside the regulating box 122 collected by the pressure sensor is less than the preset pressure standard value of the green bamboo rice gel, it means that the speed of outputting the green bamboo rice gel from the extrusion channel 132 is slow. If no adjustment is made, the final green bamboo rice particles will be smaller. At this time, the first hydraulic cylinder 133 can be opened to reduce the distance between the mechanism housing 131 and the regulating box 122, that is, to increase the pressure value of the green bamboo rice gel inside the regulating box 122, and ensure that the pressure value of the green bamboo rice gel inside the regulating box 122 is equal to the preset pressure standard value of the green bamboo rice gel, so that the final green bamboo rice particles are uniform and of appropriate size.

[0042] The relationship between the change in the distance between the mechanism housing 131 and the regulating box 122 and the change in the pressure value of the green bamboo rice gel inside the regulating box 122 can be determined by a person skilled in the art using a regression model.

[0043] The temperature value of the green bamboo rice gel affects the pressure standard value of the green bamboo rice gel. The change of the temperature value of the green bamboo rice gel and the change of the pressure standard value of the green bamboo rice gel are determined by those skilled in the art using a regression model.

[0044] S3: Based on the collected pressure data and temperature data of the material in the extrusion box 12, the distance between the extrusion box 12 and the automatic granulation mechanism 13 is controlled.

[0045] It should be noted that when in use, the first hydraulic cylinder 133 is opened, and the output end of the first hydraulic cylinder 133 will drive the push block 134 through the hydraulic rod. Since the side of the push block 134 is fixedly connected to the side of the docking box 121, and the extrusion box 12 needs to be fixed on the production ground through a bracket (not shown in the figure), the first hydraulic cylinder 133 will drive the mechanism housing 131 to move outside the adjustment box 122. When the mechanism housing 131 moves, the mechanism housing 131 will drive several extrusion channels 132 to move at the same time, so that several extrusion channels 132 can squeeze the green bamboo rice gel inside the adjustment box 122, thereby realizing the control of the pressure value of the green bamboo rice gel inside the adjustment box 122.

[0046] S4: The material is processed into granules by the automatic granulation mechanism 13 and transported to the cooling mechanism 2.

[0047] It should be noted that the first channel 1321 will transport the green bamboo rice gel to the second channel 1322, and the second channel 1322 will squeeze the green bamboo rice gel out of the discharge port 1323, and the second hydraulic cylinder 136 will be opened. The output end of the second hydraulic cylinder 136 will push the driving plate 1371 through the hydraulic rod. Since a plurality of shear strips 1374 are fixedly connected to the inner side of the driving plate 1371, the moving driving plate 1371 will drive the plurality of shear strips 1374 to move at the same time. Since the shear port 13741 matches the discharge port 1323 and the positions correspond one to one, When the cutting strip 1374 moves, when the shearing port 13741 coincides with the discharging port 1323, the discharging port 1323 will extrude the green bamboo rice gel with the largest diameter, and along one end of the shearing port 13741, the shearing port 13741 will gradually cut off the green bamboo rice gel, and the shape of the shearing port 13741 is circular, so the incision of the green bamboo rice gel will form an elliptical shape, making the cut green bamboo rice particles closer to the shape of rice, and as the shearing strip 1374 continues to move back and forth, the cooperation of the shearing port 13741 and the discharging port 1323 can continuously shear out green bamboo rice particles.

[0048] S5: The cooling mechanism 2 shapes the granular material through water cooling and conveys the granular material to the conveyor belt 3.

[0049] It should be noted that, since the regulating chamber 22 matches the mechanism housing 131, the mechanism housing 131 is embedded in the regulating chamber 22 and can slide freely in the vertical direction in the regulating chamber 22. When in use, the water pump 24 is turned on, and the water pump 24 drives the cooling water in the water circulation pipe 21 to Fig.13 For example, the cooling water in the water circulation pipe 21 flows in the counterclockwise direction of the water circulation pipe 21. When the cooling water flows to the position of the mechanism shell 131, since the mechanism shell 131 is stuck in the regulating chamber 22, the cross-sectional area of ​​the water circulation pipe 21 is reduced, so the flow rate of the cooling water at the bottom of the mechanism shell 131 will be accelerated. In this way, when the mechanism shell 131 produces green bamboo rice particles, they will be quickly washed away by the cooling water and will not accumulate in the regulating chamber 22, causing blockage in the regulating chamber 22. After the green bamboo rice particles enter the cooling water, the temperature will drop rapidly, thereby shaping into green bamboo rice, and the green bamboo rice will come to the position of the conveyor belt 3 as the cooling water flows.

[0050] S5: The granular material and the cooling water are separated on the conveyor belt 3, and the conveyor belt 3 conveys the granular material to the air drying box for air drying.

[0051] It should be noted that a number of mesh holes are evenly opened on the surface of the conveyor belt 3, and the diameter of the mesh holes is smaller than the diameter of the green bamboo rice, so that the green bamboo rice will stay on the surface of the conveyor belt 3, and the cooling water can fall into the leakage groove 23 at the bottom of the conveyor belt 3 through the mesh holes and return to the water circulation pipe 21.

[0052] The above is a detailed description of an embodiment of the present invention, but the content is only a preferred embodiment of the present invention and cannot be considered to limit the scope of implementation of the present invention. All equivalent changes and improvements made within the scope of the present invention should still fall within the scope of the patent coverage of the present invention.

Claims

1. The gel extrusion granulation equipment of green bamboo rice is characterized in that: include: An extrusion granulation mechanism (1) comprises a screw extrusion mechanism (11), the output end of the screw extrusion mechanism (11) is connected to an extrusion box (12), and the bottom of the extrusion box (12) is slidably connected to an automatic granulation mechanism (13); A cooling mechanism (2) disposed at the bottom of the automatic granulation mechanism (13); A conveyor belt (3) disposed at one end of the cooling mechanism (2); The extrusion granulation mechanism (1) controls the pressure value of the green bamboo rice gel inside the extrusion box (12) based on the distance between the extrusion box (12) and the automatic granulation mechanism (13).

2. The gel extrusion granulation equipment of green bamboo rice according to claim 1, characterized in that: The screw extrusion mechanism (11) comprises an extrusion cylinder (111), one end of the extrusion cylinder (111) is bolted to a driving motor (112), a feeding pipe (113) is fixedly connected to the top of the side surface of the extrusion cylinder (111) close to one end of the driving motor (112), and the output end of the driving motor (112) is connected to a screw rod (114) via a coupling.

3. The gel extrusion granulation equipment of green bamboo rice according to claim 2, characterized in that: The extrusion box (12) comprises a docking box body (121), one end of which is connected to the extrusion cylinder (111), and the other end of which is fixedly connected to an adjustment box body (122).

4. The gel extrusion granulation equipment of green bamboo rice according to claim 3, characterized in that: The automatic granulation mechanism (13) comprises a mechanism shell (131), a plurality of extrusion channels (132) are arranged inside the mechanism shell (131), a rectangle formed by the plurality of extrusion channels (132) matches the inner wall of the adjustment box (122), and the inner wall of the mechanism shell (131) matches the outer surface of the adjustment box (122).

5. The gel extrusion granulation equipment of green bamboo rice according to claim 4, characterized in that: A first hydraulic cylinder (133) is fixedly connected to the middle positions of both sides of the mechanism housing (131); an output end of the first hydraulic cylinder (133) is connected to a push block (134) via a hydraulic rod; and a side surface of the push block (134) is fixedly connected to a side surface of the docking box (121).

6. The gel extrusion granulation equipment of green bamboo rice according to claim 4, characterized in that: An end plate (135) is fixedly connected to one end of the mechanism housing (131) away from the adjustment box (122), and a shearing mechanism (137) is installed on the bottom surface of the end plate (135).

7. The gel extrusion granulation equipment of green bamboo rice according to claim 6, characterized in that: The shearing mechanism (137) comprises a driving plate (1371), the centers of both sides of the end plate (135) are fixedly connected to a second hydraulic cylinder (136), the output end of the second hydraulic cylinder (136) is fixedly connected to the surface of the driving plate (1371) via a hydraulic rod, a plurality of shearing strips (1374) are fixedly connected to the inner side of the driving plate (1371), and a plurality of shearing ports (13741) are passed through the surfaces of the plurality of shearing strips (1374).

8. The gel extrusion granulation equipment of green bamboo rice according to claim 7, characterized in that: The extrusion channel (132) comprises a first channel (1321), one end of the first channel (1321) is fixedly connected to the second channel (1322), one end of the second channel (1322) away from the first channel (1321) is fixedly connected to the discharge port (1323), a through hole matching the discharge port (1323) is provided on the surface of the end plate (135) near the discharge port (1323), and the shear port (13741) matches the discharge port (1323), and the positions correspond one to one.

9. The gel extrusion granulation equipment of green bamboo rice according to claim 4, characterized in that: The cooling mechanism (2) comprises a water circulation pipeline (21), a regulating chamber (22) is provided in the middle of the water circulation pipeline (21) near the mechanism housing (131), the regulating chamber (22) matches the mechanism housing (131), a liquid leakage groove (23) is provided at one end of the water circulation pipeline (21) near the conveyor belt (3), and a water pump (24) is installed at one end of the bottom of the water circulation pipeline (21).

10. A method for processing green bamboo rice, which is realized based on the gel extrusion granulation device for green bamboo rice according to any one of claims 1 to 9, characterized in that: The following steps are involved: S1: Putting raw materials into a screw extrusion mechanism (11), the screw extrusion mechanism (11) screws the raw materials into the interior of an extrusion box (12), the raw materials including bamboo leaf powder and rice powder; S2: installing a pressure sensor and a temperature sensor inside the extrusion box (12), the pressure sensor and the temperature sensor respectively collecting pressure data and temperature data of the material in the extrusion box (12); S3: controlling the distance between the extrusion box (12) and the automatic granulation mechanism (13) based on the collected pressure data and temperature data of the material in the extrusion box (12); S4: Processing the material into granules through the automatic granulation mechanism (13) and conveying it to the cooling mechanism (2); S5: The cooling mechanism (2) forms the granular material by water cooling and conveys the granular material to the conveyor belt (3); S5: The granular material and the cooling water are separated on the conveyor belt (3), and the conveyor belt (3) transports the granular material to an air drying box for air drying.