Drainage structure located on highway slope and construction method of drainage structure

By injecting high-pressure gas into the edge of the upper edge of the highway slope and setting up a drainage system, the problem of landslide on the slope of the highway mountainous sections is solved, and more efficient drainage performance and slope stability are achieved.

CN118997189AInactive Publication Date: 2024-11-22CSCEC STRAIT CONSTR & DEV
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202411202282.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-29
Publication Date
2024-11-22
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The slopes of highway mountain sections are prone to landslide due to the saturation of soil water absorption during the rainy season. The drainage performance of the existing drainage structure is limited, resulting in an increase in the risk of landslide.

Method used

The drainage structure of high-pressure gas injected into the edge area of ​​the upper edge body is adopted, and the high-pressure gas is injected through the first inflatable pipe and the air compressor to prevent groundwater penetration, and further reduce surface runoff and groundwater flow through the water trench and drainage pipes, reducing potential slopes body weight and landslide risk.

Benefits of technology

It effectively reduces the groundwater content and surface runoff of potential landslides, reduces the risk of landslides, improves the stability of the slope, and ensures smooth highways.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118997189A_ABST
    Figure CN118997189A_ABST
Patent Text Reader

Abstract

The invention relates to a drainage structure located on a highway slope and a construction method thereof, a mountain body above a highway comprises a potential landslide body and an upper edge body, the potential landslide body is arranged between the upper edge body and the highway, and the drainage structure comprises a first inflation pipe, a first air delivery pipe and an air compressor; a plurality of first drill holes are formed in the side, close to the potential landslide body, of the upper edge body, and the first inflation pipes are inserted into the first drill holes and connected with the air compressor through first air conveying pipes. The first inflation pipe is provided with a first air hole for air to penetrate through, and the air is diffused into the upper edge body through the first air hole. According to the method, high-pressure gas is injected into the edge area of the upper edge body, and the waterproof curtain is arranged on the moving path of underground water of the upper edge body; rainwater of the upper edge body is mostly discharged through surface runoff, the flowing amount of underground water of the upper edge body to the potential landslide body is reduced, the weight of the potential landslide body is reduced, and the risk that the potential landslide body develops into landslide is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of road slopes, and in particular to a drainage structure located on a highway slope and a construction method thereof. Background Art

[0002] In mountainous sections of highways, highways are often set up close to slopes; the stability of the roadside slopes is of great significance to ensuring the smooth flow of highways. In the rainy season in the south, precipitation and groundwater movement cause the slope soil to absorb water and become saturated, increasing the weight of the soil; under the action of gravity, the soil on the slope slides down along a certain weak surface or weak zone; thus, a large amount of soil accumulates on the highway, affecting traffic.

[0003] Therefore, the drainage system of the mountain highway slope plays a very important role in ensuring the stability of the roadbed slope. It can drain the excess water in the slope soil and reduce the weight of the slope soil, which helps to improve the stability of the slope.

[0004] Reference Figure 1 When constructing Expressway 3, it is often necessary to excavate soil in the middle of the mountain to allow Expressway 3 to pass through. As the soil at the location of Expressway 3 is excavated, the slope above Expressway 3 loses its lower support effect, making the slope more likely to develop into a landslide in rainy weather, thereby affecting the operation of Expressway 3.

[0005] Reference Figure 1 The mountain above the expressway 3 includes a potential landslide body 1 and an upper edge body 2. The potential landslide body 1 is adjacent to the expressway 3, and the upper edge body 2 is above the potential landslide body 1. The water source of the potential landslide body 1 includes surface water and groundwater. The surface water of the potential landslide body 1 mainly comes from the surface runoff of the upper edge body 2, and the groundwater of the potential landslide body 1 mainly comes from the precipitation infiltration of the upper edge body 2.

[0006] In the prior art, drainage structures such as drainage ditches are often set up on the slope of a potential landslide body to timely drain the water on the surface of the potential landslide body and reduce the water from penetrating into the potential landslide body. However, the drainage performance of the above drainage structures is limited, and a lot of water still penetrates into the potential landslide body, increasing the risk of the potential landslide body developing into a landslide body. Summary of the invention

[0007] In order to improve the drainage performance of a highway slope, the present application provides a drainage structure located on a highway slope and a construction method thereof.

[0008] The present application provides a drainage structure located on a highway slope and a construction method thereof, which adopts the following technical solutions: A drainage structure located on the side slope of a highway, wherein the mountain above the highway comprises a potential landslide body and an upper edge body, and the potential landslide body is arranged between the upper edge body and the highway; The drainage structure includes a first air filling pipe, a first air supply pipe and an air compressor. A plurality of first boreholes are provided on the side of the upper edge body close to the potential landslide body, and the plurality of first boreholes are arranged at intervals along the edge of the upper edge body; the first air filling pipe is inserted into the first borehole, and the first air filling pipe is connected to the air compressor through the first air supply pipe; the air compressor is used to transport gas in the first air filling pipe, and the first air filling pipe is provided with a first air hole for gas to pass through, and the gas diffuses into the upper edge body through the first air hole.

[0009] By adopting the above technical solution, the air compressor injects high-pressure gas into the upper edge body through the first air supply pipe and the first inflation pipe. The high-pressure gas squeezes the water in the pores of the soil, thereby preventing or slowing down the penetration of groundwater in the upper edge body toward the potential landslide body, thereby reducing the groundwater content of the potential landslide body.

[0010] That is, by injecting high-pressure gas into the edge area of ​​the upper edge body, a water-stop curtain is set on the movement path of groundwater in the upper edge body; so that rainwater in the upper edge body is discharged through surface runoff, reducing the flow of groundwater in the upper edge body to the potential landslide body, reducing the weight of the potential landslide body, and reducing the risk of the potential landslide body developing into a landslide.

[0011] Optionally, the drainage structure also includes a first blocking member and a first grouting body; along the direction from the bottom of the first borehole to the hole mouth, the first air pipe includes a first permeable pipe section and a first sealed pipe section, and the first air hole is arranged in the first permeable pipe section; the first blocking member is sleeved on the outer periphery of the first air pipe, the first blocking member is fixedly connected to the first air pipe, and the outer periphery of the first blocking member is abutted against the side wall of the first borehole, and the first blocking member is arranged between the first permeable pipe section and the first sealed pipe section; the first grouting body is arranged in the first sealed pipe section, and the first grouting body is abutted against the first blocking member and the side wall of the first borehole, the first grouting body is provided with a first mounting hole for the first air pipe to pass through, and the first grouting body is used to cut off the water and gas connection between the upper edge body and the first borehole cavity.

[0012] By adopting the above technical scheme, a first grouting body is arranged on the outer periphery of the first sealing pipe of the first inflation tube, and the first grouting body is used to seal the gap between the first inflation tube and the side wall of the first borehole; thereby reducing the discharge of high-pressure gas outward along the gap between the first inflation tube and the side wall of the first borehole, and the high-pressure gas injected by the air compressor can penetrate into the soil inside the upper edge body as much as possible, thereby improving the interception effect of the high-pressure gas on the groundwater of the upper edge body.

[0013] Optionally, it also includes a first guide frame, which is fixed to the outer periphery of the first inflation tube, and a plurality of first guide frames are provided along the length direction of the first inflation tube; the first guide frame is used to abut against the side wall of the first borehole, and the first guide frame is buried in the first grouting body.

[0014] By adopting the above technical solution, a plurality of first guide frames are arranged on the outer periphery of the first inflation tube, so that a gap is provided between the first inflation tube and the side wall of the first borehole, thereby facilitating the workers to cast the first grouting body.

[0015] Optionally, it also includes an intercepting ditch, a second air pipe, and a second air supply pipe, wherein the intercepting ditch is arranged on the side of the upper edge body close to the potential landslide body, and the intercepting ditch is arranged along the edge of the upper edge body, and the intercepting ditch is used to intercept the surface runoff of the upper edge body; the second air pipe is fixed at the bottom of the intercepting ditch, and the first air pipe is arranged along the length direction of the intercepting ditch, and the second air pipe is connected to the air compressor through the second air supply pipe.

[0016] By adopting the above technical solution, the intercepting ditch is used to intercept the surface runoff of the upper edge body, thereby reducing the surface runoff of the potential landslide body. When the air compressor injects high-pressure gas into the second inflation pipe, the high-pressure gas will flush the sediment at the bottom of the intercepting ditch, so that the water in the intercepting ditch can carry away the sediment.

[0017] Optionally, the drainage structure also includes a plurality of drainage pipes and water pipes, the upper edge body is provided with a plurality of second boreholes for accommodating the drainage pipes, the second boreholes are arranged on the side of the first borehole away from the potential landslide body; the water pipe is connected to the drainage pipe, the water inlet of the drainage pipe is arranged at the bottom of the second borehole, the water outlet of the water pipe is arranged at the intercepting ditch, and the water outlet elevation of the water pipe is lower than the water inlet elevation of the drainage pipe, the outer periphery of the drainage pipe is provided with drainage holes penetrated by the water supply body, and the drainage pipe is used to discharge groundwater from the upper edge body.

[0018] By adopting the above technical solution, when the air compressor injects high-pressure gas into the upper edge body, the high-pressure gas in the soil of the upper edge body intercepts the groundwater to the top of the first inflation pipe; thus, the soil above the first inflation pipe contains more groundwater. By installing a drainage pipe above the first inflation pipe, the groundwater accumulated in the upper edge body can be discharged through the drainage pipe, thereby further reducing the amount of groundwater in the upper edge body that penetrates into the potential landslide body, and further reducing the risk of the potential landslide body developing into a landslide.

[0019] Optionally, the opening of the second borehole is higher than the bottom of the second borehole.

[0020] By adopting the above technical solution, the second borehole and the drainage pipe are arranged in an upwardly inclined manner, so that the drainage pipe has a stronger water collection capacity and is also convenient for workers to construct.

[0021] Optionally, the drainage structure also includes a second blocking member and a second grouting body; along the direction from the bottom of the second borehole to the hole mouth, the drainage pipe includes a second permeable pipe section and a second sealed pipe section; the second blocking member is sleeved on the outer periphery of the drainage pipe, the second blocking member is fixedly connected to the drainage pipe, and the outer periphery of the second blocking member is abutted against the side wall of the second borehole, and the second blocking member is arranged between the second permeable pipe section and the second sealed pipe section; the second grouting body is arranged in the second sealed pipe section, and the second grouting body is abutted against the second blocking member and the side wall of the second borehole, the second grouting body is provided with a second mounting hole for the drainage pipe to pass through, and the second grouting body is used to cut off the water and gas connection between the upper edge body and the second borehole cavity.

[0022] By adopting the above technical solution, the second grouting body is used to isolate the water and gas connection between the soil in the upper edge body and the second sealed pipe section, so that the second permeable pipe section of the drainage pipe has a larger water head, which is beneficial to the discharge of groundwater.

[0023] Optionally, it also includes a second guide frame, which is fixed to the outer periphery of the drain pipe, and a plurality of second guide frames are provided along the length direction of the drain pipe; the second guide frame is used to abut against the side wall of the second borehole.

[0024] By adopting the above technical solution, a plurality of second guide frames are arranged on the outer periphery of the drainage pipe, so that a gap is provided between the drainage pipe and the side wall of the second borehole, thereby facilitating the workers to pour the second grouting body.

[0025] A construction method for a drainage structure located on a highway slope comprises the following steps: First drilling construction: Drill the first borehole along the upper edge of the body close to the edge of the potential landslide body. The first drilling hole is set vertically, and the distance between adjacent first boreholes is 5-8m; Construction of the first air-filled pipe: placing the first air-filled pipe in the first borehole, with the first blocking member and the first guide frame both abutting against the side wall of the first borehole; pouring the first grouting body between the first air-filled pipe and the side wall of the first borehole; Second drilling construction: Drill the second borehole along the upper edge of the body close to the edge of the potential landslide body. The second borehole is set obliquely downward, and the distance between adjacent first boreholes is 5-8m; Drain pipe construction: place the drain pipe in the second borehole, and the second blocking member and the second guide frame are in contact with the side wall of the second borehole, and pour the second grouting body between the drain pipe and the side wall of the second borehole; Install the air compressor: Install the air compressor in the machine room and connect the air compressor to the first air pipe using the first air pipe.

[0026] Optionally, a construction method of a drainage structure located on a highway slope further includes the following steps: Construction of intercepting ditch: Build intercepting ditch along the edge of the upper edge body close to the potential landslide body; Construction of the second air pipe: Wrap the geotechnical part around the outer circumference of the second air pipe, fix the second air pipe to the bottom of the intercepting ditch, connect one end of the second air pipe to the air compressor, and connect the other end of the second air pipe to the second air pipe; Install the drainage pipe: fix the outlet of the drainage pipe in the intercepting ditch.

[0027] In summary, the present application includes at least one of the following beneficial technical effects: 1. By injecting high-pressure gas into the edge area of ​​the upper edge body, a water-stop curtain is set on the movement path of the groundwater in the upper edge body; so that the rainwater in the upper edge body is mostly discharged through surface runoff, reducing the flow of groundwater in the upper edge body to the potential landslide body, reducing the weight of the potential landslide body, and reducing the risk of the potential landslide body developing into a landslide; 2. The first grouting body is arranged on the outer periphery of the first sealing pipe of the first inflation pipe, and the gap between the first inflation pipe and the side wall of the first borehole is sealed with the first grouting body; thereby reducing the discharge of high-pressure gas outward along the gap between the first inflation pipe and the side wall of the first borehole, and the high-pressure gas injected by the air compressor can penetrate into the soil inside the upper edge body as much as possible, thereby improving the interception effect of the high-pressure gas on the groundwater of the upper edge body; 3. When the air compressor injects high-pressure gas into the upper edge body, the high-pressure gas in the soil of the upper edge body intercepts the groundwater to the top of the first inflation pipe; thus, the soil above the first inflation pipe contains more groundwater. By installing a drainage pipe above the first inflation pipe, the groundwater accumulated in the upper edge body can be discharged through the drainage pipe, thereby further reducing the amount of groundwater in the upper edge body that penetrates into the potential landslide body, and further reducing the risk of the potential landslide body developing into a landslide. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 It is a cross-sectional view of the mountain structure in Example 1.

[0029] Figure 2 It is a cross-sectional view showing the drainage structure in Example 1.

[0030] Figure 3 yes Figure 2 Enlarged view of point A in the middle.

[0031] Figure 4It is a cross-sectional view of the second inflation tube structure in Example 1.

[0032] Figure 5 yes Figure 3 Enlarged view of point B in the middle.

[0033] Figure 6 Schematic diagram of the inflatable component in Example 1.

[0034] Figure 7 yes Figure 3 Enlarged view of point C in the middle.

[0035] Figure 8 It is a schematic diagram of the drainage component in Example 1.

[0036] Explanation of the accompanying drawings: 1. potential landslide body; 2. upper edge body; 21. first borehole; 22. second borehole; 3. highway; 4. interception assembly; 41. intercepting ditch; 42. second air filling pipe; 421. second air vent; 43. second air supply pipe; 5. air compressor; 6. filling assembly; 61. first air filling pipe; 611. first water-permeable pipe section; 6111. first air vent; 612. first sealed pipe section; 62. first blocking member; 63. first grouting body; 64. first guide frame; 65. first air supply pipe; 7. drainage assembly; 71. drainage pipe; 712. second water-permeable pipe section; 7121. drainage hole; 713. second sealed pipe section; 72. second blocking member; 73. second guide frame; 74. second grouting body; 75. water supply pipe. DETAILED DESCRIPTION

[0037] The following is combined with Figure 1-8 This application is described in further detail.

[0038] The present application embodiment discloses a drainage structure located on the slope of a highway. Figure 1 The mountain above the expressway 3 includes a potential landslide body 1 and an upper edge body 2, and the potential landslide body 1 is arranged between the upper edge body 2 and the expressway 3.

[0039] Reference Figure 2 and Figure 3 The drainage structure located on the highway slope includes an interception component 4, an inflation component 6, a drainage component 7 and an air compressor 5. The air compressor 5 is installed in the machine room, and photovoltaic power generation can be used to generate electricity for the air compressor 5. This embodiment does not limit the installation position of the air compressor 5. The air compressor 5 can be set on the roadside of the highway, or on the upper edge body 2 or the potential landslide body 1. For the convenience of display, the air compressor 5 is set at the upper edge body 2 in this application.

[0040] Reference Figure 3 and Figure 4The interception assembly 4 includes a water interception ditch 41, a second air pipe 42 and a second air delivery pipe 43. The water interception ditch 41 is arranged on the side of the upper edge body 2 close to the potential landslide body 1, and the water interception ditch 41 is arranged along the edge of the upper edge body 2. The water interception ditch 41 is used to intercept the surface runoff of the upper edge body 2, thereby reducing the surface runoff of the potential landslide body 1.

[0041] Reference Figure 3 and Figure 4 , the silt from the upper edge body 2 is easily deposited in the intercepting ditch 41, thereby affecting the drainage capacity of the intercepting ditch 41. Therefore, in this embodiment, the second air pipe 42 is fixed at the bottom of the intercepting ditch 41, and the first air pipe 61 is arranged along the length direction of the intercepting ditch 41. The first air pipe 61 is provided with a plurality of second air holes 421 for gas to pass through, and the second air pipe 42 is connected to the air compressor 5 through the second air pipe 43. The outer periphery of the second air pipe 42 is wrapped with a geotextile to reduce the accumulation of silt at the second air holes 421. When the air compressor 5 injects high-pressure gas into the second air pipe 42, the high-pressure gas will flush the silt at the bottom of the intercepting ditch 41, so that the water in the intercepting ditch 41 can carry away the silt. Thereby improving the drainage capacity of the intercepting ditch 41, and further improving the interception effect of the intercepting ditch 41 on the surface runoff of the upper edge body 2.

[0042] The intercepting ditch 41 can be built by stone masonry or poured with concrete; this embodiment does not limit the specific method of the intercepting ditch 41.

[0043] Reference Figure 3 and Figure 5 A plurality of first boreholes 21 are provided on one side of the upper edge body 2 close to the potential landslide body 1, and the plurality of first boreholes 21 are arranged at intervals along the edge of the upper edge body 2; and the first boreholes 21 are arranged vertically, and the first rotary hole is used to accommodate the inflatable component 6. The staff can use an exploration drill to drill the first boreholes 21 in the upper edge body 2; the spacing between adjacent first boreholes 21 can be any value in the range of 5-8 meters, and the vertical depth of the first borehole 21 can be any value in the range of 3-5 meters.

[0044] Reference Figure 5 and Figure 6 The inflation assembly 6 includes a first inflation pipe 61 , a first blocking member 62 , a first grouting body 63 , a first guide frame 64 and a first air delivery pipe 65 .

[0045] Reference Figure 5 and Figure 6 The first gas-filled tube 61 is a stainless steel tube, which is inserted into the first borehole 21. Along the direction from the bottom of the first borehole 21 to the hole mouth, the first borehole 21 includes a first water-permeable tube section 611 and a first sealing tube section 612. The first gas-filled tube 61 is provided with a first air-permeable hole 6111 for gas to pass through, and the first air-permeable hole 6111 is arranged in the first water-permeable tube section 611.

[0046] Reference Figure 5 and Figure 6 The first blocking member 62 is sleeved on the outer periphery of the first inflation tube 61, and the first blocking member 62 is fixedly connected to the first inflation tube 61. In this embodiment, the first blocking member 62 is an air bag; in other embodiments, the first blocking member 62 can be an annular steel plate, etc. The outer periphery of the first blocking member 62 abuts against the side wall of the first borehole 21, and the first blocking member 62 is arranged between the first permeable pipe section 611 and the first sealing pipe section 612. The first blocking member 62 is used to intercept the first grouting body 63 to reduce the first grouting body 63 from moving toward the first permeable pipe section 611.

[0047] Reference Figure 5 and Figure 6 The first guide frame 64 is fixed to the first sealing pipe section 612 of the first air-filling pipe 61, and a plurality of first guide frames 64 are provided along the length direction of the first air-filling pipe 61. The first guide frame 64 is a bent steel bar, and the first guide frame 64 is welded and fixed to the first air-filling pipe 61. The first guide frame 64 is used to abut against the side wall of the first borehole 21, so that there is a gap between the first air-filling pipe 61 and the side wall of the first borehole 21 for the first grouting body 63 to fill, so that it is convenient for the staff to pour the first grouting body 63.

[0048] Reference Figure 5 and Figure 6 After the staff has installed the first air-filling tube 61, the staff fills the space between the first air-filling tube 61 and the side wall of the first borehole 21 with mud or other particulate matter; then the staff pours cement mortar between the first air-filling tube 61 and the first borehole 21, and the cement mortar solidifies and hardens into the first grouting body 63. The first grouting body 63 is arranged in the first sealing pipe section 612, and the first grouting body 63 abuts against the first blocking member 62 and the side wall of the first borehole 21. At this time, the first guide frame 64 is buried in the first grouting body 63. The first grouting body 63 is arranged on the outer periphery of the first sealing pipe of the first air-filling tube 61, and the gap between the first air-filling tube 61 and the side wall of the first borehole 21 is sealed with the first grouting body 63. The first grouting body 63 is provided with a first mounting hole for the first air-filling tube 61 to pass through, and the first grouting body 63 is used to cut off the water-gas connection between the upper edge body 2 and the cavity of the first borehole 21.

[0049] Reference Figure 5 and Figure 6 The first air filling pipe 61 is connected to the air compressor 5 through the first air delivery pipe 65; the air compressor 5 is used to transport gas in the first air filling pipe 61, and the gas diffuses into the upper edge body 2 through the first air permeable hole 6111.

[0050] The working principle of the inflatable component 6 is: Reference Figures 3 to 6, when heavy rainstorm occurs and the potential landslide body 1 has the risk of developing into a landslide body; the staff starts the air compressor 5, and the air compressor 5 injects high-pressure gas into the upper edge body 2 through the first air pipe 65 and the first air filling pipe 61. The high-pressure gas will squeeze the water in the pores of the soil, thereby forming an unsaturated soil area containing high-pressure gas at the bottom of the upper edge body 2. The above-mentioned unsaturated area can prevent or slow down the penetration of groundwater in the upper edge body 2 toward the potential landslide body 1, and play the role of a water-cutting curtain; thereby reducing the groundwater content of the potential landslide body 1. At the same time, injecting high-pressure gas into the soil inside the upper edge body 2 can slow down the penetration of the surface runoff of the upper edge body 2; so that the precipitation of the upper edge body 2 is mostly discharged through the surface runoff, thereby further reducing the groundwater content of the upper edge body 2, as well as the groundwater content flowing to the potential landslide body 1.

[0051] That is, by injecting high-pressure gas into the edge area of ​​the upper edge body 2, a water-stop curtain is set on the movement path of the groundwater in the upper edge body 2; so that the rainwater in the upper edge body 2 is mostly discharged through surface runoff, reducing the flow of groundwater in the upper edge body 2 to the potential landslide body 1, reducing the weight of the potential landslide body 1, and reducing the risk of the potential landslide body 1 developing into a landslide.

[0052] The first grouting body 63 can reduce the discharge of high-pressure gas along the gap between the first inflation pipe 61 and the side wall of the first borehole 21. The high-pressure gas injected by the air compressor 5 can penetrate into the soil inside the upper edge body 2 as much as possible, thereby improving the interception effect of the high-pressure gas on the groundwater of the upper edge body 2.

[0053] Reference Figure 3 and Figure 7 The upper edge body 2 is provided with a plurality of second boreholes 22, which are arranged on the side of the first borehole 21 away from the potential landslide body 1. The opening of the second borehole 22 is higher than the bottom of the second borehole 22, that is, the second rotating hole is arranged in an upward tilted manner, which is convenient for the construction of the staff.

[0054] Reference Figure 7 and Figure 8 The drainage assembly 7 includes a plurality of drainage pipes 71 , a second blocking member 72 , a second guide frame 73 , a second grouting body 74 and a water delivery pipe 75 .

[0055] Reference Figure 7 and Figure 8 The drainage pipe 71 is a stainless steel pipe, and the drainage pipe 71 is inserted into the second borehole 22, and the water inlet of the drainage pipe 71 is set at the bottom of the second borehole 22. And along the direction from the bottom of the second borehole 22 to the hole mouth, the drainage pipe 71 includes a second permeable pipe section 712 and a second sealed pipe section 713. The first permeable pipe section 611 of the drainage pipe 71 is provided with a drainage hole 7121 provided for the water supply body, and the drainage pipe 71 is used to discharge the groundwater of the upper edge body 2.

[0056] Reference Figure 7 and Figure 8 The second blocking member 72 is sleeved on the outer periphery of the drain pipe 71, and the second blocking member 72 is fixedly connected to the drain pipe 71. In this embodiment, the first blocking member 62 is an air bag; in other embodiments, the first blocking member 62 can be an annular steel plate, etc. The outer periphery of the second blocking member 72 abuts against the side wall of the second borehole 22, and the second blocking member 72 is arranged between the second permeable pipe section 712 and the second sealing pipe section 713.

[0057] Reference Figure 7 and Figure 8 The second guide frame 73 is fixed to the outer periphery of the drain pipe 71, and a plurality of second guide frames 73 are provided along the length direction of the drain pipe 71. The first guide frame 64 is welded and fixed to the drain pipe 71; the second guide frame 73 is used to abut against the side wall of the second borehole 22. The second guide frame 73 allows a gap between the drain pipe 71 and the side wall of the second borehole 22, so as to facilitate the staff to pour the second grouting body 74.

[0058] Reference Figure 7 and Figure 8 After the workers have installed the drainage pipe 71, they fill the space between the drainage pipe 71 and the side wall of the second borehole 22 with mud or other particles; then they pour cement mortar between the drainage pipe 71 and the side wall of the second borehole 22, and the cement mortar solidifies and hardens into a second grouting body 74. The second grouting body 74 is disposed on the second sealing pipe section 713, and the second grouting body 74 abuts against the second blocking member 72 and the side wall of the second borehole 22. The second grouting body 74 is provided with a second installation hole for the drainage pipe 71 to pass through, and the second grouting body 74 is used to cut off the water and gas connection between the upper edge body 2 and the cavity of the second borehole 22.

[0059] Reference Figure 3 and Figure 7 The water pipe 75 is connected to the drainage pipe 71, and the water outlet of the water pipe 75 is arranged at the intercepting ditch 41, and the water outlet elevation of the water pipe 75 is lower than the water inlet elevation of the drainage pipe 71. In this embodiment, the water outlet of the water pipe 75 is arranged at the intercepting ditch.

[0060] The working principle of the drainage component 7 is: When the air compressor 5 injects high-pressure gas into the upper edge body 2, the high-pressure gas in the soil of the upper edge body 2 intercepts the groundwater to the top of the first inflation pipe 61, so that the soil above the first inflation pipe 61 contains more groundwater. By installing a drainage pipe 71 above the first inflation pipe 61, the groundwater accumulated in the upper edge body 2 can be discharged by the drainage pipe 71, so as to further reduce the amount of groundwater in the upper edge body 2 that penetrates into the potential landslide body 1, and further reduce the risk of the potential landslide body 1 developing into a landslide.

[0061] The second grouting body 74 is provided on the outer periphery of the second sealing pipe of the drainage pipe 71, and the gap between the drainage pipe 71 and the side wall of the second borehole 22 is sealed by the second grouting body 74. The second grouting body 74 isolates the water-gas connection between the soil in the upper edge body 2 and the second sealing pipe section 713, so that the second permeable pipe section 712 of the drainage pipe 71 has a larger water head, thereby increasing the drainage volume of groundwater discharged through the drainage pipe 71. At the same time, the air compressor 5 injects high-pressure gas into the upper edge body 2 through the first inflation pipe 61. The high-pressure gas helps the groundwater phase drainage pipe 71 in the upper edge body 2 to move, thereby increasing the drainage volume of groundwater in the upper edge body 2.

[0062] Embodiment 2: Reference Figures 2 to 8 ,This embodiment 2 discloses a construction method of a drainage structure located on a highway slope in embodiment 1, comprising the following steps: Construction of the first borehole 21: Drill the first borehole 21 along the edge of the upper edge body 2 close to the potential landslide body 1. The first drill hole is vertically arranged, and the distance between adjacent first boreholes 21 is 5-8m; Construction of the first air-filling tube 61: placing the first air-filling tube 61 in the first borehole 21, with the first blocking member 62 and the first guide frame 64 both in contact with the side wall of the first borehole 21; pouring the first grouting body 63 between the first air-filling tube 61 and the side wall of the first borehole 21; Construction of the second borehole 22: Drill the second borehole 22 along the edge of the upper edge body 2 close to the potential landslide body 1. The second borehole 22 is set obliquely downward, and the distance between adjacent first boreholes 21 is 5-8m; Construction of the drainage pipe 71: Place the drainage pipe 71 in the second borehole 22, and the second blocking member 72 and the second guide frame 73 are in contact with the side wall of the second borehole 22, and pour the second grouting body 74 between the drainage pipe 71 and the side wall of the second borehole 22; Construction of intercepting ditch 41: construct intercepting ditch 41 along the edge of upper edge body 2 close to the potential landslide body 1; Install the drainage pipe 71 ; and fix the water outlet of the drainage pipe 71 in the intercepting ditch 41 .

[0063] Construction of the second air-filled pipe 42: Wrap the geotechnical part around the outer periphery of the second air-filled pipe 42 and fix the second air-filled pipe 42 to the bottom of the intercepting ditch 41; Install the air compressor 5: Install the air compressor 5 in the machine room, and use the first air pipe 65 to connect the air compressor 5 to the first inflation pipe 61; connect one end of the second air pipe 43 to the air compressor 5, and connect the other end of the second air pipe 43 to the second inflation pipe 42.

[0064] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A drainage structure located on a highway slope, wherein the mountain above the highway (3) comprises a potential landslide body (1) and an upper edge body (2), wherein the potential landslide body (1) is arranged between the upper edge body (2) and the highway (3); characterized in that: The drainage structure comprises a first air filling pipe (61), a first air delivery pipe (65) and an air compressor (5); a plurality of first boreholes (21) are provided on a side of the upper edge body (2) close to the potential landslide body (1); the plurality of first boreholes (21) are arranged at intervals along the edge of the upper edge body (2); the first air filling pipe (61) is inserted into the first borehole (21), and the first air filling pipe (61) is connected to the air compressor (5) via the first air delivery pipe (65); the air compressor (5) is used to transport gas in the first air filling pipe (61); the first air filling pipe (61) is provided with a first air hole (6111) for gas to pass through, and the gas diffuses into the upper edge body (2) through the first air hole (6111).

2. The drainage structure located on the highway slope according to claim 1, characterized in that: The drainage structure further comprises a first blocking member (62) and a first grouting body (63); along the direction from the bottom of the first borehole (21) to the hole mouth, the first air-filled pipe (61) comprises a first water-permeable pipe section (611) and a first sealing pipe section (612), and the first air-permeable hole (6111) is arranged in the first water-permeable pipe section (611); the first blocking member (62) is sleeved on the outer periphery of the first air-filled pipe (61), the first blocking member (62) is fixedly connected to the first air-filled pipe (61), and the outer periphery of the first blocking member (62) is in contact with the first borehole (21). ) side walls, the first blocking member (62) is arranged between the first permeable pipe section (611) and the first sealed pipe section (612); the first grouting body (63) is arranged in the first sealed pipe section (612), and the first grouting body (63) is in contact with the first blocking member (62) and the side walls of the first borehole (21), the first grouting body (63) is provided with a first mounting hole for the first inflation tube (61) to pass through, and the first grouting body (63) is used to cut off the water-gas connection between the upper edge body (2) and the cavity of the first borehole (21).

3. The drainage structure located on the highway slope according to claim 2, characterized in that: It also includes a first guide frame (64), the first guide frame (64) is fixedly arranged on the outer periphery of the first inflation tube (61), and a plurality of the first guide frames (64) are arranged along the length direction of the first inflation tube (61); the first guide frame (64) is used to abut against the side wall of the first borehole (21), and the first guide frame (64) is buried in the first grouting body (63).

4. The drainage structure located on the highway slope according to claim 1, characterized in that: It also comprises a water intercepting ditch (41), a second air charging pipe (42), and a second air supply pipe (43); the water intercepting ditch (41) is arranged on a side of the upper edge body (2) close to the potential landslide body (1), and the water intercepting ditch (41) is arranged along the edge of the upper edge body (2); the water intercepting ditch (41) is used to intercept the surface runoff of the upper edge body (2); the second air charging pipe (42) is fixedly arranged at the bottom of the water intercepting ditch (41), and the first air charging pipe (61) is arranged along the length direction of the water intercepting ditch (41); the second air charging pipe (42) is connected to the air compressor (5) via the second air supply pipe (43).

5. The drainage structure located on the highway slope according to claim 4, characterized in that: The drainage structure further comprises a plurality of drainage pipes (71) and a water pipe (75); the upper edge body (2) is provided with a plurality of second boreholes (22) for accommodating the drainage pipes (71); the second boreholes (22) are arranged on the side of the first borehole (21) away from the potential landslide body (1); the water pipe (75) is connected to the drainage pipe (71); the water inlet of the drainage pipe (71) is arranged at the bottom of the second borehole (22); the water outlet of the water pipe (75) is arranged at the intercepting ditch (41); the water outlet of the water pipe (75) is at a lower elevation than the water inlet of the drainage pipe (71); the outer periphery of the drainage pipe (71) is provided with drainage holes (7121) for penetrating the water supply body; the drainage pipe (71) is used to discharge groundwater from the upper edge body (2).

6. The drainage structure located on the highway slope according to claim 5, characterized in that: The opening of the second bore hole (22) is higher than the bottom of the second bore hole (22).

7. The drainage structure located on the highway slope according to claim 5, characterized in that: The drainage structure further comprises a second blocking member (72) and a second grouting body (74); along the direction from the bottom of the second borehole (22) to the hole mouth, the drainage pipe (71) comprises a second permeable pipe section (712) and a second sealing pipe section (713); the second blocking member (72) is sleeved on the outer periphery of the drainage pipe (71), the second blocking member (72) is fixedly connected to the drainage pipe (71), and the outer periphery of the second blocking member (72) is in contact with the side wall of the second borehole (22); the second blocking member (72) ) is arranged between the second permeable pipe section (712) and the second sealed pipe section (713); the second grouting body (74) is arranged in the second sealed pipe section (713), and the second grouting body (74) is in contact with the second blocking member (72) and the side wall of the second borehole (22); the second grouting body (74) is provided with a second mounting hole for the water supply and drainage pipe (71) to pass through, and the second grouting body (74) is used to cut off the water and gas connection between the upper edge body (2) and the cavity of the second borehole (22).

8. The drainage structure located on the highway slope according to claim 7, characterized in that: It also comprises a second guide frame (73), the second guide frame (73) being fixedly arranged on the outer periphery of the drainage pipe (71), and a plurality of second guide frames (73) are arranged along the length direction of the drainage pipe (71); the second guide frame (73) is used to abut against the side wall of the second bore hole (22).

9. A method for constructing a drainage structure located on a highway slope as claimed in any one of claims 1 to 8, characterized in that: The following steps are involved: Construction of the first borehole (21): drilling the first borehole (21) along the edge of the upper edge body (2) close to the potential landslide body (1), the first drill hole being arranged vertically, and the distance between adjacent first boreholes (21) being 5-8 m; Construction of the first inflation tube (61): placing the first inflation tube (61) in the first borehole (21), with the first blocking member (62) and the first guide frame (64) both in contact with the side wall of the first borehole (21); pouring a first grouting body (63) between the first inflation tube (61) and the side wall of the first borehole (21); Construction of the second borehole (22): Drilling the second borehole (22) along the edge of the upper edge body (2) close to the edge of the potential landslide body (1), the second borehole (22) being arranged obliquely downward, and the distance between adjacent first boreholes (21) being 5-8 m; Construction of the drainage pipe (71): placing the drainage pipe (71) in the second borehole (22), with the second blocking member (72) and the second guide frame (73) both in contact with the side wall of the second borehole (22), and pouring the second grouting body (74) between the drainage pipe (71) and the side wall of the second borehole (22); Installing the air compressor (5): installing the air compressor (5) in the machine room, and connecting the air compressor (5) to the first air supply pipe (61) using the first air supply pipe (65).

10. A construction method for a drainage structure located on a highway slope as claimed in claim 8, characterized in that: The following steps are also included: Construction of intercepting ditch (41): constructing intercepting ditch (41) along the edge of the upper edge body (2) close to the potential landslide body (1); Construction of the second air filling pipe (42): winding the geotechnical part around the outer circumference of the second air filling pipe (42), fixing the second air filling pipe (42) to the bottom of the intercepting ditch (41), connecting one end of the second air delivery pipe (43) to the air compressor (5), and connecting the other end of the second air delivery pipe (43) to the second air filling pipe (42); Installing the drainage pipe (71): fixing the water outlet of the drainage pipe (71) in the intercepting ditch (41).

Citation Information

Patent Citations

  • Landslide inflatable drainage treatment method

    CN101575857A

  • Air inflation dewatering type slope anchoring body system and construction method thereof

    CN110424417A

  • Sectional type anchor rod suitable for anti-liquefaction reinforcement of side slope and construction method

    CN117005406A

  • Combined drainage structure in side slope

    CN117145024A

  • Slope self-adaptive drainage system

    CN117868166A