Formwork-free assembly type energy dissipation and shock absorption shear wall corner structure and connecting method

By setting energy-dissipating support components and connectors within the pre-embedded templates of shear walls, prefabrication and efficient connection of shear walls are achieved, solving the problems of complex and inefficient connection of prefabricated shear walls and improving construction efficiency and seismic performance.

CN118997356AActive Publication Date: 2024-11-22SHANDONG JIANZHU UNIV
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202410957855.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-17
Publication Date
2024-11-22
Estimated Expiration
2044-07-17

AI Technical Summary

Technical Problem

Existing prefabricated shear wall connection methods are complex, inefficient, cause serious environmental pollution, and have poor seismic performance.

Method used

The corner structure of the energy-dissipating and vibration-damping shear wall adopts a formwork-free prefabricated structure. By setting energy-dissipating support components and connectors in the pre-embedded template of the shear wall, and using angle steel to connect the outer wall panels of the shear wall, prefabrication and efficient connection are achieved.

Benefits of technology

Shorten the construction period, improve load-bearing capacity and seismic performance, reduce environmental pollution, and ensure the stability and safety of building structures.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118997356A_ABST
    Figure CN118997356A_ABST
Patent Text Reader

Abstract

The invention provides a formwork-erecting-free assembly type energy dissipation and shock absorption shear wall corner structure and a connecting method. The corner structure comprises a vertical shear wall pre-embedded formwork, and the two sides of a web of the vertical shear wall pre-embedded formwork are each symmetrically connected with a set of horizontal shear wall pre-embedded formwork; shear wall external wall panels are arranged on the outer sides of all the shear wall embedded formworks, the outer side of the vertical shear wall external wall panel and the outer side of the horizontal shear wall external wall panel are connected into a whole through angle steel, and an energy dissipation supporting component is arranged between two wing plates of the same angle steel. The inner side of the vertical shear wall external wall panel and the inner side of the horizontal shear wall external wall panel are connected into a whole through an inserting connecting piece, and the external wall panels of the two horizontal shear walls are connected into a whole through the end of the vertical shear wall embedded formwork. The problem of formwork-free connection of three prefabricated assembly type shear walls is solved, the construction period is shortened, and the bearing capacity, stability and anti-seismic performance of the shear walls are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of assembled walls, and in particular to a formwork-free assembled energy dissipation and shock-absorbing shear wall corner structure and a connection method. Background Art

[0002] With the improvement of industrialization, prefabricated structures have been vigorously developed. Prefabricated structures are wall panels prefabricated in factories, transported to the site for assembly, and concrete poured at the nodes. Compared with traditional cast-in-place structures, prefabricated structures can effectively shorten the construction period, reduce on-site environmental pollution, and have the advantages of being green and low-carbon.

[0003] At present, the connection method of prefabricated shear walls is to cast the nodes on site, which requires complex processes such as pre-formwork, grouting sleeve connection, on-site casting, and maintenance. It is inefficient, increases environmental pollution, consumes manpower, and the cast-in-place node method of prefabricated shear walls has poor horizontal seismic resistance. Summary of the invention

[0004] In response to the above problems, the present invention provides a formwork-free assembled energy dissipation and shock-absorbing shear wall corner structure and connection method, and solves the problem of connecting three prefabricated assembled shear walls without formwork, shortens the construction period, and improves the bearing capacity, stability and seismic resistance of the shear wall.

[0005] The present invention adopts the following technical solution:

[0006] A formwork-free assembled energy dissipation and shock-absorbing shear wall corner structure comprises a vertical shear wall embedded formwork, wherein a group of horizontal shear wall embedded formworks are symmetrically connected on both sides of the web of the vertical shear wall embedded formworks; shear wall outer wall panels are arranged on the outside of all shear wall embedded formworks, the outer side of the vertical shear wall outer wall panels and the outer side of the horizontal shear wall outer wall panels are connected as a whole through angle steels, and an energy-absorbing support member is arranged between the two wing plates of the same angle steel; the inner side of the vertical shear wall outer wall panels and the inner side of the horizontal shear wall outer wall panels are connected as a whole through plug-in connectors, and the outer wall panels of two horizontal shear walls are connected as a whole through the ends of the vertical shear wall embedded formworks.

[0007] Preferably, all shear wall embedded formworks include a front flange, a web and a rear flange connected in sequence, wherein the front flange, the web and the rear flange form an I-shaped structure, and the rear flange is a special-shaped structure made by bending a steel plate.

[0008] Preferably, longitudinal stiffening ribs are symmetrically arranged on both sides of the web along the height direction of the shear wall, and at least one transverse stiffening rib is arranged on both sides of the web between the longitudinal stiffening ribs and the rear flange.

[0009] Preferably, the embedded formwork for the horizontal shear wall is connected to the web of the embedded formwork for the vertical shear wall via the front flange, and the embedded formwork for the vertical shear wall is connected to the outer wall panel of the horizontal shear wall via the front flange.

[0010] Preferably, both side edges of the rear flange are symmetrically provided with concave and convex bending portions with respect to the web.

[0011] Preferably, the plug-in connector includes a vertical shear wall connector and a horizontal shear wall connector; an upper protrusion is provided on the upper surface of the front end of the vertical shear wall connector, and a retractable first elastic buckle is provided on the side of the upper protrusion; and a through hole that cooperates with the upper protrusion is provided at the front end of the horizontal shear wall connector.

[0012] Preferably, the front end and side surfaces of the vertical shear wall connector are provided with side protrusions, the lower surface of the horizontal shear wall connector is provided with grooves cooperating with the side protrusions, and both side walls of the groove are provided with retractable second elastic buckles.

[0013] Preferably, the surface of the vertical shear wall connector and the surface of the horizontal shear wall connector are both provided with sawtooth-shaped protrusions.

[0014] Preferably, the energy-absorbing support component comprises a buffer cylinder, a spring is arranged in the buffer cylinder, both ends of the spring are connected to a sliding rod, and the other end of the sliding rod protrudes out of the buffer cylinder and is rotatably connected to the angle steel wing plate on the corresponding side.

[0015] The present invention also discloses a connection method of the above structure, which is as follows:

[0016] S1: Use shear wall embedded formwork, shear wall exterior wall panels and shear wall connectors to form a frame, pour concrete into the frame, and prefabricate horizontal shear wall units and vertical shear wall units;

[0017] S2: Use the hoisting assembly to assemble the adjacent shear wall units by plugging the connectors;

[0018] S3: Connect the front flanges of the two embedded templates of the horizontal shear wall to the web of the embedded template of the vertical shear wall with bolts, and connect the front flanges of the embedded template of the vertical shear wall to the outer wall panels of the horizontal shear walls on both sides with bolts;

[0019] S4: Fix the angle steel at the connection between the vertical shear wall outer wall panel and the horizontal shear wall outer wall panel by bolts;

[0020] S5: Install the energy dissipation support member on the angle steel;

[0021] S6: Pour concrete into the hole formed by the three shear wall elements.

[0022] Preferably, in step S1, after the shear wall unit is prefabricated, the front flange of the embedded formwork, a portion of the web and a portion of the plug-in connector all protrude beyond the side plane of the wall cast by concrete.

[0023] Compared with the prior art, the present invention has the following beneficial effects:

[0024] 1. The present invention can be prefabricated in the factory in advance to realize intelligent production, thereby significantly improving production efficiency while ensuring the stability and consistency of product quality.

[0025] 2. The present invention embeds the formwork in the shear wall, giving full play to the high bearing capacity and stability of the embedded formwork, so that the shear wall exhibits better seismic performance when facing external loads.

[0026] 3. When the present invention connects the shear wall on site, there is no need to support the embedded formwork or remove the embedded formwork, which reduces manual intervention, effectively shortens the project cycle, improves construction efficiency, and reduces costs.

[0027] 4. The present invention mainly adopts pre-fixation of connectors and bolt connection, which has the characteristics of high precision and prevention of component deviation, convenient operation, reduced labor requirements, and at the same time ensures reliable connection and stability of the building structure.

[0028] 5. The present invention uses energy-absorbing support components between adjacent shear walls, which can effectively resist earthquake loads, reduce the earthquake displacement of shear walls, significantly enhance the bearing capacity and stability of shear walls, and provide a solid guarantee for the safety of building structures.

[0029] 6. The present invention pours concrete between the embedded formwork and the exterior wall panel, which is not easy to leak, making the entire structure a whole, thereby enhancing the overall strength and stability.

[0030] 7. The present invention pours concrete after bolt connection, which enhances the connection ability of the bolts and prevents them from loosening easily. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.

[0032] Figure 1 It is a top view of the overall structure of the present invention;

[0033] Figure 2 It is a stereogram of the overall structure of the present invention;

[0034] Figure 3 It is an exploded view of the overall structure of the present invention;

[0035] Figure 4 It is the prefabrication rendering of horizontal shear wall unit;

[0036] Figure 5 It is the rendering of the prefabrication of the vertical shear wall unit;

[0037] Figure 6 This is a schematic diagram of the shear wall embedded formwork structure;

[0038] Figure 7 This is a structural diagram of three shear wall embedded formworks connected;

[0039] Figure 8 It is the installation structure diagram of the energy dissipation support component;

[0040] Fig. 9 It is a schematic diagram of the internal structure of the energy-absorbing support component;

[0041] Fig.10 is a schematic diagram of the plug-in connector structure;

[0042] Fig.11 is a cross-sectional view of a plug connector;

[0043] Fig.12 It is a schematic diagram of the structure of the bottom groove of the horizontal shear wall connector.

[0044] In the figure, 1. vertical shear wall exterior wall panel, 2. first horizontal shear wall exterior wall panel, 3. second horizontal shear wall exterior wall panel, 4. vertical shear wall embedded formwork, 5. first horizontal shear wall embedded formwork, 6. second horizontal shear wall embedded formwork, 7. angle steel, 8. vertical shear wall connector, 9. horizontal shear wall connector, 10. energy-absorbing support member, 11. support seat, 12. steel plate, 4.1. front flange, 4.2. web, 4.3. transverse stiffening rib, 4.4. longitudinal stiffening rib, 4.5. rear flange, 8.1. upper protrusion, 8.2. first elastic buckle, 8.3. side protrusion, 9.1. through hole, 9.2. groove, 9.3. second elastic buckle, 10.1. sliding rod, 10.2. spring, 10.3. buffer cylinder. DETAILED DESCRIPTION

[0045] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments of the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0046] In the description of the present invention, it should be understood that the terms "inside", "outside", "left" and "right" indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or component referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.

[0047] The present invention discloses Figure 1-12 The illustrated embodiment shows a formwork-free assembled energy dissipation and shock-absorbing shear wall corner structure, which is composed of a first horizontal shear wall exterior wall panel 2, a second horizontal shear wall exterior wall panel 3, a vertical shear wall exterior wall panel 1, a first horizontal shear wall embedded formwork 5, a second horizontal shear wall embedded formwork 6, a vertical shear wall embedded formwork 4, a vertical shear wall connector 8, a horizontal shear wall connector 9, an energy-absorbing support member 10 and an angle steel 7 to form a frame, which is then poured with concrete to prefabricate three groups of shear wall units, and then assembled into a shear wall corner frame through a steel plate 12 and hexagonal bolts, and finally concrete is poured in the frame to form it.

[0048] The connecting edges of the horizontal shear wall siding and the vertical shear wall siding 1 are both provided with preset threaded holes. For example, the edges where the first horizontal shear wall siding 2 and the second horizontal shear wall siding 3 are connected are each provided with a row of threaded holes for connecting the steel plate 12, and the edges where the two horizontal shear wall sidings are adjacent to the vertical shear wall siding 1 are provided with two rows of threaded holes for connecting the angle steel 7. The edges where the vertical shear wall siding 1 is adjacent to the horizontal shear wall siding are provided with two rows of threaded holes for connecting with the other wing plate of the angle steel 7.

[0049] At least two groups of plug connectors are distributed from top to bottom on the inner side of the joint between the vertical shear wall outer wall panel 1 and the two horizontal shear wall outer wall panels. The connectors include a vertical shear wall connector 8 arranged between the two vertical shear wall outer wall panels and a horizontal shear wall connector 9 arranged between the two horizontal shear wall outer wall panels. The outer surfaces of the two connectors are both serrated and can be fully connected with the concrete after pouring the concrete. The front end of the vertical shear wall connector 8 and the rear end of the horizontal shear wall connector 9 are both provided with raised parts.

[0050] like Fig.10 , Fig.11 and Fig.12 As shown, a cylindrical upper protrusion 8.1 is provided on the front upper surface of the vertical shear wall connector 8, and a through hole 9.1 matching with the upper protrusion 8.1 is provided on the front end of the horizontal shear wall connector 9. Fig.10 and Fig.11As shown, a retractable first elastic buckle 8.2 is provided on the outer side surface of the upper protrusion 8.1, and the first elastic buckle 8.2 includes a compression spring connected to the center of the upper protrusion 8.1 and a block located at the outer end of the compression spring. The compression spring is composed of multiple pieces, and the multiple compression springs are evenly arranged in a circle along the center of the upper protrusion. Each compression spring is connected to a corresponding block, and multiple side holes are processed on the side surface of the upper protrusion 8.1. The end of the block away from the spring penetrates the side hole of the upper protrusion 8.1 outward and then protrudes from the outer surface of the upper protrusion 8.1. During the insertion of the upper protrusion 8.1 into the through hole 9.1, the block is squeezed by the side wall of the through hole, and the compression spring is squeezed inside the upper protrusion 8.1, so that the block is retracted into the upper protrusion 8.1. After the upper protrusion 8.1 passes through the through hole 9.1, under the action of the restoring force of the compression spring, the block protrudes outside the upper protrusion 8.1 and is stuck above the through hole 9.1, thereby realizing the mutual insertion of the vertical shear wall connector 8 and the horizontal shear wall connector 9 and preventing slipping. In order to facilitate the retraction of the block during the insertion process and prevent the retraction of the block after the insertion is completed, the block is designed to have an inclined upper surface and a flat lower surface.

[0051] A groove 9.2 is provided on the lower surface of the horizontal shear wall connector 9, and a retractable second elastic buckle 9.3 is symmetrically provided on the side wall of the groove. The second elastic buckle 9.3 includes a compression spring connected to the inner wall of the groove 9.2 and a block installed at the end of the compression spring. A cubic side protrusion 8.3 for inserting into the groove 9.2 during insertion is provided on the rear end side of the vertical shear wall connector 8. The block of the second elastic buckle is pressed during the insertion of the side protrusion into the groove. When the side protrusion 8.3 is fully inserted into the groove, the block of the second elastic buckle 9.3 is reset under the action of the restoring force of the compression spring, and the side protrusion 8.3 is limited in the groove and will not slip off. In order to facilitate the retraction of the block during the insertion process and prevent the retraction of the block after the insertion is completed, the block is designed to have a structure with an inclined surface on the lower surface and a flat surface on the upper surface.

[0052] The first horizontal shear wall pre-embedded formwork 5 and the second horizontal shear wall pre-embedded formwork 6 are as follows Figure 6 As shown, the structure of the vertical shear wall embedded formwork 4 is as follows Figure 5 As shown, they all include an I-shaped frame formed by welding a front flange 4.1, a web 4.2 and a rear flange 4.5, longitudinal stiffening ribs 4.4 are welded on both sides of the web 4.2, and multiple parallel transverse stiffening ribs 4.3 are welded on the web part of each longitudinal stiffening rib 4.4 near the front flange 4.1. Both left and right ends of the rear flange 4.5 are concave and convex reinforcement parts formed by transverse bending of steel plates, which are used to improve the strength of the rear flange.

[0053] In order to facilitate the connection of the front flange into a plane, screw holes are preset on the front flanges on the left and right sides of the web. In order to enhance the vertical bearing capacity, longitudinal stiffening ribs 4.4 are provided on the web. In order to enhance the stability, transverse stiffening ribs 4.3 are provided. In order to enhance the connection between concrete and formwork, the rear flange is set to a concave and convex surface and installed in the shear wall in advance.

[0054] The width of the front flange and the rear flange is not greater than the width of the prefabricated wall unit, the width of the vertical stiffening rib is slightly smaller than the width of the front and rear flanges, and the transverse stiffening ribs are the same width as the vertical stiffening ribs. Put half of the template into the shear wall, and pay attention to the wall screw holes and flange positions.

[0055] Furthermore, the screw holes of the front flange of the embedded template of the horizontal shear wall are aligned with the screw holes of the web of the embedded template of the vertical shear wall, and the two shear wall panels are fixed with angle steel 7. The two side flanges of the angle steel 7 are pre-set with screw holes, which are aligned with the screw holes of the vertical shear wall panels and the horizontal shear wall panels.

[0056] Furthermore, the front flange of the horizontal shear wall embedded formwork is aligned with the screw holes of the web of the vertical shear wall embedded formwork, and the two shear wall exterior wall panels are fixed with angle steels.

[0057] Furthermore, the embedded formwork of the three shear walls is connected by bolts, and the steel plates and energy-absorbing support components are installed.

[0058] Between the two wing plates of the angle steel 7, multiple energy dissipation support components 10 are arranged parallel to each other from top to bottom, such as Figure 8 and Fig. 9 As shown, the energy dissipation support member 10 includes a sliding rod 10.1, a spring 10.2, and a buffer cylinder 10.3. When connecting, first fix the support seat 11 on the angle steel 7, and then remove the energy dissipation support member bolts to install the energy dissipation support member. The installation structure of a set of energy dissipation support members is as follows: each wing plate of the angle steel 7 is respectively installed with a support seat 11, and each support seat 11 is rotatably connected to a sliding rod 10.1, and the other end of the sliding rod is deeply inserted into the buffer cylinder 10.3 and connected to the spring 10.2 in the buffer cylinder.

[0059] All the preset screw holes mentioned above must meet the following specifications:

[0060] 1. Force requirements: To prevent the ends of the steel plates from being sheared off, the end distance of the bolts should not be less than 2d0, where d0 is the bolt hole diameter. For tension members, the bolt distance and line distance of each row of bolts should not be too small, otherwise the stress concentration around the bolts will have a greater impact on each other, and the cross section of the steel plate will be weakened too much, thereby reducing its bearing capacity. For compression members, the bolt distance along the direction of the force should not be too large, otherwise convex bending is likely to occur between the connected plates.

[0061] 2. Structural requirements: If the bolt spacing and line spacing are too large, the contact surface of the components will not be tight enough, and moisture can easily penetrate into the gaps and cause rust.

[0062] 3. Construction requirements: Ensure there is a certain amount of space to facilitate turning the bolt wrench.

[0063] The present invention also discloses a formwork-free assembled energy dissipation and shock absorption shear wall corner structure and a connection method, comprising the following steps:

[0064] S1: Prefabricate the shear wall units in the factory and pre-set the screw holes;

[0065] S2: Check the hoisting equipment and first hoist the prefabricated horizontal shear wall unit and vertical shear wall unit to the corresponding position;

[0066] S3: Lower the first horizontal shear wall unit vertically, and pre-connect and fix the vertical shear wall unit and the first horizontal shear wall unit through the plug-in connector, specifically: pass the through hole 9.1 through the upper protrusion 8.1, and put the side protrusion 8.3 into the groove 9.2 until the first elastic buckle 8.2 and the second elastic buckle 9.3 rebound, and then make a preliminary connection.

[0067] S4: Use the hexagonal nuts of the connecting angle steel to pass through the screw holes of the supporting member, the screw holes of the angle steel and the screw holes of the horizontal shear wall to fix the support of the energy-absorbing supporting member and the two shear walls;

[0068] S5: Fix the second horizontal shear wall unit and the vertical shear wall unit in the same way;

[0069] S6: Further, the hexagonal bolts for connecting the embedded templates are passed through the screw holes of the first horizontal shear wall embedded template 5, the web screw holes of the vertical shear wall embedded template 4, and the screw holes of the second horizontal shear wall embedded template, so that the embedded templates of the three shear walls are connected into a whole;

[0070] S7: Further, use a connecting steel plate hexagonal nut to pass through the screw hole of the steel plate 12 and the front flange screw hole of the vertical shear wall embedded template 4, and use a connecting steel plate hexagonal nut to pass through the screw hole on the outside of the steel plate and the screw holes of the two horizontal shear wall outer wall panels to form a whole;

[0071] S8: Further, the energy dissipation support member is installed using nuts for assembling the support member;

[0072] S9: Furthermore, in order to improve the bonding strength between the formwork and the concrete, a layer of interface agent is applied on the formwork, and concrete is poured in the space between the three shear walls and the embedded formwork to improve the integrity of the component, increase the connection performance of the bolts and the bearing capacity of the structure.

[0073] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and changes. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A formwork-free assembled energy dissipation and shock absorption shear wall corner structure, characterized in that: It comprises a vertical shear wall embedded formwork (4), wherein a group of horizontal shear wall embedded formworks are symmetrically connected to both sides of the web of the vertical shear wall embedded formworks; shear wall external wall panels are arranged on the outside of all the shear wall embedded formworks; the outside of the vertical shear wall external wall panel (1) and the outside of the horizontal shear wall external wall panel are connected as a whole through angle steel (7); an energy-absorbing support component (10) is arranged between the two wing panels of the same angle steel; the inside of the vertical shear wall external wall panel (1) and the inside of the horizontal shear wall external wall panel are connected as a whole through a plug-in connector; and the external wall panels of the two horizontal shear walls are connected as a whole through the ends of the vertical shear wall embedded formworks.

2. The formwork-free assembled energy dissipation and shock absorption shear wall corner structure according to claim 1 is characterized in that: All shear wall embedded templates include a front flange (4.1), a web (4.2) and a rear flange (4.5) connected in sequence, wherein the front flange (4.1), the web (4.2) and the rear flange (4.5) form an "I"-shaped structure, and the rear flange (4.5) is a special-shaped structure made by bending a steel plate.

3. The formwork-free assembled energy dissipation and shock absorption shear wall corner structure according to claim 2 is characterized in that: Longitudinal stiffening ribs (4.4) are symmetrically arranged on both sides of the web (4.2) along the height direction of the shear wall, and at least one transverse stiffening rib (4.3) is arranged on both sides of the web (4.2) between the longitudinal stiffening ribs (4.4) and the rear flange (4.5).

4. The formwork-free assembled energy dissipation and shock absorption shear wall corner structure according to claim 2 is characterized in that: The horizontal shear wall embedded formwork is connected to the web (4.2) of the vertical shear wall embedded formwork via the front flange (4.1), and the vertical shear wall embedded formwork is connected to the outer wall panel of the horizontal shear wall via the front flange (4.1).

5. The formwork-free assembled energy dissipation and shock absorption shear wall corner structure according to claim 2 is characterized in that: Concave and convex bending parts are symmetrically arranged on both side edges of the rear flange (4.5) with respect to the web (4.2).

6. The formwork-free assembled energy dissipation and shock absorption shear wall corner structure according to claim 2 is characterized in that: The plug-in connector comprises a vertical shear wall connector (8) and a horizontal shear wall connector (9); an upper protrusion (8.1) is arranged on the upper surface of the front end of the vertical shear wall connector (8), and a retractable first elastic buckle (8.2) is arranged on the side of the upper protrusion (8.1); and a through hole (9.1) cooperating with the upper protrusion (8.1) is arranged at the front end of the horizontal shear wall connector (9).

7. The formwork-free assembled energy dissipation and shock absorption shear wall corner structure according to claim 6 is characterized in that: The front end and side surfaces of the vertical shear wall connector (8) are provided with side protrusions (8.3), the lower surface of the horizontal shear wall connector (9) is provided with grooves (9.2) that cooperate with the side protrusions (8.3), and the two side walls of the groove (9.2) are provided with retractable second elastic buckles (9.3).

8. The formwork-free assembled energy dissipation and shock absorption shear wall corner structure according to claim 6 is characterized in that: The surface of the vertical shear wall connector (8) and the surface of the horizontal shear wall connector (9) are both provided with sawtooth-shaped protrusions.

9. The formwork-free assembled energy dissipation and shock absorption shear wall corner structure according to claim 1 is characterized in that: The energy-absorbing support component comprises a buffer cylinder (10.3) in which a spring (10.2) is arranged. Both ends of the spring are respectively connected to a sliding rod (10.1). The other end of the sliding rod protrudes out of the buffer cylinder and is rotatably connected to the angle steel wing plate on the corresponding side.

10. A method for connecting shear wall corners according to the formwork-free assembled energy dissipation and shock absorption shear wall corner structure according to any one of claims 1 to 9, characterized in that: The details are as follows: S1: Use shear wall embedded formwork, shear wall exterior wall panels and shear wall connectors to form a frame, pour concrete into the frame, and prefabricate horizontal shear wall units and vertical shear wall units; S2: Use the hoisting assembly to assemble the adjacent shear wall units by plugging the connectors; S3: Connect the front flanges of the two embedded templates of the horizontal shear wall to the web of the embedded template of the vertical shear wall with bolts, and connect the front flanges of the embedded template of the vertical shear wall to the outer wall panels of the horizontal shear walls on both sides with bolts; S4: Fix the angle steel at the connection between the vertical shear wall outer wall panel and the horizontal shear wall outer wall panel by bolts; S5: Install the energy dissipation support member on the angle steel; S6: Pour concrete into the hole formed by the three shear wall elements.

Citation Information

Patent Citations

  • Prefabricated assembly type shear wall vertical slit connecting structure and construction method thereof

    CN105484388A

  • Assembly type shear wall vertical joint friction energy consumption connecting device

    CN112854539A

  • Concrete shear wall structure with end posts

    CN114263295A

  • Assembled steel-wood composite shear wall structure system

    CN114263296A

  • Fabricated shear wall with corners

    CN209874150U