Preparation method of rolling ring of gate-type bucket-wheel stacker-reclaimer
Through the removal of residual stress of group welding and welding, combined with ultra-audio induction hardening treatment, the problems of easy deformation and short service life of the roller ring of the gantry bucket wheel stacking machine are solved, and the stable operation and convenient transportation of the rollers are achieved.
Patent Information
- Application Number
- CN202411136164.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-19
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2044-08-19
AI Technical Summary
The roller ring of the gantry bucket wheel stacker is prone to deform during operation, and insufficient track hardness leads to a short service life and inconvenient transportation. The prior art is difficult to solve these problems.
The rollers are processed as a whole by welding, and the welding residual stress removal and ultra-audio induction hardening are performed on the rollers after welding to ensure that the track roundness and hardness meet the design requirements, the decomposition is easy to transport and improve installation accuracy.
It improves the rigidity and wear resistance of the roller structure, extends the service life, and is easy to transport and high-precision installation, meeting the needs of stable operation and long life.
Smart Images

Figure CN119017012A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of bucket wheel machine roller preparation, and in particular to a method for preparing a roller ring of a portal bucket wheel stacker reclaimer. Background Art
[0002] As a continuous and efficient bulk material handling and conveying machinery, gantry bucket wheel stacker and reclaimer has been widely used in many industries such as power plants, steel mills, ports, and mines. The use of gantry stacker and reclaimer as a bulk material handling machinery began in foreign countries in the early 20th century. It evolved from bucket wheel excavators. my country began to develop bucket wheel stacker and reclaimer in the mid-1960s. Especially in the late 1980s, with the development of the power industry and the steel industry, the stacker and reclaimer industry has also developed rapidly. It has the characteristics of high recovery rate, convenient operation, flat material pile, easy management and easy to realize automatic control, etc. It realizes high and low position stacking and reclaiming operations across the material yard, and can realize multiple functions such as stacking, return material reclaiming, and direct material reclaiming.
[0003] The rollers are the most vulnerable to damage during the operation of the gantry bucket wheel stacker and reclaimer. Since the roundness and hardness of the rollers do not meet the requirements during the preparation process, the rollers are very easy to deform under continuous heavy loads. At the same time, the insufficient roundness and hardness of the rails make the rollers unstable, and the wear resistance of the rails contacting the supporting wheels is poor, resulting in a short service life of the rollers. In addition, due to the large overall specifications of the rollers, their transportation is also extremely inconvenient. Summary of the invention
[0004] In order to solve at least one of the above technical problems, the present invention proposes a method for preparing a roller ring of a gantry bucket wheel stacker and reclaimer, which is processed as a whole by assembly welding, and the upper rail and the lower rail are welded together with the roller structure matrix and then finely processed to prepare the roller, and then the roller is accurately disassembled and positioned and installed, and at the same time, the welded roller is subjected to welding residual stress elimination and ultrasonic induction quenching treatment, which solves the problems of easy deformation of the roller ring during operation, easy wear of the rail, short service life of the roller ring and inconvenient transportation.
[0005] To achieve the above object, the present invention adopts the following technical solution:
[0006] A method for preparing a rolling ring of a portal bucket wheel stacker and reclaimer comprises the following steps:
[0007] S1, cutting the components of the roller according to the design requirements of the roller;
[0008] S2, assembling the components of the welding roller to form a complete roller;
[0009] S3, disassemble the complete roller into three parts;
[0010] S4, tempering the disassembled roller parts to eliminate welding residual stress;
[0011] S5, rounding the disassembled roller assembly and then machining it so that the roller track meets the roundness requirement;
[0012] S6, quenching the track surface of the roller after machining;
[0013] S7, assembling the hopper to form a rolling circle;
[0014] S8, cleaning, sandblasting and painting the roller ring.
[0015] Preferably, the component parts include an outer plate for mounting the hopper, an inner plate concentric with the outer plate and located inside the outer plate, an upper annular plate and a lower annular plate arranged on both sides of the inner and outer plates, and an upper track and a lower track located at the lower part of the upper and lower annular plates and located on both sides of the lower end of the inner plate;
[0016] The rails are made of 45# steel plates and their chemical composition is re-inspected. The thickness and width of the 45# steel plates should reserve machining allowances. The shrinkage of welding should be considered when cutting the upper and lower circular ring plates.
[0017] Preferably, S2 includes:
[0018] S2.1, assembling or placing round tires on the platform, the flatness shall be ±1mm;
[0019] S2.2, mark the ground sample, use the marking gauge to determine the inner and outer circles of the upper and lower circular plates, ensure concentricity, and at the same time ensure that the track side diameter of the upper and lower circular plates should be 6-8mm larger than the design diameter;
[0020] S2.3, with the lower circular plate as the bottom, assemble the lower flange plate according to the ground sample, level it after splicing and use a ruler to find the circle;
[0021] S2.4, mark the outer plate, inner plate, lower rib plate and upper rib plate assembly lines on the lower annular plate;
[0022] S2.5, after the outer plate is cut, the square hole for hopper installation is accurately marked on the outer plate and cut intermittently; the outer plate and inner plate are rolled and the roundness is measured with a template and flame corrected until the requirements of the drawing are met. The roundness diameter of the outer plate when rolled should be 6-8mm larger than the design diameter; the outer plate, inner plate, upper ring plate and lower rib plate are assembled in sequence;
[0023] S2.6, assemble the lower rail and the upper rail. The roundness of the upper rail and the lower rail shall be flame corrected until it meets the requirements of the drawing. When the lower rail and the upper rail are in a free state, the rolling roundness diameter shall be 6-8mm larger than the design diameter. The assembly gap shall be within 0-2mm to ensure the flatness and roundness of the rails.
[0024] S2.7, accurately divide the circle and assemble the upper rib plate and upper flange, ensure that the upper rib plate is perpendicular to the upper flange and fix them with spot welding;
[0025] S2.8, after the upper and lower ribs are double-stretched, the components are welded by carbon dioxide gas shielded welding;
[0026] S2.9, after welding, check the verticality and roundness of the upper and lower rails.
[0027] Preferably, the ovality and radial runout of the upper and lower rails are no more than 1.5 mm, the end face runout is no more than 2.5 mm, and the outer circle ovality is no more than 5 mm.
[0028] Preferably, S3 includes:
[0029] S3.1, before the roller is disassembled, the overall dimensions of the roller are inspected in the double-layer tensioned state of the upper rib plate and the lower rib plate, and the assembly line and disassembly line of the connecting plate are marked;
[0030] S3.2, when the roller is disassembled, cut the roller straight along the disassembly line;
[0031] S3.3, cut the hopper hole along the square hole line of the hopper, and after disassembly, check the verticality of the upper and lower rails and the chord lengths of the rollers;
[0032] S3.4, after the roller is disassembled into three parts, the connecting plates are welded together at the disassembly opening.
[0033] Preferably, the S4 includes:
[0034] S4.1, level the three parts of the roller in the heat treatment furnace;
[0035] S4.2, heat the temperature in the heat treatment furnace to 630-650℃ and keep it at that temperature for 3-4h and then cool it with the furnace.
[0036] Preferably, the heating rate of the heat treatment furnace is less than 80°C.
[0037] Preferably, the S5 includes:
[0038] S5.1, remove the upper and lower ribs on the platform and draw the alignment of the connecting plate group;
[0039] S5.2, machine the plane of the connecting plate and mark the center line of the connecting plate hole, and drill the connecting plate hole with the tire plate;
[0040] S5.3, round the three parts of the roller on a vertical lathe;
[0041] S5.4, align the track line, rough turn the track, and reserve 3-5mm machining allowance in the diameter direction after rough turning; when finishing the track, loosen the chuck appropriately, reduce the clamping force, and ensure that the clamping force is uniform;
[0042] S5.5, mark the center line of the pin hole, the pin hole line, drill the pin shaft hole and assemble the pin shaft.
[0043] Preferably, the S6 includes:
[0044] S6.1, after the upper and lower rails are machined and the rollers are inspected and qualified, the surfaces of the upper and lower rails are quenched;
[0045] S6.2, after quenching, check the surface hardness, roundness and verticality of the upper and lower rails to see if they meet the design standards.
[0046] Preferably, the quenching treatment adopts ultrasonic induction quenching. During the quenching treatment, the workpiece rotates, and a U-shaped quenching heating ring is made according to the shape of the upper rail and the lower rail. The quenching temperature is 830-860°C. After quenching, water cooling is performed to quickly harden the surface and form a martensitic structure. The surface hardness of the upper and lower rails in contact with the support wheel after quenching should reach HRC48-55, and the hardness layer depth should be 3-4mm.
[0047] Compared with the prior art, the present invention has the following beneficial effects:
[0048] The present invention processes the roller as a whole by means of group welding, and welds the upper rail and the lower rail to the roller structure matrix and then finely processes the roller. The roller is then accurately disassembled, and the welding residual stress of the welded roller is eliminated. The rail of the roller is subjected to ultrasonic induction quenching treatment, so that the roller structure is rigid, stable, light and not easy to deform. At the same time, the surface hardness of the upper rail and the lower rail is high and the hardness layer thickness is moderate, which improves the wear resistance of the rail and achieves the purpose of stable operation and long service life of the roller. By disassembling the roller into three parts and setting a pin shaft for positioning and installation on the connecting plate and the rail at the disassembly port, the roller can be easily transported in parts and not easily deformed during transportation, and is also convenient for subsequent high-precision combined installation, so that the installed roller and rail have good roundness and installation accuracy, meeting the requirements of stable operation. BRIEF DESCRIPTION OF THE DRAWINGS
[0049] Figure 1 A schematic diagram of the rolling ring structure of a portal bucket wheel stacker and reclaimer;
[0050] Figure 2 for Figure 1AA section view;
[0051] Figure 3 This is a schematic diagram of the distribution of the pin holes of the connecting plate, the upper track and the lower track in the present invention;
[0052] Figure 4 for Figure 3 Enlarged view of point A in the middle;
[0053] Figure 5 It is a schematic diagram of the process support structure in the present invention;
[0054] Figure 6 It is a diagram of a part of the roller in the present invention;
[0055] In the figure: 1, upper track; 2, upper flange; 3, pin; 4, upper rib plate; 5, upper circular ring plate; 6, upper partition; 7, inner plate; 8, outer plate; 9, lower partition; 10, lower circular ring plate; 11, lower rib plate; 12, lower flange; 13, lower track; 14, pin hole; 15, roller; 16, hopper; 17, process support structure; 171, triangular frame; 172, support rod; 18, connecting plate; 19, square hole. DETAILED DESCRIPTION
[0056] In order to enable those skilled in the art to better understand the technical solutions in the present invention, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. It is obvious that the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments of the present invention.
[0057] Please refer to Figure 1-6 As shown, a method for preparing a rolling ring of a portal bucket wheel stacker and reclaimer comprises the following steps:
[0058] S1, according to the design requirements of the roller 15, the components of the roller 15 are cut.
[0059] Specifically, if Figure 2 As shown, the main components of the preparation roller 15 include an outer plate 8 for installing the hopper 16, an inner plate 7 concentric with the outer plate 8 and located inside it, an upper circular plate 5 and a lower circular plate 10 arranged on both sides of the inner plate 7 and the outer plate 8, and an upper track 1 and a lower track 13 located at the lower part of the upper circular plate 5 and the lower circular plate 10 and on both sides of the lower end of the inner plate 7.
[0060] The upper rail 1 and the lower rail 13 are made of 45# steel plates and their chemical composition is re-tested. The purpose of the chemical composition re-test is to determine whether the carbon content in the 45# steel plate meets the standard, so as to avoid the following quenching treatment of the rails rolled from the 45# steel plate and the hardness failing to meet the requirements.
[0061] In addition, the thickness and width of the 45# steel plate should reserve machining allowances. Specifically, the thickness of the 45# steel plate should be 10-15mm greater than the design thickness of the track, and the width should be 20mm greater than the design width of the track. When cutting the upper and lower circular plates 5 and 10, the shrinkage of welding should be considered. The inner and outer diameters should be 6-8mm larger than the design diameter to ensure that during the welding process, sufficient allowances are reserved to compensate for the shrinkage deformation and stress release after welding.
[0062] S2, assembling the components of the welding roller 15 to form a complete roller 15.
[0063] Specifically, S2 includes:
[0064] S2.1, assembling or placing round tires on the platform, the flatness shall be ±1mm;
[0065] S2.2, mark the ground sample, use the marking gauge to determine the inner and outer circles of the upper circular plate 5 and the lower circular plate 10, ensure the concentricity, and at the same time ensure that the track side diameter of the upper circular plate 5 and the lower circular plate 10 should be 6-8mm larger than the design diameter;
[0066] S2.3, with the lower circular plate 10 as the bottom, assemble the lower flange 12 plate according to the ground sample, level it after splicing and use a ruler to find the circle;
[0067] S2.4, mark the assembly lines of the outer plate 8, the inner plate 7, the lower rib plate 11 and the upper rib plate 4 on the lower annular plate 10 to facilitate the assembly and installation of the outer plate 8, the inner plate 7, the lower rib plate 11 and the upper rib plate 4.
[0068] S2.5, after the outer plate 8 is cut, the square hole 19 for installing the hopper 16 is accurately marked on the outer plate 8 and cut intermittently; the outer plate 8 and the inner plate 7 are rolled and the roundness is measured with a template and flame corrected until it meets the requirements of the drawing. When the outer plate 8 is rolled, the roundness diameter should be 6-8mm larger than the design diameter; the outer plate 8, the inner plate 7, the upper annular plate 5 and the lower rib plate 11 are assembled in sequence.
[0069] S2.6, assemble the lower track 13 and the upper track 1, the roundness of the upper track 1 and the lower track 13 needs to be flame corrected until it meets the requirements of the drawing. When the lower track 13 and the upper track 1 are in a free state, the rolled roundness diameter should be 6-8mm larger than the design diameter, and the assembly gap should be within 0~2mm to ensure the track flatness and roundness.
[0070] Please refer to Figure 5As shown, it should be noted that, in order to facilitate the assembly of the various components of the roller 15, in this embodiment, the free state mentioned above means that a process support structure 17 is provided inside the roller 15, mainly including a triangular frame 171 inscribed inside the roller 15, preferably, an equilateral triangular frame 171. At the same time, in order to provide stable support for the roller 15, a plurality of support rods 172 are arranged between each side of the equilateral triangular frame 171 and the inner wall of the roller 15.
[0071] In order to facilitate the assembly of the outer plate 8 and the inner plate 7, in this embodiment, a lower partition plate 9 close to the lower annular plate 10 and an upper partition plate 6 close to the upper annular plate 5 are arranged between the outer plate 8 and the inner plate 7. It can be understood that the upper partition plate 6 and the lower partition plate 9 play a supporting role.
[0072] In order to ensure the accuracy of the roundness measurement of the upper rail 1 and the lower rail 13, it is necessary to remove the above-mentioned process support structure 17 during measurement to eliminate its influence on the roundness measurement of the upper rail 1 and the lower rail 13, so that the upper rail 1 and the lower rail 13 are in a free state.
[0073] The flatness of the upper rail 1 and the lower rail 13 can be measured by a level to ensure the flatness of the upper rail 1 and the lower rail 13 after assembly.
[0074] S2.7, accurately divide the circle and assemble the upper rib plate 4 and the upper flange 2, ensure that the upper rib plate 4 is perpendicular to the upper flange 2 and fix them by spot welding.
[0075] It should be noted that the corresponding positions of the upper annular plate 5 and the upper flange 2 and the corresponding positions of the lower annular plate 10 and the lower flange 12 are provided with pin holes 14, and the upper rib plate 4 and the lower rib plate 11 are fixed by pins 3 adapted to the pin holes 14. In the above manner, the annular array centered on the upper annular plate 5 is fixed by the pins 3 on the outer circumference of the upper annular plate 5 and the inner circumference of the lower annular plate 10, so as to realize the double-sided tightening of the roller 15.
[0076] S2.8, after the upper rib plate 4 and the lower rib plate 11 are double-stretched, the components are welded by carbon dioxide gas shielded welding.
[0077] Specifically, during welding, the welding wire is ER50-6. 3-4 persons divide the circle into n equal parts and weld intermittently in the same direction. First, weld the vertical seams of the upper rib plate 4 and the lower rib plate 11. Two upper rib plates 4 or lower rib plates 11 can be welded at intervals until all the vertical seams of the upper rib plates 4 and the lower rib plates 11 are welded, and then weld the flat seams of the upper rib plates 4 and the lower rib plates 11 at the same intervals.
[0078] Use a small current when welding and keep the welding specifications consistent. Weld one layer first, then weld flat and overhead, and then weld the second layer.
[0079] The upper circular plate 5 and the peripheral plate 8 corner welds are first welded overhead, and then the lower circular plate 10 and the peripheral plate 8 corner welds are welded. Multi-layer welding is adopted, and it is necessary to weld intermittently one circle at a time, and then weld the next layer after one layer is completed. The above welding method is adopted to weld the upper rail 1 and the lower rail 13 annular seams and the remaining parts.
[0080] S2.9, after welding, check the verticality and roundness of the upper rail 1 and the lower rail 13.
[0081] The ovality and radial runout of the upper rail 1 and the lower rail 13 are not greater than 1.5mm, the end face runout is not greater than 2.5mm, and the outer circle ovality is not greater than 5mm. The end face runout refers to the difference between the maximum and minimum values measured by a fixed indicator in a given measuring direction during the process of the actual measured element rotating around the reference axis without axial movement.
[0082] It can be understood that the good roundness of the upper rail 1 and the lower rail 13 can enable the bucket wheel rolling ring to maintain good track stability during operation, thereby improving the service life and safety of the bucket wheel.
[0083] S3, disassemble the complete roller 15 into three parts.
[0084] Specifically, S3 includes:
[0085] S3.1, before the roller 15 is disassembled, the overall size of the roller 15 is detected in the double-layer tensioned state of the upper rib plate 4 and the lower rib plate 11, and the assembly line and disassembly line of the connecting plate 18 are marked;
[0086] S3.2, when the roller 15 is disassembled, the roller 15 is cut straightly along the disassembly line;
[0087] S3.3, cutting the hole of the hopper 16 along the square hole line of the hopper 16, and after disassembly, checking the verticality of the upper track 1 and the lower track 13 and the chord length of each roller 15;
[0088] S3.4, after the roller 15 is disassembled into three parts, a connecting plate 18 is assembled and welded at the disassembly opening.
[0089] It should be noted that by cutting the roller 15 straightly along the disassembly line, the straightness and accuracy of the disassembly openings of the three parts of the roller 15 after disassembly can be guaranteed to the greatest extent, reducing unnecessary deformation and damage during the cutting process, thereby ensuring the structural integrity of the three parts of the roller 15 that are subsequently disassembled and returned to a circle.
[0090] S4, tempering the disassembled parts of the roller 15 to eliminate welding residual stress;
[0091] Specifically, S4 includes:
[0092] S4.1, the three parts of the roller 15 are leveled in the heat treatment furnace respectively;
[0093] S4.2, heat the temperature in the heat treatment furnace to 630-650°C and keep it at this temperature for 3-4 hours and then cool it down with the furnace. The heating rate of the heat treatment furnace is less than 80°C.
[0094] It should be noted that gradually heating at an appropriate temperature to reach a set temperature, keeping warm, and cooling can effectively eliminate the residual stress that may be generated in the roller 15 after welding, and can effectively prevent the roller 15 from deforming or cracking during use, thereby improving the service life and safety of the roller 15.
[0095] In addition, the track quenching treatment can improve the hardness of the track of the roller 15 to ensure that the track of the roller 15 has good wear resistance and the overall roller deformation resistance.
[0096] S5, the disassembled rollers 15 are assembled into a circle and then mechanically processed so that the rollers 15 meet the roundness requirements;
[0097] Specifically, S5 includes:
[0098] S5.1, remove the upper rib plate 4 and the lower rib plate 11 on the platform, and mark the alignment of the connecting plate 18;
[0099] S5.2, machine the plane of the connecting plate 18 and mark the center line of the connecting plate hole, and drill the connecting plate hole with the tire plate;
[0100] S5.3, returning the three disassembled parts of the roller 15 to a circle on a vertical lathe;
[0101] S5.4, align the track line, rough turn the track, and reserve 3-5mm machining allowance in the diameter direction after rough turning; when finishing the track, loosen the chuck appropriately, reduce the clamping force, and ensure that the clamping force is uniform;
[0102] S5.5, mark the center line of the pin hole and the pin hole line, drill the pin shaft hole 14 and assemble the pin shaft 3.
[0103] It should be noted that if Figure 2 , Figure 3 and Figure 4 As shown, by marking the assembly lines of the connecting plate 18 and drilling the connecting plate holes through the tire plate, the precision and accuracy of the installation of the connecting plate 18 and the opening of the connecting plate holes are ensured, the accuracy of the positioning of the connecting plate holes is ensured, and then the assembly accuracy of the three parts of the roller 15 is ensured.
[0104] It should be noted that according to the marking of the pin hole 14, the pin hole 14 is drilled on the connecting plate 18, the upper rail 1 and the lower rail 13, and the pin 3 is spot welded and fixed on the pin hole 14, so that the roller 15 can be accurately positioned during assembly, ensuring that the upper rail 1 and the lower rail 13 have high installation accuracy after installation.
[0105] S6, quenching the track surface of the roller after machining;
[0106] Specifically, S6 includes:
[0107] S6.1, rolling the machined upper rail 1 and the lower rail 13, after the overall inspection is qualified, the surface of the upper rail 1 and the lower rail 13 is quenched;
[0108] S6.2, after the quenching treatment is completed, check the surface hardness, roundness and verticality of the upper rail 1 and the lower rail 13 to see if they meet the design standards.
[0109] The quenching treatment adopts ultrasonic induction quenching. During the quenching treatment, the workpiece rotates, and a U-shaped quenching heating ring is made according to the shape of the upper rail 1 and the lower rail 13. The quenching temperature is 830-860°C. After quenching, water cooling is carried out to quickly harden the surface and form a martensitic structure. The surface hardness of the upper rail 1 and the lower rail 13 in contact with the support wheel after quenching should reach HRC48-55, and the hardness layer depth should be 3-4mm.
[0110] It should be noted that when the hardness of the track surface is not enough, the wear resistance of the upper track 1 and the lower track 13 cannot meet the requirements. When the hardness layer is too thin, the durability of the upper track 1 and the lower track 13 is poor. When the hardness layer is too thick, the hardness layer of the upper track 1 and the lower track 13 is easy to fall off under the rolling force during operation. Therefore, after high-frequency quenching and medium-frequency quenching tests, this application finally adopts ultrasonic induction quenching to achieve the appropriate hardness and hardness layer of the track surface, thereby improving the stability and life cycle of the roller 15.
[0111] Please refer to Figure 6 As shown, S7, the hopper 16 is assembled to form a rolling circle.
[0112] It should be noted that when installing the hoppers 16, it is necessary to ensure that the positions of the hoppers 16 and the pre-opened square holes 19 correspond to each other. In order to achieve the above purpose, in this embodiment, holes are also drilled through the tire plate to ensure the relative consistency of the positions of the installation holes of the hoppers 16 and the square holes 19, thereby ensuring the consistency of the installation positions of the hoppers 16.
[0113] S8, cleaning, sandblasting and painting the roller ring.
[0114] It should be noted that, for the convenience of transportation, the hopper 16 and the roller 15 are transported separately after the hopper 16 and the roller 15 are installed for trial. At the same time, in order to prevent the roller 15 from being deformed during transportation after disassembly, a process tie rod should be drawn at the disassembly port.
[0115] The present invention processes the roller 15 as a whole by welding the upper rail 1 and the lower rail 13 together with the structural matrix of the roller 15, and then processes the roller 15 accurately, and then the roller 15 is precisely disassembled, and the welding residual stress of the welded roller 15 is eliminated, and the track of the roller 15 is subjected to ultrasonic induction quenching treatment, so that the roller 15 structure is rigid and stable, light and not easy to deform. At the same time, the upper rail 1 and the lower rail 13 have high surface hardness and moderate hardness layer thickness, which improves the wear resistance of the track and achieves the purpose of stable operation and long service life of the roller 15. By disassembling the roller 15 into three parts and setting a pin shaft 3 for positioning and installation on the connecting plate 18 and the track at the disassembly port, the roller 15 is not only easy to transport and not easy to deform during transportation, but also easy to be assembled and installed with high precision later, so that the roller 15 and the track after installation have good roundness and installation accuracy, and meet the requirements of stable operation.
[0116] The above is a specific implementation of the embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention. These improvements and modifications should also be regarded as the scope of protection of this application.
Claims
1. A method for preparing a rolling ring of a gantry bucket wheel stacker and reclaimer, characterized in that: The steps include: S1, cutting the components of the roller (15) according to the design requirements of the roller (15); S2, assembling the components of the welding roller (15) to form a complete roller (15); S3, disassemble the complete roller (15) into three parts; S4, performing a tempering treatment on each part of the disassembled roller (15) to eliminate welding residual stress; S5, reassembling the disassembled rollers (15) and returning them to a circle and then machining them so that the track of the rollers (15) meets the roundness requirement; S6, quenching the track surface of the roller (15) after machining; S7, assembling the hopper (16) to form a rolling ring; S8, cleaning, sandblasting and painting the roller ring.
2. The method for preparing the rolling ring of a gantry bucket wheel stacker and reclaimer according to claim 1, characterized in that: The components include an outer plate (8) for mounting the hopper (16), an inner plate (7) concentric with the outer plate (8) and located inside the outer plate (8), an upper annular plate (5) and a lower annular plate (10) arranged on both sides of the inner plate (7) and the outer plate (8), and an upper track (1) and a lower track (13) located below the upper annular plate (5) and the lower annular plate (10) and located on both sides of the lower end of the inner plate (7); The upper rail (1) and the lower rail (13) are made of 45# steel plates and their chemical composition is re-inspected. The thickness and width of the 45# steel plates should be reserved for machining allowances. When cutting the upper circular plate (5) and the lower circular plate (10), the shrinkage of welding should be considered.
3. The method for preparing the rolling ring of a gantry bucket wheel stacker and reclaimer according to claim 2, characterized in that: The S2 includes: S2.1, assembling or placing round tires on the platform, the flatness shall be ±1mm; S2.2, marking the ground sample, using a marking gauge to determine the inner and outer circles of the upper circular plate (5) and the lower circular plate (10), ensuring concentricity, and at the same time ensuring that the track side diameter of the upper circular plate (5) and the lower circular plate (10) should be 6-8 mm larger than the design diameter; S2.3, use the lower circular plate (10) as the bottom, assemble the lower flange (12) plate according to the ground sample, level it after splicing, and use a ruler to find the circle; S2.4, marking the assembly lines of the outer plate (8), the inner plate (7), the lower rib plate (11) and the upper rib plate (4) on the lower annular plate (10); S2.5, after the outer plate (8) is cut, the square hole (19) for installing the hopper (16) is accurately marked on the outer plate (8) and cut intermittently; the outer plate (8) and the inner plate (7) are rolled and the roundness is measured with a template and corrected by flame until the requirements of the drawing are met. The roundness diameter of the outer plate (8) when rolled should be 6-8 mm larger than the design diameter; the outer plate (8), the inner plate (7), the upper annular plate (5) and the lower rib plate (11) are assembled in sequence; S2.6, assemble the lower rail (13) and the upper rail (1), the roundness of the upper rail (1) and the lower rail (13) shall be flame corrected until they meet the requirements of the drawings. When the lower rail (13) and the upper rail (1) are in a free state, the roundness diameter of the rolling shall be 6-8 mm larger than the design diameter, and the assembly clearance shall be within 0-2 mm to ensure the flatness and roundness of the upper rail (1) and the lower rail (13); S2.7, accurately divide the circle and assemble the upper rib plate (4) and the upper flange (2), ensure that the upper rib plate (4) and the upper flange (2) are perpendicular and fixed by spot welding; S2.8, after the upper rib plate (4) and the lower rib plate (11) are double-stretched, the components are welded by carbon dioxide gas shielded welding; S2.9, after welding, check the verticality and roundness of the upper rail (1) and the lower rail (13).
4. The method for preparing the rolling ring of a gantry bucket wheel stacker and reclaimer according to claim 3, characterized in that: The ovality and radial runout of the upper rail (1) and the lower rail (13) are no greater than 1.5 mm, the end face runout is no greater than 2.5 mm, and the outer circle ovality is no greater than 5 mm.
5. The method for preparing the rolling ring of a gantry bucket wheel stacker and reclaimer according to claim 4, characterized in that: The S3 includes: S3.1, before the roller (15) is disassembled, the overall dimensions of the roller (15) are inspected in a double-layer tensioned state of the upper rib plate (4) and the lower rib plate (11), and the assembly line and disassembly line of the connecting plate (18) are marked; S3.2, when the roller (15) is disassembled, the roller (15) is cut straight along the disassembly line; S3.3, cutting the hopper hole along the square hole line of the hopper (16), and after disassembly, checking the verticality of the upper track (1) and the lower track (13) and the chord lengths of the rollers (15); S3.4, after the roller (15) is disassembled into three parts, a connecting plate (18) is assembled and welded at the disassembly opening.
6. The method for preparing the rolling ring of a gantry bucket wheel stacker and reclaimer according to claim 5, characterized in that: The S4 includes: S4.1, the three parts of the roller (15) are leveled in a heat treatment furnace; S4.2, heat the temperature in the heat treatment furnace to 630-650℃ and keep it at that temperature for 3-4h and then cool it with the furnace.
7. The method for preparing the rolling ring of a gantry bucket wheel stacker and reclaimer according to claim 6, characterized in that: The heating rate of the heat treatment furnace is less than 80°C.
8. The method for preparing the rolling ring of a gantry bucket wheel stacker and reclaimer according to claim 7, characterized in that: The S5 includes: S5.1, remove the upper rib plate (4) and the lower rib plate (11) on the platform, and draw the alignment line of the connecting plate (18); S5.2, machine the plane of the connecting plate (18) and mark the center line of the connecting plate hole, and drill the connecting plate hole with a tire plate; S5.3, returning the three disassembled parts of the roller (15) to a circular shape on a vertical lathe; S5.4, align the track line, rough turn the track, and reserve 3-5mm machining allowance in the diameter direction after rough turning; when finishing the track, loosen the chuck appropriately, reduce the clamping force, and ensure that the clamping force is uniform; S5.5, mark the center line of the pin hole and the pin hole line, drill the pin shaft hole (14) and assemble the pin shaft (3).
9. The method for preparing the rolling ring of a gantry bucket wheel stacker and reclaimer according to claim 8, characterized in that: The S6 includes: S6.1, after the upper rail (1) and the lower rail (13) are machined and rolled, and after the overall inspection is qualified, the surfaces of the upper rail (1) and the lower rail (13) are quenched; S6.2, after the quenching treatment is completed, check the surface hardness, roundness and verticality of the upper rail (1) and the lower rail (13) to see if they meet the design standards.
10. The method for preparing the rolling ring of a portal bucket wheel stacker and reclaimer according to claim 9, characterized in that: The quenching treatment adopts ultrasonic induction quenching. During the quenching treatment, the workpiece rotates, and a U-shaped quenching heating ring is made according to the shape of the upper rail (1) and the lower rail (13). The quenching temperature is 830-860°C. After quenching, water cooling is performed to quickly harden the surface and form a martensitic structure. After the quenching treatment, the surface hardness of the upper rail (1) and the lower rail (13) in contact with the support wheel should reach HRC48-55, and the hardness layer depth should be 3-4mm.
Citation Information
Patent Citations
Up-to-standard end face run-out mounting method of large rolling ring of carbon black drying machine
CN104567345A
Forged rolling ring assembling form applicable to aging drum and processing method thereof
CN106632696A
Manufacturing process of annular blocking structure of bucket-wheel body of bucket-wheel stacker-reclaimer
CN115592354A
Fabricated frame and production process thereof
CN118270163A
The processing apparatus using inducting heating ofthe part in the long bar and a method thereof
KR1020050052448A