Wall-attaching-free type construction elevator fixing device and mounting method
Through the non-climbing construction elevator fixing device, the combination of foundation reinforced structure and tower body structure is used to solve the problem of difficulty in fixing construction elevators in arc-shaped wall sections or space-constrained buildings, and the stable fixation and safe passage of elevators are achieved. It has wider application and flexible channel design.
Patent Information
- Application Number
- CN202310588178.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-05-23
- Publication Date
- 2024-11-26
AI Technical Summary
In the prior art, arc-shaped wall sections or building bodies with limited space are not suitable for attaching construction elevators, resulting in the obstruction of personnel's access function.
The elevator fixing device is adopted for non-clustered construction, including foundation reinforcement structure, tower body structure, elevator guide rail and walkway platform. It is fixed to the concrete foundation through planting tendons and threaded sleeves, and the elevator guide rail is attached to the tower body structure at any distance. , realizes a stable and independent up and down vertical movement function.
It realizes stable fixation and safe passage of construction elevators in arc-shaped wall sections or space-constrained buildings, has wider application, and can flexibly design the size of the walkway platform according to space needs, and the passage can be detached and used.
Smart Images

Figure CN119018742A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of elevator construction, and in particular to a non-wall-attached construction elevator fixing device and an installation method. Background Art
[0002] Construction elevators are commonly used machines for vertical transportation of people and goods in construction. Conventional construction elevator guide frames generally use wall-mounted devices to fix the construction elevator on the completed walls of the building to ensure the safe lifting of the construction elevator and facilitate the up and down movement of personnel and materials on the construction work surface.
[0003] It is common for high-rise building construction to use construction elevators as vertical transportation channels for personnel. Construction elevators are mostly attached to the main body of the project and fixed to the main structure through attachments. However, for curved wall sections or limited space, when the construction elevator is located far away from the main structure and is not suitable for attachment to the main structure, it is generally not convenient to attach to the main structure in the existing technology, which hinders the function of personnel passage. Summary of the invention
[0004] In view of the above-mentioned deficiencies in the prior art, the object of the present invention is to provide a non-wall-attached construction elevator fixing device and installation method, so as to solve the technical problem in the prior art that the curved wall sections or the building bodies with limited space are not suitable for attachment to the main structure, resulting in inconvenience in passage.
[0005] In order to solve the above problems, the first object of the present invention is to provide a non-wall-attached construction elevator fixing device, comprising:
[0006] The foundation reinforcement structure comprises a foundation beam, a rebar planted on the periphery of the foundation beam, a plate beam sleeved on the rebar, and a threaded sleeve threadedly connected to the top of the rebar, wherein one end of the plate beam is pressed on the foundation beam, and the other end is abutted against the threaded sleeve, and the bottom of the rebar is buried in reinforced concrete;
[0007] A tower body structure is vertically arranged on the foundation reinforcement structure;
[0008] An elevator guide rail is arranged in parallel on one side of the tower structure, and the elevator guide rail is fixed to the tower structure at intervals in the vertical direction through a small-distance attachment device;
[0009] The elevator guide rail comprises a plurality of guide rail frame standard sections vertically stacked and connected up and down and a guide rail attachment assembly for fixing the guide rail frame standard sections on the tower structure, wherein the root of the guide rail frame standard section at the bottom is threadedly connected to the embedded reinforcement;
[0010] A walkway platform has one side connected to the tower structure and the other side connected to the main building structure.
[0011] Furthermore, it also includes an elevator frame and an elevator box, the elevator box is slidably connected to the side of the elevator guide rail away from the tower structure, the elevator frame includes a load-bearing beam and a full-length pressure plate beam vertically connected to each other, the full-length pressure plate beam is located at the bottom of the elevator guide rail, and the load-bearing beam is suitable for being supported at the bottom of the elevator box.
[0012] Furthermore, the tower structure includes a plurality of attachment frames vertically stacked and connected up and down, a tower fixing assembly for connecting two of the attachment frames, and a tower embedded bolt assembly, wherein the tower embedded bolt assembly is suitable for connecting the root of the attachment frame to the foundation reinforcement structure and reinforced concrete.
[0013] Furthermore, the foundation beam is a double-layer tic-tac-toe structure.
[0014] Furthermore, the attachment frame includes a vertical beam, a horizontal beam, an oblique support beam and a stiffener plate. The four vertical beams are respectively vertically arranged at the four corners of the square. The horizontal beams are respectively horizontally connected to the top and middle positions of every two adjacent vertical beams. The two ends of the oblique support beam are respectively connected to the intersection of the vertical beam and the horizontal beam. The stiffener plate is connected to the connection between the vertical beam and the foundation beam.
[0015] Furthermore, the guide rail attachment assembly includes an angle steel, a clamping plate, a clamping plate, a first connecting bolt and a locking assembly, and one side of the angle steel is fixedly connected to the tower structure through the locking assembly;
[0016] The hoop clamp plate comprises a long hoop clamp plate and a short hoop clamp plate, and the middle positions of the opposite sides of the long hoop clamp plate and the short hoop clamp plate are both provided with a vertical semicircular hoop groove to form a vertical circular channel, and the two ends of the long hoop clamp plate and the short hoop clamp plate are connected by the first connecting bolt;
[0017] The hoop stiffening plate comprises a long hoop stiffening plate and a short hoop stiffening plate, and the long hoop stiffening plate and the short hoop stiffening plate are respectively connected to the positions of the long hoop clamping plate and the short hoop clamping plate facing the semicircular hoop groove.
[0018] Furthermore, the locking assembly includes a locking plate, a locking top plate, an adjustment plate and a second connecting bolt, the second connecting bolt passes through the angle steel and the locking plate to lock the tower corner column in the middle, and the adjustment plate is used to adjust the distance between the tower corner column and the angle steel.
[0019] The second object of the present invention is to provide a method for fixing and installing a non-wall-attached construction elevator. Based on the above-mentioned non-wall-attached construction elevator fixing device, the method for fixing and installing comprises:
[0020] S 100: Adopting anchoring glue, anchoring and threaded sleeve, the foundation beam and the pressure plate beam are connected and fixed on the poured concrete foundation to form a foundation reinforcement structure;
[0021] S 200: The tower body structure and the elevator guide rail are both fixed by the foundation reinforcement structure, and the elevator guide rail is connected to the tower body structure by a small distance attachment device, so that the forces of the tower body structure and the elevator guide rail are transmitted to the foundation through the foundation;
[0022] S 300: Install an elevator chassis and an elevator box, wherein the elevator box is slidably connected to the side of the elevator guide rail away from the tower structure to achieve an up and down vertical movement function;
[0023] S 400: One end of the walkway platform is connected to the tower structure, and the other end is connected to the main structure at different distances from the tower structure.
[0024] Furthermore, the embedded reinforcement is a HRB500 grade ribbed steel bar, the length of which is not less than 2000 mm and the embedding depth in the concrete is 800 mm; and / or
[0025] A backing plate is provided below the threaded sleeve. The backing plate is made of a thick steel plate with a length of 200 mm, a width of 200 mm, and a thickness of 20 mm. A hole with a diameter of 34 mm is opened on the backing plate.
[0026] Furthermore, the short-distance attachment device is provided with seven paths, and the distance between each path of attachment does not exceed 6.5 meters.
[0027] Compared with the prior art, the present invention has the following beneficial effects:
[0028] 1. The present application adopts a foundation reinforcement structure, part of which is buried in reinforced concrete. The foundation reinforcement structure is composed of a foundation beam, embedded steel bars, a pressure plate beam and a threaded sleeve, wherein the embedded steel bars are partially buried in the cast concrete, and the foundation beam and the pressure plate beam are firmly fixed to the concrete foundation by means of embedded steel bars and threaded sleeves; the tower structure is vertically arranged on the concrete foundation through the foundation reinforcement structure; an elevator guide rail is vertically arranged parallel to and vertically on one side of the tower structure, the bottom of the elevator guide rail is fixed by the foundation reinforcement structure, and the elevator guide rail is fixed to the tower structure at intervals in the vertical direction by a small distance attachment device, so that the tower structure and the elevator guide rail can be firmly connected; the elevator guide rail comprises a plurality of guide rail frame standard sections and guide rail attachment assemblies vertically stacked and connected up and down, the guide rail attachment assembly is used to fix the guide rail frame standard section to the tower structure, wherein the root of the bottom guide rail frame standard section is threadedly connected to the embedded steel bars; one side of the walkway platform is connected to the tower structure, and the other side is connected to the main structure of the building. Through the combination of foundation reinforcement and guide rail attached independent attachment frame (tower body), self-stabilization measures are provided for the construction elevator. The elevator guide rails of the construction elevator box are connected and fixed to the guide rail attachment components to realize the up and down vertical movement function. The guide rail attachment components and the elevator frame both transmit force to the foundation through the foundation, replacing the traditional attachment main structure force method with the foundation force method; in addition, the construction elevator is a certain distance away from the main structure, and an L-shaped walkway platform is designed, which is fixed to the tower body through a connecting component. One end of the L is connected to the construction elevator, and the other end extends to the main structure. People enter the walkway platform from the elevator box to reach the main structure. The walkway platform is equipped with an outward-opening door at the elevator car exit that can only be opened from the elevator car side to ensure the safe passage of people and realize the independent layout of the construction elevator. There are no requirements for the main structure and it has a wider applicability.
[0029] 2. The size of the walkway platform can be flexibly designed according to space requirements, and multiple channels can be formed at the same time to lead to the main structure parts with different distances from the construction elevator. The channels can be disassembled and used in rotation, which is more flexible. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] Figure 1 It is a schematic diagram of the structure of a non-wall-attached construction elevator fixing device in one direction according to an embodiment of the present invention;
[0031] Figure 2 It is a schematic diagram of the structure of the non-wall-attached construction elevator fixing device in another direction according to an embodiment of the present invention;
[0032] Figure 3 It is a schematic diagram of the top view of the structure of the non-wall-attached construction elevator fixing device in an embodiment of the present invention;
[0033] Figure 4 Schematic diagram of the connection structure between the tower body structure and the elevator guide rail in an embodiment of the present invention;
[0034] Figure 5 It is a schematic diagram of a top view of the basic reinforcement structure, tower structure, elevator guide rails, elevator underframe and elevator box in an embodiment of the present invention;
[0035] Figure 6 Schematic diagram of the top view of the structure of the foundation beam and the elevator underframe in an embodiment of the present invention;
[0036] Figure 7 It is a schematic diagram of the main structure of the attachment frame in the embodiment of the present invention;
[0037] Figure 8 Schematic diagram of the connection structure between the attachment frame and the basic reinforcement structure in an embodiment of the present invention;
[0038] Fig. 9 It is a structural schematic diagram of a foundation beam in an embodiment of the present invention;
[0039] Fig.10 It is a schematic diagram of a top view of the basic reinforcement structure, tower structure, elevator guide rails, elevator underframe and elevator box in an embodiment of the present invention;
[0040] Fig.11 It is a schematic diagram of a top view of the tower structure and the elevator underframe in an embodiment of the present invention;
[0041] Fig.12 Schematic diagram of the top view of the elevator underframe in an embodiment of the present invention;
[0042] Fig.13 Schematic diagram of the connection structure between the tower body structure and the walkway platform in an embodiment of the present invention;
[0043] Fig.14 This is a schematic diagram of the top view of the walkway platform in an embodiment of the present invention;
[0044] Fig.15 This is a schematic diagram of the upward structure of the walkway platform in an embodiment of the present invention;
[0045] Fig.16 It is a schematic diagram of the side structure of the walkway platform in an embodiment of the present invention;
[0046] Fig.17 for Fig.14 Schematic diagram of the structure at A in FIG.
[0047] Fig.18 for Fig.15 Schematic diagram of the structure at B in FIG.
[0048] Fig.19 It is a schematic flow chart of a method for fixing and installing a non-wall-attached construction elevator in an embodiment of the present invention.
[0049] Description of reference numerals:
[0050] 1- Foundation reinforcement structure;
[0051] 11-foundation beam; 111-tower corner column; 12-embedded reinforcement; 13-pressing beam; 14-shield; 15-threaded sleeve;
[0052] 2-Tower structure;
[0053] 21- attachment frame; 211- vertical beam; 212- horizontal beam; 213- oblique support beam; 214- rib plate; 22- tower body fixing assembly; 221- stiffening plate; 23- tower body embedded bolt assembly;
[0054] 3- Elevator guide rails;
[0055] 31-guide rail attachment assembly; 311-angle steel; 312-hoop card; 3121-hoop long card; 3122-hoop short card; 313-hoop stiffening plate; 3131-hoop long stiffening plate; 3132-hoop short stiffening plate; 314-first connecting bolt; 315-locking assembly; 3151-locking plate; 3152-locking top plate; 3153-adjusting pad; 3154-second connecting bolt; 32-guide rail frame standard section;
[0056] 4- Elevator chassis;
[0057] 41- load-bearing beam; 42- full-length pressure plate beam;
[0058] 5- Elevator box;
[0059] 6-Walkway platform;
[0060] 61- transverse quilting frame; 62- longitudinal quilting frame; 63- inner scissors support; 64- first connecting component; 65- second connecting component. DETAILED DESCRIPTION
[0061] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0062] In the description of the present invention, it should be noted that the terms "first", "second", etc. are used for descriptive purposes and cannot be understood as indicating or implying relative importance.
[0063] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, it can also be the internal connection of two components, it can be a wireless connection, or it can be a wired connection. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0064] In addition, the technical features involved in the different embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.
[0065] Referring to Figures 1-18, an embodiment of the present invention provides a non-wall-attached construction elevator fixing device, the non-wall-attached construction elevator fixing device comprises a foundation reinforcement structure 1, a tower structure 2, an elevator guide rail 3 and a walkway platform 6, wherein:
[0066] like Figure 8 As shown, in the preferred embodiment of the present invention, the foundation reinforcement structure 1 includes a foundation beam 11, a rebar 12, a plate beam 13 and a threaded sleeve 15, the lower part of the rebar 12 is vertically buried in the reinforced concrete, the upper part of the rebar 12 is planted on the periphery of the foundation beam 11, the plate beam 13 is sleeved on the rebar 12, the threaded sleeve 15 is threadedly connected to the top of the rebar 12, and one end of the plate beam 13 is pressed on the foundation beam 11, and the other end of the plate beam 13 is abutted against the threaded sleeve 15. In this way, the foundation beam 11 and the plate beam 13 are firmly locked on the foundation through the rebar 12 and the threaded sleeve 15.
[0067] The tower structure 2 has a certain height, and its specific height is determined according to the main building structure nearby. The tower structure 2 is vertically arranged on the foundation reinforcement structure 1, and is connected to the tower structure 2 through the foundation reinforcement structure 1, so that the tower structure 2 is firmly connected to the foundation.
[0068] The elevator guide rail 3 is used to realize the vertical movement of heavy objects such as personnel and goods. In this embodiment, the elevator guide rail 3 is arranged in parallel on one side of the tower structure 2, and the elevator guide rail 3 is fixed to the tower structure 2 at a certain distance in the vertical direction through a small distance attachment device.
[0069] As the best preferred mode of the embodiment of the present invention, the elevator guide rail 3 includes a plurality of guide rail frame standard sections 32 vertically stacked and connected up and down and a guide rail attachment assembly 31 for fixing the guide rail frame standard section 32 on the tower structure 2, wherein the root of the bottommost guide rail frame standard section 32 is threadedly connected to the embedded steel bar 12. The advantage of such a setting is that the elevator guide rail 3 can be stably arranged near one side of the tower structure 2, and realizes the vertical transportation of personnel, heavy objects, etc. up and down.
[0070] One side of the walkway platform 6 is connected to the tower structure 2, and the other side is connected to the main structure of the building. Therefore, the non-wall-attached construction elevator can be arranged independently without being attached to the main project, has no requirements on the main structure, and has wider applicability.
[0071] In addition, through the combination of foundation reinforcement and guide rail attached independent attachment frame (tower body), self-stabilization measures are provided for the construction elevator. The elevator guide rail 3 is connected and fixed to the attachment frame to realize the up and down vertical movement function. The attachment frame and the elevator frame both transmit force to the foundation through the foundation, replacing the traditional attachment main structure force mode with the foundation force mode.
[0072] See also Fig. 9 As shown, in the embodiment of the present invention, the foundation beam 11 preferably adopts a cross-shaped steel beam, and the tower body structure for the attachment of the construction elevator is built by the cross-shaped steel beam, and the length of the horizontal section of the tower body is two meters. The foundation beam 11 is fixed by embedded reinforcement 12 and a pressure plate beam 13, the load-bearing beam 41 adopts a full-length pressure plate beam, and the elevator frame and the pressure plate beam are connected by welding or bolts.
[0073] As a preferred method in the embodiment of the present invention, the foundation beam 11 is welded into a tic-tac-toe shape using HW400*400*13*21 steel, with a double-layer arrangement, and the upper and lower layers are connected by bolts (not less than 8.8 grade M20 bolts). Rib plates 16 are welded at the legs and the pressure plate beam 13. The rib plates 16 are made of 20 mm thick steel plates, made of Q235, and have no burrs on the surface of the steel plates. Gas shielded welding is used during welding. The rib plates 16 are welded to the H-shaped steel (that is, the foundation beam 11) with a groove treatment. The welding position of the rib plates 16 is adjusted according to the actual position of the embedded reinforcement 12.
[0074] In addition, the welding of foundation beam 11 at all places must be firm, and the welds must not have defects such as incomplete welding, root shrinkage and poor contact. The welds must not have defects such as surface pores, slag inclusions, undercuts, cracks and arc scratches. The weld width is greater than 10mm, and the welding is carried out by gas shielded welding or manual welding with E43 type electrodes, and the weld is a secondary weld.
[0075] Preferably, in this embodiment, the embedded reinforcement 12 uses 60 hot-rolled ribbed steel bars with a diameter of 32 mm, the depth of the embedded reinforcement 12 is ≥800 mm, the pull-out resistance design value of a single embedded reinforcement 12 is not less than 300 KN, and the reserved length above the ground is ensured to be ≥1250 mm, the embedded reinforcement hole can be adjusted by 100 mm in the direction of the steel beam and by 170 mm in the direction perpendicular to the steel beam. The foundation beam 11 is fixed by a matching threaded sleeve 15 (thread length ≥200 mm) and a pad 14 (20 mm steel pad).
[0076] Preferably, in this embodiment, the platen beam 13 is welded into a box beam using 20# channel steel and 10mm steel plate, wherein the first platen beam 13 is 500mm away from the center line of the steel beam, the second platen beam 13 is 500mm away from the first platen beam 13, and the third platen beam 13 is 725mm away from the second platen beam 13. Considering the interference between the on-site embedded reinforcement 12 and the raft slab steel bars, the size of the platen beam 13 is designed to be 820mm long, and the length of the platen beam 13 can be shortened according to actual conditions.
[0077] See also Figure 1 , 2 As shown in Figures 3 and 4, the non-wall-attached construction elevator fixing device in the embodiment of the present invention further includes an elevator chassis 4 and an elevator box 5, wherein the elevator box 5 is slidably connected to the side of the elevator guide rail 3 away from the tower structure 2. For the driving method of the elevator box 5 sliding up and down, a cable pulley system is preferably used in the embodiment of the present invention. When the installation height of the construction elevator is high, it is greatly affected by the power supply voltage, wind force and its own gravity. A cable pulley is selected to be installed at the lower part of the elevator box 5, which has a simple structure and is easy to install. The guide rail frame of the elevator box 5 is not only the running track of the elevator box 5 but also the running track of the cable pulley, so it is less affected by wind force and is used in very common occasions.
[0078] The elevator underframe 4 is composed of a load-bearing beam 41 and a full-length pressure plate beam 42 which are vertically connected to each other, wherein the load-bearing beam 41 is used to bear the weight of the elevator car 5, and the elevator underframe is composed of a full-length pressure plate beam 42.
[0079] Therefore, the non-wall-attached construction elevator fixing device is composed of five parts, including the elevator car 5, the elevator guide rail 3 (standard section of the guide rail frame), the attachment frame (standard section tower body), the walkway platform 6 and the foundation reinforcement structure 1. During the installation process, the surface of the elevator frame 4 is cleaned, the installation position and direction are determined, and the plane of the load-bearing beam 41 is leveled (leveled with a spirit level), and the elevator frame 4 is connected to the foundation reinforcement structure 1 with M30×180 bolts to realize the base installation of the elevator guide rail 3.
[0080] The tower structure 2 and the construction elevator (elevator chassis 4) are both fixed by the foundation, which is divided into two forms:
[0081] Form 1: Suitable for the location where the elevator is installed, but not suitable for pouring a dedicated elevator foundation or a foundation that cannot be integrated with the main raft foundation of the project. Through the anchor bolt method, the diameter of the anchor bolt 12 in this embodiment is 32mm, the drilling diameter is 40mm, the drilling depth is 800mm, and the anchor bolt glue (Hilti brand) is used to fix the anchor bolt 12 in the concrete, and the criss-cross steel beam and the pressure plate beam are used to connect and fix it to the foundation.
[0082] For form 1, double-layer H-shaped steel beams with stiffening plates are welded as foundation beams, double channel steel and steel plates are welded as pressure plate beams, and are connected and fixed to the foundation through anchor bars 12. A pad 14 (200×200×20mm thick steel plate with a hole of 34mm in diameter) is provided below the threaded sleeve 15 and is welded and fixed to the threaded sleeve 15, with the thread leaking out of the upper threaded sleeve 15 by at least 20mm. The main chord of the tower body is directly welded and fixed to the foundation beam; the elevator guide rail 3 is welded to the full-length pressure plate beam through the elevator chassis 4, and the pressure plate beam is connected to the foundation beam 11 as a whole through anchor bars 12.
[0083] Form 2: Applicable to elevators and tower foundations, which can be integrated with the engineering raft foundation, and bolts can be embedded directly in the foundation.
[0084] For form 2, when pouring the foundation slab, 4 groups of embedded bolts are buried for fixing the tower body (6 M48 bolts in each group, with a length ≥1350mm), and 4 M30 bolts are buried for fixing the elevator guide rails / base frame, with a length ≥500mm. High-strength bolts are the best. The tower body and the elevator guide rail base frame are directly connected and fixed to the foundation with embedded bolts.
[0085] See also Figure 7 , 8 As shown, in an embodiment of the present invention, the tower structure 2 includes a plurality of attachment frames 21 vertically stacked and connected up and down, a tower fixing assembly 22 for connecting two attachment frames 21, and a tower embedded bolt assembly 23, and the tower embedded bolt assembly 23 is suitable for connecting the root of the attachment frame 21 to the foundation reinforcement structure 1 and the reinforced concrete.
[0086] In an embodiment of the present invention, the tower body structure 2 includes a plurality of attachment frames 21, a tower body fixing assembly 22 and a tower body embedded bolt assembly 23 which are vertically connected to each other, wherein the number of the attachment frames 21 can be flexibly determined according to the actual height of the main building. In this embodiment, the size of each section of the attachment frame 21 (standard section of the tower body) is 2*2*3m. Since the installation height needs to reach 45m, a total of 15 sections of the attachment frames 21 (also known as standard sections) are required to be vertically connected.
[0087] The tower body fixing assembly 22 is composed of a plurality of stiffening plates 221 and is fixedly connected to the foundation reinforcement structure 1 through a tower body embedded bolt assembly 23 .
[0088] In some other embodiments, the tower structure 2 can also be enlarged, and a double steel ladder and a platform (cage ladder) can be built in as a backup safety passage. The tower structure 2 can select different cross-sections according to the size of the on-site space, the height of the construction elevator to be operated, the typhoon resistance, etc., or a similar steel frame can be used instead of the tower crane standard section.
[0089] It is understandable that due to the different installation heights of the elevator car 5, the standard sections of the tower structure 2 (that is, the attachment frame 21) are configured differently. The wall thickness of the main chord tube of the standard section of the attachment frame 21 is configured differently as the installation height increases. A conversion section must be set between standard sections with different main chord tube wall thicknesses.
[0090] In this embodiment, since the maximum installation height of the tower structure 2 is 45 meters, and the size of the attachment frame 21 (ie, the standard section of the tower crane) is 2*2*3 meters, a total of 15 standard sections are required.
[0091] See also Figure 6 , 9 As shown, in the embodiment of the present invention, the foundation beam 11 is a double-layer tic-tac-toe structure. The tic-tac-toe structure can ensure that the foundation of the foundation reinforcement structure 1 is stable and reliable.
[0092] See also Figure 7 As shown, in an embodiment of the present invention, the attachment frame 21 includes a vertical beam 211, a horizontal beam 212, an oblique support beam 213 and a rib plate 214. The four vertical beams 211 are respectively vertically arranged at the four corners of the square, the horizontal beams 212 are respectively horizontally connected to the top and the middle position of each two adjacent vertical beams 211, the two ends of the oblique support beam 213 are respectively connected to the intersection of the vertical beam 211 and the horizontal beam 212, and the rib plate 214 is connected to the connection between the vertical beam 211 and the base beam 11.
[0093] In this embodiment, the oblique support beam 213 is supported and connected at the diagonal position of each two adjacent vertical beams 211, and is connected to the end of the horizontal beam 212. The rib plate 214 is used to fix the bottom of each vertical beam 211 to the base beam 11.
[0094] See also Figure 5 As shown, in the embodiment of the present invention, the elevator guide rail 3 includes a guide rail attachment assembly 31 and a guide rail frame standard section 32, and the guide rail frame standard section 32 is suitable for sliding up and down on the guide rail attachment assembly 31, wherein:
[0095] The guide rail frame standard section 32 is the running track of the elevator car 5, and is composed of a standard section with a length of 1508mm connected by 8.8-grade M24×230 high-strength bolts (the bolt installation pre-tightening torque is not less than 300N·m). The standard section is welded by seamless steel pipes or welded pipes, angle steels or cold-bent steels, steel pipes, etc. The standard section is equipped with racks (a single-cage standard section has 1 rack, and a double-cage standard section has 2 racks). Each rack is fastened by three hexagon socket screws, and the racks are removable.
[0096] The driving system of the cable pulley system includes a driving body and a driving unit. The driving body is a component that connects the transmission devices to form an integral structure. It transmits the driving force generated by the driving unit to the elevator car 5, so that it can move up and down. The connecting bolts of the driving body and the driving unit are connected by 8.8 grade high-strength bolts. The driving unit is the power part of the elevator car 5. It is driven by three groups of power sources working together at the same time to drive the self-weight part of the elevator car 5 and the load (or construction personnel) in the elevator car 5 to move up and down.
[0097] In this embodiment, the driving unit is composed of a driving gear, a reducer, a coupling (a plum blossom-shaped elastic element), a motor (with a brake), etc. The reducer is an arc cylindrical worm reducer, which has the characteristics of compact structure, high load-bearing capacity, high mechanical efficiency, long service life, and stable operation. The coupling is a flexible claw type, and there is an elastic element (polyurethane rubber) between the two couplings to reduce the impact and vibration during operation.
[0098] The motor is a YZEJ132M-4 three-phase asynchronous motor with disc brake for lifting. Its brake electromagnet can automatically track the wear of the brake disc, and the braking torque is adjustable.
[0099] See also Figure 4 As shown, in an embodiment of the present invention, the guide rail attachment assembly 31 includes an angle steel 311, a clamp plate 312, a clamp stiffening plate 313, a first connecting bolt 314 and a locking assembly 315, and one side of the angle steel 311 is fixedly connected to the tower structure 2 through the locking assembly 315.
[0100] The clamping hoop plate 312 includes a long clamping hoop plate 3121 and a short clamping hoop plate 3122. A vertical semicircular clamping groove is provided in the middle position of the opposite side of the long clamping hoop plate 3121 and the short clamping hoop plate 3122 to form a vertical circular channel in combination. The two ends of the long clamping hoop plate 3121 and the short clamping hoop plate 3122 are then connected by a first connecting bolt 314.
[0101] The hoop stiffening plate 313 includes a long hoop stiffening plate 3131 and a short hoop stiffening plate 3132 , and the long hoop stiffening plate 3131 and the short hoop stiffening plate 3132 are respectively connected to the positions of the long hoop clamping plate 3121 and the short hoop clamping plate 3122 facing the semicircular hoop groove.
[0102] In order to ensure the structural strength of the clamping hoop clamp 312, the long clamping hoop clamp 3131 and the short clamping hoop clamp 3132 are respectively connected to the positions opposite to the semicircular hoop grooves on the long clamping hoop clamp 3121 and the short clamping hoop clamp 3122. In this embodiment, the long clamping hoop clamp 3131 and the short clamping hoop clamp 3132 are arranged on the same horizontal line.
[0103] The locking assembly 315 includes a locking plate 3151, a locking top plate 3152, an adjustment plate 3153 and a second connecting bolt 3154. The second connecting bolt 3154 passes through the angle steel 311 and the locking plate 3151 to lock the tower corner column 111 in the middle. The adjustment plate 3153 is used to adjust the distance between the tower corner column 111 and the angle steel 311.
[0104] In order to enable the guide rail attachment assembly 31 to be reliably connected to the tower structure 2, the locking assembly 315 in this embodiment is composed of a locking plate 3151, a locking top plate 3152, an adjustment pad 3153 and a second connecting bolt 3154. The second connecting bolt 3154 passes through the angle steel 311 and the locking plate 3151 to lock the tower corner column 111 in the middle, wherein the adjustment pad 3153 is used to adjust the distance between the tower corner column 111 and the angle steel 311.
[0105] Similarly, due to the installation height of the tower body structure 2, the configuration of the guide rail frame standard section 32 is also different. In this embodiment, since the maximum installation height of the tower body structure 2 is 45 meters, the height of the elevator guide rail 3 must be greater than 45 meters. In this embodiment, the final installation height of the elevator guide rail 3 is 47.8 meters, and the height of a single-section guide rail frame standard section 32 is 1508 mm, so a total of 31 sections are required.
[0106] Please see attached Fig.15 , 16 As shown in FIGS. 17 and 18, the walkway platform 6 can be designed into an L-shaped platform of different sizes according to the actual space on site to connect the main structure at different distances from the tower structure 2. The walkway platform 6 is connected to the tower structure 2 by welding the first connecting assembly 64 (two groups of connecting assemblies on the top surface) and the first connecting assembly 65 (two groups of connecting assemblies on the bottom surface) to the tower corner column 111, and the assembly top block is fixed to the connection assembly by a steel bolt. The assembly top block is detachable and is installed on the tower structure 2 according to different height requirements using the standard step position structure.
[0107] Specifically in the embodiment of the present invention, the main limb of the walkway platform 6 is made of 16# channel steel, and the limb is made of 10# channel steel. The longitudinal dimension of the lattice is 5650*2260*1716mm, and the transverse dimension of the lattice is 4510*2260*1613mm (including the overlapping part with the longitudinal direction). Steel plates with a thickness of 8mm and a material of Q235 are welded at the limb nodes.
[0108] The connection between the transverse lattice frame 61 and the longitudinal lattice frame 62 must be added with an internal scissor brace 63 in the longitudinal lattice frame 62. The main limb of the longitudinal lattice frame 62 within 2400mm near one end of the attached steel frame is added with a sealing plate to form a box-shaped structure. The sealing plate is made of 8mm thick steel plate, made of Q235
[0109] The size of the walkway platform can be flexibly designed according to space requirements, and multiple channels can be formed at the same time to lead to the main structure parts at different distances from the elevator. The channels can be disassembled and used in rotation, which is more flexible.
[0110] The construction elevator is a certain distance away from the main structure. An L-shaped walkway platform is designed to be fixed to the tower body through connecting components. One end of the L is connected to the construction elevator, and the other end extends to the main structure. People enter the walkway platform from the elevator car to reach the main structure. An outward-opening door that can only be opened from the elevator car side is set at the elevator car exit of the walkway platform to ensure the safe passage of personnel.
[0111] See also Fig.19 As shown, an embodiment of the present invention further provides a method for fixing and installing a non-wall-attached construction elevator, using the above-mentioned non-wall-attached construction elevator fixing device, and the fixing and installing method includes:
[0112] S 100: The foundation beam 11 and the pressure plate beam 13 are connected and fixed to the poured concrete foundation by using the anchoring glue and the threaded sleeve 15 to form the foundation reinforcement structure 1;
[0113] S 200: The tower body structure 2 and the elevator guide rail 3 are both fixed by the foundation reinforcement structure 1, and the elevator guide rail 3 is connected to the tower body structure 2 by a small distance attachment device, so that the forces of the tower body structure 2 and the elevator guide rail 3 are transmitted to the foundation through the foundation;
[0114] S 300: Install the elevator chassis 4 and the elevator box 5, the elevator box 5 is slidably connected to the side of the elevator guide rail 3 away from the tower structure 2, and realizes the vertical movement function up and down;
[0115] S 400: One end of the walkway platform 6 is connected to the tower structure 2 , and the other end is connected to the main structure at different distances from the tower structure 2 .
[0116] Specifically, see Figure 3 As shown, in the embodiment of the present invention, the embedded reinforcement 12 is a ribbed steel bar of HRB500 grade, the length of which is not less than 2000 mm, and the embedding depth in the concrete is 800 mm.
[0117] Preferably, a backing plate 14 is provided below the threaded sleeve 15 . The backing plate 14 is made of a thick steel plate with a length of 200 mm, a width of 200 mm, and a thickness of 20 mm. A hole with a diameter of 34 mm is opened on the backing plate 14 .
[0118] Specifically, see Figure 3 As shown, in the embodiment of the present invention, the short-distance attachment device is provided with seven paths, and the distance between each path of attachment does not exceed 6.5 meters.
[0119] Since the standard section 32 of the guide rail frame is fixed to the tower structure 2 through a small-distance attachment device, the first attachment is at 7.6m (height of the elevator guide rail frame). Considering the resistance to a level 15 typhoon, the attachment spacing is not more than 6.5m, and the hanging height above the attachment is not more than 5.2m. There are 7 attachments in total, which can be adjusted on site, but not more than this spacing requirement.
[0120] The construction elevator is independent of the main structure and is attached to the independent tower body (standard section of the finished product on the market) through the guide rail to achieve free lifting and has the ability to resist a typhoon of level 15. The elevator guide rail 3 is connected to the tower body through the attachment frame connection assembly. One end of the attachment frame is connected to the tower body, and the other end is connected to the standard section of the elevator guide rail frame.
[0121] Working process: Through the combination of foundation reinforcement and guide rails with independent attachment frames (tower bodies), self-stabilization measures are provided for the construction elevator. The elevator guide rails 3 are connected and fixed to the attachment frames to realize the vertical movement function up and down. The attachment frames and the elevator chassis 4 both transmit force to the foundation through the foundation, replacing the traditional force bearing method of the attached main structure with the force bearing method of the foundation. The construction elevator is a certain distance away from the main structure. The L-shaped walkway platform 6 is designed to be fixed to the tower body structure 2 through a connecting component. One end of the L-shaped walkway platform is connected to the construction elevator, and the other end extends to the main structure. People enter the walkway platform 6 from the elevator box to reach the main structure. The walkway platform 6 is provided with an outward opening door at the exit of the elevator box 5 that can only be opened from the side of the elevator box 5 to ensure the safe passage of people.
[0122] Although the present invention is disclosed as above, the protection scope of the present invention is not limited thereto. Those skilled in the art may make various changes and modifications without departing from the spirit and scope of the present invention, and these changes and modifications will fall within the protection scope of the present invention.
Claims
1. A non-wall-attached construction elevator fixing device, characterized in that: include: A foundation reinforcement structure (1) comprises a foundation beam (11), a rebar (12) planted on the periphery of the foundation beam (11), a plate beam (13) sleeved on the rebar (12), and a threaded sleeve (15) threadedly connected to the top of the rebar (12), wherein one end of the plate beam (13) is pressed on the foundation beam (11) and the other end is in contact with the threaded sleeve (15), and the bottom of the rebar (12) is buried in reinforced concrete; A tower body structure (2) is vertically arranged on the foundation reinforcement structure (1); An elevator guide rail (3) is arranged in parallel on one side of the tower body structure (2), and the elevator guide rail (3) is fixed to the tower body structure (2) at intervals in the vertical direction through a small-distance attachment device; The elevator guide rail (3) comprises a plurality of guide rail frame standard sections (32) vertically stacked and connected up and down, and a guide rail attachment assembly (31) for fixing the guide rail frame standard section (32) on the tower body structure (2), wherein the root of the guide rail frame standard section (32) at the bottom is threadedly connected to the embedded reinforcement (12); A walkway platform (6) has one side connected to the tower structure (2) and the other side connected to the main building structure.
2. The non-wall-attached construction elevator fixing device according to claim 1 is characterized in that: The elevator also comprises an elevator frame (4) and an elevator box (5), wherein the elevator box (5) is slidably connected to the side of the elevator guide rail (3) away from the tower structure (2), and the elevator frame (4) comprises a load-bearing beam (41) and a full-length pressure plate beam (42) which are vertically connected to each other, wherein the full-length pressure plate beam (42) is located at the bottom of the elevator guide rail (3), and the load-bearing beam (41) is suitable for being supported at the bottom of the elevator box (5).
3. The non-wall-attached construction elevator fixing device according to claim 1 is characterized in that: The tower structure (2) comprises a plurality of attachment frames (21) vertically stacked and connected up and down, a tower fixing assembly (22) for connecting two attachment frames (21), and a tower pre-embedded bolt assembly (23), wherein the tower pre-embedded bolt assembly (23) is suitable for connecting the roots of the attachment frames (21) to the foundation reinforcement structure (1) and the reinforced concrete.
4. The non-wall-attached construction elevator fixing device according to claim 1 is characterized in that: The foundation beam (11) is a double-layer tic-tac-toe structure.
5. The non-wall-attached construction elevator fixing device according to claim 3 is characterized in that: The attachment frame (21) comprises a vertical beam (211), a horizontal beam (212), an oblique support beam (213) and a rib plate (214); the four vertical beams (211) are respectively vertically arranged at the four corners of a square; the horizontal beams (212) are respectively horizontally connected to the top and middle positions of every two adjacent vertical beams (211); the two ends of the oblique support beam (213) are respectively connected to the intersection of the vertical beam (211) and the horizontal beam (212); and the rib plate (214) is connected to the connection between the vertical beam (211) and the base beam (11).
6. The non-wall-attached construction elevator fixing device according to claim 1 is characterized in that: The guide rail attachment assembly (31) comprises an angle steel (311), a hoop clamping plate (312), a hoop stiffening plate (313), a first connecting bolt (314) and a locking assembly (315); one side of the angle steel (311) is fixedly connected to the tower structure (2) via the locking assembly (315); The hoop clamp plate (312) comprises a long hoop clamp plate (3121) and a short hoop clamp plate (3122), and a semicircular hoop groove in a vertical direction is provided at the middle position of the opposite side of the long hoop clamp plate (3121) and the short hoop clamp plate (3122) to form a circular channel in a vertical direction, and the two ends of the long hoop clamp plate (3121) and the short hoop clamp plate (3122) are connected by the first connecting bolt (314); The hoop stiffening plate (313) comprises a long hoop stiffening plate (3131) and a short hoop stiffening plate (3132), and the long hoop stiffening plate (3131) and the short hoop stiffening plate (3132) are respectively connected to the positions of the long hoop clamping plate (3121) and the short hoop clamping plate (3122) facing the semicircular hoop groove.
7. The non-wall-attached construction elevator fixing device according to claim 6 is characterized in that: The locking assembly (315) comprises a locking plate (3151), a locking top plate (3152), an adjusting pad (3153) and a second connecting bolt (3154), wherein the second connecting bolt (3154) passes through the angle steel (311) and the locking plate (3151) to lock the tower corner column (111) in the middle, and the adjusting pad (3153) is used to adjust the distance between the tower corner column (111) and the angle steel (311).
8. A method for fixing and installing a non-wall-attached construction elevator, based on the non-wall-attached construction elevator fixing device according to any one of claims 2 to 7, characterized in that: The fixed installation method comprises: S 100: Using rebar embedding glue, the foundation beam (11) and the pressure plate beam (13) are connected and fixed on the poured concrete foundation by means of rebar embedding (12) and a threaded sleeve (15) to form a foundation reinforcement structure (1); S 200: The tower body structure (2) and the elevator guide rail (3) are both fixed via a foundation reinforcement structure (1), and the elevator guide rail (3) is connected to the tower body structure (2) via a small distance attachment device, so that the forces on the tower body structure (2) and the elevator guide rail (3) are both transmitted to the foundation via the foundation; S 300: An elevator chassis (4) and an elevator box (5) are installed, wherein the elevator box (5) is slidably connected to a side of the elevator guide rail (3) away from the tower structure (2) to achieve an up-and-down vertical movement function; S 400 : One end of the walkway platform (6) is connected to the tower structure (2), and the other end is connected to the main structure at different distances from the tower structure (2).
9. The method for fixing and installing a non-wall-attached construction elevator according to claim 8, characterized in that: The embedded reinforcement (12) is a HRB500 grade ribbed steel bar with a length of not less than 2000 mm and a depth of 800 mm in the concrete; and / or A backing plate (14) is provided below the threaded sleeve (15). The backing plate (14) is made of a thick steel plate with a length of 200 mm, a width of 200 mm and a thickness of 20 mm, and a hole with a diameter of 34 mm is opened on the backing plate (14).
10. The method for fixing and installing a non-wall-attached construction elevator according to claim 8, characterized in that: The short-distance attachment device is provided with seven tracks, and the distance between each track of attachment does not exceed 6.5 meters.