Dry quenching furnace pre-storage chamber gas treatment device and treatment method
Through the dry-extinguishing furnace pre-store room gas treatment device, high-temperature combustible gas is introduced into the annular air duct or primary dust collector and burned, solving the problem of explosion and overtemperature of the cooling system when filling red burn, improving safety and avoiding Corrosion and coke powder deposition of emergency discharge devices.
Patent Information
- Application Number
- CN202411194697.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-28
- Publication Date
- 2024-11-26
AI Technical Summary
During the process of filling the red coke in the dry-extinguishing furnace, the high-temperature combustible gases in the pre-stored room gather, causing explosions, and the inlet of the cooling system is prone to overtemperature, affecting safety.
A gas treatment device for pre-storage chamber of dry quench furnace is designed. The high-temperature combustible gas on the top of the pre-storage chamber is introduced into the annular air duct or primary dust collector through the high-temperature flue gas air conduit, and air is input through the middle bolt hole for combustion to prevent gas from passing through. The red hot coke layer reduces the combustion degree of coke powder, uses valves made of high-temperature resistant materials and emergency discharge devices, and uses inert gas to clean the coke powder in combination with the purge pipeline.
It effectively reduces the high-temperature combustible gas content at the top of the pre-store chamber, avoids explosions, reduces overtemperature at the entrance of the cooling system, improves safety, and avoids the low-temperature sulfur corrosion and coke powder deposition problems of emergency discharge devices.
Smart Images

Figure CN119020053A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of dry coke quenching production, and in particular to a gas treatment device and method for a pre-storage chamber of a dry coke quenching furnace. Background Art
[0002] As an environmentally friendly and energy-saving technology, coke dry quenching technology has been widely used in coking enterprises in recent years. The dry quenching furnace is the main cooling equipment of the coke dry quenching device. The upper part of the dry quenching furnace is the pre-storage chamber, the middle is the ramp area, and the lower part is the cooling chamber. The periphery of the straight section of the pre-storage chamber is a circular air duct connected to the ramp area of the dry quenching furnace. The circular air duct is connected to the inlet of the primary dust collector, the outlet of the primary dust collector is connected to the inlet of the cooling system, and the outlet of the cooling system is connected to the cooling chamber. When the dry quenching furnace is working, the circulating gas is introduced from the cooling chamber, and after heat exchange with the high-temperature red coke, it enters the cooling system after the circular air duct and the primary dust collector, and then the cooled circulating gas is introduced into the cooling chamber to cool the red coke.
[0003] Since the CDQ furnace needs to open the top furnace cover intermittently to load red coke during the production process, in this process, the high-temperature gas in the pre-storage chamber is replaced by the red coke out of the CDQ furnace, and the residual volatiles (mainly CO and H2) in the red coke loaded into the pre-storage chamber are constantly precipitated and accumulated in large quantities in the space at the top of the pre-storage chamber. If there is a problem with production control, when the furnace cover is opened, safety problems such as explosions are likely to occur; moreover, the high-temperature combustible gas in the upper part of the pre-storage chamber will pass through the red-hot coke layer and enter the annular air duct together with the circulating gas. In order to reduce the content of combustible gas components in the circulating gas of the CDQ system, air is generally introduced into the middle bolt hole on the annular air duct to react with CO and H2 in the circulating gas in the annular air duct. However, the high-temperature combustible gas at the top of the pre-storage chamber carries a large amount of coke powder when passing through the red-hot coke layer. The coke powder burns in the annular air duct to generate a large amount of heat, which easily leads to overheating of the inlet of the CDQ cooling system. Therefore, it is urgent to solve the problem of explosion caused by the accumulation of high-temperature combustible gas at the top of the pre-storage chamber and overheating of the cooling system inlet. Summary of the invention
[0004] The purpose of the present invention is to provide a gas treatment device and method for the pre-storage chamber of a dry quenching furnace to solve the problems existing in the above-mentioned prior art, prevent explosion when filling red coke, and avoid overheating at the inlet of the cooling system, which is safer.
[0005] To achieve the above object, the present invention provides the following solutions:
[0006] A gas treatment device for a dry quenching furnace pre-storage chamber comprises: a dry quenching furnace, a primary dust collector, a cooling system and a high-temperature flue gas duct, wherein an annular air duct connected to the interior of the dry quenching furnace is arranged outside the dry quenching furnace pre-storage chamber, the inlet of the primary dust collector is connected to the annular air duct, the outlet of the primary dust collector is connected to the inlet of the cooling system, the outlet of the cooling system is connected to the cooling chamber of the dry quenching furnace, the annular air duct is provided with a first middle bolt hole, the first middle bolt hole is used to input air, one end of the high-temperature flue gas duct is connected and communicated with the top of the dry quenching furnace pre-storage chamber, and the other end is connected and communicated with the annular air duct and / or the inlet of the primary dust collector.
[0007] Preferably, the high-temperature flue gas air duct includes a first air duct, a second air duct and a third air duct, one end of the first air duct is connected to and communicated with the top of the dry quenching furnace pre-storage chamber, one end of the second air duct is connected to and communicated with an end of the first air duct away from the dry quenching furnace, and the other end is connected to and communicated with the primary dust collector, one end of the third air duct is connected to and communicated with an end of the first air duct away from the dry quenching furnace, and the other end is connected to and communicated with the annular air duct.
[0008] Preferably, the second air duct and the third air duct are both provided with valves.
[0009] Preferably, the valves are all made of high temperature resistant material.
[0010] Preferably, the annular air duct also has a second center bolt hole, and the end of the third air duct away from the first air duct is connected and communicated with the second center bolt hole; the primary dust collector is provided with a high-temperature flue gas inlet, and the high-temperature flue gas inlet is connected and communicated with the end of the second air duct away from the first air duct.
[0011] Preferably, an emergency relief device is also included, which includes a working module and a connecting pipe, one end of the connecting pipe is connected to the top of the dry quenching furnace pre-storage chamber, and the other end of the connecting pipe is connected to the working module, and the connecting pipe forms the first air duct.
[0012] Preferably, it also includes a purge pipeline, one end of which is connected to and communicated with the high-temperature flue gas duct, and the other end is used for introducing nitrogen.
[0013] Preferably, the high-temperature flue gas air duct also includes a connecting duct, one end of the connecting duct is connected to an end of the first air duct away from the dry quenching furnace, and the other end has two interfaces, one interface is connected and connected to an end of the second air duct away from the primary dust collector, and the other interface is connected and connected to an end of the third air duct away from the annular air duct, the purge pipeline includes a main pipeline, a first purge pipeline, a second purge pipeline and a third purge pipeline, one end of the first purge pipeline is connected and connected to a position of the connecting duct close to the first air duct, and the other end is connected and connected to the main pipeline; one end of the second purge pipeline is connected and connected to a position of the second air duct close to the primary dust collector, and the other end is connected and connected to the main pipeline, one end of the third purge pipeline is connected and connected to a position of the third air duct close to the annular air duct, and the other end is connected to the main pipeline.
[0014] Preferably, the high-temperature flue gas duct is made of high-temperature resistant metal material.
[0015] The present invention also provides a method for treating gas in a dry quenching furnace pre-storage chamber, comprising the following steps: introducing the gas at the top of the dry quenching furnace pre-storage chamber into a primary dust collector and / or an annular air duct through a high-temperature flue gas duct, and introducing air into the annular air duct through a first middle bolt hole.
[0016] Compared with the prior art, the present invention has achieved the following technical effects:
[0017] The dry quenching furnace pre-storage chamber gas processing device provided by the present invention has the high-temperature combustible gas on the top of the dry quenching furnace being led out of the dry quenching furnace. When the furnace cover is opened to load red coke, the content of the high-temperature combustible gas on the top of the pre-storage chamber is reduced, that is, explosion is less likely to occur; and the high-temperature combustible gas is directly led out from the top of the dry quenching furnace without passing through the red coke layer in the pre-storage chamber, thereby reducing the coke powder content in the high-temperature combustible gas. This method of quickly leading out the gas from the pre-storage chamber reduces the degree of coke powder combustion, avoids overheating of the dry quenching boiler inlet, and is safer.
[0018] Furthermore, the high-temperature combustible gas is continuously discharged from the connecting pipe of the emergency relief device, thereby avoiding the problems of low-temperature sulfur corrosion and coke powder deposition in the emergency relief pipe, which is more conducive to production. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0020] Figure 1A schematic diagram of the structure of the dry quenching furnace provided by the present invention;
[0021] Figure 2 for Figure 1 A partial enlarged view of the middle A;
[0022] In the figure: 1- dry quenching furnace, 2- annular air duct, 3- primary dust collector, 4- cooling system, 5- high-temperature flue gas duct, 51- first duct, 52- second duct, 53- third duct, 54- valve, 55- connecting duct, 6- purge pipeline, 61- main pipeline, 62- first purge pipeline, 63- second purge pipeline, 64- third purge pipeline, 7- emergency release device. DETAILED DESCRIPTION
[0023] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0024] The purpose of the present invention is to provide a gas treatment device and method for the pre-storage chamber of a dry quenching furnace to solve the problems existing in the above-mentioned prior art, prevent explosion when filling red coke, and avoid overheating at the inlet of the cooling system, which is safer.
[0025] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.
[0026] Embodiment 1
[0027] This embodiment provides a gas treatment device for the pre-storage chamber of a CDQ furnace, such as Figure 1-2 As shown, it includes: a dry quenching furnace 1, a primary dust collector 3, a cooling system 4 and a high-temperature flue gas duct 5. An annular air duct 2 connected to the inside of the dry quenching furnace 1 is arranged outside the pre-storage chamber of the dry quenching furnace 1. The inlet of the primary dust collector 3 is connected to the annular air duct 2, and the outlet of the primary dust collector 3 is connected to the inlet of the cooling system 4. The outlet of the cooling system 4 is connected to the cooling chamber of the dry quenching furnace 1. The annular air duct 2 has a first middle bolt hole, and the first middle bolt hole is used to input air. One end of the high-temperature flue gas duct 5 is connected and communicated with the top of the pre-storage chamber of the dry quenching furnace 1, and the other end is connected and communicated with the inlet of the annular air duct 2 and / or the primary dust collector 3.
[0028] The present embodiment provides a gas treatment device for the pre-storage chamber of the dry quenching furnace. The high-temperature combustible gas can enter the bolt hole in the annular air duct 2 and / or the entrance of the primary dust collector 3 through the high-temperature flue gas duct 5 and burn after contacting with the air introduced into the annular air duct. The burned gas can enter the cooling system and be re-blown into the cooling chamber to cool the red coke after cooling down. Since the high-temperature combustible gas at the top of the dry quenching furnace 1 is led out of the dry quenching furnace 1, when the furnace cover is opened to load the red coke, the content of the high-temperature combustible gas at the top of the pre-storage chamber is reduced, that is, it is not easy to have a blast; and the high-temperature combustible gas is directly led out of the top of the dry quenching furnace 1 without passing through the red coke layer in the pre-storage chamber, which reduces the coke powder content in the high-temperature combustible gas. This rapid lead-out method reduces the degree of coke powder combustion, avoids overheating at the entrance of the cooling system 4, and is safer. Among them, the cooling system 4 is composed of a dry quenching boiler, a secondary dust collector, a feedwater preheater (heat pipe heat exchanger) and other equipment, which are all prior art, so they are not repeated.
[0029] In a preferred implementation of the present embodiment, the high-temperature flue gas duct 5 includes a first duct 51, a second duct 52 and a third duct 53, one end of the first duct 51 is connected and communicated with the top of the pre-storage chamber of the dry quenching furnace 1, one end of the second duct 52 is connected with the end of the first duct 51 away from the dry quenching furnace 1, and the other end is connected and communicated with the primary dust collector 3, one end of the third duct 53 is connected with the end of the first duct 51 away from the dry quenching furnace 1, and the other end is connected and communicated with the annular air duct 2. During the production process of dry quenching coke, the high-temperature combustible gas at the top of the dry quenching furnace 1 enters the second duct 52 and / or the third duct 53 through the first duct 51, and is passed into the annular air duct 2 and / or the primary dust collector 3.
[0030] In a preferred implementation of the present embodiment, valves 54 are provided on both the second air duct 52 and the third air duct 53. The valves 54 on the second air duct 52 and the third air duct 53 can respectively control the opening and closing of the second air duct 52 and the third air duct 53, so as to adapt to different gas flow conditions. For example, when the flow rate of the high-temperature combustible gas is small, only the valve 54 on the third air duct 53 can be opened, and the high-temperature combustible gas can be introduced into the annular air duct 2 for processing. When the gas flow rate is large, both valves 54 can be opened to simultaneously introduce the high-temperature combustible gas into the annular air duct 2 and the primary dust collector 3 for processing.
[0031] In order to ensure that each valve 54 can be used normally, in a preferred implementation manner of this embodiment, the valves 54 are all made of high temperature resistant material.
[0032] In order to facilitate the extraction of high-temperature combustible gas from the top of the pre-storage chamber, in a preferred implementation manner of this embodiment, the annular air duct 2 is also provided with a second center bolt hole, and the end of the third air duct 53 away from the first air duct 51 is connected to and communicated with the second center bolt hole; a high-temperature flue gas inlet is provided on the primary dust collector 3, and the high-temperature flue gas inlet is connected to and communicated with the end of the second air duct 52 away from the first air duct 51.
[0033] In a preferred implementation of this embodiment, an emergency relief device 7 is also included. The emergency relief device 7 includes a working module and a connecting pipe. One end of the connecting pipe is connected to the top of the pre-storage chamber of the dry quenching furnace 1, and the other end of the connecting pipe is connected to the working module. The connecting pipe forms a first air duct 51. A control valve is provided on the connecting pipe in the existing emergency relief device 7. Only when the emergency relief device 7 needs to be started, the control valve will be opened and the working module will be used to exhaust and reduce the pressure of the dry quenching furnace 1. After the emergency relief device 7 is used, the control valve is closed. The gas discharged from the dry quenching furnace 1 contains a small amount of coke powder, which is easy to deposit in the connecting pipe. As the temperature of the pipeline decreases, the temperature below the dew point will cause low-temperature sulfur corrosion in the connecting pipe, thereby causing damage to the emergency relief device 7. After the connecting pipe is set as the first air duct 51, since the high-temperature combustible gas continuously flows in the first air duct 51, the first air duct 51 can maintain a relatively high temperature, which can prevent the emergency relief device 7 from low-temperature sulfur corrosion and coke powder deposition.
[0034] In a preferred implementation of the first embodiment of the present invention, the present invention further includes a purge pipeline 6, one end of which is connected and communicated with the high-temperature flue gas duct 5, and the other end is used to introduce an inert gas. Since the high-temperature combustible gas introduced into the high-temperature flue gas duct 5 still contains a small amount of coke powder, when the coke powder content is high, it is easy to deposit in the pipeline and cause blockage. The inert gas introduced into the high-temperature flue gas duct 5 through the purge pipeline 6 can clean the deposited coke powder and avoid blockage. Among them, the inert gas is preferably nitrogen.
[0035] In a preferred implementation manner of the present embodiment, the high-temperature flue gas air duct 5 also includes a connecting duct 55, one end of the connecting duct 55 is connected to an end of the first air duct 51 away from the dry quenching furnace 1, and the other end has two interfaces, one interface is connected and communicated with an end of the second air duct 52 away from the primary dust collector 3, and the other interface is connected and communicated with an end of the third air duct 53 away from the annular air duct 2, and the purge pipeline 6 includes a main pipeline 61, a first purge pipeline 62, a second purge pipeline 63 and a third purge pipeline 64, one end of the first purge pipeline 62 is connected and communicated with a position of the connecting duct 55 close to the first air duct 51, and the other end is connected and communicated with the main pipeline 61; one end of the second purge pipeline 63 is connected and communicated with a position of the second air duct 52 close to the primary dust collector 3, and the other end is connected and communicated with the main pipeline 61, one end of the third purge pipeline 64 is connected to a position of the third air duct 53 close to the annular air duct 2, and the other end is connected to the main pipeline 61. Since coke powder is more likely to clog the connection between pipelines, arranging the purge pipeline 6 near the connection between pipelines can improve the purge effect. Among them, the main pipeline 61, the first purge pipeline 62, the second purge pipeline 63 and the third purge pipeline 64 are all provided with control valves.
[0036] In a preferred implementation of this embodiment, the high-temperature flue gas duct 5 is made of high-temperature resistant material.
[0037] Embodiment 2
[0038] The present embodiment also provides a method for treating gas in a pre-storage chamber of a dry quenching furnace, comprising the following steps: introducing the gas at the top of the pre-storage chamber of the dry quenching furnace into a primary dust collector and / or an annular air duct through a high-temperature flue gas duct, and introducing air into the annular air duct through a first middle bolt hole.
[0039] The present invention uses specific examples to illustrate the principles and implementation methods of the present invention. The above examples are only used to help understand the method and core ideas of the present invention. At the same time, for those skilled in the art, according to the ideas of the present invention, there will be changes in the specific implementation methods and application scopes. In summary, the content of this specification should not be understood as limiting the present invention.
Claims
1. A gas treatment device for a pre-storage chamber of a dry quenching furnace, comprising: A dry quenching furnace, a primary dust collector and a cooling system, wherein an annular air duct connected to the interior of the dry quenching furnace is arranged outside the dry quenching furnace pre-storage chamber, the inlet of the primary dust collector is connected to the annular air duct, the outlet of the primary dust collector is connected to the inlet of the cooling system, the outlet of the cooling system is connected to the cooling chamber of the dry quenching furnace, the annular air duct has a first middle bolt hole, the first middle bolt hole is used to input air, and is characterized in that: it also includes: a high-temperature flue gas duct, one end of the high-temperature flue gas duct is connected and communicated with the top of the dry quenching furnace pre-storage chamber, and the other end is connected and communicated with the annular air duct and / or the inlet of the primary dust collector.
2. The CDQ furnace pre-chamber gas treatment device according to claim 1, characterized in that: The high-temperature flue gas air duct includes a first air duct, a second air duct and a third air duct, one end of the first air duct is connected to and communicated with the top of the dry quenching furnace pre-storage chamber, one end of the second air duct is connected to and communicated with the end of the first air duct away from the dry quenching furnace, and the other end is connected to and communicated with the primary dust collector, one end of the third air duct is connected to and communicated with the end of the first air duct away from the dry quenching furnace, and the other end is connected to and communicated with the annular air duct.
3. The CDQ furnace pre-chamber gas treatment device according to claim 2, characterized in that: The second air duct and the third air duct are both provided with valves.
4. The CDQ furnace pre-chamber gas treatment device according to claim 3 is characterized in that: The valves are all made of high temperature resistant materials.
5. The CDQ furnace pre-chamber gas treatment device according to claim 2, characterized in that: The annular air duct also has a second center bolt hole, and the end of the third air duct away from the first air duct is connected and communicated with the second center bolt hole; the primary dust collector is provided with a high-temperature flue gas inlet, and the high-temperature flue gas inlet is connected and communicated with the end of the second air duct away from the first air duct.
6. The dry quenching furnace pre-chamber gas treatment device according to claim 2, further comprising an emergency relief device, the emergency relief device comprising a working module and a connecting pipe, one end of the connecting pipe is connected to the top of the dry quenching furnace pre-chamber, and the other end of the connecting pipe is connected to the working module, characterized in that: The connecting tube forms the first air duct.
7. The CDQ furnace pre-chamber gas treatment device according to claim 2, characterized in that: It also includes a purge pipeline, one end of which is connected and communicated with the high-temperature flue gas duct, and the other end is used for introducing nitrogen.
8. The gas treatment device for the pre-storage chamber of a CDQ furnace according to claim 7, characterized in that: The high-temperature flue gas air duct also includes a connecting duct, one end of the connecting duct is connected to an end of the first air duct away from the dry quenching furnace, and the other end has two interfaces, one interface is connected and connected to an end of the second air duct away from the primary dust collector, and the other interface is connected and connected to an end of the third air duct away from the annular air duct, the purge pipeline includes a main pipeline, a first purge pipeline, a second purge pipeline and a third purge pipeline, one end of the first purge pipeline is connected and connected to a position of the connecting duct close to the first air duct, and the other end is connected and connected to the main pipeline; one end of the second purge pipeline is connected and connected to a position of the second air duct close to the primary dust collector, and the other end is connected and connected to the main pipeline, one end of the third purge pipeline is connected and connected to a position of the third air duct close to the annular air duct, and the other end is connected to the main pipeline.
9. The CDQ furnace pre-chamber gas treatment device according to claim 1, characterized in that: The high-temperature flue gas guide pipe is made of high-temperature resistant metal material.
10. A method for treating gas in a pre-storage chamber of a dry quenching furnace, characterized in that: The following steps are involved: The gas at the top of the CDQ furnace pre-storage chamber is introduced into the primary dust collector and / or the annular air duct through the high-temperature flue gas duct, and air is introduced into the annular air duct through the first middle bolt hole.
