Architectural decoration engineering management system based on artificial intelligence

Through the building decoration engineering management system based on artificial intelligence, the construction progress and status are monitored using BIM models, and timely reminding and dispatching decoration personnel to solve the problems of building decoration engineering supervision and ensuring the construction progress and quality.

CN119027278AInactive Publication Date: 2024-11-26HOME (SHENZHEN) HOUSING RENTAL CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411134522.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-19
Publication Date
2024-11-26
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

It is difficult for building decoration projects to continuously supervise the construction process, especially the difficulty in monitoring the internal quality in real time, resulting in the inability to modify some projects that fail to meet the standards in a timely manner, affecting the construction progress and quality.

Method used

The building decoration engineering management system based on artificial intelligence, including the decoration engineering monitoring module, the reconstruction module and the stage engineering scheduling module, periodically analyzes the construction progress and status through the BIM model, promptly reminds the reconstruction, and reasonably dispatches decoration personnel to ensure construction quality. .

Benefits of technology

Real-time monitoring and quality assurance of building decoration projects have been achieved, timely reminding re-construction, reasonable dispatch of decoration personnel to ensure construction progress and quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119027278A_ABST
    Figure CN119027278A_ABST
Patent Text Reader

Abstract

The invention discloses a building decoration engineering management system based on artificial intelligence, relates to the technical field of building decoration engineering, and discloses a decoration engineering monitoring module, a reconstruction module and a stage engineering scheduling module. The building decoration engineering is periodically analyzed through the BIM model, the decoration construction progress and state of the building decoration engineering are known, when the state of the decoration engineering goes wrong, a decoration person is reminded to reconstruct the decoration engineering in time, a stage engineering scheduling module is arranged, all stages of the building decoration engineering can be monitored, and the construction efficiency is improved. And the construction qualification of the decoration personnel is timely canceled according to the monitoring result, and the corresponding decoration personnel are reasonably scheduled to perform decoration construction, so that the progress of the building decoration project is ensured, the construction quality of the building decoration project is ensured, and the reasonable scheduling of the decoration personnel in the building decoration project is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of building decoration engineering, and more specifically, to a building decoration engineering management system based on artificial intelligence. Background Art

[0002] Building decoration projects are projects that use decorative materials to treat the internal and external surfaces or spaces of buildings. Building decoration projects need to be constructed in a basic order, such as the first step: the main demolition and modification stage (including wall demolition, wall construction, wall scraping, etc.), the second step: the water and electricity modification stage (including threading, line modification, burying the bottom box, etc.), the third step: the carpentry stage (including the production and installation of wooden products such as ceilings, background walls, cabinets, etc.), the fourth step is the tile work stage (including tiling, waterproofing, etc.), and the fifth step is the painting stage (including scraping putty, wall construction, leveling, etc.).

[0003] At present, it is difficult to continuously supervise the construction process of building decoration projects. Usually, acceptance is carried out after each stage is completed. This acceptance method can often only inspect the surface of the decoration project, but it is difficult to inspect the inside of the decoration project. In addition, some projects that do not meet the standards cannot be modified, or modifications will greatly delay the construction period. How to ensure the construction quality of building decoration projects while ensuring the progress of building decoration construction is a problem that needs to be solved urgently. Summary of the invention

[0004] In view of the deficiencies in the prior art, the purpose of the present invention is to provide an architectural decoration project management system based on artificial intelligence.

[0005] To achieve the above object, the present invention provides the following technical solutions: Artificial intelligence-based building decoration project management system, including decoration project monitoring module, re-construction module, and stage project scheduling module; The decoration project monitoring module is used to regularly generate building decoration records for building decoration projects; The re-construction module is used to determine whether to remind the decoration staff to re-construct according to the comparison result of the decoration evaluation value recorded in the building decoration and its threshold value; The stage engineering scheduling module determines whether it is necessary to schedule decorators according to the comparison result between the decoration impact value of the building decoration project and its threshold value, and selects appropriate decorators for scheduling.

[0006] Furthermore, a BIM model of the building is constructed before the decoration project begins. After the decoration project begins, the BIM model of the building is updated every r time period, and the building decoration record of the building is generated after the update.

[0007] Furthermore, the building decoration record includes decoration stage, stage decoration progress, model update time, and decoration evaluation value.

[0008] Furthermore, the decoration evaluation value is obtained in the following manner: basic decoration data of the building at the decoration stage is obtained according to the updated BIM model, the basic decoration data of the building at the decoration stage is used as input data of the corresponding decoration evaluation model, and the decoration evaluation model outputs the decoration evaluation value.

[0009] Furthermore, based on the comparison result between the decoration evaluation value of the building decoration record and its threshold, it is determined whether to remind the decorators to re-construct. Specifically, a decoration evaluation threshold is set. When the decoration evaluation value of the building decoration record is less than the decoration evaluation threshold, the decorators at that decoration stage are reminded to re-construct the decoration that does not meet the standards, and the building decoration record is deleted simultaneously. After the decorators re-construct the decoration that does not meet the standards, a redecoration record of the building decoration project is generated and marked as JLi, where i is the sequential number of the redecoration record, i=1, 2, ..., N, N is a positive integer, and the redecoration record includes the decoration stage, decoration start time, and decoration completion time.

[0010] Furthermore, the decoration stage of the building decoration project is obtained, and then the decoration impact value of the building decoration project in this decoration stage is obtained, and a decoration impact threshold is set. When the decoration impact value is greater than or equal to the decoration impact threshold, the construction qualification of the decoration personnel in this decoration stage is cancelled, and the decoration project is marked as a decoration delayed project.

[0011] Furthermore, the decoration impact value of the building decoration project in the decoration stage is obtained by the following method: obtain all the redecoration records of the building decoration project in the decoration stage, mark the total number of redecoration records as DGT, calculate the time difference between the decoration completion time and the decoration start time of the redecoration records to obtain the decoration delay time, sum the decoration delay time to obtain the total decoration delay time, and mark it as PCS, sort all the redecoration records in numerical order, calculate the time difference between the decoration start time of the next redecoration record after sorting and the decoration completion time of the previous redecoration record to obtain the delay interval, sum all the delay intervals and take the average to obtain the average delay interval, and mark it as NCR, and use the formula The decoration impact value SEX of the building decoration project in this decoration stage is obtained, where a1 is the coefficient of the number of redecoration records, a2 is the coefficient of the total decoration delay duration, and a3 is the coefficient of the average delay interval.

[0012] Furthermore, appropriate decoration personnel are selected for scheduling, specifically: taking the location of the building where the delayed decoration project is located as the center, draw a circle with a preset radius to obtain the scheduling range of the decoration personnel, mark the decoration projects of the remaining buildings within the scheduling range of the decoration personnel as preliminary decoration projects, obtain the decoration stage of the preliminary decoration projects, mark the preliminary decoration projects that are in the same decoration stage as the delayed decoration project as secondary decoration projects, obtain the stage evaluation value of the secondary decoration projects, set the stage evaluation threshold, when the stage evaluation value of the secondary decoration project is greater than or equal to the stage evaluation threshold, mark the secondary decoration project as the final decoration project, obtain the stage scheduling value of the final decoration project, mark the final decoration project with the largest stage scheduling value as the final decoration project, and dispatch the decoration personnel of the final decoration project at this decoration stage to the delayed decoration project for decoration construction.

[0013] Furthermore, the stage evaluation of the secondary decoration project is obtained in the following way: obtain all redecoration records and all building decoration records of the secondary decoration project in the decoration stage, mark the total number of redecoration records as ERP, sort all building decoration records in the order of model update time, calculate the difference between the stage decoration progress of two adjacent building decoration records after sorting, obtain the stage progress value, set the stage progress threshold, when the stage progress value is greater than or equal to the stage progress threshold, increase the number of over-progress times of the decoration stage by one, sum the number of over-progress times of the decoration stage, obtain the total number of over-progress times, and mark it as SJY, calculate the difference between the decoration evaluation values ​​of two adjacent building decoration records after sorting and take the absolute value, obtain the decoration evaluation variable value, set the decoration evaluation threshold variable value, when the decoration evaluation variable value is greater than or equal to the decoration evaluation threshold variable value, increase the number of evaluation fluctuations of the decoration stage by one, sum the number of evaluation fluctuations of the decoration stage, obtain the total number of evaluation fluctuations, and mark it as FSB, and use the formula The stage evaluation value SXH of the second-choice decoration project is obtained, where b1 is the coefficient of the number of redecoration records, b2 is the coefficient of the total number of overschedule times, and b3 is the coefficient of the total number of evaluation fluctuations.

[0014] Furthermore, the stage scheduling value of the selected decoration project is obtained by the following method: the distance difference between the building location of the selected decoration project and the building location of the decoration delay project is calculated to obtain the scheduling distance difference, which is marked as EQW, and the stage evaluation value of the selected decoration project is obtained. The stage scheduling value BKC of the selected decoration project is obtained, where c1 is the stage evaluation coefficient and c2 is the scheduling distance difference coefficient.

[0015] Compared with the prior art, the present invention has the following beneficial effects: 1. Set up a decoration project monitoring module and a re-construction module, and periodically analyze the building decoration project through the BIM model to understand the decoration construction progress and status of the building decoration project. When there is a problem with the status of the decoration project, promptly remind the decoration staff to re-construct the decoration project; 2. Set up a phase project scheduling module to monitor each stage of the building decoration project, cancel the construction qualifications of the decorators in a timely manner according to the monitoring results, and reasonably schedule the corresponding decorators to carry out decoration construction, so as to ensure the progress of the building decoration project while ensuring the construction quality of the building decoration project and the reasonable scheduling of the decorators in the building decoration project. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 A flowchart to remind decorators to re-construct the decoration project; Figure 2 This is a flowchart for scheduling decoration personnel. DETAILED DESCRIPTION Example

[0017] Reference Figure 1 , an artificial intelligence-based building decoration project management system, including decoration project monitoring module and re-construction module.

[0018] Decoration project monitoring module: construct the BIM model of the building. After the decoration project starts, the BIM model of the building is updated every r period of time. After the update, the building decoration record of the building is generated. The building decoration record includes the decoration stage (i.e. the decoration construction stage), stage decoration progress (i.e. the progress of the decoration construction in this stage), model update time (i.e. the update time of the BIM model), and decoration evaluation value.

[0019] The decoration evaluation value is obtained in the following way: according to the updated BIM model, the basic decoration data of the building at that stage of decoration is obtained (for example, in the carpentry stage, the surface flatness of the ceiling at that stage, the height difference of the joints and other data are obtained; different decoration stages correspond to different basic decoration data), and the basic decoration data of the building at that stage of decoration is used as the input data of the corresponding decoration evaluation model (each decoration stage corresponds to a decoration evaluation model), and the decoration evaluation model outputs the decoration evaluation value.

[0020] Example: The decoration evaluation model of the carpentry stage is obtained in the following way: multiple groups of basic decoration data of the carpentry stage are obtained (each group of basic decoration data includes the surface flatness of the ceiling, the height difference of the joints, the straightness of the joints, the verticality of the facade of the background wall, the width of the joints and other data), each group of basic decoration data of the carpentry stage can be real recorded data or virtual set data, and different labels are assigned to each group of basic decoration data of the carpentry stage, and the labels are decoration evaluation values. Multiple groups of basic decoration data of the carpentry stage are divided into training sets and verification sets. The setting ratio of the training set and the verification set can be set and adjusted according to the needs, and the decoration evaluation model of the carpentry stage is obtained through iterative training of the neural network. The value of the decoration evaluation value is greater than zero, where the larger the value of the decoration evaluation value, the more the decoration construction of the carpentry stage meets the standard, and the smaller the value of the decoration evaluation value, the less the decoration construction of the carpentry stage meets the standard.

[0021] The BIM model of a building is obtained in the following way: collect the basic data of the building, which includes land data, topographic maps, and planning permits; clean the collected basic data; use modeling software such as Revit and Archicad to model the building framework; and then gradually establish model components in the building. Model components include walls, columns, beams, floor slabs, windows, etc.; establish the relationship between model components, and finally complete the construction of the BIM model of the building.

[0022] Reconstruction module: Set the decoration evaluation threshold. The decoration evaluation threshold is the system setting threshold and can be modified according to actual needs.

[0023] When the decoration evaluation value of the building decoration record is greater than or equal to the decoration evaluation threshold, no corresponding processing is performed.

[0024] When the decoration evaluation value of the building decoration record is less than the decoration evaluation threshold, the decorators at that decoration stage are reminded to re-construct the decoration that does not meet the standards, and the building decoration record is deleted simultaneously. After the decorators re-construct the decoration that does not meet the standards, a redecoration record of the building decoration project is generated and marked as JLi, where i is the sequential number of the redecoration record, i=1, 2, ..., N, where N is a positive integer, and the redecoration record includes the decoration stage, decoration start time, and decoration completion time.

[0025] Set up a decoration project monitoring module and a re-construction module, and use the BIM model to periodically analyze the building decoration project to understand the decoration construction progress and status of the building decoration project. When there is a problem with the status of the decoration project, promptly remind the decoration personnel to re-construct the decoration project. Example

[0026] Reference Figure 2On the basis of the embodiment, it also includes a phase engineering scheduling module, which obtains the decoration stage of the building decoration project, and then obtains the decoration impact value of the building decoration project in the decoration stage, and sets the decoration impact threshold. The decoration impact threshold is a system-set threshold and can be modified according to actual needs.

[0027] When the decoration impact value is less than the decoration impact threshold, no corresponding processing is performed. When the decoration impact value is greater than or equal to the decoration impact threshold, the construction qualification of the decorator at this decoration stage is cancelled, and the decoration project is marked as a delayed decoration project. With the location of the building where the delayed decoration project is located as the center, a circle is drawn with a preset radius to obtain the dispatch range of the decorator. The decoration projects of the remaining buildings within the dispatch range of the decorator are marked as preliminary decoration projects, the decoration stage of the preliminary decoration project is obtained, the preliminary decoration project at the same decoration stage as the delayed decoration project is marked as a secondary decoration project, the stage evaluation value of the secondary decoration project is obtained, and the stage evaluation threshold is set. The stage evaluation threshold is a system-set threshold and can be modified according to actual needs. When the stage evaluation value of the secondary decoration project is greater than or equal to the stage evaluation threshold, the secondary decoration project is marked as a final decoration project, the stage scheduling value of the final decoration project is obtained, the final decoration project with the largest stage scheduling value is marked as the final decoration project, and the decorator of the final decoration project at this decoration stage is dispatched to the delayed decoration project for decoration construction.

[0028] The decoration impact value of the building decoration project in this decoration stage is obtained by the following method: obtain all the redecoration records of the building decoration project in this decoration stage, mark the total number of redecoration records as DGT, calculate the time difference between the decoration completion time and the decoration start time of the redecoration records to obtain the decoration delay time, sum the decoration delay time to obtain the total decoration delay time, and mark it as PCS, sort all the redecoration records in numerical order, calculate the time difference between the decoration start time of the next redecoration record after sorting and the decoration completion time of the previous redecoration record to obtain the delay interval, sum all the delay intervals and take the average to obtain the average delay interval, and mark it as NCR, using the formula The decoration impact value SEX of the building decoration project in this decoration stage is obtained, where a1 is the coefficient of the number of redecoration records, a2 is the coefficient of the total decoration delay duration, and a3 is the coefficient of the average delay interval. The value of a1 is 0.39, the value of a2 is 0.26, and the value of a3 is 0.89.

[0029] The stage evaluation of the secondary decoration project is obtained in the following way: obtain all the redecoration records and all the building decoration records of the secondary decoration project in the decoration stage, mark the total number of redecoration records as ERP, sort all the building decoration records in the order of model update time, calculate the difference between the stage decoration progress of the two adjacent building decoration records after sorting, and obtain the stage progress value, set the stage progress threshold, the stage progress threshold is the system set threshold, which can be modified according to actual needs, when the stage progress value is greater than or equal to the stage progress threshold, the number of over-progress of the decoration stage is increased once, when the stage progress value is less than the stage progress threshold, no corresponding processing is performed, the number of over-progress of the decoration stage is summed up to obtain the total number of over-progress, and marked as SJY, calculate the difference between the decoration evaluation values ​​of the two adjacent building decoration records after sorting and take the absolute value, obtain the decoration evaluation variable value, set the decoration evaluation threshold variable value, the decoration evaluation threshold variable value is the system set threshold, which can be modified according to actual needs.

[0030] When the decoration evaluation change value is greater than or equal to the decoration evaluation threshold change value, the evaluation fluctuation times of the decoration stage are increased by one. When the decoration evaluation change value is less than the decoration evaluation threshold change value, no corresponding processing is performed.

[0031] The number of evaluation fluctuations in the decoration stage is summed up to obtain the total number of evaluation fluctuations, which is marked as FSB. The stage evaluation value SXH of the second-choice decoration project is obtained, where b1 is the coefficient of the number of redecoration records, b2 is the coefficient of the total number of overschedule times, and b3 is the coefficient of the total number of evaluation fluctuations. The value of b1 is 0.98, the value of b2 is 5.68, and the value of b3 is 1.23.

[0032] The stage scheduling value of the selected decoration project is obtained by the following method: calculate the distance difference between the building location of the selected decoration project and the building location of the decoration delay project, obtain the scheduling distance difference, and mark it as EQW, obtain the stage evaluation value of the selected decoration project, and use the formula The stage scheduling value BKC of the selected decoration project is obtained, where c1 is the stage evaluation coefficient, c2 is the scheduling distance difference coefficient, the value of c1 is 0.65, and the value of c2 is 0.63.

[0033] By setting up a phase project scheduling module, you can monitor each stage of the building decoration project, cancel the construction qualifications of the decorators in a timely manner based on the monitoring results, and reasonably schedule the corresponding decorators to carry out decoration construction. While ensuring the progress of the building decoration project, it also ensures the construction quality of the building decoration project and ensures the reasonable scheduling of the decorators in the building decoration project.

[0034] The above formulas are all dimensionless and numerical calculations. The formula is a formula for the most recent real situation obtained by collecting a large amount of data and performing software simulation. The preset parameters in the formula are set by technicians in this field according to actual conditions.

[0035] The above embodiments can be implemented in whole or in part by software, hardware, firmware or any other combination. When implemented by software, the above embodiments can be implemented in whole or in part in the form of a computer program product. The computer program product includes one or more computer instructions or computer programs. When the computer instructions or computer programs are loaded or executed on a computer, the process or function described in the embodiment of the present application is generated in whole or in part. The computer can be a general-purpose computer, a special-purpose computer, a computer network, or other programmable device. The computer instructions can be stored in a computer-readable storage medium, or transmitted from one computer-readable storage medium to another computer-readable storage medium. For example, the computer instructions can be transmitted from one website site, computer, server or data center to another website site, computer, server or data center by wired or wireless (e.g., infrared, wireless, microwave, etc.). The computer-readable storage medium can be any available medium that a computer can access or a data storage device such as a server or data center that contains one or more available media sets. The available medium can be a magnetic medium (e.g., a floppy disk, a hard disk, a tape), an optical medium (e.g., a DVD), or a semiconductor medium. The semiconductor medium can be a solid-state hard disk.

[0036] It should be understood that in the various embodiments of the present application, the size of the serial numbers of the above-mentioned processes does not mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present application.

[0037] Those of ordinary skill in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.

[0038] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working processes of the systems, devices and units described above can refer to the corresponding processes in the aforementioned method embodiments and will not be repeated here.

[0039] In the several embodiments provided in the present application, it should be understood that the disclosed systems, devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic. For example, the division of the units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.

[0040] If the functions are implemented in the form of software functional units and sold or used as independent products, they can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present application can be essentially or partly embodied in the form of a software product that contributes to the prior art. The computer software product is stored in a storage medium and includes several instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the methods described in the various embodiments of the present application. The aforementioned storage media include: various media that can store program codes, such as USB flash drives, mobile hard disks, read-only memories (ROM), random access memories (RAM), magnetic disks or optical disks.

[0041] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any person skilled in the art who is familiar with the present technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.

Claims

1. The building decoration project management system based on artificial intelligence is characterized by: It includes decoration project monitoring module, re-construction module and phase project scheduling module; The decoration project monitoring module is used to regularly generate building decoration records for building decoration projects; The re-construction module is used to determine whether to remind the decoration staff to re-construct according to the comparison result of the decoration evaluation value recorded in the building decoration and its threshold value; The stage engineering scheduling module determines whether it is necessary to schedule decorators according to the comparison result between the decoration impact value of the building decoration project and its threshold value, and selects appropriate decorators for scheduling.

2. The artificial intelligence-based building decoration project management system according to claim 1 is characterized in that: The BIM model of the building is constructed before the decoration project begins. After the decoration project begins, the BIM model of the building is updated every r period of time, and the architectural decoration record of the building is generated after the update.

3. The artificial intelligence-based building decoration project management system according to claim 2 is characterized in that: Architectural decoration records include decoration stage, stage decoration progress, model update time, and decoration evaluation value.

4. The artificial intelligence-based building decoration project management system according to claim 3 is characterized in that: The decoration evaluation value is obtained in the following way: the basic decoration data of the building at the decoration stage is obtained according to the updated BIM model, the basic decoration data of the building at the decoration stage is used as the input data of the corresponding decoration evaluation model, and the decoration evaluation model outputs the decoration evaluation value.

5. The artificial intelligence-based building decoration project management system according to claim 1 is characterized in that: According to the comparison result of the decoration evaluation value of the building decoration record with its threshold, determine whether to remind the decoration personnel to re-construct, specifically: set the decoration evaluation threshold, when the decoration evaluation value of the building decoration record is less than the decoration evaluation threshold, remind the decoration personnel in the decoration stage to re-construct the decoration that does not meet the standards, and delete the building decoration record at the same time. After the decoration personnel re-construct the decoration that does not meet the standards, generate a redecoration record of the building decoration project and mark it as JLi, i is the sequential number of the redecoration record, i=1, 2, ..., N, N is a positive integer, and the redecoration record includes the decoration stage, decoration start time, and decoration completion time.

6. The artificial intelligence-based building decoration project management system according to claim 1 is characterized in that: Get the decoration stage of the building decoration project, and then get the decoration impact value of the building decoration project in this decoration stage, set the decoration impact threshold, when the decoration impact value is greater than or equal to the decoration impact threshold, cancel the construction qualification of the decoration personnel in this decoration stage, and mark the decoration project as a decoration delayed project.

7. The artificial intelligence-based building decoration project management system according to claim 6 is characterized in that: The decoration impact value of the building decoration project in this decoration stage is obtained by the following method: obtain all the redecoration records of the building decoration project in this decoration stage, mark the total number of redecoration records as DGT, calculate the time difference between the decoration completion time and the decoration start time of the redecoration record to obtain the decoration delay time, sum up all the decoration delay time to obtain the total decoration delay time, and mark it as PCS, sort all the redecoration records in numerical order, calculate the time difference between the decoration start time of the next redecoration record after sorting and the decoration completion time of the previous redecoration record to obtain the delay interval, sum up all the delay intervals and take the average to obtain the average delay interval, and mark it as NCR, and use the formula The decoration impact value SEX of the building decoration project in this decoration stage is obtained, where a1 is the coefficient of the number of redecoration records, a2 is the coefficient of the total decoration delay duration, and a3 is the coefficient of the average delay interval.

8. The artificial intelligence-based building decoration project management system according to claim 1 is characterized in that: Select appropriate decoration personnel for scheduling, specifically: take the location of the building where the decoration delayed project is located as the center, draw a circle with a preset radius, get the decoration personnel scheduling range, mark the decoration projects of other buildings within the decoration personnel scheduling range as preliminary decoration projects, obtain the decoration stage of the preliminary decoration projects, mark the preliminary decoration projects that are in the same decoration stage as the decoration delayed project as secondary decoration projects, obtain the stage evaluation value of the secondary decoration projects, set the stage evaluation threshold, when the stage evaluation value of the secondary decoration project is greater than or equal to the stage evaluation threshold, mark the secondary decoration project as the final decoration project, obtain the stage scheduling value of the final decoration project, mark the final decoration project with the largest stage scheduling value as the final decoration project, and dispatch the decoration personnel of the final decoration project at this decoration stage to the decoration delayed project for decoration construction.

9. The artificial intelligence-based building decoration project management system according to claim 8 is characterized in that: The stage evaluation of the secondary decoration project is obtained in the following way: obtain all redecoration records and all building decoration records of the secondary decoration project in the decoration stage, mark the total number of redecoration records as ERP, sort all building decoration records in the order of model update time, calculate the difference between the stage decoration progress of two adjacent building decoration records after sorting, obtain the stage progress value, set the stage progress threshold, when the stage progress value is greater than or equal to the stage progress threshold, increase the number of over-progress times of the decoration stage by one, sum the number of over-progress times of the decoration stage, obtain the total number of over-progress times, and mark it as SJY, calculate the difference between the decoration evaluation values ​​of two adjacent building decoration records after sorting and take the absolute value, obtain the decoration evaluation variable value, set the decoration evaluation threshold variable value, when the decoration evaluation variable value is greater than or equal to the decoration evaluation threshold variable value, increase the number of evaluation fluctuations of the decoration stage by one, sum the number of evaluation fluctuations of the decoration stage, obtain the total number of evaluation fluctuations, and mark it as FSB, and use the formula The stage evaluation value SXH of the second-choice decoration project is obtained, where b1 is the coefficient of the number of redecoration records, b2 is the coefficient of the total number of overschedule times, and b3 is the coefficient of the total number of evaluation fluctuations.

10. The artificial intelligence-based building decoration project management system according to claim 8 is characterized in that: The stage scheduling value of the selected decoration project is obtained by the following method: calculate the distance difference between the building location of the selected decoration project and the building location of the decoration delay project, obtain the scheduling distance difference, and mark it as EQW, obtain the stage evaluation value of the selected decoration project, and use the formula The stage scheduling value BKC of the selected decoration project is obtained, where c1 is the stage evaluation coefficient and c2 is the scheduling distance difference coefficient.