Steel-concrete combined inner support for deep foundation pit and dismantling construction method of steel-concrete combined inner support

Through the combined structure of sliding columns, screws and block limit rings, the problem of the difficulty of removing internal support in the steel-mixed combination of deep foundation pits is solved, and a more efficient removal process is achieved, simplifying the recovery operation of the support pipe.

CN119061905APending Publication Date: 2024-12-03CSCEC STRAIT CONSTR & DEV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411351306.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-26
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

When the existing deep foundation pit steel-mixed internal support is removed, it is difficult to press and remove the filling block between the pad plate and the press plate, which increases the difficulty of dismantling.

Method used

Using slip column and screw structure, the pressure plate is driven to the steel bracket through the jack, and the slip column is restricted from retracting the support pipe with a clamp and a limit ring, reducing the difficulty of removal, and controlling the insertion block and tilting parts through elastic components and tilted parts. The rotation of the limit ring simplifies the removal process of the support pipe.

Benefits of technology

It effectively reduces the difficulty of removing internal support of the steel-concrete combination of deep foundation pit, improves the removal efficiency, reduces the demand for jack thrust, and simplifies the recovery process of support pipes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119061905A_ABST
    Figure CN119061905A_ABST
Patent Text Reader

Abstract

The invention relates to the field of foundation pit supporting, in particular to a deep foundation pit steel-concrete combined inner support and a dismantling construction method thereof.The deep foundation pit steel-concrete combined inner support comprises a retaining wall arranged along the inner side wall of a foundation pit, surrounding purlins are fixedly installed on the inner wall of the retaining wall in the circumferential direction, supporting columns are installed between the two adjacent sides of the surrounding purlins, and supporting pipes are arranged between the two opposite inner side walls of the surrounding purlins; steel brackets are arranged at the two ends of the supporting pipe and fixedly installed on the inner wall of the enclosing purlin, a fixed connector is connected to one end of the supporting pipe through a flange, a sliding column is arranged at the other end of the supporting pipe in a sliding and penetrating mode, a pressing plate is fixedly installed at the end, away from the fixed connector, of the sliding column, and the sliding column is provided with a threaded rod and a bayonet allowing the threaded rod to penetrate through. A limiting block is fixedly installed at one end of the screw, the screw is sleeved with a first limiting ring in a threaded mode, a clamping block is installed on the screw in a sliding mode, the clamping block is located between the first limiting ring and the limiting block, and the clamping block is connected to the bayonet in a clamped mode. The dismounting method has the effect of reducing the dismounting difficulty of the steel-concrete combined inner support of the deep foundation pit.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of foundation pit support, and in particular to a deep foundation pit steel-concrete composite internal support and a dismantling construction method thereof. Background Art

[0002] Underground buildings such as underground civil air defense projects and underground garages are located below the ground. When constructing underground buildings, it is necessary to dig a foundation pit and provide support. A deep foundation pit refers to an excavation depth of more than 5 meters (including 5 meters) or a depth of less than 5 meters.

[0003] At present, the related art discloses a steel-concrete composite inner support for a deep foundation pit, including a retaining wall arranged along the inner wall of the foundation pit, and a purlin is fixedly installed on the inner wall of the retaining wall along the circumferential direction. Support columns are welded between the adjacent two sides of the purlin, and a support pipe is arranged between the two opposite inner walls of the purlin. Steel brackets are arranged at both ends of the support pipe, and the steel brackets are fixedly installed on the inner wall of the purlin. A fixed joint is connected to a flange at one end of the support pipe, and a pad is fixedly installed at the other end of the support pipe. A pressing plate is arranged on the side of the pad away from the fixed joint. A filling block is filled between the pressing plate and the pad. The fixed joint is abutted against a steel bracket, and a cylinder is placed between the pressing plate and the pad. The cylinder is extended, thereby driving the pressing plate to press the steel bracket, and then the filling block is inserted between the pressing plate and the pad, so that after the cylinder is removed, the filling block drives the pressing plate to continue to press against the steel bracket.

[0004] With regard to the above-mentioned related technologies, as the construction inside the foundation pit progresses, the support inside the foundation pit needs to be removed. When removing the support pipe, the jack is placed between the pressure plate and the pad to apply thrust, and then the filling block is taken out from between the pressure plate and the pad. After the filling block is taken out, the jack gradually reduces the thrust to unload the force, and then the support pipe is lifted out of the foundation pit by a crane for recycling. However, the filling block is pressed tightly between the pad and the pressure plate, making it difficult to remove, thereby increasing the difficulty of removing the support inside the steel-concrete combination of the deep foundation pit. Summary of the invention

[0005] In order to reduce the difficulty of dismantling the steel-concrete composite internal support of a deep foundation pit, the present application provides a deep foundation pit steel-concrete composite internal support and a dismantling construction method thereof.

[0006] This application provides a deep foundation pit steel-concrete composite internal support and its removal construction method, which adopts the following technical solutions: A steel-concrete composite inner support for a deep foundation pit, comprising a retaining wall arranged along the inner wall of the foundation pit, wherein a purlin is fixedly installed on the inner wall of the retaining wall along the circumferential direction, a support column is installed between the adjacent two sides of the purlin, a support pipe is arranged between the two opposite inner walls of the purlin, steel brackets are arranged at both ends of the support pipe, the steel brackets are fixedly installed on the inner wall of the purlin, one end of the support pipe is flange-connected with a fixed joint, and a sliding column is slidably penetrated at the other end of the support pipe, and the sliding column is away from A pressure plate is fixedly installed at one end of the fixed joint, and the pressure plate is tightly against a steel bracket, and the fixed joint is tightly against another steel bracket. The sliding column is provided with a screw, and the sliding column has a bayonet for the screw to pass through. A limit block is fixedly installed at one end of the screw, and the screw thread sleeve is provided with a first limit ring. A clamping block is slidably installed on the screw, and the clamping block is located between the first limit ring and the limit block. The clamping block is passed through the bayonet, and the clamping block is inclined away from the side of the support tube.

[0007] By adopting the above technical solution, the jack is placed between the pressure plate and the support tube, the jack drives the pressure plate to press against the steel bracket, and then the clamp is inserted into the clamp, and the screw passes through the clamp and is tightened with the first limit ring. After that, the jack is removed, and the sliding column is restricted to retract into the support tube by the clamp, so that the pressure plate can press the steel bracket, and the support tube can play a good supporting role.

[0008] When the support pipe needs to be removed, the jack is placed between the pressure plate and the support pipe and extended, and then the first limit ring is removed from the screw. After that, when the jack unloads the force, the block is squeezed and slides out of the bayonet, thereby reducing the difficulty of removing the support inside the steel-concrete combination of the deep foundation pit.

[0009] Optionally, the screw sliding sleeve is provided with a fixing ring, the fixing ring is located on the side of the clamping block close to the first limiting ring, the fixing ring is provided with a plurality of plug-in blocks, a plurality of sockets for the plug-in blocks to slide through are opened on the side of the fixing ring close to the first limiting ring, a slot for the plug-in blocks to slide through is opened on the side of the first limiting ring close to the fixing ring, and an elastic component is installed on the fixing ring, and the elastic component is used to drive the plug-in block to extend from the socket and then insert into the slot.

[0010] By adopting the above technical solution, when the support tube needs to be removed, press the elastic component to pull the plug out of the slot. Then rotate the first limit ring to offset the plug and the slot. After the plug and the slot are offset, release the elastic component so that the elastic component drives the plug to press against the first limit ring. Then rotate the first limit ring again, and after the plug and the slot are aligned, the plug is reinserted into the slot driven by the elastic component, thereby limiting the rotation of the first limit ring. By allowing the plug to enter and exit the slot, it is convenient to control the angle of each rotation of the limit ring, and thus there is no need to support the block between the pressure plate and the support tube with a jack to remove the block.

[0011] Optionally, the elastic component includes a spring and a push ring, a ring groove is provided on the circumferential side of the fixed ring, the socket is connected to the ring groove, the spring and the push ring are both sleeved on the fixed ring, the push ring is fixedly connected to each of the plug blocks, one end of the spring is fixedly installed on the side of the push ring away from the plug block, and the other end of the spring is connected to the inner wall of the side of the slot away from the limit ring, and the spring is used to drive the push ring to move toward the first limit ring.

[0012] By adopting the above technical solution, the push ring is pressed away from the first limiting ring, so that each plug block can be easily pulled out of the slot. After that, when the push ring is released, the spring drives the push ring to move toward the first limiting ring, so that the plug block can be easily inserted into the slot.

[0013] Optionally, a first inclined portion is provided on the side of the insert block that is away from the direction in which the first limit ring is screwed into the screw, and a second inclined portion is provided on the other side of the insert block. When the insert block enters the slot, part of the first inclined portion is located outside the slot, and the entire second inclined portion is located inside the slot.

[0014] By adopting the above technical solution, when the first limiting ring is screwed into the screw rod, the first inclined portion is pressed against the inner wall of the slot, so that the plug block is pulled out of the slot, and the first limiting ring is conveniently tightened. When the plug block is inserted into the slot, the first inclined portion and the second inclined portion guide the plug block to be inserted into the slot.

[0015] Optionally, the end faces of both ends of the support column are inclined to fit the inner wall of the surrounding purlin, and two clamping plates are installed on both ends of the support column, and the two clamping plates are clamped on the surrounding purlin.

[0016] By adopting the above technical solution, after the support column is placed at the corner of the purlin, the purlin is clamped by two clamps, and then the support column is pushed to the corner of the purlin to continue moving and clamping, and then the clamps and support columns are welded to the purlin, thereby facilitating the installation of the support column.

[0017] Optionally, the purlin is provided with a plurality of insertion holes, and the plurality of insertion holes are arranged along the circumference of the purlin, and the clamp is provided with a first connecting rod, and second connecting rods are fixedly installed at both ends of the first connecting rod, and the second connecting rod is passed through the insertion holes, and a second limiting ring is threadedly sleeved on the first connecting rod, and the clamp is located between the two second connecting rods, and the first connecting rod is located on the side of the clamp away from the purlin, and the wall thickness of the second limiting ring is smaller than the thickness of the clamp.

[0018] By adopting the above technical solution, after the second connecting rod is inserted into the insertion hole, the second limiting ring is rotated to make the second limiting ring tightly against the clamping plate, so that the angle of the support column in the surrounding purlin is kept fixed, thereby facilitating the installation of the support column on the surrounding purlin.

[0019] Optionally, the second connecting rod threaded sleeve is provided with a third limiting ring, the inner wall of the surrounding purlin is provided with a plurality of mounting grooves, the mounting grooves correspond to the insertion holes one by one, the mounting grooves are connected with the insertion holes, and the third limiting ring is located inside the mounting grooves.

[0020] By adopting the above technical solution, the third limiting ring is screwed into the second connecting rod, thereby reducing the possibility of the second connecting rod being pulled out of the insertion hole.

[0021] Optionally, the support tube includes a plurality of sub-tubes connected in sequence by flanges, a plurality of airbags are arranged inside the support tube, the airbags are located at the connection between two adjacent sub-tubes, the airbags are fixedly connected to an air intake hose, a through hole is opened on the tube wall of the sub-tube for the air intake hose to pass through, and an inflation head is fixedly installed on the end of the air intake hose away from the airbag.

[0022] By adopting the above technical solution, the airbag supports the connection between adjacent sub-tubes after being inflated, thereby reducing the possibility of the support tube being squeezed and bent.

[0023] Optionally, the intake hose is provided with a pressure sensor, which is mounted on the intake hose. The pressure sensor is electrically connected to a processor, which is electrically connected to a display. The pressure sensor is used to generate a pressure signal based on the pressure received from the intake hose and send it to the processor. The processor is used to display the pressure of each intake hose to the pressure sensor on the display based on the pressure signal.

[0024] By adopting the above technical solution, when the support tube is bent, the support tube will squeeze the airbag, thereby increasing the squeezing force of the intake hose on the pressure sensor. By detecting the change of the squeezing force of the intake hose on the pressure sensor, it is convenient to determine whether the support tube is bent.

[0025] A method for dismantling a deep foundation pit steel-concrete composite internal support, comprising the following dismantling methods: Remove the support column from the purlin, and then take the support column out of the foundation pit for recycling; Use a jack to apply thrust between the pressure plate and the support tube, rotate the first limit ring to remove it from the screw, pull the screw and the block out of the bayonet, and then use the jack to unload the force in stages before taking the support tube out of the foundation pit for recycling; Remove the purlins and steel brackets, then take them out of the foundation pit for recycling. By adopting the above technical solution, when the support tube needs to be removed, the first limit ring is screwed out, and the clamping block is squeezed by the sliding column and pulled out from the clamping port, thereby facilitating the removal of the support tube.

[0026] In summary, the present application includes at least one of the following beneficial technical effects: 1. Insert the block into the bayonet, use the first limiting ring to screw into the screw and press the block, so as to limit the sliding column from retracting into the support tube. When removing the support tube, unscrew the first limiting ring, and the block is squeezed by the sliding column to slide out of the bayonet, so as to facilitate the removal of the support tube, thereby reducing the difficulty of removing the internal support of the steel-concrete combination of the deep foundation pit; 2. The connection between two adjacent sub-tubes is supported by airbags, thereby reducing the bending of the support tube. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 It is a schematic diagram of the overall structure of Example 1 of the present application; Figure 2 It is a schematic diagram of the structure between the surrounding purlin, the support tube and the support column in Example 1 of the present application; Figure 3 This is a schematic diagram of the structure of the support tube of Example 1 of the present application; Figure 4 This is an exploded view of the support tube between the sliding columns in Example 1 of the present application; Figure 5 This is a schematic diagram of the structure of the support tube of Example 2 of the present application; Figure 6 It is a structural schematic diagram of a sliding column in Example 2 of the present application; Figure 7 is an exploded view of the fixing ring between the support columns in Example 2 of the present application; Figure 8 This is a schematic diagram of the structure between the elastic component and the plug-in block in Example 2 of the present application; Fig. 9 It is a schematic diagram of the structure between the surrounding purlin, the support tube and the support column in Example 3 of the present application; Fig.10 yes Fig. 9 A magnified view at point A; Fig.11 is a schematic structural diagram of a first connecting rod and a second connecting rod in Example 3 of the present application; Fig.12 is a schematic structural diagram of a support tube according to Example 4 of the present application; Fig.13 is an exploded view of the support tube of Example 4 of the present application; Fig.14 This is the principle block diagram of Example 4 of the present application.

[0028] Explanation of the reference numerals in the accompanying drawings: 1. retaining wall; 2. purlin; 3. support column; 4. splint; 5. support pipe; 51. sub-pipe; 6. steel bracket; 7. fixed joint; 8. sliding column; 9. pressure plate; 10. placement groove; 11. screw; 12. bayonet; 13. limit block; 14. first limit ring; 15. second limit ring; 16. third limit ring; 17. block; 18. fixing ring; 19. ring groove; 20. socket; 21. plug block; 22. elastic component; 221. spring; 222. push ring; 23. slot; 24. first inclined portion; 25. second inclined portion; 26. socket; 27. first connecting rod; 28. second connecting rod; 29. ​​mounting groove; 30. airbag; 31. intake hose; 32. through hole; 33. pressure sensor; 34. processor; 35. display; 36. inflation head. DETAILED DESCRIPTION

[0029] The following is combined with Figure 1-14 This application is described in further detail.

[0030] Example 1.

[0031] The embodiment of the present application discloses a deep foundation pit steel-concrete composite internal support and a method for dismantling the same.

[0032] Reference Figure 1 A deep foundation pit steel-concrete composite inner support includes a retaining wall 1 arranged along the inner wall of the foundation pit. The retaining wall 1 is formed by supporting a formwork on the inner wall of the foundation pit and pouring.

[0033] Reference Figure 2 , Figure 3 The inner wall of the retaining wall 1 is fixedly installed with a purlin 2 along the circumferential direction. The purlin 2 is formed by splicing a plurality of rectangular cross-section tubes in sequence. When the purlin 2 is fixedly installed on the inner wall of the retaining wall 1, generally, an angle steel is first set on the bottom side of the purlin 2, and the angle steel is driven into the retaining wall 1 through expansion bolts. After the angle steel supports the purlin 2, concrete is poured between the outer wall of the purlin 2 and the inner wall of the retaining wall 1 to connect them, so that the purlin 2 is fixedly installed on the inner wall of the retaining wall 1.

[0034] Reference Figure 2 A support column 3 is provided between the adjacent two sides of the purlin 2, and two clamping plates 4 are fixedly installed at both ends of the support column 3. The end faces of both ends of the support column 3 are inclined to fit the inner wall of the purlin 2. After the support column 3 is lifted by a crane and placed inside the foundation pit, the two clamping plates 4 are used to clamp the purlin 2, so as to facilitate the temporary fixation of the support column 3. Then, the support column 3 is pushed to move to the corner of the purlin 2. After the two ends of the support column 3 are pressed against the inner wall of the purlin 2, the clamping plates 4 and the support column are welded to the purlin 2, so as to facilitate the installation of the support column 3.

[0035] Reference Figure 2 , Figure 3A plurality of support pipes 5 are arranged between the two opposite inner walls of the purlin 2, and the support pipes 5 are formed by flange connection of a plurality of sub-pipes 51 in sequence. Steel brackets 6 are arranged at both ends of the support pipe 5. The steel bracket 6 is fixedly installed on the inner wall of the purlin 2. A fixed joint 7 is flange-connected at one end of the support pipe 5, and a sliding column 8 is slidably penetrated at the other end of the support pipe 5. After the support pipe 5 is hoisted into the foundation pit, the fixed joint 7 is placed on one steel bracket 6, and the sliding column 8 is placed on the other steel bracket 6, so as to facilitate temporary support of the support column 3.

[0036] Reference Figure 2 , Figure 3 A pressing plate 9 is fixedly installed at one end of the sliding column 8 away from the fixed joint 7. The pressing plate 9 is used to press against one steel bracket 6, and the fixed joint 7 is used to press against another steel bracket 6. Placement grooves 10 are opened on both sides of the sliding column 8, and the placement grooves 10 extend to the pressing plate 9. The cylinder part of the jack is placed in the placement groove 10, and the piston rod of the jack is pressed against the support tube 5. Then the jack is started to push the pressing plate 9 and the support tube 5 away from each other, so that the pressing plate 9 presses against one steel bracket 6, and the fixed joint 7 presses against the other steel bracket 6.

[0037] Reference Figure 3 , Figure 4 The sliding column 8 is provided with a screw 11, and the sliding column 8 is provided with a bayonet 12 for the screw 11 to pass through. A limit block 13 is fixedly installed at one end of the screw 11, and a first limit ring 14 is threadedly sleeved on the screw 11. A clamping block 17 is slidably installed on the screw 11, and the clamping block 17 is located between the first limit ring 14 and the limit block 13. The clamping block 17 is passed through the bayonet 12, and the clamping block 17 is tilted away from the side of the support tube 5.

[0038] After the jack drives the pressure plate 9 to press against the steel bracket 6, the block 17 is inserted into the bayonet 12, and the inclined side of the block 17 is set away from the support tube 5. Then the screw 11 is used to pass through the block 17, and the first limit ring 14 is screwed into the screw 11 and presses the block 17, so that the block 17 remains fixed.

[0039] In another embodiment, each bayonet 12 corresponds to two clamping blocks 17. One clamping block 17 is inserted from one end of the bayonet 12, and the other clamping block 17 is inserted from the other end of the bayonet 12.

[0040] Reference Figure 3 , Figure 4 After the block 17 is inserted into the bayonet 12, the jack is unloaded, and then the jack is removed from between the pressure plate 9 and the support tube 5. The block 17 is inserted into the bayonet 12 to limit the sliding column 8 from retracting into the support tube 5, so that the pressure plate 9 is kept close to the steel bracket 6.

[0041] A method for dismantling a deep foundation pit steel-concrete composite internal support, comprising the following steps: S1. Remove the support column 3 from the purlin 2, and then take the support column 3 out of the foundation pit for recycling.

[0042] Use hot scissors or cutting machines to remove the welded portion between the support column 3 and the purlin 2, and then use a crane to lift the support column 3 out of the foundation pit, thereby facilitating the removal of the support column 3.

[0043] S2. Use a jack to apply thrust between the pressure plate 9 and the support tube 5, rotate the first limit ring 14 to remove it from the screw 11, pull the screw 11 and the block 17 out of the bayonet 12, and then use the jack to unload the force in stages to remove the support tube 5 from the foundation pit for recovery.

[0044] Place the cylinder of the jack into the placement groove 10 and press it against the pressure plate 9, and the piston rod of the jack is tightly pressed against the end of the support tube 5 away from the fixed joint 7. Start the jack to apply pressure to the pressure plate 9 away from the support tube 5. Then rotate the first limit ring 14 to remove it from the screw 11. After the first limit ring 14 is removed from the screw 11, the jack unloads the force in stages, and the block 17 slides out of the bayonet 12 due to the compression of the sliding column 8, and then the screw 11 and the block 17 are taken out. After the jack unloads the force, the crane lifts the support tube 5 out of the foundation pit, thereby reducing the difficulty of dismantling the support tube 5, and then reducing the difficulty of dismantling the support inside the steel-concrete combination of the deep foundation pit.

[0045] S3, dismantle the purlin 2 and the steel bracket 6, and then take the purlin 2 and the steel bracket 6 out of the foundation pit for recycling.

[0046] The implementation principle of a deep foundation pit steel-concrete composite internal support and its removal construction method in an embodiment of the present application is: when removing the support tube 5, the first limit ring 14 is unscrewed, and then the block 17 will automatically slide out of the bayonet 12 under the squeezing of the sliding column 8, thereby reducing the difficulty of disassembling the support tube 5, and further reducing the difficulty of removing the deep foundation pit steel-concrete composite internal support.

[0047] Example 2.

[0048] The embodiment of the present application discloses a deep foundation pit steel-concrete composite internal support and a method for dismantling the same.

[0049] Reference Figure 5 , Figure 6 The difference between the deep foundation pit steel-concrete combined internal support of the embodiment of the present application and the embodiment 1 is that the sliding sleeve of the screw rod 11 is provided with a fixing ring 18, and the fixing ring 18 is located on the side of the block 17 close to the first limiting ring 14.

[0050] Reference Figure 7 , Figure 8A ring groove 19 is provided on the circumferential side of the fixed ring 18, and a plurality of sockets 20 are provided on the side of the fixed ring 18 close to the first limiting ring 14, and the sockets 20 are connected to the ring groove 19. The fixed ring 18 is provided with a plurality of plug blocks 21, and the plug blocks 21 are slidably inserted into the sockets 20. The fixed ring 18 is provided with an elastic component 22, and the elastic component 22 includes a spring 221 and a push ring 222. The spring 221 and the push ring 222 are both sleeved on the fixed ring 18, and the spring 221 is fixedly installed between the push ring 222 and the inner side wall of the ring groove 19 away from the first limiting ring 14. The plug block 21 is fixedly installed on the side of the push ring 222 close to the first limiting ring 14. The spring 221 is used to drive the push ring 222 to move toward the first limiting ring 14.

[0051] Reference Figure 7 , Figure 8 The first stop ring 14 is provided with a plurality of slots 23 on one side close to the fixing ring 18 for the insert block 21 to pass through. The insert block 21 is provided with a first inclined portion 24 on the side away from the direction in which the first stop ring 14 is screwed into the screw rod 11, and a second inclined portion 25 is provided on the other side of the insert block 21. When the insert block 21 enters the slot 23, part of the first inclined portion 24 is located outside the slot 23, and the second inclined portion 25 is located entirely inside the slot 23.

[0052] The implementation principle of the deep foundation pit steel-concrete composite internal support and its removal construction method in the embodiment of the present application is as follows: when the first limiting ring 14 is rotated to move toward the clamping block 17, the first limiting ring 14 presses the clamping block 17 through the fixing ring 18. During the tightening process of the first limiting ring 14, the inner wall of the slot 23 squeezes the first inclined portion 24, so that the plug 21 is pulled out of the slot 23, thereby facilitating the tightening of the first limiting ring 14. After tightening the first limiting ring 14, the plug 21 is inserted into the slot 23, thereby reducing the occurrence of the first limiting ring 14 spinning away from the clamping block 17.

[0053] When it is necessary to pull the block 17 out of the bayonet 12, press the push ring 222 away from the first limiting ring 14 to pull the insert block 21 out of the slot 23. Then, rotate the first limiting ring 14 away from the block 17, and after the insert block 21 is misaligned with the slot 23, release the push ring 222. After releasing the push ring 222, continue to rotate the first limiting ring 14 to block 17. After the insert block 21 is aligned with the slot 23, the insert block 21 is reinserted into the slot 23 under the guidance of the first inclined portion 24 and the second inclined portion 25. When the first limiting ring 14 is removed from the screw rod 11, the insert block 21 repeatedly enters and exits the slot 23, so that the first limiting ring 14 is slowly moved away from the block 17. By slowly moving the first limiting ring 14 away from the block 17, it is convenient for the block 17 to be gradually pulled out of the bayonet 12 under the pressure of the sliding column 8, thereby facilitating the sliding column 8 to slowly unload the force. The support pipe 5 can be removed easily by gradually unloading the force on the sliding column 8 without using a jack.

[0054] Example 3.

[0055] The embodiment of the present application discloses a deep foundation pit steel-concrete composite internal support and a method for dismantling the same.

[0056] Reference Fig. 9 , Fig.10 The difference between the deep foundation pit steel-concrete composite internal support of the embodiment of the present application and the embodiment 1 is that the purlin 2 is provided with a plurality of insertion holes 26, the plurality of insertion holes 26 are arranged along the circumference of the purlin 2, and the insertion holes 26 are located at the corners of the purlin 2. The clamping plate 4 is provided with a first connecting rod 27, and the second connecting rods 28 are fixedly installed at both ends of the first connecting rod 27.

[0057] Reference Fig.10 , Fig.11 , the second connecting rod 28 is inserted into the insertion hole 26, and the first connecting rod 27 is threadedly sleeved with the second limiting ring 15. The first connecting rod 27 is located on the side of the clamping plate 4 away from the surrounding purlin 2, and the clamping plate 4 is located between the two second connecting rods 28. The wall thickness of the second limiting ring 15 is less than the thickness of the clamping plate 4. The second limiting ring 15 is rotated, and the second limiting ring 15 pushes the clamping plate 4 to move toward the corner of the surrounding purlin 2, so that the supporting column 3 can support the surrounding purlin 2.

[0058] The second connecting rod 28 is threadedly sleeved with a third limiting ring 16 , and the inner wall of the surrounding purlin 2 is provided with a plurality of mounting grooves 29 , which correspond to the insertion holes 26 one by one, are connected with the insertion holes 26 , and the third limiting ring 16 is located inside the mounting grooves 29 .

[0059] After the second limiting ring 15 is tightened, the third limiting ring 16 is tightened from the mounting groove 29 , thereby reducing the possibility of the second connecting rod 28 being pulled out of the insertion hole 26 .

[0060] The implementation principle of the deep foundation pit steel-concrete composite internal support and its removal construction method in the embodiment of the present application is as follows: when the support column needs to be removed, the third limiting ring 16 is rotated, and the third limiting ring 16 is taken out from the second connecting rod 28. Then, the second limiting ring 15 is rotated away from the clamping plate 4, so that the support column 3 is pulled away from the corner of the surrounding purlin 2, and the clamping plate 4 is separated from the surrounding purlin 2, so as to facilitate the removal of the support column 3.

[0061] Example 4.

[0062] The embodiment of the present application discloses a deep foundation pit steel-concrete composite internal support and a method for dismantling the same.

[0063] Reference Fig.12 , Fig.13The difference between the deep foundation pit steel-concrete composite internal support of the embodiment of the present application and the embodiment 1 is that a plurality of air bags 30 are arranged inside the support pipe 5, and the air bags 30 are located at the connection between two adjacent sub-pipes 51. The air bags 30 are fixedly connected to the air intake hose 31, and the pipe wall of the sub-pipe 51 is provided with a through hole 32 for the air intake hose 31 to pass through. An inflator head 36 is fixedly installed at one end of the air intake hose 31 away from the air bag 30.

[0064] The airbag 30 is placed at the connection between two adjacent sub-tubes 51, and then the airbag 30 is inflated through the air intake hose 31. After the airbag 30 is inflated, it supports the connection between the two adjacent sub-tubes 51, thereby reducing the bending of the two ends of the support tube 5 after being compressed.

[0065] Reference Fig.13 , Fig.14 The air intake hose 31 is provided with a pressure sensor 33, which is provided on the air intake hose 31. The pressure sensor 33 is electrically connected to a processor 34, which is electrically connected to a display 35. The pressure sensor 33 is used to generate a pressure signal according to the pressure received from the air intake hose 31 and send it to the processor 34. The processor 34 is used to display the pressure of each air intake hose 31 on the pressure sensor 33 on the display 35 according to the pressure signal.

[0066] The implementation principle of the deep foundation pit steel-concrete composite internal support and its removal construction method in the embodiment of the present application is as follows: when the support tube 5 is bent, the support tube 5 squeezes the airbag 30, and the air inside the airbag 30 enters the inside of the air intake hose 31, thereby increasing the squeezing force of the air intake hose 31 on the pressure sensor 33. The processor 34 displays the squeezing force detected by the pressure sensor 33 on the display 35, so as to facilitate the judgment of whether the support tube 5 is bent.

[0067] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A steel-concrete composite internal support for a deep foundation pit, characterized in that: The invention comprises a retaining wall (1) arranged along the inner wall of a foundation pit, wherein a purlin (2) is fixedly installed on the inner wall of the retaining wall (1) along the circumferential direction, a support column (3) is installed between the adjacent two sides of the purlin (2), a support pipe (5) is arranged between the two opposite inner walls of the purlin (2), steel brackets (6) are arranged at both ends of the support pipe (5), and the steel brackets (6) are fixedly installed on the inner wall of the purlin (2), one end of the support pipe (5) is flange-connected with a fixed joint (7), the other end of the support pipe (5) is slidably penetrated by a sliding column (8), and a pressing plate (9) is fixedly installed on the end of the sliding column (8) away from the fixed joint (7), and the pressing plate (9) is fixedly installed on the inner wall of the purlin (2). 9) is tightly against a steel bracket (6), the fixed joint (7) is tightly against another steel bracket (6), the sliding column (8) is provided with a screw (11), the sliding column (8) is provided with a bayonet (12) for the screw (11) to pass through, one end of the screw (11) is fixedly installed with a limit block (13), the screw (11) is threadedly sleeved with a first limit ring (14), the screw (11) is slidably installed with a clamping block (17), the clamping block (17) is located between the first limit ring (14) and the limit block (13), the clamping block (17) is passed through the bayonet (12), and the clamping block (17) is inclined away from the side of the support tube (5).

2. A deep foundation pit steel-concrete composite internal support according to claim 1, characterized in that: The screw rod (11) sliding sleeve is provided with a fixed ring (18), and the fixed ring (18) is located on a side of the clamping block (17) close to the first limiting ring (14). The fixed ring (18) is provided with a plurality of plug blocks (21). A plurality of sockets (20) for the plug blocks (21) to slide through are provided on a side of the fixed ring (18) close to the first limiting ring (14). A slot (23) for the plug blocks (21) to slide through is provided on a side of the first limiting ring (14) close to the fixed ring (18). An elastic component (22) is installed on the fixed ring (18), and the elastic component (22) is used to drive the plug blocks (21) to extend from the sockets (20) and then insert into the slots (23).

3. A deep foundation pit steel-concrete composite internal support according to claim 2, characterized in that: The elastic component (22) comprises a spring (221) and a push ring (222); a ring groove (19) is provided on the circumferential side of the fixing ring (18); the socket (20) is communicated with the ring groove (19); the spring (221) and the push ring (222) are both sleeved on the fixing ring (18); the push ring (222) is fixedly connected to each of the plug blocks (21); one end of the spring (221) is fixedly mounted on a side of the push ring (222) away from the plug block (21); the other end of the spring (221) is connected to an inner wall of a side of the slot (23) away from the limiting ring; the spring (221) is used to drive the push ring (222) to move toward the first limiting ring (14).

4. The deep foundation pit steel-concrete composite internal support according to claim 2 is characterized by: A first inclined portion (24) is provided on one side of the insert block (21) that is away from the direction in which the first limiting ring (14) is screwed into the screw rod (11), and a second inclined portion (25) is provided on the other side of the insert block (21); when the insert block (21) enters the interior of the slot (23), part of the first inclined portion (24) is located outside the slot (23), and the entirety of the second inclined portion (25) is located inside the slot (23).

5. The deep foundation pit steel-concrete composite internal support according to claim 1 is characterized by: The end surfaces at both ends of the support column (3) are arranged to be inclined so as to fit the inner wall of the surrounding purlin (2), and two clamping plates (4) are installed at both ends of the support column (3), and the two clamping plates (4) are clamped on the surrounding purlin (2).

6. The deep foundation pit steel-concrete composite internal support according to claim 5 is characterized by: The surrounding purlin (2) is provided with a plurality of insertion holes (26), and the plurality of insertion holes (26) are arranged along the circumference of the surrounding purlin (2); the clamping plate (4) is provided with a first connecting rod (27), and second connecting rods (28) are fixedly installed at both ends of the first connecting rod (27), and the second connecting rod (28) is inserted into the insertion holes (26); the first connecting rod (27) is threadedly sleeved with a second limiting ring (15); the clamping plate (4) is located between the two second connecting rods (28), and the first connecting rod (27) is located on a side of the clamping plate (4) away from the surrounding purlin (2); and the wall thickness of the second limiting ring (15) is less than the thickness of the clamping plate (4).

7. The deep foundation pit steel-concrete composite internal support according to claim 6 is characterized by: The second connecting rod (28) is threadedly sleeved with a third limiting ring (16); the inner wall of the surrounding purlin (2) is provided with a plurality of mounting grooves (29); the mounting grooves (29) correspond to the insertion holes (26) one by one; the mounting grooves (29) are connected to the insertion holes (26); and the third limiting ring (16) is located inside the mounting grooves (29).

8. The deep foundation pit steel-concrete composite internal support according to claim 1 is characterized by: The support tube (5) comprises a plurality of sub-tubes (51) connected in sequence by flanges. A plurality of air bags (30) are arranged inside the support tube (5). The air bags (30) are located at the connection between two adjacent sub-tubes (51). The air bags (30) are fixedly connected to an air intake hose (31). A through hole (32) for the air intake hose (31) to pass through is provided on the tube wall of the sub-tube (51). An inflator head (36) is fixedly mounted on one end of the air intake hose (31) away from the air bag (30).

9. A deep foundation pit steel-concrete composite internal support according to claim 8, characterized in that: The air intake hose (31) is provided with a pressure sensor (33), the pressure sensor (33) is provided on the air intake hose (31), the pressure sensor (33) is electrically connected to a processor (34), the processor (34) is electrically connected to a display (35), the pressure sensor (33) is used to generate a pressure signal according to the pressure received from the air intake hose (31) and send the pressure signal to the processor (34), and the processor (34) is used to display the pressure of each air intake hose (31) on the pressure sensor (33) on the display (35) according to the pressure signal.

10. A method for dismantling a deep foundation pit steel-concrete composite internal support, applied to a deep foundation pit steel-concrete composite internal support as claimed in any one of claims 1 to 9, characterized in that: The following removal methods are included: The support column (3) is removed from the purlin (2), and then the support column (3) is taken out from the foundation pit for recycling; A jack is used to apply a thrust between the pressure plate (9) and the support tube (5), the first limit ring (14) is rotated to be removed from the screw rod (11), the screw rod (11) and the clamping block (17) are pulled out from the clamping hole (12), and then the jack is used to unload the force in stages and the support tube (5) is taken out from the foundation pit for recovery; The purlin (2) and the steel bracket (6) are removed, and then the purlin (2) and the steel bracket (6) are taken out from the foundation pit for recycling.