Equipment and method for testing anchoring performance of anchor rod
By designing automated anchoring performance testing equipment, using laser displacement sensors and pressure sensors for automatic data acquisition, combined with pneumatic hydraulic pumps to achieve uniform loading, the inaccurate anchor test results and uneven pressurization in the existing technology are solved. Problem, improving testing efficiency and accuracy.
Patent Information
- Application Number
- CN202411234025.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-04
- Publication Date
- 2024-12-03
AI Technical Summary
The existing anchor bolt tensile range is limited, and multiple loading and unloading are required during the test process. The anchor bolt displacement needs to be measured manually, resulting in discontinuous, inaccurate results, uneven pressing, and inconvenient manual operation.
An anchor performance testing equipment was designed, including connectors, tension guide rods, reaction support barrels, hollow multi-stage jacks, loading heads, fixing nuts, sensing units, loading units and data processing control units, using laser displacement The sensor and pressure sensor are automatically monitored and collected, and uniform and stable loading is achieved through pneumatic hydraulic pumps.
It realizes high-precision and continuous anchoring performance testing, shortens the test time, improves the testing efficiency, and has high data accuracy. The test process only requires loading and unloading at one time, ensuring uniformity of pressurization.
Smart Images

Figure CN119064123A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of anchor support testing, and in particular relates to an anchor bolt anchoring performance testing device and method. Background Art
[0002] Anchor support is used for surrounding rock support of underground projects and has become the most widely used support and reinforcement method in underground projects. The support performance of anchors determines the support effect of anchors, so the performance test of anchors is particularly important. Anchor performance test includes anchor bearing capacity test and anchor anchor non-destructive testing. Anchor performance is usually tested by destructive test to measure the curve of the relationship between anchor pull-out force and anchor displacement and the damage of anchor. The performance of anchors is mainly tested by anchor tension meter. The existing anchor tension meter has limited range, and multiple loading and unloading are required during the test process; the displacement of anchors during the pulling process usually needs to be measured manually by staff, so the measured displacement is discontinuous and inconvenient, the measured result is of low accuracy, and the measured anchor force and displacement curve is not true; manual pressurization leads to uneven pressurization and inconvenient manual operation. Summary of the invention
[0003] The purpose of the present invention is to provide an anchoring performance testing device and method for anchor rods, so as to realize a large-scale, high-precision and intelligent anchoring performance test on anchor rods.
[0004] In order to achieve the above object, the technical solutions adopted by the present invention are as follows:
[0005] An anchor bolt anchoring performance testing device, comprising a connector, a tension guide rod, a reaction force support cylinder, a hollow multi-stage jack, a loading head, a fixing nut, a sensor unit, a loading unit and a data processing control unit;
[0006] One end of the connector is connected to the exposed end of the anchor rod, and the other end of the connector is connected to the inner end of the tension guide rod;
[0007] The inner end of the reaction support cylinder abuts against the surrounding rock, and the outer end of the reaction support cylinder is provided with the hollow multi-stage jack;
[0008] The loading head is arranged at the telescopic end of the hollow multi-stage jack, a loading hole is arranged in the middle of the loading head, and the tension guide rod passes through the loading hole;
[0009] The outer end of the tension guide rod is connected to the fixing nut, and the loading head abuts against the fixing nut;
[0010] The loading head is provided with the sensing unit;
[0011] The loading unit is dynamically connected to the hollow multi-stage jack, and the loading unit drives the telescopic end of the hollow multi-stage jack to telescope relative to the fixed end, and the telescopic end of the hollow multi-stage jack extends relative to the fixed end to drive the loading head to move toward the direction of the fixing nut;
[0012] The data processing control unit is respectively connected to the sensing unit and the loading unit by signals.
[0013] Preferably, the hollow multi-stage jack comprises a cylinder body, a first piston sleeve, a second piston sleeve and a guide sleeve;
[0014] The outer end of the reaction force support cylinder is provided with the cylinder body, the first piston sleeve, the second piston sleeve and the guide sleeve are nested in sequence inside the cylinder body, the tension guide rod passes through the inside of the guide sleeve, and the outer end of the second piston sleeve is connected to the loading head;
[0015] The cylinder body, the first piston sleeve, the second piston sleeve and the guide sleeve are all arranged along the vertical direction, the guide sleeve is fixedly connected to the cylinder body, the first piston sleeve can move along the vertical direction relative to the cylinder body, and the second piston sleeve can move along the vertical direction relative to the first piston sleeve;
[0016] The space between the inner end of the first piston sleeve, the cylinder body and the guide sleeve is the first extension drive chamber, the space between the outer end of the first piston sleeve and the cylinder body is the first retraction drive chamber, the space between the inner end of the second piston sleeve, the first piston sleeve and the guide sleeve is the second extension drive chamber, and the space between the outer end of the second piston sleeve and the first piston sleeve is the second retraction drive chamber;
[0017] The inner end of the cylinder body is connected to an oil inlet nozzle, and the oil inlet nozzle is communicated with the first extension drive chamber;
[0018] A bidirectional pressure control valve is provided at the inner end of the first piston sleeve;
[0019] The outer end of the cylinder body is connected to a first oil return nozzle, and the first oil return nozzle is communicated with the first retraction drive chamber;
[0020] The outer end of the first piston sleeve is connected to a second oil return nozzle, and the second oil return nozzle is communicated with the second retraction drive chamber.
[0021] Preferably, a first thrust ring is provided at the outer end edge of the cylinder body, and the first thrust ring can block the first piston sleeve;
[0022] A second thrust ring is arranged at the outer end edge of the first piston sleeve, and the second thrust ring can block the second piston sleeve.
[0023] Preferably, the inner wall of the first thrust ring is provided with a first dustproof gasket in sliding contact with the first piston sleeve;
[0024] The inner wall of the second thrust ring is provided with a second dustproof gasket which is in sliding contact with the second piston sleeve.
[0025] Preferably, sealing gaskets are arranged between the first piston sleeve and the cylinder body, between the first piston sleeve and the second piston sleeve, and between the second piston sleeve and the guide sleeve.
[0026] Preferably, the loading unit is configured as a pneumatic oil pressure pump, and the pneumatic oil pressure pump is connected to the oil inlet nozzle, the first oil return nozzle and the second oil return nozzle via an oil circuit.
[0027] Preferably, the sensing unit includes a pressure sensor and a laser displacement sensor, the trigger end of the pressure sensor abuts against the telescopic end of the hollow multi-stage jack and / or the fixing nut, and the sensing end of the laser displacement sensor faces the fixed end of the hollow multi-stage jack.
[0028] Preferably, it further comprises a data acquisition unit, wherein the data acquisition unit is respectively connected to the pressure sensor and the laser displacement sensor by signals, and the data processing control unit is connected to the data acquisition unit by signals.
[0029] Preferably, an anchor net is laid on the outer wall of the surrounding rock, and the reaction support cylinder and the hollow multi-stage jack are connected to the anchor net via safety ropes.
[0030] A method for testing the anchoring performance of an anchor rod, using the above-mentioned anchoring performance testing device, the method comprises the following steps:
[0031] Step 1. Select the anchor to be tested on the surrounding rock, connect one end of the connector to the exposed end of the anchor, connect the other end of the connector to the inner end of the tension guide rod, pass the reaction support tube, the hollow multi-stage jack and the loading head through the tension guide rod, and make the inner end of the reaction support tube abut against the surrounding rock, connect the reaction support tube and the hollow multi-stage jack to the anchor net through the safety rope, and connect the fixing nut to the outer end of the tension guide rod;
[0032] Step 2: The data processing control unit triggers the loading unit to drive the telescopic end of the hollow multi-stage jack to extend relative to the fixed end, thereby driving the loading head to move toward the direction of the fixed nut. At the same time, the pressure sensor monitors the pressure data in real time, and the laser displacement sensor monitors the displacement data in real time, and a preload force is applied to the anchor rod. The data acquisition unit collects the pressure data monitored by the pressure sensor and the displacement data monitored by the laser displacement sensor and uploads them to the data processing control unit;
[0033] Step 3: The data processing control unit performs zero adjustment on the pressure data and displacement data of the data acquisition unit;
[0034] Step 4, the data processing control unit triggers the loading unit to drive the telescopic end of the hollow multi-stage jack to continue to extend relative to the fixed end, thereby driving the loading head to continue to move toward the direction of the fixed nut. At the same time, the pressure sensor monitors the pressure data in real time, the laser displacement sensor monitors the displacement data in real time, and the data acquisition unit collects the pressure data monitored by the pressure sensor and the displacement data monitored by the laser displacement sensor and uploads them to the data processing control unit until the anchor rod is broken or the anchor rod is pulled out;
[0035] Step 5: The data processing control unit draws a curve of the relationship between the anchor pull-out force and the displacement according to the pressure data and the displacement data.
[0036] The beneficial technical effects of the present invention are:
[0037] 1. The structure is simple, easy to assemble, and convenient to carry to the mine for operation. The intelligent test solves the problems of inaccurate test data and difficult reading, shortens the test time, and greatly improves the test efficiency;
[0038] 2. The hollow multi-stage jack can be used to continuously test the anchor rod over a large range. The test process only requires loading and unloading once, and the test accuracy is high;
[0039] 3. Automatically monitor and collect pressure data and displacement data during the test process, with high test data accuracy. In particular, displacement monitoring can achieve continuous collection, with higher data accuracy;
[0040] 4. The pneumatic hydraulic pump is used to facilitate the use of high-pressure air drive in underground mines, and the hollow multi-stage jack can achieve uniform and stable loading of the anchor rod. BRIEF DESCRIPTION OF THE DRAWINGS
[0041] Figure 1 It is a schematic diagram of the layout of the anchor bolt anchoring performance testing equipment according to an embodiment of the present invention;
[0042] Figure 2 It is a three-dimensional diagram of the reaction force support cylinder, the hollow multi-stage jack and the loading head according to the embodiment of the present invention;
[0043] Figure 3 It is a cross-sectional view of a force support cylinder, a hollow multi-stage jack and a loading head according to an embodiment of the present invention;
[0044] Figure 4 It is a transverse cross-sectional view of the loading head part of an embodiment of the present invention;
[0045] Figure 5 A longitudinal cross-sectional view of a loading head portion of an embodiment of the present invention;
[0046] Figure 6 It is a schematic diagram of the structure of a data processing control unit according to an embodiment of the present invention. DETAILED DESCRIPTION
[0047] In order to make the purpose, technical scheme and beneficial effects of the present invention more clearly understood, the present invention is further described in detail below in combination with specific embodiments and with reference to the accompanying drawings. Certain embodiments of the present invention will be described more comprehensively with reference to the accompanying drawings, in which some but not all embodiments will be shown. In fact, the various embodiments of the present invention can be implemented in many different forms and should not be construed as being limited to the embodiments described herein; rather, these embodiments are provided so that the present invention meets applicable legal requirements.
[0048] In the description of the present invention, it should be noted that the terms "inside", "outside", "upper", "lower", "front", "back" and the like indicate directions or positional relationships based on directions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as limiting the present invention. In addition, the terms "first" and "second" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.
[0049] In an embodiment of the present invention, an anchor bolt anchoring performance testing device and method are provided. Figures 1 to 6 shown.
[0050] An anchor bolt anchoring performance testing device includes a connector 11, a tension guide rod 12, a reaction force support tube 2, a hollow multi-stage jack 3, a loading head 4, a fixing nut 13, a sensor unit, a loading unit and a data processing control unit 74.
[0051] A borehole is drilled in the surrounding rock 10 , an anchor rod 14 is anchored into the borehole through an anchoring agent 15 , and an anchor net 16 is laid on the outer wall of the surrounding rock 10 .
[0052] One end of the connector 11 is connected to the exposed end of the anchor rod 14, and the other end of the connector 11 is connected to the inner end of the tension guide rod 12. The outer wall of the tension guide rod 12 is provided with an external thread, and both ends of the connector 11 are provided with threaded holes, and the two ends of the connector 11 are respectively threadedly connected to the anchor rod 14 and the tension guide rod 12.
[0053] The inner end of the reaction support tube 2 abuts against the surrounding rock 10, and the outer end of the reaction support tube 2 is provided with a hollow multi-stage jack 3. A loading head 4 is provided at the telescopic end of the hollow multi-stage jack 3, and a loading hole is provided in the middle of the loading head 4, through which the tension guide rod 12 passes; the outer end of the tension guide rod 12 is connected to a fixing nut 13, and the loading head 4 abuts against the fixing nut 13. The reaction support tube 2 and the hollow multi-stage jack 3 are both connected to the anchor net 16 via a safety rope 17, so as to fix the reaction support tube 2 and the hollow multi-stage jack 3 before applying a pre-tightening force to the anchor rod 14 to prevent them from falling off.
[0054] The hollow multi-stage jack 3 includes a cylinder body 31, a first piston sleeve 32, a second piston sleeve 33 and a guide sleeve 34. The outer end of the reaction support cylinder 2 is provided with the cylinder body 31, the first piston sleeve 32, the second piston sleeve 33 and the guide sleeve 34 are nested in the cylinder body 31 in sequence, the tension guide rod 12 passes through the inside of the guide sleeve 34, and the outer end of the second piston sleeve 33 is connected to the loading head 4.
[0055] During the test, the hollow multi-stage jack 3 should always be kept coaxial with the axis of the anchor rod 14 to ensure that the rod body of the anchor rod 14 does not contact the wall of the borehole, so as to improve the accuracy of the test. In this embodiment, the tension guide rod 12 passes through the guide sleeve 34, and the guide sleeve 34 performs axial guidance and positioning on the tension guide rod 12 to keep the hollow multi-stage jack 3 coaxial with the axis of the anchor rod 14 during the test to ensure that the rod body of the anchor rod 14 does not contact the wall of the borehole.
[0056] The cylinder body 31, the first piston sleeve 32, the second piston sleeve 33 and the guide sleeve 34 are all arranged in the vertical direction. The inner end of the guide sleeve 34 is fixedly connected to the inner end of the cylinder body 31. The first piston sleeve 32 can move in the vertical direction relative to the cylinder body 31, and the second piston sleeve 33 can move in the vertical direction relative to the first piston sleeve 32.
[0057] The inner wall and outer wall of the inner end of the first piston sleeve 32 are both provided with sealing gaskets 61. The sealing gasket 61 of the inner wall of the inner end of the first piston sleeve 32 is in sliding contact with the outer wall of the guide sleeve 34, and the sealing gasket 61 of the inner wall of the inner end of the first piston sleeve 32 is in sliding contact with the inner wall of the cylinder body 31. The outer edge of the cylinder body 31 is provided with a first thrust ring 621, which can block the first piston sleeve 32. The inner wall of the first thrust ring 621 is provided with a first dustproof gasket 631 in sliding contact with the first piston sleeve 32. The inner wall and outer wall of the inner end of the second piston sleeve 33 are both provided with sealing gaskets 61. The sealing gasket 61 of the inner wall of the inner end of the second piston sleeve 33 is in sliding contact with the outer wall of the guide sleeve 34, and the sealing gasket 61 of the inner wall of the inner end of the second piston sleeve 33 is in sliding contact with the inner wall of the first piston sleeve 32. A second thrust ring 622 is disposed at the outer end edge of the first piston sleeve 32 , and the second thrust ring 622 can block the second piston sleeve 33 . A second dustproof gasket 632 is disposed on the inner wall of the second thrust ring 622 and is in sliding contact with the second piston sleeve 33 .
[0058] In this way, the space between the inner end of the first piston sleeve 32, the cylinder body 31 and the guide sleeve 34 is the first extension drive chamber 511, the space between the outer end of the first piston sleeve 32 and the cylinder body 31 is the first retraction drive chamber 521, the space between the inner end of the second piston sleeve 33, the first piston sleeve 32 and the guide sleeve 34 is the second extension drive chamber 512, and the space between the outer end of the second piston sleeve 33 and the first piston sleeve 32 is the second retraction drive chamber 522.
[0059] The inner end of the cylinder body 31 is connected to an oil inlet nozzle 53, which is in communication with the first extension drive chamber 511. The inner end of the first piston sleeve 32 is provided with a two-way pressure control valve 54, the outer end of the cylinder body 31 is connected to a first oil return nozzle 551, which is in communication with the first retraction drive chamber 521, and the outer end of the first piston sleeve 32 is connected to a second oil return nozzle 552, which is in communication with the second retraction drive chamber 522.
[0060] By injecting oil into the oil inlet nozzle 53, the oil in the first extension drive chamber 511 drives the first piston sleeve 32 to extend relative to the cylinder body 31, and the oil in the first retraction drive chamber 521 flows out through the first return oil nozzle 551; when the oil pressure in the first extension drive chamber 511 is greater than the opening pressure of the two-way pressure control valve 54, the oil in the first extension drive chamber 511 enters the second extension drive chamber 512 through the two-way pressure control valve 54, and the oil in the second extension drive chamber 512 drives the second piston sleeve 33 to extend relative to the first piston sleeve 32. Among them, by adjusting the opening pressure of the two-way pressure control valve 54, the extension and retraction procedures of the first piston sleeve 32 and the second piston sleeve 33 are controlled and the two piston sleeves are controlled to obtain the same constant working resistance. In the above process, the hollow multi-stage jack 3 drives the loading head 4 to achieve two-stage extension, thereby realizing a large-scale test of the anchor rod 14. By injecting oil into the second oil return nozzle 552, the oil in the second retracting drive chamber 522 drives the second piston sleeve 33 to retract relative to the first piston sleeve 32, and the oil in the second extending drive chamber 512 flows to the first extending drive chamber 511 through the two-way pressure control valve 54. By injecting oil into the first oil return nozzle 551, the oil in the first retracting drive chamber 521 drives the first piston sleeve 32 to retract relative to the cylinder body 31, and the oil in the first extending drive chamber 511 flows out through the oil inlet nozzle 53.
[0061] The loading head 4 is provided with the sensing unit, specifically, the sensing unit includes a pressure sensor 71 and a laser displacement sensor 72, the trigger end of the pressure sensor 71 is in contact with the telescopic end and the fixing nut 13 of the hollow multi-stage jack 3, and the sensing end of the laser displacement sensor 72 is facing the fixed end of the hollow multi-stage jack 3. The outer end of the second piston sleeve 33 of the hollow multi-stage jack 3 is connected to the loading head 4 via the connecting seat 34, and the sensing end of the laser displacement sensor 72 is facing the cylinder body 31 of the hollow multi-stage jack 3.
[0062] The laser displacement sensor 72 solves the problem that the displacement of the anchor rod 14 cannot be continuously monitored during the pulling process. The laser displacement sensor 72 is fixed on the loading head 4. During the pulling process of the anchor rod 14, the sensing end of the laser displacement sensor 72 senses the displacement between the cylinder body 31 of the hollow multi-stage jack 3 in real time, and imports the displacement data into the data acquisition unit 73 in real time through the data line.
[0063] The data acquisition unit 73 is signal-connected to the pressure sensor 71 and the laser displacement sensor 72 , and the data processing control unit 74 is signal-connected to the data acquisition unit 73 .
[0064] The loading unit is dynamically connected to the hollow multi-stage jack 3, and the loading unit drives the telescopic end of the hollow multi-stage jack 3 to extend and retract relative to the fixed end. The telescopic end of the hollow multi-stage jack 3 extends relative to the fixed end to drive the loading head 4 to move toward the direction of the fixing nut 13.
[0065] The data processing control unit 74 is connected to the sensing unit and the loading unit by wireless signals. The pressure sensor 71 of the sensing unit monitors the pressure data in real time, the laser displacement sensor 72 monitors the displacement data in real time, and the data acquisition unit 73 acquires the pressure data monitored by the pressure sensor 71 and the displacement data monitored by the laser displacement sensor 72 and uploads them to the data processing control unit 74. The data processing control unit 74 is used to trigger the loading unit to supply power to the hollow multi-stage jack 3, thereby driving the telescopic end of the hollow multi-stage jack 3 to telescope relative to the fixed end.
[0066] The loading unit is configured as a pneumatic oil pressure pump 8, which is connected to the oil inlet nozzle 53, the first oil return nozzle 551 and the second oil return nozzle 552 through an oil circuit to supply high-pressure oil to the oil inlet nozzle 53, the first oil return nozzle 551 and the second oil return nozzle 552. The start, oil inlet, pause and oil return of the pneumatic oil pressure pump 8 are controlled by triggering buttons on the data processing control unit 74, and a low-speed button and a high-speed button are used to control the amount of oil inlet, thereby controlling the speed of the hollow multi-stage jack 3 to extend and retract.
[0067] A method for testing the anchoring performance of an anchor rod, using the above-mentioned anchoring performance testing device of this embodiment, the method comprises the following steps:
[0068] Step 1, open the data analysis software of the data processing control unit 74, input the material, diameter, length and drilling depth of the anchor rod 14 through the touch screen operation, and automatically calculate the anchoring length of the anchor rod through the formula (1) provided in the software, so as to judge whether the installation of the anchor rod in this test achieves the designed anchoring effect, and then use it to select the anchor rod installed on the surrounding rock 10 that achieves the designed anchor rod effect as the anchor rod 14 to be tested.
[0069]
[0070] in:
[0071] L0 represents the anchor length of the anchor rod, mm;
[0072] L mg Indicates the length of anchor, mm;
[0073] D represents the diameter of the drill hole, mm;
[0074] D1 represents the diameter of the resin anchor, mm;
[0075] D2 represents the diameter of the anchor rod, mm;
[0076] Select the anchor rod 14 to be tested on the surrounding rock 10, connect one end of the connector 11 to the exposed end of the anchor rod 14, connect the other end of the connector 11 to the inner end of the tension guide rod 12, pass the reaction support tube 2, the hollow multi-stage jack 3 and the loading head 4 through the tension guide rod 12, and make the inner end of the reaction support tube 2 abut against the surrounding rock 10, connect the reaction support tube 2 and the hollow multi-stage jack 3 to the anchor net 16 through the safety rope 17, and connect the fixing nut 13 to the outer end of the tension guide rod 12.
[0077] Step 2: The data processing control unit 74 triggers the loading unit to drive the telescopic end of the hollow multi-stage jack 3 to extend relative to the fixed end, thereby driving the loading head 4 to move toward the direction of the fixing nut 13. At the same time, the pressure sensor 71 monitors the pressure data in real time, and the laser displacement sensor 72 monitors the displacement data in real time, and a pre-tightening force is applied to the anchor rod 14. The data acquisition unit 73 collects the pressure data monitored by the pressure sensor 71 and the displacement data monitored by the laser displacement sensor 72 and uploads them to the data processing control unit 74.
[0078] Among them, during the loading process, oil is injected into the oil inlet nozzle 53 to make the first piston sleeve 32 extend relative to the cylinder body 31. The first piston sleeve 32 extends to the maximum length. When the oil pressure in the first extension drive chamber 511 is greater than the opening pressure of the two-way pressure control valve 54, the oil in the first extension drive chamber 511 enters the second extension drive chamber 512 through the two-way pressure control valve 54, and the second piston sleeve 33 extends relative to the first piston sleeve 32.
[0079] The data processing control unit 74 triggers the loading unit to drive the hollow multi-stage jack 3 to load. First, high-speed and then low-speed operations are adopted. First, the high-speed button of the data processing control unit 74 is clicked to pressurize. During the loading process, always keep an eye on the anchor pull-out force and displacement relationship curve displayed on the display screen of the data processing control unit 74. After the yield load of the anchor 14 is loaded, click the low-speed button of the data processing control unit 74 to continue to slowly pressurize.
[0080] Step 3: The data processing control unit 74 performs zero adjustment on the pressure data and displacement data of the data acquisition unit 73 .
[0081] Step 4, the data processing control unit 74 triggers the loading unit to drive the telescopic end of the hollow multi-stage jack 3 to continue to extend relative to the fixed end, thereby driving the loading head 4 to continue to move in the direction of the fixing nut 13. At the same time, the pressure sensor 71 monitors the pressure data in real time, and the laser displacement sensor 72 monitors the displacement data in real time. The data acquisition unit 73 collects the pressure data monitored by the pressure sensor 71 and the displacement data monitored by the laser displacement sensor 72 and uploads them to the data processing control unit 74 until the anchor rod 14 is broken or the anchor rod is pulled out.
[0082] Step 5: The data processing control unit 74 draws a curve of the relationship between the anchor rod pull-out force and the displacement according to the pressure data and the displacement data, and displays it on the screen through the data processing control unit 74.
[0083] After the test is completed, the data processing control unit 74 intelligently generates a report on the test, which can accurately determine whether the anchor rod 14 of this test has reached the designed anchoring force during the pulling process, and judge whether the anchoring performance of the anchor rod 14 is qualified, thereby achieving safety warning.
[0084] So far, the present embodiment has been described in detail in conjunction with the accompanying drawings. Based on the above description, those skilled in the art should have a clear understanding of the anchor bolt anchoring performance test equipment and method of the present invention. The anchor bolt anchoring performance test equipment and method of the present invention have a simple structure, are easy to assemble, and are convenient to carry to the mine for operation. The intelligent test solves the problems of inaccurate test data and difficult reading, shortens the test time, and greatly improves the test efficiency; the hollow multi-stage jack 3 can be used to perform a large-scale continuous test on the anchor bolt 14, and the test process only requires one loading and unloading, and the test accuracy is high; the pressure data and displacement data of the test process are automatically monitored and collected, and the test data has high accuracy, especially the displacement monitoring can realize continuous collection, and the data accuracy is higher; the pneumatic hydraulic pump 8 is used to facilitate the use of high-pressure wind drive in the mine, and the hollow multi-stage jack 3 can realize uniform and stable loading of the anchor bolt 14.
[0085] Of course, the specific embodiments described above further illustrate the purpose, technical solutions and beneficial effects of the present invention. It should be understood that the above description is only a specific embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.
Claims
1. An anchor bolt anchoring performance testing device, characterized in that: It includes a connector, a tension guide rod, a reaction force support cylinder, a hollow multi-stage jack, a loading head, a fixing nut, a sensor unit, a loading unit and a data processing control unit; One end of the connector is connected to the exposed end of the anchor rod, and the other end of the connector is connected to the inner end of the tension guide rod; The inner end of the reaction support cylinder abuts against the surrounding rock, and the outer end of the reaction support cylinder is provided with the hollow multi-stage jack; The loading head is arranged at the telescopic end of the hollow multi-stage jack, a loading hole is arranged in the middle of the loading head, and the tension guide rod passes through the loading hole; The outer end of the tension guide rod is connected to the fixing nut, and the loading head abuts against the fixing nut; The loading head is provided with the sensing unit; The loading unit is dynamically connected to the hollow multi-stage jack, and the loading unit drives the telescopic end of the hollow multi-stage jack to telescope relative to the fixed end, and the telescopic end of the hollow multi-stage jack extends relative to the fixed end to drive the loading head to move toward the direction of the fixing nut; The data processing control unit is respectively connected to the sensing unit and the loading unit by signals.
2. The anchor bolt anchoring performance testing device according to claim 1, characterized in that: The hollow multi-stage jack comprises a cylinder body, a first piston sleeve, a second piston sleeve and a guide sleeve; The outer end of the reaction force support cylinder is provided with the cylinder body, the first piston sleeve, the second piston sleeve and the guide sleeve are nested in sequence inside the cylinder body, the tension guide rod passes through the inside of the guide sleeve, and the outer end of the second piston sleeve is connected to the loading head; The cylinder body, the first piston sleeve, the second piston sleeve and the guide sleeve are all arranged along the vertical direction, the guide sleeve is fixedly connected to the cylinder body, the first piston sleeve can move along the vertical direction relative to the cylinder body, and the second piston sleeve can move along the vertical direction relative to the first piston sleeve; The space between the inner end of the first piston sleeve, the cylinder body and the guide sleeve is the first extension drive chamber, the space between the outer end of the first piston sleeve and the cylinder body is the first retraction drive chamber, the space between the inner end of the second piston sleeve, the first piston sleeve and the guide sleeve is the second extension drive chamber, and the space between the outer end of the second piston sleeve and the first piston sleeve is the second retraction drive chamber; The inner end of the cylinder body is connected to an oil inlet nozzle, and the oil inlet nozzle is communicated with the first extension drive chamber; A bidirectional pressure control valve is provided at the inner end of the first piston sleeve; The outer end of the cylinder body is connected to a first oil return nozzle, and the first oil return nozzle is communicated with the first retraction drive chamber; The outer end of the first piston sleeve is connected to a second oil return nozzle, and the second oil return nozzle is communicated with the second retraction drive chamber.
3. The anchor bolt anchoring performance testing device according to claim 2, characterized in that: A first thrust ring is provided at the outer end edge of the cylinder body, and the first thrust ring can block the first piston sleeve; A second thrust ring is arranged at the outer end edge of the first piston sleeve, and the second thrust ring can block the second piston sleeve.
4. The anchor bolt anchoring performance testing device according to claim 3, characterized in that: The inner wall of the first thrust ring is provided with a first dustproof gasket in sliding contact with the first piston sleeve; The inner wall of the second thrust ring is provided with a second dustproof gasket which is in sliding contact with the second piston sleeve.
5. The anchor bolt anchoring performance testing device according to claim 2, characterized in that: Sealing gaskets are arranged between the first piston sleeve and the cylinder body, between the first piston sleeve and the second piston sleeve, and between the second piston sleeve and the guide sleeve.
6. The anchor bolt anchoring performance testing device according to claim 2, characterized in that: The loading unit is configured as a pneumatic oil pressure pump, and the pneumatic oil pressure pump is connected to an oil inlet nozzle, a first oil return nozzle, and a second oil return nozzle via an oil circuit.
7. The anchor bolt anchoring performance testing device according to claim 1, characterized in that: The sensing unit includes a pressure sensor and a laser displacement sensor. The trigger end of the pressure sensor abuts against the telescopic end of the hollow multi-stage jack and / or the fixing nut, and the sensing end of the laser displacement sensor faces the fixing end of the hollow multi-stage jack.
8. The anchor bolt anchoring performance testing device according to claim 7, characterized in that: It also includes a data acquisition unit, which is respectively connected to the pressure sensor and the laser displacement sensor by signal, and the data processing control unit is connected to the data acquisition unit by signal.
9. The anchor bolt anchoring performance testing device according to claim 1, characterized in that: An anchor net is laid on the outer wall of the surrounding rock, and the reaction support cylinder and the hollow multi-stage jack are connected to the anchor net via safety ropes.
10. A method for testing anchor bolt anchoring performance, characterized in that: Using the anchor bolt anchoring performance testing device according to any one of claims 1 to 9, the method comprises the following steps: Step 1. Select the anchor to be tested on the surrounding rock, connect one end of the connector to the exposed end of the anchor, connect the other end of the connector to the inner end of the tension guide rod, pass the reaction support tube, the hollow multi-stage jack and the loading head through the tension guide rod, and make the inner end of the reaction support tube abut against the surrounding rock, connect the reaction support tube and the hollow multi-stage jack to the anchor net through the safety rope, and connect the fixing nut to the outer end of the tension guide rod; Step 2: The data processing control unit triggers the loading unit to drive the telescopic end of the hollow multi-stage jack to extend relative to the fixed end, thereby driving the loading head to move toward the direction of the fixed nut. At the same time, the pressure sensor monitors the pressure data in real time, and the laser displacement sensor monitors the displacement data in real time, and a preload force is applied to the anchor rod. The data acquisition unit collects the pressure data monitored by the pressure sensor and the displacement data monitored by the laser displacement sensor and uploads them to the data processing control unit; Step 3: The data processing control unit performs zero adjustment on the pressure data and displacement data of the data acquisition unit; Step 4, the data processing control unit triggers the loading unit to drive the telescopic end of the hollow multi-stage jack to continue to extend relative to the fixed end, thereby driving the loading head to continue to move toward the direction of the fixed nut. At the same time, the pressure sensor monitors the pressure data in real time, the laser displacement sensor monitors the displacement data in real time, and the data acquisition unit collects the pressure data monitored by the pressure sensor and the displacement data monitored by the laser displacement sensor and uploads them to the data processing control unit until the anchor rod is broken or the anchor rod is pulled out; Step 5: The data processing control unit draws a curve of the relationship between the anchor pull-out force and the displacement according to the pressure data and the displacement data.
Citation Information