Automatic equipment manufacturing method and system based on large model

By decomposing and sorting item order data in the MES system, the problem of low production efficiency of customized items is solved, batch processing and assembly of multiple items of the same element is realized, and production efficiency and timeliness are improved.

CN119067426AInactive Publication Date: 2024-12-03JIANGSU HEMA INFORMATION TECH CO LTD
View PDF 10 Cites 0 Cited by

Patent Information

Application Number
CN202411153586.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-21
Publication Date
2024-12-03
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

During the manufacturing process, the order data processing efficiency of customized items is low, resulting in multiple customized items with the same elements that need to be customized separately for the entire process, resulting in slow production speed.

Method used

By decomposing item order data in the MES system, generating item production elements collections, and sorting them according to element type and time labels, batch processing and assembly of multiple items of the same element are achieved.

Benefits of technology

It improves order data processing efficiency and customized item production speed, saves time and costs, and simplifies the item production process, avoids the use of measurement tools in traditional methods, and improves production efficiency and timeliness.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119067426A_ABST
    Figure CN119067426A_ABST
Patent Text Reader

Abstract

The invention provides an automatic equipment manufacturing method and system based on a large model, and the method comprises the steps: extracting article elements of the same type in all article production element sets, generating a plurality of first element sets, dividing the corresponding article elements in the first element sets into the same element unit, sorting all the element units in the first element set according to the corresponding manufacturing time labels to obtain a second element set, sending the second element set to different preparation terminals according to the types of a plurality of different second element sets, and establishing a storage space based on the quantity of the article order data, and selecting the article order data with the minimum time label, extracting the number of article parts in each article order data and the attributes of the article parts to obtain an assembly number, and determining an assembly end corresponding to the assembly number to assemble the article parts in the corresponding storage space. A plurality of same customized articles can be subjected to article customization processing at the same time, and the processing efficiency and the production speed are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of data processing, and in particular to an equipment automated manufacturing method and system based on a large model. Background Art

[0002] MES software is the production process execution management software for manufacturing enterprises. It is a production information management system for the execution layer of the workshop of manufacturing enterprises. MES can provide enterprises with management modules including manufacturing data management, planning and scheduling management, production scheduling management, inventory management, quality management, human resources management, work center / equipment management, tool and fixture management, procurement management, cost management, project kanban management, production process control, bottom-level data integration analysis, and upper-level data integration decomposition, etc., to create a solid, reliable, comprehensive and feasible manufacturing collaborative management platform for enterprises.

[0003] In the production process of items, there will be many customized items, such as furniture and other items. When processing the order data of customized items, they are generally processed according to the order data. Each time the item is customized, the whole process is customized. As a result, multiple customized items with the same elements will also be customized in the whole process separately, resulting in low order data processing efficiency and slow production speed of customized items. Summary of the invention

[0004] The embodiment of the present invention provides a large-model-based equipment automation manufacturing method and system, which can enable multiple customized items with the same elements to undergo full-process item customization processing simultaneously, thereby improving the efficiency of order data processing and the production speed of customized items.

[0005] In a first aspect of an embodiment of the present invention, a method and system for automated manufacturing of equipment based on a large model are provided, wherein a processing model terminal is connected to a preparation terminal, a sorting terminal, and an assembly terminal respectively, and item order data is processed through the following steps, including: The processing model decomposes all the item order data in the MES system to obtain the item production element set corresponding to each item order data, and adds corresponding item tags and time tags to all item elements in the item production element set; Extracting the same type of item elements from all item production element sets to generate multiple first element sets, and dividing the corresponding item elements in the first element sets into the same element unit; Determine the smallest time tag among all item elements in each element unit as the production time tag, and sort all element units in the first element set in descending order according to their corresponding production time tags to obtain a second element set; Sending the second element sets to different preparation terminals according to the types of the plurality of different second element sets, so that the staff prepares the item parts according to the order of the element units in the second element sets, and adding item tags to the item parts based on the preparation terminals; Establish storage space based on the quantity of the item order data, and set a corresponding item label for each storage space so that the staff can sort the item parts into the corresponding storage space according to the sorting terminal; The item order data with the smallest time tag is selected, the quantity of item parts and the attributes of the item parts in each item order data are extracted to obtain the assembly quantity, and the assembly end corresponding to the assembly quantity is determined to assemble the item parts in the corresponding storage space.

[0006] Optionally, in a possible implementation manner of the first aspect, in the step of extracting the same type of item elements in all item production element sets to generate multiple first element sets, and dividing the same item elements in the first element sets into the same element unit, specifically includes: Obtain the one-dimensional type label corresponding to each item element in all item production element sets, and classify the item elements with the same one-dimensional type label into the first element set; A two-dimensional type label corresponding to each item element in each first element set is extracted, wherein the two-dimensional type label includes specification information, and the item elements having corresponding specification information are divided into the same element unit.

[0007] Optionally, in a possible implementation manner of the first aspect, in extracting the two-dimensional type label corresponding to each item element in each first element set, the two-dimensional type label including specification information, and dividing the item elements having the corresponding specification information into the same element unit, specifically includes: If the first element set is a plate element set and the item element is a plate element, obtaining specification information of each plate element in the plate element set, wherein the specification information includes at least shape information and size information; Comparing shape information of any two item elements to obtain a first shape comparison value, and if the first shape comparison value is greater than a preset shape value, comparing size information of the two item elements to obtain a first size comparison value; If the first size comparison value is greater than the preset size value, a fusion comparison value is obtained according to the first shape comparison value and the first size comparison value. If the fusion comparison value is greater than the fusion preset value, it is determined that the two object elements correspond to each other.

[0008] Optionally, in a possible implementation manner of the first aspect, the step of comparing shape information of any two object elements to obtain a first shape comparison value specifically includes: Respectively obtain a first view set and a second view set of two item elements, each of the first view set and the second view set including a first subview and a second subview respectively; Performing coordinate processing on the first subview and the second subview to obtain a coordinate value of each pixel point, and obtaining the coordinates of target pixel points in each of the first subview and the second subview to generate a first coordinate set and a second coordinate set; A first shape comparison value is obtained by calculating based on the first coordinate sets and the second coordinate sets of all the first sub-views and the second sub-views.

[0009] Optionally, in a possible implementation manner of the first aspect, the step of calculating the first shape comparison value based on the first coordinate set and the second coordinate set of all the first sub-views and the second sub-views specifically includes: Obtaining the number of pixel points having the same coordinates in each first coordinate set and the corresponding second coordinate set to obtain a first same number; Obtaining the number of pixel points with different coordinates in each first coordinate set and the corresponding second coordinate set to obtain a first sub-number, and obtaining the number of pixel points with different coordinates in each second coordinate set and the corresponding first coordinate set to obtain a second sub-number; Obtaining a first different quantity according to the first sub-quantity and the second sub-quantity; A first shape comparison value is obtained by calculating a first number of similarities and a first number of differences of all corresponding first sub-views and second sub-views; The first shape comparison value is calculated by the following formula, Among them, b1 is the first shape comparison value, x i is the first identical number of the first and second subviews corresponding to the i-th subview, y i is the first different number of the i-th corresponding first subview and second subview, N is the number of the corresponding first subview and second subview, k u is the shape comparison weight.

[0010] Optionally, in a possible implementation manner of the first aspect, the step of comparing the size information of two item elements to obtain a first size comparison value specifically includes: Obtain a length difference, a width difference and a height difference according to the length information, the width information and the height information of the size information in the two item elements, and calculate a first size comparison value according to the length difference, the width difference and the height difference; The first size comparison value is calculated by the following formula, Where b2 is the first size comparison value, a is the first constant value, k I is the length weight value, l1 is the long information in the first item element, l2 is the long information in the second item element, k d is the width weight value, d1 is the width information in the first item element, d2 is the width information in the second item element, k g is the height weight value, g1 is the high information in the first item element, and g2 is the high information in the second item element; The obtaining of the fusion comparison value according to the first shape comparison value and the first size comparison value specifically includes: The fusion alignment value is calculated by the following formula: Among them, r1 is the fusion comparison value, e1 is the first fusion weight, e2 is the second fusion weight, and u is the second constant value.

[0011] Optionally, in a possible implementation manner of the first aspect, the step of selecting the item order data with the smallest time tag and extracting the quantity of item parts and the attributes of the item parts in each item order data to obtain the assembly quantity specifically includes: Extract the number of plate elements, the number of fixture elements, and the number of bracket elements of the item parts in the item order data; Extracting plate properties, fixture properties, and bracket properties of the item parts, and quantifying the plate properties, fixture properties, and bracket properties to obtain plate quantization values, fixture quantization values, and bracket quantization values; A predicted assembly time is obtained by performing a comprehensive calculation based on the number of plate elements, the number of fixture elements, the number of bracket elements, the plate quantification value, the fixture quantification value and the bracket quantification value; The predicted assembly time is compared with the planned production time to obtain the assembly quantity.

[0012] Optionally, in a possible implementation manner of the first aspect, the step of comparing the predicted assembly time with the planned production time to obtain the assembly quantity specifically includes: The preliminary quantity is calculated by the following formula, Among them, s1 is the preliminary quantity, α1 is the number of plate elements, β1 is the plate quantification value, α2 is the number of fixture elements, β2 is the fixture quantification value, α3 is the number of bracket elements, β3 is the bracket quantification value, π is the preset standard value, θ1 is the assembly weight value, t1 is the preset standard time, and t2 is the planned production time; If the calculated assembly quantity is an integer, the preliminary quantity is used as the assembly quantity; If the calculated assembly quantity is not an integer, the integer that is larger than the preliminary quantity and closest to the preliminary quantity will be used as the assembly quantity.

[0013] Optionally, in a possible implementation of the first aspect, if it is determined that the user adds an assembly quantity based on the calculated assembly quantity, an added value of the assembly quantity is determined, and the added value is compared with the calculated assembly quantity to obtain a first adjustment value; The assembly weight value is increased based on the first adjustment value, and the increased assembly weight value is obtained by the following formula: Among them, θ2 is the assembly weight value after the increase processing, s2 is the added value, and ω1 is the increase weight value; If it is determined that the user reduces the assembly quantity based on the calculated assembly quantity, determining the reduction value of the assembly quantity, and comparing the reduction value with the calculated assembly quantity to obtain a second adjustment value; The assembly weight value is reduced based on the second adjustment value, and the assembly weight value after the increase is obtained by the following formula: Among them, θ2 is the assembly weight value after the reduction process, s3 is the reduction value, and ω2 is the reduction weight value.

[0014] The second aspect of an embodiment of the present invention provides an equipment automation manufacturing system based on a large model, including: a processing module, used to decompose all item order data in the MES system to obtain a set of item production elements corresponding to each item order data, and add corresponding item tags and time tags to all item elements in the item production element set.

[0015] The preparation module is used to classify the item modules with corresponding item labels and time labels added in the processing module, generate a first element set and a second element set, and classify the item elements in the element set in a certain way and send them to the sorting module.

[0016] The sorting module is used to sort the parts of the items according to the classification in the preparation module.

[0017] The assembly module is used to assemble the sorted item parts.

[0018] According to a third aspect of an embodiment of the present invention, there is provided an electronic device, comprising: a memory, a processor and a computer program, wherein the computer program is stored in the memory, and the processor runs the computer program to execute the first aspect of the present invention and various methods that may be involved in the first aspect.

[0019] According to a fourth aspect of an embodiment of the present invention, a storage medium is provided, in which a computer program is stored. When the computer program is executed by a processor, it is used to implement the method of the first aspect of the present invention and various possible designs of the first aspect.

[0020] The beneficial effects of the present invention are as follows: 1. This solution uses the server to decompose items to obtain corresponding item production elements, and then uniformly assembles the decomposed item elements after processing. The process adopts intelligent processing, which is easy to operate and greatly improves production efficiency, avoiding the problem of inefficiency caused by producing items one by one. This solution can produce similar item elements at the same time, without the need to produce items one by one, and can produce items in chronological order, first producing time-critical items, saving time costs, and greatly improving the efficiency of item production.

[0021] 2. This solution obtains the subview of the item element through image processing, and then coordinates the subview to compare the shape and size of the item element. This method can easily obtain the shape of each item element, and can also well abandon the time and effort spent on measuring the size of the item using a ruler or other measuring tools in the traditional method. In the future, only the number of coordinate points in each coordinate subview and the difference in length, width and height of each item element need to be compared to obtain the similarity between the item elements. The comparison process adopts intelligent processing, which is very convenient and simple, and the efficiency is greatly improved compared with the traditional method. 3. This solution effectively improves the speed and efficiency of item production by sorting the item elements by time and then allocating the appropriate number of assembly personnel to them according to the number and attributes of the item elements. This method can produce urgent items first, and can also allocate the appropriate number of people to them according to the difficulty of item production, ensuring the timeliness of item production and avoiding the problem of not being able to complete item orders due to time constraints or too high difficulty in item production during item production. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 It is a schematic flow chart of a large-model-based equipment automation manufacturing method provided by an embodiment of the present invention; Figure 2 It is a structural schematic diagram of a large-model-based equipment automation manufacturing system provided by an embodiment of the present invention; Figure 3 It is a schematic diagram of the hardware structure of an electronic device provided by an embodiment of the present invention. DETAILED DESCRIPTION

[0023] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0024] The terms "first", "second", "third", "fourth", etc. (if any) in the specification and claims of the present invention and the above drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the numbers used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in sequences other than those illustrated or described herein.

[0025] It should be understood that in various embodiments of the present invention, the size of the sequence number of each process does not mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present invention.

[0026] It should be understood that in the present invention, "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions. For example, a process, method, system, product or apparatus comprising a series of steps or units is not necessarily limited to those steps or units explicitly listed, but may include other steps or units not explicitly listed or inherent to these processes, methods, products or apparatuses.

[0027] It should be understood that in the present invention, "plurality" refers to two or more than two. "And / or" is merely a description of the association relationship of associated objects, indicating that three relationships may exist. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. The character " / " generally indicates that the objects associated before and after are in an "or" relationship. "Contains A, B and C", "Contains A, B, C" means that A, B, and C are all included, "Contains A, B or C" means that one of A, B, and C is included, and "Contains A, B and / or C" means that any one, any two, or any three of A, B, and C are included.

[0028] It should be understood that in the present invention, "B corresponding to A", "B corresponding to A", "A corresponds to B" or "B corresponds to A" means that B is associated with A and B can be determined based on A. Determining B based on A does not mean determining B based only on A, but B can also be determined based on A and / or other information. A and B match when the similarity between A and B is greater than or equal to a preset threshold.

[0029] Depending on the context, "if" as used herein may be interpreted as "when" or "when" or "in response to determining" or "in response to detecting."

[0030] The technical solution of the present invention is described in detail with specific embodiments below. The following specific embodiments can be combined with each other, and the same or similar concepts or processes may not be described in detail in some embodiments.

[0031] See also Figure 1 , is a schematic diagram of a large model-based equipment automation manufacturing method provided by an embodiment of the present invention, Figure 1 The execution subject of the method shown may be a software and / or hardware device. The execution subject of the present application may include but is not limited to at least one of the following: user equipment, network equipment, etc. Among them, the user equipment may include but is not limited to computers, smart phones, personal digital assistants (Personal Digital Assistant, referred to as: PDA) and the electronic devices mentioned above. The network device may include but is not limited to a single network server, a server group consisting of multiple network servers, or a cloud based on cloud computing consisting of a large number of computers or network servers, wherein cloud computing is a type of distributed computing, a super virtual computer consisting of a group of loosely coupled computers. This embodiment does not limit this. It includes steps S1 to S6, as follows: S1, the processing model end decomposes all the item order data in the MES system to obtain the item production element set corresponding to each item order data, and adds corresponding item tags and time tags to all item elements in the item production element set.

[0032] Since there will be many customized items in the production process, in order to avoid wasting time and energy on making customized items one by one, this solution adopts the method of decomposing the items and then processing them accordingly to improve the order data processing efficiency and the production speed of customized items.

[0033] Specifically, the processing model end can be a server. The processing model end will first receive all the item order data from the MES system, and after decomposing it, it will obtain the item production element set corresponding to each item order data. Since the item can be composed of plates, brackets and fixtures, many plate elements, bracket elements and fixture elements will be generated after decomposing it. In order to facilitate distinction, they need to be marked in the server. For example, if the plate is decomposed, it is marked as a plate element, the bracket is decomposed and marked as a bracket element, and the fixture is decomposed and marked as a fixture element. Since the production time of each item is different, it is also necessary to mark it with time, that is, add corresponding item tags and time tags to all item elements in the item production element set as mentioned in S1.

[0034] After decomposing the item elements, adding corresponding item tags and time tags to them is conducive to subsequent processing according to the added tags.

[0035] This solution achieves mass production of items by decomposing the items through the server and then performing corresponding processing. The entire process adopts intelligent processing, the operation is very simple and convenient, and it can greatly improve the efficiency of item production.

[0036] In order to fully reflect this solution, the following steps S2 to S6 will be described in detail: S2, extracting the same type of item elements from all item production element sets to generate multiple first element sets, and dividing the corresponding item elements in the first element sets into the same element unit.

[0037] Among them, the first element set can be a plate element set, a bracket element set and a fixing element set. Since the decomposed item elements are marked, the item elements belonging to the same mark can be extracted to generate the first element set based on the mark. Since the shapes and specification information between plates, brackets and fixings are also different, a more detailed division must be performed after the first element set is generated to extract similar item elements for subsequent operations.

[0038] In some embodiments, S2 (extracting the same type of item elements from all item production element sets to generate multiple first element sets, and dividing the corresponding item elements in the first element sets into the same element unit.) includes steps S21 to S22, which are specifically as follows: S21, obtaining a one-dimensional type label corresponding to each item element in all item production element sets, and classifying item elements with the same one-dimensional type label into a first element set.

[0039] Among them, the one-dimensional type label is a mark made to extract the same type of item elements. The one-dimensional type label can be the plate elements, bracket elements and fixing elements corresponding to the item after being decomposed. There can be multiple one-dimensional type labels. In order to integrate the item elements extracted by the one-dimensional type label, the one-dimensional type labels of the same category are classified into a first element set. There can also be multiple first element sets. For example, the one-dimensional type labels corresponding to the plate elements are classified into a first element set, the one-dimensional type labels corresponding to the bracket elements are classified into a first element set, and the one-dimensional type labels corresponding to the fixing elements are classified into a first element set.

[0040] After the first step of classifying the item elements through one-dimensional type labels, in order to extract similar item elements, we need to perform the following steps: S22, extracting the two-dimensional type label corresponding to each item element in each first element set, wherein the two-dimensional type label includes specification information, and classifying the item elements with corresponding specification information into the same element unit.

[0041] Among them, the two-dimensional type label is used to mark the item elements that are similar to the item elements classified according to the one-dimensional type label. The two-dimensional type label can be the specification information of the item element. In order to extract similar plate elements, bracket elements and fixture elements, we need to obtain the specification information of all plate elements, bracket elements and fixture elements, and find similar plate elements, bracket elements and fixture elements by comparing their specification information.

[0042] In some other embodiments, step S22 (extracting the two-dimensional type tag corresponding to each item element in each first element set, the two-dimensional type tag including specification information, and classifying the item elements with corresponding specification information into the same element unit) includes steps S221 to S223, which are specifically as follows: S221: If the first element set is a plate element set and the object element is a plate element, obtain specification information of each plate element in the plate element set, where the specification information includes at least shape information and size information.

[0043] Specifically, after obtaining the first element set, the specification information of the item elements in the first element set is obtained, because to constitute an item element, at least the shape and size must be included. Since the shapes of the item elements may be different, and the lengths, widths and heights may also be different, at least the shape information and size information of the item elements must be included to determine whether two item elements are similar. If only one of them is included, it may result in the same shape but different size or the same size but different shape.

[0044] In order to obtain item elements with similar shapes, this solution adopts the following method: S222: Compare shape information of any two item elements to obtain a first shape comparison value. If the first shape comparison value is greater than a preset shape value, compare size information of the two item elements to obtain a first size comparison value.

[0045] Specifically, in order to obtain item elements with the same shape, it is necessary to compare the shape information of any two item elements. After the comparison, a numerical value will be obtained, which will be recorded as the first shape comparison value. In order to determine whether two item elements are similar based on the first shape comparison value, we preset a shape value here. The preset shape value can be the minimum value required for two item elements to be similar. If the obtained first shape comparison value is greater than the preset comparison value, it means that the shapes of the two item elements have reached the similarity value. If the obtained first shape comparison value is less than the preset comparison value, it means that the shapes of the two item elements have not reached the similarity value.

[0046] The first shape comparison value can be obtained by following the steps below: A first view set and a second view set of two item elements are obtained respectively, and each of the first view set and the second view set includes a first sub-view and a second sub-view respectively.

[0047] Among them, after data collection, a first subview and a second subview can be obtained, and the shapes of the object elements can be compared through the first subview and the second subview to see if they are similar. The first subview and the second subview can both be multiple subviews, for example, both can be top views or side views. After the subviews are processed and compared to see if they are consistent, it can be concluded whether the shapes of the two object elements are consistent. The processing method is as follows: coordinate processing is performed on the first subview and the second subview to obtain the coordinate value of each pixel point, and the coordinates of the target pixel points in each of the first subview and the second subview are obtained to generate a first coordinate set and a second coordinate set.

[0048] Coordinate processing of the first sub-view and the second sub-view can obviously analyze the image and well show the image rules. Subsequently, according to the position and number of the coordinate points, it is possible to well compare whether the shapes of the object elements are similar.

[0049] The target pixel point may be a black coordinate. The coordinate value of each target pixel point may be obtained after coordinate processing of the first subview and the second subview. For example, if the shapes of the subviews of the two item elements are respectively circular and square, after the subviews of the two item elements are coordinate processed, the target pixel point will display different coordinate points on the first coordinate set and the second coordinate set respectively. The coordinates of the target pixel point in the first coordinate set will generate a corresponding circle, and the coordinates of the target pixel point in the second coordinate set will generate a corresponding square. By comparing whether the coordinate positions of the target pixel points in the first coordinate set and the second coordinate set match, it can be concluded whether the shapes of the two item elements are similar. For example, the coordinate (2,1) in the first coordinate set is a black coordinate, and the coordinate (2,1) in the second coordinate set is a white coordinate, which means that the coordinate (2,1) in the first coordinate set and the second coordinate set is different. The coordinate point positions of all other coordinates can be compared in the same way.

[0050] A first shape comparison value is obtained by calculating based on the first coordinate sets and the second coordinate sets of all the first sub-views and the second sub-views.

[0051] In some embodiments, the first shape comparison value calculated based on the first coordinate set and the second coordinate set of all the first sub-views and the second sub-views can be obtained by the following method: The number of pixel points with the same coordinates in each first coordinate set and the corresponding second coordinate set is obtained to obtain a first same number.

[0052] Specifically, the same coordinate points in the first coordinate set and the second coordinate set are extracted. Since the same coordinate points in the first coordinate set and the second coordinate set are the same no matter which coordinate set is used as the reference object, there is no need to add their numbers. If the number of the same pixel points in the first coordinate set and the second coordinate set is 50, the first same number is also 50.

[0053] The number of pixel points with different coordinates in each first coordinate set and the corresponding second coordinate set is obtained to obtain a first sub-number, and the number of pixel points with different coordinates in each second coordinate set and the corresponding first coordinate set is obtained to obtain a second sub-number.

[0054] Specifically, since the number of different pixel points obtained when the reference object is different will also be different, it is not possible to use only one of the coordinate sets as a reference to calculate the total number of different coordinates. For example, when the first coordinate set is used as a reference, there can be 50 points in the second coordinate set that are different from the first coordinate set, and when the second coordinate set is used as a reference, there can be 80 points in the first coordinate set that are different from the second coordinate set. Then their total number of differences should be 130, not 50 or 80. Therefore, it is necessary to obtain the number of pixel points with different coordinates in each first coordinate set and the corresponding second coordinate set to obtain the first sub-number and the number of pixel points with different coordinates in each second coordinate set and the corresponding first coordinate set to obtain the second sub-number. The first sub-number and the second sub-number are the number of different coordinates in the first coordinate set and the number of different coordinates in the second coordinate set.

[0055] A first different number is obtained according to the first sub-number and the second sub-number.

[0056] Among them, the first sub-quantity is the number of coordinate points in the first coordinate set that are different from those in the second coordinate set when the second coordinate set is used as a reference, and the second sub-quantity is the number of coordinate points in the second coordinate set that are different from those in the first coordinate set when the first coordinate set is used as a reference. Adding the two together can obtain the total number of differences, that is, the first different number.

[0057] After obtaining the same number of coordinates and different number of coordinates between the item elements after subview coordinate conversion, they can be compared. The more the same number of coordinates is, the more similar the two item elements are. The specific comparison method is as follows: A first shape comparison value is obtained by calculating the first sameness number and the first differentness number of all corresponding first sub-views and second sub-views, The first shape comparison value is calculated by the following formula, Among them, b1 is the first shape comparison value, x i is the first identical number of the first and second subviews corresponding to the i-th subview, y i is the first different number of the i-th corresponding first subview and second subview, N is the number of the corresponding first subview and second subview, k u is the shape comparison weight.

[0058] From the formula, we can see that x i is proportional to b1, x i The larger b1 is, the more the first subview and the second subview have the same number, and the higher the similarity between the item elements is. iInversely proportional to b1, y i The larger b1 is, the smaller b1 is, which means that the number of the first sub-view and the second sub-view that are the same is less, and the similarity between the object elements will be lower. Since there are multiple first sub-views and second sub-views, it is necessary to sum the multiple first sub-views and second sub-views, and then divide them by the total number to get the average value of the multiple first sub-views and second sub-views. The average value can be used to know the average comparison value of multiple sub-views. The larger the shape comparison value, the more similar the shapes of the compared object elements.

[0059] Among them, k u It can be set in advance, and the setting of the shape comparison weight value will be different according to different actual manufacturing scenarios. For example, when the accuracy requirement for the first shape comparison value is relatively high, the shape comparison weight value can be lowered; when the accuracy requirement for the first shape comparison value is relatively low, the shape comparison weight value can be increased.

[0060] The shape comparison value between two item elements can be obtained through the above formula. The larger the shape comparison value is, the more similar the shapes of the compared item elements are. Similar item elements can be extracted to facilitate subsequent operations.

[0061] After obtaining the first shape comparison value through the above formula, if the obtained first shape comparison value is greater than the preset comparison value, it means that the shape similarity of the item element meets the minimum standard. If the obtained first shape comparison value is less than the preset comparison value, it means that the shape similarity of the item element does not meet the requirements, and it is excluded. After comparing the shapes of the item elements, we also need to compare the sizes of the item elements to further determine the similarity of the item elements. The specific method is as follows: In S222 (comparing the shape information of any two item elements to obtain a first shape comparison value, and if the first shape comparison value is greater than a preset shape value, comparing the size information of the two item elements to obtain a first size comparison value.), the size information of the two item elements may be compared to obtain the first size comparison value using the following steps: Obtain a length difference, a width difference and a height difference according to the length information, the width information and the height information of the size information in the two item elements, and calculate a first size comparison value according to the length difference, the width difference and the height difference; The first size comparison value is calculated by the following formula, Where b2 is the first size comparison value, a is the first constant value, k l is the length weight value, l1 is the long information in the first item element, I2 is the long information in the second item element, k dis the width weight value, d1 is the width information in the first item element, d2 is the width information in the second item element, k g is the height weight value, g1 is the high information in the first item element, and g2 is the high information in the second item element.

[0062] In real life, the sizes of object elements may vary greatly, so the size comparison value can be used to know the degree of difference between the two. According to the above formula, the size is inversely proportional to the size comparison value, so the larger the size comparison value, the smaller the size difference between the object elements.

[0063] According to the above formula, |I1-I2|, |d1-d2|, and |g1-g2| are inversely proportional to b2. |I1-I2| represents the absolute value of the difference between the length information in the first item element and the length information in the second item element. |d1-d2| represents the absolute value of the difference between the width information in the first item element and the width information in the second item element. |g1-g2| represents the absolute value of the difference between the height information in the first item element and the height information in the second item element. The larger |l1-l2| is, the greater the difference between the length information in the first item element and the length information in the second item element is. The larger |d1-d2| is, the greater the difference between the width information in the first item element and the width information in the second item element is. The larger |g1-g2| is, the greater the difference between the height information in the first item element and the height information in the second item element is. When k l |l1-l2|+k d |d1-d2|+k g The larger |g1-g2| is, the larger the size difference of the compared item elements is, so the first size comparison value b2 will also be smaller.

[0064] Among them, a, k l , k d , k g It can be set in advance according to actual conditions. For example, when the precision requirement of the first size comparison value is high, the length weight value, width weight value, and height weight value can be adjusted down accordingly. When the precision requirement of the first size comparison value is low, the length weight value, width weight value, and height weight value can be adjusted up accordingly.

[0065] After obtaining the first shape comparison value and the first size comparison value, because the first shape comparison value and the first size comparison value obtained according to the above formula are only a minimum and cannot guarantee the high accuracy of the data, in order to make the obtained data more accurate, we also need to perform a fusion processing on the first shape comparison value and the first size comparison value, as follows: S223, if the first size comparison value is greater than the preset size value, a fusion comparison value is obtained according to the first shape comparison value and the first size comparison value. If the fusion comparison value is greater than the fusion preset value, it is determined that the two object elements correspond to each other.

[0066] In order to obtain item elements of similar size, after calculating the first size ratio, we also need to compare it with the preset size value. The preset size value is the minimum value required for the item elements to be similar. Only when the first size ratio is greater than the preset size value do we consider that the item elements have reached the minimum similarity standard.

[0067] The step of obtaining the fusion comparison value according to the first shape comparison value and the first size comparison value specifically includes: The fusion alignment value is calculated by the following formula: Among them, r1 is the fusion comparison value, e1 is the first fusion weight, e2 is the second fusion weight, and u is the second constant value.

[0068] According to the formula and formula It can be seen that the larger b1 is, the closer the shapes of the compared item elements are, and the larger b2 is, the closer the sizes of the compared item elements are. Therefore, the larger the value when they are added together, the closer the specification information of the compared item elements is.

[0069] It can be seen from the above formula that e1·b1+e2·b2 is proportional to r1. When the values ​​of b1 and b2 are larger, the value of r1 will also be larger, and the specification information of the compared item elements will be closer.

[0070] Among them, the first fusion weight and the second fusion weight can be set in advance according to the actual situation. The setting method is the same as the above weight value setting method, which will not be repeated here. In order to know whether the calculated fusion comparison value meets the requirements, we can set a fusion preset value. The fusion preset value can be the minimum value that the item elements need to reach. Compare the fusion comparison value with the fusion preset value. If the fusion comparison value is greater than the fusion preset value, it means that the two item elements are corresponding.

[0071] The above steps compare the similarity of the shapes and sizes of the object elements by converting the sub-views after image processing into coordinates. This is not only easy to operate, but also does not require measuring the objects with a ruler or other measuring tools, thus saving a lot of time and labor costs.

[0072] After obtaining item elements with the same type and specification information through the above steps, since different item elements require different production times, it is necessary to classify the item elements in terms of time to ensure that the item elements with more urgent production time are produced first to avoid the item elements not being produced on time due to time problems. The time division of item elements can be carried out according to the following steps: S3, determining the smallest time tag among all item elements in each element unit as the production time tag, and sorting all element units in the first element set in descending order according to their corresponding production time tags to obtain a second element set.

[0073] Specifically, the smallest time tag marked in all item elements is extracted as the production time tag. The smaller the marked time tag, the earlier the production time is. Therefore, in order to facilitate the first production, it needs to be extracted, and then sorted in descending order according to the marked production time tag. The item elements in the first element set can be arranged from large to small in chronological order to facilitate production in chronological order. The set generated by the arrangement is named the second element set to distinguish it from the first element set.

[0074] In some embodiments, all element units in the first element set may be sorted in ascending order according to their corresponding production time labels to obtain the second element set, and the effect is the same as the above method, which will not be described in detail here.

[0075] This solution sorts the item elements in chronological order by marking the time of the item elements. The item elements with the earliest time can be produced first in chronological order, which improves the speed of item production and avoids the situation where the items are not completed within the specified time. After the item elements are sorted in chronological order, the item parts can be prepared according to the arranged order to facilitate the subsequent staff to sort them. The preparation process is as follows: S4, sending the second element set to different preparation terminals according to the types of multiple different second element sets, so that the staff can prepare the item parts according to the order of the element units in the second element set, and add item labels to the item parts based on the preparation terminal.

[0076] Specifically, after obtaining the second element set according to step S3, different types of second element sets will be sent to different preparation terminals. For example, plate elements, bracket elements, and fixture elements will be sent to different preparation terminals for pre-production. Since the plate elements, bracket elements, and fixture elements in the first element set have been sorted to generate second element units, the staff can prepare the item parts according to the order of the element units in the second element set. Since the number of item parts is large, item tags can be added to them. Among them, the item tag can be a physical tag, such as a QR code.

[0077] After preparing the parts according to the above steps, we still need to sort the prepared parts before completing the subsequent assembly operations. The specific steps are as follows: S5, establishing storage space based on the quantity of the item order data, and setting a corresponding item label for each storage space, so that the staff can sort the item parts into the corresponding storage space according to the sorting terminal.

[0078] Specifically, when spare parts are prepared, we need to store them due to the large number of spare parts, so we need to establish a storage space. The storage space is used to store item order data. For easy access, the storage space can be set with an item label corresponding to the item label added to the item parts. For example, if the item label of the item part is set to 1, the corresponding storage space can also be set to 1. This is conducive to the staff to sort the item parts into the corresponding storage space according to the corresponding item labels.

[0079] After completing the corresponding sorting, the sorted parts can be assembled to obtain a complete item. The specific assembly steps are as follows: S6, select the item order data with the smallest time tag, extract the number of item parts and the attributes of the item parts in each item order data to obtain the assembly quantity, and determine the assembly end corresponding to the assembly quantity to assemble the item parts in the corresponding storage space.

[0080] Specifically, in order to complete the most urgent item order first, it is necessary to select the item order data with the smallest time tag. Since the number and material of each item part are different, for example, a board with the same specification information can be made of wood or iron, and the number of boards in an item order can be 1 or more, it is necessary to extract the number of item parts and the attributes of item parts in each item order data to obtain the assembly quantity. The assembly quantity here refers to the number of people required to complete the assembly. After obtaining the assembly quantity, the item parts can be assembled. Among them, the step S6 (selecting the item order data with the smallest time tag, extracting the number of item parts and the attributes of item parts in each item order data to obtain the assembly quantity) includes steps S61 to S64, which are as follows: S61, extracting the number of plate elements, the number of fixing elements and the number of bracket elements of the item parts in the item order data.

[0081] Specifically, in order to know exactly the parts needed to assemble each item, we need to extract the number of plate elements, the number of fixing elements, and the number of bracket elements of the item parts in the item order data.

[0082] S62, extracting the plate properties, fixture properties and bracket properties of the item parts, and quantifying the plate properties, fixture properties and bracket properties to obtain plate quantization values, fixture quantization values ​​and bracket quantization values.

[0083] In practical applications, the number of plates, fixtures and brackets is very large, so we need to perform a quantification process. After dividing them according to different attributes, we also need to quantify the plate attributes, fixture attributes and bracket attributes to obtain the plate quantification value, fixture quantification value and bracket quantification value.

[0084] S63, performing comprehensive calculation based on the number of plate elements, the number of fixing element elements, the number of bracket elements, the plate quantification value, the fixing quantification value and the bracket quantification value to obtain a predicted assembly time.

[0085] After obtaining the number of plate elements, the number of fixture elements, the number of bracket elements, the plate quantification value, the fixture quantification value and the bracket quantification value through the above steps, we can calculate based on these data to get the predicted assembly time to estimate how long the assembly will take. Since the actual production of items is time-limited, we also need to get the assembly quantity based on the planned production time. For example, if the planned production time is four hours, we need to get the assembly quantity within four hours based on the assembly time, that is, how many people are needed to complete the assembly of items within four hours, and then the assembly can be completed within the planned production time. The calculation of the assembly quantity is as follows: S64, comparing the predicted assembly time with the planned production time to obtain the assembly quantity, and calculating the preliminary quantity by the following formula: Among them, s1 is the preliminary quantity, α1 is the number of plate elements, β1 is the plate quantification value, α2 is the number of fixture elements, β2 is the fixture quantification value, α3 is the number of bracket elements, β3 is the bracket quantification value, π is the preset standard value, θ1 is the assembly weight value, t1 is the preset standard time, and t2 is the planned production time; In actual applications, the time spent on items of different materials and quantities will also be different. For example, the production time of wooden boards and iron boards will be different. Therefore, the approximate production time of an item can be calculated through α1·β1+α2·β2+α3·β3. Then, the calculated approximate time minus the preset standard value can be used to see whether the production time of the item will be longer than the preset time. If the difference of α1·β1+α2·β2+α3·β3-π is greater than zero, the value before t1 will be greater than 1, which means that the actual production time of the item will be greater than the preset time. If the difference of a1·β1+α2·β2+α3·β3-π is a negative number, the value before t1 will be less than 1, which means that the actual production time of the item is less than the preset time. The actual time required to produce the item can be calculated. From the formula, it can be seen that s1 is proportional to α1·β1+α2·β2+α3·β3, that is, the larger the values ​​of the number of plate elements, plate quantification value, the number of fixing elements, fixing quantification value, the number of bracket elements, and bracket quantification value, the larger the value of the preliminary quantity will be. The preliminary quantity can be calculated by dividing the calculated actual production time by the planned production time.

[0086] Among them, θ1 can be pre-set according to actual conditions, for example, by making corresponding adjustments according to the accuracy. The adjustment method is the same as the weight value adjustment method in S222-3(4) (the first shape comparison value is calculated based on the first same number and the first different number of all corresponding first sub-views and second sub-views.), which will not be repeated here.

[0087] If the calculated assembly quantity is an integer, the preliminary quantity is used as the assembly quantity; If the calculated assembly quantity is not an integer, the integer that is larger than the preliminary quantity and closest to the preliminary quantity will be used as the assembly quantity.

[0088] Since the calculated value is likely to be a non-integer, but the assembly quantity refers to the number of people required to complete the assembly, and it is impossible to have half a person, the calculated data needs to be rounded.

[0089] This solution allocates the assembly quantity according to the number and attributes of the item elements, that is, the number of people required to complete the assembly of the item. This can well guarantee the timeliness of item production and ensure that the assembly of the item can be completed within the specified time.

[0090] In actual applications, after obtaining the assembly quantity, the user may add or reduce the assembly quantity according to needs, which may cause deviations. Therefore, corresponding adjustments need to be made after calculating the assembly quantity, including steps S66 to S69, as follows: S66, if it is determined that the user adds the assembly quantity based on the calculated assembly quantity, determine the added value of the assembly quantity, and compare the added value with the calculated assembly quantity to obtain a first adjustment value.

[0091] If the user adds the assembly quantity, the added assembly quantity will be greater than the original assembly quantity, which will cause the calculated assembly quantity to be less than the actual assembly quantity, so we need to increase the assembly quantity by increasing the assembly weight value.

[0092] Specifically, the number added by the user is determined, and then the increased number is compared with the originally calculated assembly number to obtain a first adjustment value, which is the assembly weight value after the increase processing, and the specific method is as follows: S67, increasing the assembly weight value based on the first adjustment value, and obtaining the increased assembly weight value by the following formula: Among them, θ2 is the assembly weight value after the increase processing, s2 is the added value, and ω1 is the increase weight value.

[0093] It can be seen from the formula that θ2 and It is a proportional relationship. The larger s2 is, the larger θ2 will be. That is, the larger the added value is, the larger the corresponding assembly weight value after the increase will be. Among them, ω1 can be pre-set according to actual conditions. The setting method can be consistent with the weight value setting method of S64 (compare the predicted assembly time with the planned production time to obtain the assembly quantity, and calculate the preliminary quantity through the following formula), which will not be repeated here.

[0094] By increasing the assembly weight value, the assembly quantity can be increased accordingly to ensure the accuracy of the data.

[0095] S68, if it is determined that the user reduces the assembly quantity based on the calculated assembly quantity, then determine the reduction value of the assembly quantity, and compare the reduction value with the calculated assembly quantity to obtain a second adjustment value.

[0096] If the user reduces the assembly quantity, the reduced assembly quantity will be less than the original assembly quantity, which will cause the calculated assembly quantity to be greater than the actual assembly quantity, so we need to reduce the assembly quantity by reducing the assembly weight value.

[0097] Specifically, the number of reductions by the user is determined, and then the reduced number is compared with the originally calculated assembly number to obtain a second adjustment value, and the assembly weight value is reduced by the second adjustment value, specifically in the following manner: S69, based on the second adjustment value, the assembly weight value is reduced, and the assembly weight value after the increase process is obtained by the following formula: Among them, θ2 is the assembly weight value after the reduction process, s3 is the reduction value, and ω2 is the reduction weight value. It can be seen from the formula that θ2 and It is inversely proportional. The larger s3 is, the smaller θ2 will be. That is, the larger the reduction value is, the smaller the assembly weight value after the corresponding reduction will be. Among them, ω2 can be pre-set according to actual conditions, and the setting method can be the same as the setting method of ω1, which will not be repeated here.

[0098] By reducing the assembly weight value, the number of assemblies can be reduced accordingly, and the accuracy of the data can also be ensured.

[0099] See also Figure 2 , is a schematic diagram of a structure of a large model-based equipment automation manufacturing system provided by an embodiment of the present invention, the large model-based equipment automation manufacturing system includes: The processing module is used to process the model end to decompose all the item order data in the MES system to obtain the item production element set corresponding to each item order data, and add corresponding item tags and time tags to all item elements in the item production element set; An extraction module, used for extracting the same type of item elements from all item production element sets to generate multiple first element sets, and dividing the corresponding item elements in the first element sets into the same element unit; A time module, used to determine the smallest time tag among all item elements in each element unit as the production time tag, and sort all element units in the first element set in descending order according to their corresponding production time tags to obtain a second element set; A preparation module, configured to send the second element sets to different preparation terminals according to the types of the plurality of different second element sets, so that the staff prepares the item parts according to the order of the element units in the second element sets, and adds item tags to the item parts based on the preparation terminals; A storage module, used to establish storage space based on the quantity of the item order data, and set a corresponding item label for each storage space, so that the staff can sort the item parts into the corresponding storage space according to the sorting terminal; The assembly module is used to select the item order data with the smallest time tag, extract the number of item parts and the attributes of the item parts in each item order data to obtain the assembly quantity, and determine the assembly end corresponding to the assembly quantity to assemble the item parts in the corresponding storage space.

[0100] See also Figure 3 , is a schematic diagram of the hardware structure of an electronic device provided in an embodiment of the present invention, the electronic device 30 includes: a processor 31, a memory 32 and a computer program; wherein The memory 32 is used to store the computer program, and the memory may also be a flash memory. The computer program is, for example, an application program, a functional module, etc. for implementing the above method.

[0101] The processor 31 is used to execute the computer program stored in the memory to implement each step performed by the device in the above method. For details, please refer to the relevant description in the above method embodiment.

[0102] Optionally, the memory 32 may be independent or integrated with the processor 31 .

[0103] When the memory 32 is a device independent of the processor 31, the device may further include: The bus 33 is used to connect the memory 32 and the processor 31 .

[0104] The present invention also provides a storage medium, in which a computer program is stored. When the computer program is executed by a processor, it is used to implement the methods provided by the various embodiments described above.

[0105] Among them, the storage medium can be a computer storage medium or a communication medium. The communication medium includes any medium that facilitates the transmission of a computer program from one place to another. The computer storage medium can be any available medium that can be accessed by a general-purpose or special-purpose computer. For example, the storage medium is coupled to the processor so that the processor can read information from the storage medium and write information to the storage medium. Of course, the storage medium can also be a component of the processor. The processor and the storage medium can be located in an application-specific integrated circuit (Application Specific Integrated Circuits, referred to as ASIC). In addition, the ASIC can be located in a user device. Of course, the processor and the storage medium can also exist in a communication device as discrete components. The storage medium can be a read-only memory (ROM), a random access memory (RAM), a CD-ROM, a magnetic tape, a floppy disk, an optical data storage device, and the like.

[0106] The present invention also provides a program product, which includes an execution instruction, which is stored in a storage medium. At least one processor of a device can read the execution instruction from the storage medium, and at least one processor executes the execution instruction so that the device implements the methods provided in the above various embodiments.

[0107] In the above-mentioned terminal or server embodiments, it should be understood that the processor may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), etc. A general-purpose processor may be a microprocessor or any conventional processor. The steps of the method disclosed in the present invention may be directly implemented as being executed by a hardware processor, or may be executed by a combination of hardware and software modules in the processor.

[0108] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.

Claims

1. A large-scale model-based equipment automated manufacturing method, characterized in that: The processing model end is connected to the preparation terminal, the sorting terminal and the assembly terminal respectively, and the item order data is processed through the following steps, including: The processing model decomposes all the item order data in the MES system to obtain the item production element set corresponding to each item order data, and adds corresponding item tags and time tags to all item elements in the item production element set; Extracting the same type of item elements from all item production element sets to generate multiple first element sets, and dividing the corresponding item elements in the first element sets into the same element unit; Determine the smallest time tag among all item elements in each element unit as the production time tag, and sort all element units in the first element set in descending order according to their corresponding production time tags to obtain a second element set; Sending the second element sets to different preparation terminals according to the types of the plurality of different second element sets, so that the staff prepares the item parts according to the order of the element units in the second element sets, and adding item tags to the item parts based on the preparation terminals; Establish storage space based on the quantity of the item order data, and set a corresponding item label for each storage space so that the staff can sort the item parts into the corresponding storage space according to the sorting terminal; The item order data with the smallest time tag is selected, the quantity of item parts and the attributes of the item parts in each item order data are extracted to obtain the assembly quantity, and the assembly end corresponding to the assembly quantity is determined to assemble the item parts in the corresponding storage space.

2. The large model-based equipment automated manufacturing method according to claim 1, characterized in that: The step of extracting the same type of item elements from all item production element sets to generate multiple first element sets and dividing the same item elements in the first element sets into the same element unit specifically includes: Obtain the one-dimensional type label corresponding to each item element in all item production element sets, and classify the item elements with the same one-dimensional type label into the first element set; A two-dimensional type label corresponding to each item element in each first element set is extracted, wherein the two-dimensional type label includes specification information, and the item elements having corresponding specification information are divided into the same element unit.

3. The large model-based equipment automated manufacturing method according to claim 2, characterized in that: In the step of extracting the two-dimensional type label corresponding to each item element in each first element set, the two-dimensional type label includes specification information, and classifying the item elements with corresponding specification information into the same element unit, specifically includes: if the first element set is a plate element set, and the item element is a plate element, obtaining the specification information of each plate element in the plate element set, and the specification information includes at least shape information and size information; Comparing shape information of any two item elements to obtain a first shape comparison value, and if the first shape comparison value is greater than a preset shape value, comparing size information of the two item elements to obtain a first size comparison value; If the first size comparison value is greater than the preset size value, a fusion comparison value is obtained according to the first shape comparison value and the first size comparison value. If the fusion comparison value is greater than the fusion preset value, it is determined that the two object elements correspond to each other.

4. The large model-based equipment automated manufacturing method according to claim 3, characterized in that: The step of comparing the shape information of any two object elements to obtain a first shape comparison value specifically includes: Respectively obtain a first view set and a second view set of two item elements, each of the first view set and the second view set including a first subview and a second subview respectively; Performing coordinate processing on the first subview and the second subview to obtain a coordinate value of each pixel point, and obtaining the coordinates of target pixel points in each of the first subview and the second subview to generate a first coordinate set and a second coordinate set; A first shape comparison value is obtained by calculating based on the first coordinate sets and the second coordinate sets of all the first sub-views and the second sub-views.

5. The large model-based equipment automated manufacturing method according to claim 4, characterized in that: The step of calculating the first shape comparison value based on the first coordinate set and the second coordinate set of all the first sub-views and the second sub-views specifically includes: Obtaining the number of pixel points having the same coordinates in each first coordinate set and the corresponding second coordinate set to obtain a first same number; Obtaining the number of pixel points with different coordinates in each first coordinate set and the corresponding second coordinate set to obtain a first sub-number, and obtaining the number of pixel points with different coordinates in each second coordinate set and the corresponding first coordinate set to obtain a second sub-number; Obtaining a first different quantity according to the first sub-quantity and the second sub-quantity; A first shape comparison value is obtained by calculating a first number of similarities and a first number of differences of all corresponding first sub-views and second sub-views; The first shape comparison value is calculated by the following formula, Among them, b1 is the first shape comparison value, x i is the first identical number of the first and second subviews corresponding to the i-th subview, y i is the first different number of the i-th corresponding first subview and second subview, N is the number of the corresponding first subview and second subview, k u is the shape comparison weight.

6. The large model-based equipment automated manufacturing method according to claim 5, characterized in that: The step of comparing the size information of two item elements to obtain a first size comparison value specifically includes: Obtain a length difference, a width difference and a height difference according to the length information, the width information and the height information of the size information in the two item elements, and calculate a first size comparison value according to the length difference, the width difference and the height difference; The first size comparison value is calculated by the following formula, b2 is the first size comparison value, a is the first constant value, k1 is the length weight value, l1 is the long information in the first item element, l2 is the long information in the second item element, k d is the width weight value, d1 is the width information in the first item element, d2 is the width information in the second item element, k g is the height weight value, g1 is the high information in the first item element, and g2 is the high information in the second item element; The obtaining of the fusion comparison value according to the first shape comparison value and the first size comparison value specifically includes: The fusion alignment value is calculated by the following formula: Among them, r1 is the fusion comparison value, e1 is the first fusion weight, e2 is the second fusion weight, and u is the second constant value.

7. The large model-based equipment automated manufacturing method according to claim 1, characterized in that: The step of selecting the item order data with the smallest time tag, extracting the quantity of item parts and the attributes of the item parts in each item order data to obtain the assembly quantity specifically includes: Extract the number of plate elements, the number of fixture elements, and the number of bracket elements of the item parts in the item order data; Extracting plate properties, fixture properties, and bracket properties of the item parts, and quantifying the plate properties, fixture properties, and bracket properties to obtain plate quantization values, fixture quantization values, and bracket quantization values; A predicted assembly time is obtained by performing a comprehensive calculation based on the number of plate elements, the number of fixture elements, the number of bracket elements, the plate quantification value, the fixture quantification value and the bracket quantification value; The predicted assembly time is compared with the planned production time to obtain the assembly quantity.

8. The large model-based equipment automated manufacturing method according to claim 7, characterized in that: The step of comparing the predicted assembly time with the planned production time to obtain the assembly quantity specifically includes: The preliminary quantity is calculated by the following formula, Among them, s1 is the preliminary quantity, α1 is the number of plate elements, β1 is the plate quantification value, α2 is the number of fixture elements, β2 is the fixture quantification value, α3 is the number of bracket elements, β3 is the bracket quantification value, π is the preset standard value, θ1 is the assembly weight value, t1 is the preset standard time, and t2 is the planned production time; If the calculated assembly quantity is an integer, the preliminary quantity is used as the assembly quantity; If the calculated assembly quantity is not an integer, the integer that is larger than the preliminary quantity and closest to the preliminary quantity will be used as the assembly quantity.

9. The large model-based equipment automated manufacturing method according to claim 8, characterized in that: Also includes: If it is determined that the user adds an assembly quantity based on the calculated assembly quantity, determining an added value of the assembly quantity, and comparing the added value with the calculated assembly quantity to obtain a first adjustment value; The assembly weight value is increased based on the first adjustment value, and the increased assembly weight value is obtained by the following formula: Among them, θ2 is the assembly weight value after the increase processing, s2 is the added value, and ω1 is the increase weight value; If it is determined that the user reduces the assembly quantity based on the calculated assembly quantity, determining the reduction value of the assembly quantity, and comparing the reduction value with the calculated assembly quantity to obtain a second adjustment value; The assembly weight value is reduced based on the second adjustment value, and the assembly weight value after the increase is obtained by the following formula: Among them, θ2 is the assembly weight value after the reduction process, s3 is the reduction value, and ω2 is the reduction weight value.

10. A large model-based equipment automation manufacturing system, characterized in that: The processing model end is connected to the preparation terminal, the sorting terminal and the assembly terminal respectively, and the item order data is processed through the following steps, including: The processing module is used to process the model end to decompose all the item order data in the MES system to obtain the item production element set corresponding to each item order data, and add corresponding item tags and time tags to all item elements in the item production element set; An extraction module, used for extracting the same type of item elements from all item production element sets to generate multiple first element sets, and dividing the corresponding item elements in the first element sets into the same element unit; A time module, used to determine the smallest time tag among all item elements in each element unit as the production time tag, and sort all element units in the first element set in descending order according to their corresponding production time tags to obtain a second element set; A preparation module, configured to send the second element sets to different preparation terminals according to the types of the plurality of different second element sets, so that the staff prepares the item parts according to the order of the element units in the second element sets, and adds item tags to the item parts based on the preparation terminals; A storage module, used to establish storage space based on the quantity of the item order data, and set a corresponding item label for each storage space, so that the staff can sort the item parts into the corresponding storage space according to the sorting terminal; The assembly module is used to select the item order data with the smallest time tag, extract the number of item parts and the attributes of the item parts in each item order data to obtain the assembly quantity, and determine the assembly end corresponding to the assembly quantity to assemble the item parts in the corresponding storage space.

Citation Information

Patent Citations

  • MES platform for mass customization of furniture

    CN108596422A

  • Large-scale personalized customization method based on RFID

    CN109978332A

  • Batch combination optimization method and system for improving plate stacking rate

    CN111754072A

  • Lightweight APS double-bridge planning system

    CN112270444A

  • Order grouping processing method for personalized customized furniture

    CN113689094A