Preparation method of high-strength flow-state solidified soil based on mountain cutting soil

By mixing water and open soil in the cured soil mixing barrel and adding curing agent to form a cured slurry, the problem of difficult to deal with open soil is solved, and the preparation of high-strength fluid solidified soil is realized, avoiding abandonment and transportation, saving costs and Reduce pollution.

CN119077946APending Publication Date: 2024-12-06SHENZHEN HONGYEJI GEOTECHNICAL TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411189319.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-28
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

In the prior art, it is difficult to effectively deal with mountain soil, resulting in high transportation costs, land occupation and serious environmental pollution.

Method used

The high-strength fluid solidified soil preparation method based on the Kaishan soil is adopted. By mixing water and Kaishan soil in the curing soil mixing barrel, adding a curing agent to form a solidified slurry, and then mixing it with the liquid Kaishan soil to form a high-strength fluid solidified soil. Avoid disposal and transport out of waste and realize recycling of waste.

Benefits of technology

It saves concrete materials, reduces transportation costs, avoids accumulation of soil and pollutes the environment, and realizes the recycling of waste.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119077946A_ABST
    Figure CN119077946A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of flow state solidified soil, and discloses a mountain cutting soil-based high-strength flow state solidified soil preparation method, which comprises: 1) injecting a set amount of water into a solidified soil stirring barrel, loading a set amount of mountain cutting soil into the solidified soil stirring barrel by using an excavator, and uniformly stirring the water and the mountain cutting soil by using the solidified soil stirring barrel to form flow state mountain cutting soil; a set amount of water is injected into the solidified slurry stirring barrel, then a set amount of curing agent is added into the solidified slurry stirring barrel, the curing agent and the water are uniformly stirred to form solidified slurry, and the solidified slurry is discharged into a slurry storage pool; (2) the solidified slurry in the slurry storage pool is pumped and discharged into a solidified soil stirring barrel through a slurry pump, the solidified slurry and the flow-state mountain cutting soil are mixed and stirred to be uniform through the solidified soil stirring barrel, flow-state solidified soil is formed, and the flow-state solidified soil is discharged into a solidified soil storage barrel; and (3) the slurry pump is used for pumping and discharging the flow-state solidified soil into the mixer truck.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The patent of this invention relates to the technical field of fluidized solidified soil, and specifically, to a method for preparing high-strength fluidized solidified soil based on mountain excavation soil. Background Art

[0002] With the continuous advancement of mountain road construction, a large number of highways are built in mountainous areas, which brings a lot of mountain excavation and produces a lot of mountain soil.

[0003] In the prior art, the excavated soil generated by road excavation is usually used for roadbed backfilling and rolling. The excess excavated soil is transported out and abandoned. The current disposal method of excavated soil increases transportation costs on the one hand, and on the other hand, abandonment will occupy precious land resources, and large-scale stacking will cause serious environmental pollution and safety problems. Summary of the invention

[0004] The purpose of the present invention is to provide a method for preparing high-strength fluidized solidified soil based on mountain excavation soil, aiming to solve the problem that mountain excavation soil is difficult to handle in the prior art.

[0005] The present invention is achieved by a method for preparing high-strength fluidized solidified soil based on mountain soil, comprising the following preparation steps:

[0006] 1) Provide a solidified soil mixing barrel, inject a set amount of water into the solidified soil mixing barrel, and then use an excavator to load a set amount of excavated soil into the solidified soil mixing barrel. The solidified soil mixing barrel mixes the water and the excavated soil evenly to form fluid excavated soil;

[0007] Providing a solidifying slurry stirring barrel, injecting a set amount of water into the solidifying slurry stirring barrel, then adding a set amount of curing agent into the solidifying slurry stirring barrel, stirring the curing agent and the water evenly to form solidifying slurry, and discharging the solidifying slurry into a slurry storage tank;

[0008] According to the weight ratio, the curing agent includes 5-40 parts of cement clinker, 45-65 parts of slag powder, 5-15 parts of quicklime, 12-25 parts of fly ash, 5-25 parts of desulfurized gypsum, 10-15 parts of water glass, 1-5 parts of water reducer, and 2-6 parts of activator;

[0009] 2) Provide a mud pump, the mud pump is connected to a slurry delivery pipe, the outer end of the slurry delivery pipe is connected to the solidified soil mixing barrel, the solidified slurry in the slurry storage tank is pumped into the solidified soil mixing barrel by the mud pump and the slurry delivery pipe, and the solidified slurry is mixed with the fluidized mountain excavation soil; the solidified soil mixing barrel mixes and stirs the solidified slurry and the fluidized mountain excavation soil evenly to form fluidized solidified soil, and the fluidized solidified soil is discharged into the solidified soil storage barrel;

[0010] 3) Provide a slurry pump, wherein the slurry pump is connected to a liquid soil delivery pipe, the outer end of the liquid soil delivery pipe is connected to a mixer truck, and the fluidized solidified soil is pumped into the mixer truck using the slurry pump and the liquid soil delivery pipe.

[0011] Optionally, in the preparation step 1), before the excavated soil is loaded into the solidified soil mixing barrel, the excavated soil is sampled to obtain a sample, and the particle size distribution of the sample is measured. When the particle size distribution meets the set standard, the excavated soil is loaded into the solidified soil mixing barrel; when the particle size distribution does not meet the set standard, soil particles are added to make the particle size distribution of the excavated soil meet the set standard.

[0012] Optionally, the pulp storage tank is arranged in a concave shape, a first motor is mounted on the pulp storage tank, and a first rotating shaft extending into the pulp storage tank is provided at the bottom of the first motor;

[0013] In the preparation step 1), after the solidified slurry is discharged into the slurry storage tank, the solidified slurry is continuously stirred by a first rotating shaft to prevent the solidified slurry from solidifying or settling.

[0014] Optionally, the solidified soil storage barrel is provided with a second motor, and the bottom of the second motor has a second rotating shaft extending into the solidified soil storage barrel;

[0015] In the preparation step 2), after the fluidized solidified soil is discharged into the solidified soil storage bucket, the fluidized solidified soil is continuously stirred by the second rotating shaft to prevent the fluidized solidified soil from solidifying or settling.

[0016] Optionally, the curing agent is stored in a storage bin, the bottom of the storage bin is connected to a discharge pipe, the bottom of the discharge pipe is connected to a screw conveyor, and the screw conveyor is arranged in an inclined shape; a conveying feed port is formed at the bottom of the screw conveyor, a conveying discharge port is formed at the top of the screw conveyor, the spiral discharge port is connected to a feed pipe, the feed pipe is extended downward and connected to a curing slurry stirring barrel;

[0017] In the preparation step 1), a set amount of curing agent falls into the screw conveyor through the discharge pipe, and the screw conveyor conveys the curing agent to the delivery discharge port, and falls into the curing slurry stirring barrel through the feed pipe.

[0018] Optionally, the solidifying slurry stirring barrel has a first stirring shaft; in the preparation step 1), during the process of adding a set amount of curing agent into the solidifying slurry stirring barrel, the first stirring shaft continuously stirs.

[0019] Optionally, the solidified soil mixing barrel is arranged horizontally, and a transverse cavity is provided in the solidified soil mixing barrel, and two second mixing shafts arranged at intervals are provided in the transverse cavity, and the second mixing shafts are extended along the axial direction of the transverse cavity, so a plurality of mixing blades are provided on the outer periphery of the second mixing shaft;

[0020] The top of the solidified soil mixing barrel is provided with a solidified soil feed port, the solidified soil feed port is connected to the transverse cavity, and along the length direction of the solidified soil mixing barrel, the solidified soil feed port is located in the middle of the solidified soil mixing barrel, and a cover plate is detachably connected to the solidified soil feed port;

[0021] The top of the solidified soil mixing barrel is provided with an inner upper convex ring and an outer upper convex ring protruding upward, the inner upper convex ring and the outer upper convex ring are arranged concentrically, the inner upper convex ring is arranged around the circumference of the solidified soil feed port, there is an annular embedded gap between the inner upper convex ring and the outer upper convex ring, and the top of the outer upper convex ring is higher than the top of the inner upper convex ring;

[0022] In the step 1), the feed hopper is placed on the top of the solidified soil mixing barrel, and the bottom of the feed hopper is embedded in the embedding interval, and the top of the outer upper convex ring abuts against the surface of the feed hopper. After the feed hopper is fixed, an excavator is used to load a set amount of excavated soil into the transverse cavity through the feed hopper.

[0023] Optionally, in the preparation step 1), the second stirring shaft continues to stir during the process of loading a set amount of excavated soil into the solidified soil mixing barrel using an excavator.

[0024] Optionally, a slurry feed port is provided on the solidified soil mixing barrel, the outer end of the slurry delivery pipe is connected to the slurry feed port, an annular tube is provided in the transverse cavity, and the annular tube is arranged in an annular shape at the top of the transverse cavity; a plurality of slurry outlet holes opening downward are provided on the annular tube, and the plurality of slurry outlets are arranged at intervals along the extension direction of the annular tube, and a connecting tube protruding outward is provided on the annular tube, and the connecting tube is connected to the slurry feed port;

[0025] The annular tube has an annular cavity, which is connected to the connecting tube. The slurry outlet hole is provided with an elastic diaphragm that closes the annular cavity. The middle of the elastic diaphragm is provided with a slurry outlet. When the elastic diaphragm is in a natural state, the slurry outlet is closed. When the elastic diaphragm is deformed downward by force, the slurry outlet is opened.

[0026] In the preparation step 2), during the process of pumping the solidified slurry in the slurry storage tank to the solidified soil mixing barrel, the solidified slurry enters the slurry feed port and then enters the annular cavity through the connecting pipe. The solidified slurry moves along the extension direction of the annular cavity until the annular cavity is completely filled with the solidified slurry. Under the squeezing of the solidified slurry, the plurality of elastic diaphragms are forced to bend downward, the slurry outlets on the elastic diaphragms are opened, and the solidified slurry is sprayed downward into the transverse cavity through the slurry outlets.

[0027] Optionally, a plurality of hemispherical elastic protrusions are provided in the annular cavity, the outer periphery of the elastic protrusions is fixedly connected to the side wall of the annular cavity, the middle part of the elastic protrusions protrudes downward, the plurality of elastic protrusions are arranged at intervals along the axis of the annular cavity, and the plurality of elastic protrusions and the plurality of elastic diaphragms are arranged correspondingly up and down;

[0028] In the preparation step 2), during the process of pumping the solidified slurry in the slurry storage tank into the solidified soil mixing barrel, when the solidified slurry impacts the elastic protrusion, the elastic protrusion is concave inward, and the solidified slurry impacting the elastic protrusion moves downward, driving the solidified slurry to squeeze the elastic diaphragm to bend downward.

[0029] Compared with the prior art, the method for preparing high-strength fluidized solidified soil based on mountain-cut soil provided by the present invention, according to the ratio, a set amount of water is injected into the solidified slurry mixing barrel, this part of water is evenly mixed with a set amount of curing agent to form a solidified slurry, after the solidified slurry is formed, the valve is opened, the solidified slurry is discharged into the slurry storage tank, and then the solidified slurry is pumped into the solidified soil mixing barrel through a slurry pump, according to the ratio, a set amount of water and mountain-cut soil are injected into the solidified soil mixing barrel, the mountain-cut soil and the water are pre-mixed to form fluidized mountain-cut soil, the fluidized mountain-cut soil and the solidified slurry are evenly mixed to form fluidized solidified soil, the valve is opened, the fluidized solidified soil is discharged into the solidified soil storage barrel, and then pumped into the mixer truck through a slurry pump, and the mixer truck transports the fluidized solidified soil to the transportation site for the construction of road surface, etc. In this way, the abandonment and transportation of mountain-cut soil is avoided, the recycling of waste is realized, concrete materials are saved, transportation costs are reduced, and the accumulation of mountain-cut soil and environmental pollution are avoided. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] Figure 1 It is a schematic flow chart of a method for preparing high-strength fluidized solidified soil based on mountain-cutting soil provided by the present invention;

[0031] Figure 2 It is a schematic diagram of the preparation method of high-strength fluidized solidified soil based on mountain-cutting soil provided by the present invention;

[0032] Figure 3 It is a top view schematic diagram of a solidified soil mixing barrel provided by the present invention;

[0033] Figure 4It is a schematic diagram of the arrangement of the annular tube provided by the present invention;

[0034] Figure 5 is a cross-sectional schematic diagram of the annular tube provided by the present invention;

[0035] Figure 6 It is a schematic diagram of the connection between the feed hopper, the inner upper convex ring and the outer upper convex ring provided by the present invention. DETAILED DESCRIPTION

[0036] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.

[0037] The implementation of the present invention is described in detail below in conjunction with specific embodiments.

[0038] The same or similar numbers in the drawings of this embodiment correspond to the same or similar parts; in the description of the present invention, it should be understood that if the terms "upper", "lower", "left", "right" and the like indicate directions or positional relationships based on the directions or positional relationships shown in the drawings, it is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction. Therefore, the terms describing the positional relationship in the drawings are only used for illustrative purposes and cannot be understood as limitations on this patent. For ordinary technicians in this field, the specific meanings of the above terms can be understood according to specific circumstances.

[0039] Reference Figure 1-6 The figure shows a preferred embodiment of the present invention.

[0040] The method for preparing high-strength fluidized solidified soil based on mountain excavation soil provided by the present invention comprises the following preparation steps:

[0041] 1) Provide a solidified soil mixing barrel 600, inject a set amount of water into the solidified soil mixing barrel 600, and then use an excavator to load a set amount of excavated soil into the solidified soil mixing barrel 600. The solidified soil mixing barrel 600 mixes the water and the excavated soil evenly to form fluid excavated soil;

[0042] A solidifying slurry stirring barrel 300 is provided, a set amount of water is injected into the solidifying slurry stirring barrel 300, and a set amount of curing agent is added into the solidifying slurry stirring barrel 300, the curing agent and the water are stirred evenly to form solidifying slurry, and the solidifying slurry is discharged into the slurry storage tank 400;

[0043] According to the weight ratio, the curing agent includes 5-40 parts of cement clinker, 45-65 parts of slag powder, 5-15 parts of quicklime, 12-25 parts of fly ash, 5-25 parts of desulfurized gypsum, 10-15 parts of water glass, 1-5 parts of water reducing agent, and 2-6 parts of activator;

[0044] 2) Provide a mud pump 500, the mud pump 500 is connected to a slurry delivery pipe 510, the outer end of the slurry delivery pipe 510 is connected to a solidified soil mixing barrel 600, and the solidified slurry in the slurry storage tank 400 is pumped into the solidified soil mixing barrel 600 by the mud pump 500 and the slurry delivery pipe 510, and the solidified slurry is mixed with the fluidized mountain-opening soil; the solidified soil mixing barrel 600 mixes and stirs the solidified slurry with the fluidized mountain-opening soil to form fluidized solidified soil, and the fluidized solidified soil is discharged into the solidified soil storage barrel 700;

[0045] 3) Provide a slurry pump 800, which is connected to a liquid soil delivery pipe 810, and the outer end of the liquid soil delivery pipe 810 is connected to the mixer truck 900. The slurry pump 800 and the liquid soil delivery pipe 810 are used to pump the fluidized solidified soil into the mixer truck 900.

[0046] The above-mentioned method for preparing high-strength fluidized solidified soil based on excavated soil is as follows: according to the ratio, a set amount of water is injected into the solidification slurry mixing barrel 300, and this part of water is evenly mixed with a set amount of curing agent to form a solidified slurry. After the solidified slurry is formed, the valve is opened, and the solidified slurry is discharged into the slurry storage tank 400, and then the solidified slurry is pumped into the solidified soil mixing barrel 600 through the mud pump 500. According to the ratio, a set amount of water and excavated soil are injected into the solidified soil mixing barrel 600, and the excavated soil and the water are pre-mixed to form fluidized excavated soil. The fluidized excavated soil and the solidification slurry are evenly mixed to form fluidized solidified soil. The valve is opened, and the fluidized solidified soil is discharged into the solidified soil storage barrel 700, and then pumped into the mixer truck 900 through the slurry pump 800. The mixer truck 900 transports the fluidized solidified soil to the transportation site for construction of road surface layers, etc. In this way, the disposal and transportation of excavated soil is avoided, waste recycling is achieved, concrete materials are saved, transportation costs are reduced, and the accumulation of excavated soil and environmental pollution are avoided.

[0047] In the preparation step 1), before loading the excavated soil into the solidified soil mixing barrel 600, the excavated soil is sampled to obtain a sample, and the sample particle size distribution is measured. When the particle size distribution meets the set standard, the excavated soil is loaded into the solidified soil mixing barrel 600; when the particle size distribution does not meet the set standard, soil particles are added to make the particle size distribution of the excavated soil meet the set standard.

[0048] Technical principle: The rock and soil solidifier composed of industrial solid waste + activator can react chemically with water and clay minerals in the soil to form mineral crystals such as ettringite and hydrated calcium silicate. This crystal is needle-shaped or rod-shaped, and continuously grows and penetrates in the soil. The formed gelling material wraps up a large number of fine soil particles, and at the same time connects a large number of coarse particles to form a solidified soil body with a certain strength.

[0049] Minerals such as slag powder, fly ash, and waste gypsum do not have much activity themselves, but when an activator is added, the active minerals in different solid waste minerals are activated under the action of the activator. These minerals can not only react chemically with each other under the action of water, but also react chemically with clay minerals in the soil to generate needle-shaped and rod-shaped calcium aluminate crystals and hydrated calcium silicate crystals. In these chemical reactions, only clay minerals with extremely fine particles (particle size below 50μm) participate in the chemical reaction, while particles above 75μm do not participate in the chemical reaction and only play the role of skeleton. If the mutual grading of particles of different particle sizes in the mountain soil reaches the optimal value, then the soil has the highest density, and thus can achieve the highest strength under the action of rock and soil curing agent.

[0050] The different particle sizes in the mountain soil are divided into clay particles (particle size <0.075mm), fine particles (0.075-0.25mm), medium particles (0.25-0.5mm), coarse particles (0.5-2mm), and gravel (2-5mm). If the particle size gradation reaches the optimal value, the final solidified soil will have the highest strength.

[0051] The soil is screened using sieves with different mesh sizes. If Cu≤5 and Cc=1.5-2.5, it is considered well-graded soil. Otherwise, soil of different particle sizes should be added to the soil to make it meet the standards of well-graded soil.

[0052] If Cc is less than 1.5, it means that the content of medium and fine particles is high, while the content of coarse particles and gravel is low. The content of coarse particles and gravel should be increased appropriately. If Cc is greater than 2.5, it means that the content of coarse particles and gravel is high, while the content of fine particles and medium particles is low. The content of this type of soil should be increased appropriately. The soil of various particle size components that need to be added can be obtained by screening with sieves of different particle sizes set on site.

[0053] Generally, the sample is about 100-500kg, and is manually screened using sieves of different particle sizes. Before screening, a 5mm sieve is used to remove particles larger than 5mm to prevent large particles from affecting the test results. There are 5 types of sieves, with mesh sizes of 5mm, 2mm, 0.5mm, 0.25mm, and 0.075mm. According to the cumulative content of different particle sizes screened, the Cc and Cu values ​​are calculated respectively.

[0054] The pulp storage tank 400 is arranged in a concave shape, a first motor is mounted on the pulp storage tank 400, and a first rotating shaft extending into the pulp storage tank 400 is provided at the bottom of the first motor;

[0055] In the preparation step 1), after the solidified slurry is discharged into the slurry storage tank 400, the solidified slurry is continuously stirred by the first rotating shaft to prevent the solidified slurry from solidifying or settling.

[0056] The solidified soil storage barrel 700 is provided with a second motor, and the bottom of the second motor has a second rotating shaft extending into the solidified soil storage barrel 700;

[0057] In the preparation step 2), after the fluidized solidified soil is discharged into the solidified soil storage barrel 700, the fluidized solidified soil is continuously stirred by the second rotating shaft to prevent the fluidized solidified soil from solidifying or settling.

[0058] The curing agent is stored in the storage bin 100, the bottom of the storage bin 100 is connected to a discharge pipe, the bottom of the discharge pipe is connected to the screw conveyor 200, and the screw conveyor 200 is arranged in an inclined shape; the bottom of the screw conveyor 200 is formed with a conveying feed port, the top of the screw conveyor 200 is formed with a conveying discharge port, the spiral discharge port is connected to a feed pipe, the feed pipe is extended downward, and is connected to the curing slurry stirring barrel 300;

[0059] In the preparation step 1), a set amount of curing agent falls into the screw conveyor 200 through the discharge pipe, and the screw conveyor 200 conveys the curing agent to the conveying discharge port, and falls into the curing slurry mixing barrel 300 through the feed pipe. In this way, the metering system on the storage bin 100 ensures accurate discharge, the discharge pipe ensures accurate feeding, the screw conveyor 200 is used to transport the curing agent, and the feed pipe is used to accurately feed the curing agent.

[0060] The solidifying slurry stirring barrel 300 has a first stirring shaft; in the preparation step 1), when a set amount of curing agent is added to the solidifying slurry stirring barrel 300, the first stirring shaft is continuously stirred. In this way, the curing agent is prevented from accumulating at the inlet and rapid mixing is achieved.

[0061] The solidified soil mixing barrel 600 is arranged horizontally, and has a horizontal cavity in it. Two second mixing shafts arranged at intervals are arranged in the horizontal cavity. The second mixing shafts are arranged to extend along the axial direction of the horizontal cavity, so a plurality of mixing blades are arranged on the outer circumference of the second mixing shaft.

[0062] The top of the solidified soil mixing barrel 600 is provided with a solidified soil feed port, which is connected to the transverse cavity. Along the length direction of the solidified soil mixing barrel 600, the solidified soil feed port is located in the middle of the solidified soil mixing barrel 600, and a cover plate is detachably connected to the solidified soil feed port;

[0063] The top of the solidified soil mixing barrel 600 is provided with an inner upper convex ring 610 and an outer upper convex ring 620 that convex upwards. The inner upper convex ring 610 and the outer upper convex ring 620 are arranged concentrically. The inner upper convex ring 610 is arranged around the circumference of the solidified soil feed port. There is an annular embedded gap between the inner upper convex ring 610 and the outer upper convex ring 620. The top of the outer upper convex ring 620 is higher than the top of the inner upper convex ring 610.

[0064] In step 1), the feed hopper 6000 is placed on the top of the solidified soil mixing barrel 600, and the bottom of the feed hopper 6000 is embedded in the embedding interval, and the top of the outer upper convex ring 620 abuts against the surface of the feed hopper 6000. After the feed hopper 6000 is fixed, a set amount of excavated soil is loaded into the transverse cavity through the feed hopper 6000 using an excavator. In this way, the positioning installation of the feed hopper 6000 is achieved through the design of the embedding interval, which facilitates the accurate loading of the excavated soil into the transverse cavity.

[0065] In this embodiment, the inner upper convex ring 610 is provided with a plurality of hollow strip holes 6100, the strip holes 6100 penetrate the inner upper convex ring 610 transversely, and the plurality of strip holes 6100 are arranged at intervals along the circumference of the inner upper convex ring 610. The inner upper convex ring 610 has an annular surface facing the embedded interval, and the annular surface is covered with an annular rubber block 611, and the annular rubber block 611 is arranged along the circumference of the annular surface. The annular rubber block 611 is provided with a plurality of annular ribs 612 protruding toward the embedded interval, and the plurality of annular ribs 612 are arranged at intervals along the height direction of the annular rubber block 611;

[0066] The bottom of the feed hopper 6000 has an annular groove that matches the annular rib 612. When the feed hopper 6000 is inserted into the insertion interval, the annular rubber block 611 is squeezed and deformed toward the strip hole 6100, and the annular rib 612 is inserted into the annular groove. In this way, the feed hopper 6000 is fixed by the annular rubber block 611, and the longitudinal movement of the feed hopper 6000 is further limited by the action of the annular rib 612.

[0067] In the preparation step 1), the second stirring shaft continuously stirs the process of loading a set amount of excavated soil into the solidified soil mixing barrel 600 by using an excavator. In this way, the excavated soil is prevented from accumulating in the middle of the transverse cavity, which makes it impossible to continue feeding, and the excavated soil is quickly dispersed.

[0068] The solidified soil mixing barrel 600 is provided with a slurry feed port, the outer end of the slurry delivery pipe 510 is connected to the slurry feed port, and an annular pipe 630 is provided in the transverse cavity, and the annular pipe 630 is arranged in an annular shape at the top of the transverse cavity; the annular pipe 630 is provided with a plurality of slurry outlet holes opening downward, and the plurality of slurry outlets are arranged at intervals along the extension direction of the annular pipe 630, and the annular pipe 630 is provided with a connecting pipe 640 protruding outward, and the connecting pipe 640 is connected to the slurry feed port;

[0069] The annular tube 630 has an annular cavity, which is connected to the connecting tube 640. An elastic diaphragm 631 is provided on the slurry outlet to close the annular cavity. A slurry outlet is provided in the middle of the elastic diaphragm 631. When the elastic diaphragm 631 is in a natural state, the slurry outlet is closed. When the elastic diaphragm 631 is deformed downward by force, the slurry outlet is opened.

[0070] In the preparation step 2), during the process of pumping the solidified slurry in the slurry storage tank 400 to the solidified soil mixing barrel 600, after the solidified slurry enters the slurry feed port, it enters the annular cavity through the connecting pipe 640, and the solidified slurry moves along the extension direction of the annular cavity until the annular cavity is completely filled with the solidified slurry. Under the pressure of the solidified slurry, multiple elastic diaphragms 631 are forced to bend downward, and the slurry outlet on the elastic diaphragm 631 opens, and the solidified slurry is sprayed downward into the transverse cavity through the slurry outlet. In this way, the solidified slurry is sprayed downward in multiple directions, and the mixing efficiency of the solidified slurry and the fluidized mountain-opening soil is improved.

[0071] A plurality of hemispherical elastic protrusions 632 are provided in the annular cavity. The outer periphery of the elastic protrusions 632 is fixedly connected to the side wall of the annular cavity. The middle part of the elastic protrusions 632 protrudes downward. The plurality of elastic protrusions 632 are arranged at intervals along the axis of the annular cavity. The plurality of elastic protrusions 632 and the plurality of elastic diaphragms 631 are arranged correspondingly up and down.

[0072] In the preparation step 2), when the solidified slurry in the slurry storage tank 400 is pumped to the solidified soil mixing barrel 600, when the solidified slurry impacts the elastic protrusion 632, the elastic protrusion 632 is concave inward, and the solidified slurry impacting the elastic protrusion 632 moves downward, driving the solidified slurry to squeeze the elastic diaphragm 631 to bend downward. In this way, the downward squeezing force of the solidified slurry is enhanced by the design of the elastic protrusion 632.

[0073] As a preferred embodiment, a rubber block 633 is respectively provided on both sides of the elastic diaphragm 631, the bottom of the rubber block 633 is fixed on the side wall of the annular cavity, the middle part of the rubber block 633 is arched upward, and the rubber block 633 and the elastic protrusion 632 are arranged up and down; when the solidified slurry passes through the rubber block 633, under the action of the rubber block 633, the channel is narrowed, and the solidified slurry is accelerated to rush toward the elastic protrusion 632, thereby enhancing the downward extrusion force of the solidified slurry.

[0074] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A method for preparing high-strength fluidized solidified soil based on mountain soil, characterized in that: The method comprises the following preparation steps: 1) Provide a solidified soil mixing barrel, inject a set amount of water into the solidified soil mixing barrel, and then use an excavator to load a set amount of excavated soil into the solidified soil mixing barrel. The solidified soil mixing barrel mixes the water and the excavated soil evenly to form fluid excavated soil; Providing a solidifying slurry stirring barrel, injecting a set amount of water into the solidifying slurry stirring barrel, then adding a set amount of curing agent into the solidifying slurry stirring barrel, stirring the curing agent and the water evenly to form solidifying slurry, and discharging the solidifying slurry into a slurry storage tank; According to the weight ratio, the curing agent includes 5-40 parts of cement clinker, 45-65 parts of slag powder, 5-15 parts of quicklime, 12-25 parts of fly ash, 5-25 parts of desulfurized gypsum, 10-15 parts of water glass, 1-5 parts of water reducer, and 2-6 parts of activator; 2) Provide a mud pump, the mud pump is connected to a slurry delivery pipe, the outer end of the slurry delivery pipe is connected to the solidified soil mixing barrel, and the solidified slurry in the slurry storage tank is pumped into the solidified soil mixing barrel by the mud pump and the slurry delivery pipe, and the solidified slurry is mixed with the fluidized mountain-opening soil; The solidified soil mixing barrel mixes and stirs the solidified slurry and the fluidized excavation soil to form fluidized solidified soil, and discharges the fluidized solidified soil into the solidified soil storage barrel; 3) Provide a slurry pump, wherein the slurry pump is connected to a liquid soil delivery pipe, the outer end of the liquid soil delivery pipe is connected to a mixer truck, and the fluidized solidified soil is pumped into the mixer truck using the slurry pump and the liquid soil delivery pipe.

2. The method for preparing high-strength fluidized solidified soil based on mountain soil according to claim 1, characterized in that: In the preparation step 1), before the mountain excavation soil is loaded into the solidified soil mixing barrel, the mountain excavation soil is sampled to obtain a sample, and the particle size distribution of the sample is measured. When the particle size distribution meets the set standard, the mountain excavation soil is loaded into the solidified soil mixing barrel; When the particle size distribution does not meet the set standard, soil particles are added to make the particle size distribution of the mountain soil meet the set standard.

3. The method for preparing high-strength fluidized solidified soil based on mountain soil according to claim 1, characterized in that: The pulp storage tank is arranged in a concave shape, a first motor is mounted on the pulp storage tank, and a first rotating shaft extending into the pulp storage tank is provided at the bottom of the first motor; In the preparation step 1), after the solidified slurry is discharged into the slurry storage tank, the solidified slurry is continuously stirred by a first rotating shaft to prevent the solidified slurry from solidifying or settling.

4. The method for preparing high-strength fluidized solidified soil based on mountain soil according to claim 1, characterized in that: The solidified soil storage barrel is provided with a second motor, and the bottom of the second motor has a second rotating shaft extending into the solidified soil storage barrel; In the preparation step 2), after the fluidized solidified soil is discharged into the solidified soil storage barrel, the fluidized solidified soil is continuously stirred by the second rotating shaft to prevent the fluidized solidified soil from solidifying or settling.

5. The method for preparing high-strength fluidized solidified soil based on mountain soil according to claim 1, characterized in that: The curing agent is stored in a storage bin, a discharge pipe is connected to the bottom of the storage bin, the bottom of the discharge pipe is connected to a screw conveyor, and the screw conveyor is arranged in an inclined shape; a conveying feed port is formed at the bottom of the screw conveyor, a conveying discharge port is formed at the top of the screw conveyor, and a feed pipe is connected to the spiral discharge port, the feed pipe is extended downward and connected to a curing slurry stirring barrel; In the preparation step 1), a set amount of curing agent falls into the screw conveyor through the discharge pipe, and the screw conveyor conveys the curing agent to the delivery discharge port, and falls into the curing slurry stirring barrel through the feed pipe.

6. The method for preparing high-strength fluidized solidified soil based on mountain soil according to claim 1, characterized in that: The solidifying slurry stirring barrel has a first stirring shaft; in the preparation step 1), during the process of adding a set amount of curing agent into the solidifying slurry stirring barrel, the first stirring shaft continuously stirs.

7. The method for preparing high-strength fluidized solidified soil based on mountain soil according to claim 1, characterized in that: The solidified soil mixing barrel is arranged horizontally, and has a horizontal cavity in it. Two second mixing shafts arranged at intervals are arranged in the horizontal cavity. The second mixing shafts are arranged to extend along the axial direction of the horizontal cavity, so a plurality of mixing blades are arranged on the outer circumference of the second mixing shaft. The top of the solidified soil mixing barrel is provided with a solidified soil feed port, the solidified soil feed port is connected to the transverse cavity, and along the length direction of the solidified soil mixing barrel, the solidified soil feed port is located in the middle of the solidified soil mixing barrel, and a cover plate is detachably connected to the solidified soil feed port; The top of the solidified soil mixing barrel is provided with an inner upper convex ring and an outer upper convex ring protruding upward, the inner upper convex ring and the outer upper convex ring are arranged concentrically, the inner upper convex ring is arranged around the circumference of the solidified soil feed port, there is an annular embedded gap between the inner upper convex ring and the outer upper convex ring, and the top of the outer upper convex ring is higher than the top of the inner upper convex ring; In the step 1), the feed hopper is placed on the top of the solidified soil mixing barrel, and the bottom of the feed hopper is embedded in the embedding interval, and the top of the outer upper convex ring abuts against the surface of the feed hopper. After the feed hopper is fixed, an excavator is used to load a set amount of excavated soil into the transverse cavity through the feed hopper.

8. The method for preparing high-strength fluidized solidified soil based on mountain soil according to claim 7, characterized in that: In the preparation step 1), during the process of loading a set amount of excavated soil into the solidified soil mixing bucket using an excavator, the second stirring shaft continues to stir.

9. The method for preparing high-strength fluidized solidified soil based on mountain soil according to claim 7, characterized in that: The solidified soil mixing barrel is provided with a slurry feed port, the outer end of the slurry delivery pipe is connected to the slurry feed port, an annular tube is provided in the transverse cavity, and the annular tube is arranged in an annular shape at the top of the transverse cavity; the annular tube is provided with a plurality of slurry outlet holes opening downward, and the plurality of slurry outlets are arranged at intervals along the extension direction of the annular tube, and the annular tube is provided with a connecting pipe protruding outward, and the connecting pipe is connected to the slurry feed port; The annular tube has an annular cavity, which is connected to the connecting tube. The slurry outlet hole is provided with an elastic diaphragm that closes the annular cavity. The middle of the elastic diaphragm is provided with a slurry outlet. When the elastic diaphragm is in a natural state, the slurry outlet is closed. When the elastic diaphragm is deformed downward by force, the slurry outlet is opened. In the preparation step 2), during the process of pumping the solidified slurry in the slurry storage tank to the solidified soil mixing barrel, the solidified slurry enters the slurry feed port and then enters the annular cavity through the connecting pipe. The solidified slurry moves along the extension direction of the annular cavity until the annular cavity is completely filled with the solidified slurry. Under the squeezing of the solidified slurry, the plurality of elastic diaphragms are forced to bend downward, the slurry outlets on the elastic diaphragms are opened, and the solidified slurry is sprayed downward into the transverse cavity through the slurry outlets.

10. The method for preparing high-strength fluidized solidified soil based on mountain soil according to claim 9, characterized in that: A plurality of hemispherical elastic protrusions are arranged in the annular cavity, the outer periphery of the elastic protrusions is fixedly connected to the side wall of the annular cavity, the middle part of the elastic protrusions protrudes downward, the plurality of elastic protrusions are arranged at intervals along the axis of the annular cavity, and the plurality of elastic protrusions and the plurality of elastic diaphragms are arranged correspondingly up and down; In the preparation step 2), during the process of pumping the solidified slurry in the slurry storage tank into the solidified soil mixing barrel, when the solidified slurry impacts the elastic protrusion, the elastic protrusion is concave inward, and the solidified slurry impacting the elastic protrusion moves downward, driving the solidified slurry to squeeze the elastic diaphragm to bend downward.