Unpowered drifting dismantling method for underwater bearing platform

Through the unpowered drifting method, the water buoyancy and flow force are used to move the water buoyancy to the shore, which solves the problem of difficulty in using large-tonnage floating crane equipment in the existing technology, realizes the safe and economical demolition of the buoyancy, and reduces the construction cost and risk.

CN119083338APending Publication Date: 2024-12-06ROAD & BRIDGE INT CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411052960.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-02
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

When removing the water-mounted platform of old river-span concrete bridges, large-tonnage floating crane equipment and traction equipment are required, resulting in high construction costs, high risk of underwater operation for workers, and limited lifting capacity of floating cranes, making it difficult to deal with weight. Ten thousand tons of bearing.

Method used

The powerless drifting method is used to float the cut support platform with airbags and nylon ropes, and drift it to the shore with water flow and buoyancy. It is bound to move it to the shallow area through wire rope constraints, and strand it at low water level, without completing it. Demolition of large lifting equipment.

Benefits of technology

It reduces construction costs, reduces the number of underwater cutting times, improves construction safety, and avoids underwater construction risks, achieving safe and economical demolition of the bearing.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119083338A_ABST
    Figure CN119083338A_ABST
Patent Text Reader

Abstract

The invention relates to an unpowered drifting dismantling method for an underwater bearing platform, which comprises the following steps of: firstly, integrally cutting the underwater bearing platform along a riverbed line, then connecting a steel wire rope between the underwater bearing platform and a shoreside bearing platform, binding an air bag with a large enough volume on the bearing platform, inflating the air bag to float the bearing platform when a high water level is selected, and drifting the bearing platform to a shoal area of a river bank by virtue of water flow. And the air bag is deflated to enable the bearing platform to be stranded. The underwater bearing platform is moved by completely utilizing water buoyancy and water flow force, large hoisting equipment and traction equipment are not needed, and the construction cost can be reduced; the underwater cutting frequency of the bearing platform can be reduced, the underwater construction time is shortened, and the safety of constructors is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of bridge demolition and reconstruction construction, and relates to a demolition construction of an underwater pedestal of an old bridge, and specifically to a method for demolishing an underwater pedestal by unpowered drifting. Background Art

[0002] After some cross-river concrete bridges have been in operation for a certain number of years, their structures will inevitably suffer various types of damage. Even after repair, they still cannot meet the requirements for safe operation and need to be demolished and rebuilt. Some cross-river bridges also need to be demolished and rebuilt because the spacing between the underwater piers in the original design cannot meet the current and future navigation requirements.

[0003] When dismantling a cross-river bridge, the upper structure and pier parts of the bridge are usually cut into pieces and then dismantled using floating cranes, cable cranes, bridge cranes and other equipment. For the underwater pier, if it is also cut and dismantled in pieces, it will require a long time of underwater construction, which not only increases the risk of underwater workers but also is costly. Therefore, it is safer to use the method of overall cutting along the riverbed and overall salvage.

[0004] At present, the salvage of the pedestal in the water usually uses a large-tonnage floating crane to lift the pedestal, and then tow the floating crane to the shore, and the floating crane lowers the pedestal to the shallow area on the shore. However, the lifting capacity of the floating crane is limited. Even the largest floating crane in China, the "Blue Whale", has a lifting weight of only 7,500 tons. Some large-volume pedestals can weigh up to 10,000 tons, which far exceeds the lifting capacity of the floating crane. It is difficult to salvage the pedestal as a whole with a floating crane. In addition, under the influence of river water and strong winds, the towing equipment for towing the floating crane to the shore also requires a high cost. Summary of the invention

[0005] The purpose of the present invention is to address the above-mentioned problems and provide a method for the unpowered drifting removal of an underwater pedestal, which utilizes water buoyancy and water flow force to transport the integrally cut pedestal to the shore without the need for large-tonnage lifting and traction equipment, while reducing the workers' underwater cutting operation time and improving construction safety.

[0006] The technical solution of the present invention is as follows:

[0007] A method for removing a bearing platform in water by unpowered drifting, characterized in that it comprises the following steps:

[0008] (1) According to the number of underwater caps to be removed, prepare a corresponding number of air bags in advance, and the volume of each air bag after inflation is greater than 1.5 times the volume of the cap;

[0009] (2) When the water level is low, the cap is cut as a whole along the riverbed underwater, and at least two high-strength nylon ropes are inserted into the cut seam while cutting. Both ends of the nylon ropes are left with sufficient length outside the cap to be used for tying the airbags on the cap in subsequent construction;

[0010] After the cutting of the cap is completed, stones are tied to the airbags in the vacuum state, and the airbags are lowered to the top surfaces of the caps in the water by floating cranes, and the airbags and the caps are firmly tied with the nylon ropes; the weight of the stones tied to the airbags can make the airbags sink in the water;

[0011] (3) Use a steel wire rope to connect the cut foundation in the water with the foundation on the shore; tie several small buoys to the steel wire rope so that the steel wire rope can float in the water;

[0012] When the water level is high, the air supply boat is connected to the air bag through the air pipe and inflated into the air bag. When the air bag floats the platform, the inflation is stopped and the air supply boat is evacuated quickly.

[0013] (4) The pedestal and airbag floating in the water drift downstream under the action of the water flow, and due to the constraint of the wire rope, the pedestal and airbag in the water will drift downstream and move toward the shore. When the pedestal moves to the shallow area close to the shore, the air release hole on the airbag is opened to make the pedestal run aground; the wire rope and airbag connected to the pedestal are released to complete the unpowered drifting removal of the pedestal in the water.

[0014] Compared with the prior art, the present invention has the following beneficial effects:

[0015] 1. Use water buoyancy as the vertical force to lift the cap, and use the force of water flow to move the cap in the water to the shallow area of ​​the river bank. This is completely dependent on natural forces, does not require large lifting equipment and traction equipment, and can reduce construction costs;

[0016] 2. The overall cutting of the foundation reduces the number of underwater cutting of the foundation and the underwater construction time, which is beneficial to ensure the safety of construction workers;

[0017] 3. After the foundation drifts to the shallow area of ​​the river bank, when the water level of the river is low, the foundation can be completely exposed from the riverbed. The foundation can be cut and decomposed in a waterless environment and the foundation fragments can be transported to the waste dump to avoid the risk of underwater construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a construction flow chart of the present invention;

[0019] Figure 2 It is a schematic diagram of the state where a vacuum air bag is lowered to the top of the underwater pedestal using a floating crane;

[0020] Figure 3 It is a schematic diagram of the elevation state when the airbag is inflated to float the platform;

[0021] Figure 4 It is a schematic diagram of the plane state when the airbag is inflated to float the platform;

[0022] Figure 5It is a schematic diagram of the state in which the water flow is used to drift the foundation to the shallows near the river bank. DETAILED DESCRIPTION

[0023] The construction method of the present invention is described below through a specific embodiment.

[0024] A certain river-crossing bridge was originally designed as a concrete continuous beam bridge, including the main span, two side spans and approach bridges on both sides. Because the bridge is old and the piers at the junction of the main span and the two side spans affect navigation, it is necessary to demolish the old bridge and build a new suspension bridge in the original location. The upper structure and piers of the main span and the two side spans have been demolished by floating cranes, and now it is necessary to demolish the two underwater pedestals. Because the overall weight of the pedestals exceeds the lifting weight of the floating crane, the method of the present invention is used for demolition. The construction process is as follows: Figure 1 The specific construction method is as follows:

[0025] (1) According to the number of underwater pedestals to be removed, prepare a corresponding number of air bags in advance, and the volume of each air bag after inflation is greater than 1.5 times the volume of the pedestal.

[0026] The airbag is made of high-strength rubber material; the volume setting of the airbag after inflation is calculated based on the following principles:

[0027] Since the platform has a certain buoyancy F in the water 浮 The vertical force F that lifts the foundation in water is equal to the foundation's deadweight G minus the buoyancy F borne by the foundation. 浮 , that is: F = GF 浮 ;

[0028] The foundation is cast in concrete, and the density of general concrete is 2.5t / m 3 , and the density of water is 1t / m 3 , that is, to convert 1m 3 To lift the concrete in water, 1.5 tons of vertical force is required;

[0029] Without considering the weight of the airbag, 1.5m 3 The inflated airbag can generate 1.5t of buoyancy when fully immersed in water. Therefore, it can be concluded that the volume of the inflated airbag should be 1.5 times greater than the volume of the platform. The buoyancy when the airbag is fully immersed in water can float the platform.

[0030] (2) Figure 2 As shown, when the water level is low, a rope saw is used to cut the cap 1 as a whole along the riverbed underwater, and at least two high-strength nylon ropes 2 are inserted into the cut seam while cutting. Sufficient lengths are reserved at both ends of the nylon ropes 2 outside the cap for tying the airbags on the cap in subsequent construction.

[0031] After the cutting of the foundation is completed, stones are tied to the airbags 3 in the vacuum state, and the airbags 3 are lowered to the top surfaces of the underwater foundations 1 by using the floating crane 7, and the airbags 3 and the foundations 1 are firmly tied with the nylon rope 2; the stones are tied to the airbags to enable the airbags to sink smoothly into the water, and high-density heavy objects such as concrete blocks and iron blocks can also be tied, and the tying weight is sufficient to enable the airbags to sink in the water.

[0032] (3) Figure 3 , Figure 4 As shown, a steel wire rope 4 is used to connect the cut foundation 1 in the water with the approach bridge foundation 6 on the shore; a number of small buoys 5 are tied to the steel wire rope 4, and a small buoy 5 is arranged on the steel wire rope at a certain interval so that the steel wire rope 4 can float in the water;

[0033] When the water level is high, the air supply boat 8 is connected to the air bag through the inflation pipe and inflates the air bag 3. When the air bag 3 floats the platform 1, the inflation is stopped and the air supply boat 8 is quickly evacuated;

[0034] (4) Figure 4 , Figure 5 As shown, the pedestal 1 and the airbag 3 floating in the water drift downstream under the action of the water flow, and due to the restraint of the wire rope 4, the pedestal 1 and the airbag in the water will drift downstream and move toward the shore. When the pedestal 1 moves to the shallow area close to the shore, the deflation hole on the airbag is opened, and the buoyancy of the airbag is reduced after the airbag is deflated, so that the pedestal 1 falls and runs aground in the shallow area; the wire rope and the airbag connected to the pedestal are released, and the unpowered drifting removal of the pedestal in the water is completed.

[0035] The shoal area is the riverbank area between the riverbank at the highest water level and the riverbank at the lowest water level. After the foundation is stranded, at low water level, the foundation is completely exposed from the riverbed. The foundation can be cut and decomposed in a waterless environment and the fragments can be transported to the designated waste dump, which is convenient for construction and avoids the risk of underwater construction.

Claims

1. A method for removing a cap in water by unpowered drifting, characterized in that: The following steps are involved: (1) According to the number of underwater caps to be removed, prepare a corresponding number of air bags in advance, and the volume of each air bag after inflation is greater than 1.5 times the volume of the cap; (2) When the water level is low, the cap is cut as a whole along the riverbed underwater, and at least two high-strength nylon ropes are inserted into the cut seam while cutting. Both ends of the nylon ropes are left with sufficient length outside the cap to be used for tying the airbags on the cap in subsequent construction; After the cutting of the cap is completed, stones are tied to the airbags in the vacuum state, and the airbags are lowered to the top surfaces of the caps in the water by floating cranes, and the airbags and the caps are firmly tied with the nylon ropes; the weight of the stones tied to the airbags can make the airbags sink in the water; (3) Use a steel wire rope to connect the cut foundation in the water with the foundation on the shore; tie several small buoys to the steel wire rope so that the steel wire rope can float in the water; When the water level is high, the air supply boat is connected to the air bag through the air pipe and inflated into the air bag. When the air bag floats the platform, the inflation is stopped and the air supply boat is evacuated quickly. (4) The pedestal and airbag floating in the water drift downstream under the action of the water flow, and due to the constraint of the wire rope, the pedestal and airbag in the water will drift downstream and move toward the shore. When the pedestal moves to the shallow area close to the shore, the air release hole on the airbag is opened to make the pedestal run aground; the wire rope and airbag connected to the pedestal are released to complete the unpowered drifting removal of the pedestal in the water.