Post-tensioning method unbonded prestressed grouting mix proportion trial preparation method
Through the post-tension method, the problem of high grouting cost and poor slurry flow in the prestressed grouting system without bonding is solved, and the construction cost is reduced and construction cost is reduced. Improve economic benefits.
Patent Information
- Application Number
- CN202411183573.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-27
- Publication Date
- 2024-12-06
AI Technical Summary
The finished grouting material used in the existing post-bonding non-tensioned steel strand prestressed grouting system has high cost and poor slurry fluidity, resulting in poor construction difficulty and economicality.
The post-tension method is used to test mixing method without bonding prestress grouting, including slurry screening, flowability measurement, water discharge rate and volume change measurement, water discharge performance and stability inspection in steel strands, mass and volume Mixing ratio measurement, compression and flexural strength measurement, and settling time measurement, the optimal mix ratio of prestressed grout was obtained through mixing ratio test.
Through a large number of mix ratio tests, the optimal mix ratio for prestressed grout was formed, replacing the existing special finished grouting materials, greatly reducing construction costs, improving economic benefits, and providing sufficient slurry flow time to fill the domestic market The mix ratio design of the prestressed grouting system for post-bonding without bonding is blank.
Smart Images

Figure CN119086348A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building construction, in particular to a post-tensioning non-bonded prestressed grouting mix ratio trial preparation method. Background Art
[0002] Post-tensioned bonded prestressed concrete technology is to establish prestress for concrete structures through pre-buried pipes, reinforcing bars, tensioning, grouting and other processes to meet design requirements. After the prestressed tendons are tensioned, cement slurry is pressed into the prestressed holes to effectively bond the prestressed tendons to the concrete of the component, thereby controlling the spacing and width of cracks during overload, reducing the load on the anchors at both ends, and preventing the prestressed tendons from rusting.
[0003] At present, most domestic nuclear power projects use a prestressed grouting system with bonding and pre-tensioning. Its disadvantages are that the prestressed tendons are mostly arranged in a straight line, and it is difficult to arrange them in curves; a fixed pedestal or batches of steel membranes are required, which increases the difficulty and cost of construction; the finished slurry used in the existing non-bonded system is very expensive and has poor economic efficiency. Summary of the invention
[0004] In view of this, the purpose of the present invention is to provide a method for trial mixing mix proportions of post-tensioned unbonded prestressed grouting in order to address the problems and shortcomings of the prior art, so as to solve the technical problems of high cost and poor slurry fluidity of the finished grouting materials used in the existing unbonded post-tensioned steel strand prestressed grouting system.
[0005] To solve the above problems, the present invention adopts the following technical solutions:
[0006] A post-tensioning unbonded prestressed grouting mix ratio trial preparation method comprises the following steps:
[0007] Step 1: slurry screening;
[0008] Pass a certain amount of slurry through the sieve to check for lumps;
[0009] Step 2: Slurry fluidity measurement;
[0010] Under specified conditions, measure the time required for a specified amount of slurry to pass through the bottom hole of the Martens cone to determine the fluidity of the slurry;
[0011] Step 3: Measure the water bleeding rate and volume change of the slurry;
[0012] Step 4: In the presence of steel strands, test the water bleeding performance and volume stability of the slurry;
[0013] Step 5: measuring the mixing ratio of the slurry by mass and volume in a flowing state;
[0014] Step 6: Measure the compressive strength and flexural strength of the slurry;
[0015] Step 7: measuring the setting time of the slurry;
[0016] Step 8: Obtain the optimal mix ratio of prestressed grouting through mix ratio test.
[0017] Preferably, in step 1, the diameter of the sieve is 145-155 mm, and the pore size is ≤ 2 mm.
[0018] Preferably, in step 2, the specific steps of measuring the slurry fluidity include:
[0019] The Martens cone is installed axially and vertically, and the side with the largest diameter of the Martens cone is installed at the top;
[0020] A cylindrical sieve is placed below the outlet of the Martens cone to seal the bottom hole of the Martens cone;
[0021] Slowly inject the slurry into the Malvern cone, open the small hole at the bottom of the Malvern cone, and start timing with a stopwatch;
[0022] The time it takes for the slurry to completely flow into the container is recorded.
[0023] Preferably, in step 3, the specific steps of measuring the water bleeding rate and volume change of the slurry include:
[0024] The first transparent test tube is fixedly placed vertically with the top open;
[0025] Placing a steel strand in the first transparent test tube, with one end of the steel strand fixed to the bottom of the first transparent test tube and the other end arranged along the vertical center line of the first transparent test tube;
[0026] A piece of graph paper is pasted on the upper outer part of the first transparent test tube, so that the top of the graph paper is 25 mm higher than the upper end of the steel strand;
[0027] Pour the slurry into the first transparent test tube at a steady and slow flow rate until it is 9-11 mm above the upper end of the steel strand;
[0028] Seal the top of the first transparent test tube with a tube cap, and record the temperature of the slurry and the ambient temperature during the test;
[0029] Record the start time t0 and height h0 of grouting on the graph paper;
[0030] Within the first hour after the test slurry is poured, record the test slurry height h on graph paper every 15 minutes. g1 and water seepage height h w, then record the grouting height h at the 2nd hour, 3rd hour and 24th hour respectively gi ;
[0031] The inhomogeneity of the slurry observed through the first transparent test tube was recorded.
[0032] Preferably, in step 4, the specific steps of testing the water bleeding performance and volume stability of the slurry include:
[0033] Two identical second transparent test tubes are respectively installed on the support frame, and the inclination angle of the second transparent test tubes is set to be 30±2° in the horizontal direction;
[0034] Insert 12 steel strands into each of the second transparent test tubes, cover the tubes with caps after the steel strands are inserted, and check whether there is water seepage or air above the slurry in the second transparent test tubes;
[0035] Preparing a slurry, and collecting and measuring the fluidity of the slurry sample;
[0036] Performing a grouting test on one of the second transparent test tubes;
[0037] A grouting test was performed on another of the second transparent test tubes.
[0038] Preferably, the step of performing a grouting test on one of the second transparent test tubes comprises:
[0039] Begin to press-inject grout into the bottom of one of the second transparent test tubes;
[0040] When the slurry with the same consistency as that injected from the bottom flows out of the top slurry outlet of the second transparent test tube, the valve is closed;
[0041] When the pressure reached 5 Bar, the bottom grouting port of one of the second transparent test tubes was closed, and measurements were taken 30 minutes, 1 hour, 3 hours and 24 hours after grouting.
[0042] Preferably, the step of performing a grouting test on another of the second transparent test tubes comprises:
[0043] After one of the second transparent test tubes has been grouting for 30 minutes, the grouting port and the grouting discharge port of the other second transparent test tube are opened;
[0044] Start the grouting pump and measure the flow time of the slurry;
[0045] When the slurry flows out from the top slurry discharge port of the other second transparent test tube, close the valve;
[0046] When the pressure reaches 5 Bar, close the bottom grouting port of the other second transparent test tube;
[0047] The liquid level was measured within 0-24 hours after the completion of the initial grouting of the second transparent test tube, and the liquid level was measured at 30 minutes, 1 hour, 3 hours and 24 hours after the completion of the subsequent grouting.
[0048] Preferably, in step 5, a slurry specific gravity scale is used to measure the mixing ratio of the mass and volume of the slurry.
[0049] Preferably, in step 8, the components in the prestressed grouting are, by weight, 340 parts of water; 1000 parts of cement; 30 parts of water reducer; 4 parts of retarder; and 1 part of stabilizer.
[0050] Compared with the prior art, the present invention has significant advantages and beneficial effects, which are specifically embodied in the following aspects:
[0051] The post-tensioning unbonded prestressed grouting mix proportion trial preparation method of the present invention includes the following steps: slurry screening, passing a certain amount of slurry through the sieve to check whether there is agglomeration; slurry fluidity measurement, under specified conditions, measuring the time required for a specified amount of slurry to pass through the bottom hole of the Martens cone to determine the slurry fluidity; measuring the water bleeding rate and volume change of the slurry; in the presence of steel strands, checking the water bleeding performance and volume stability of the slurry; measuring the mixing ratio of the mass and volume of the slurry in a flowing state; measuring the compressive strength and flexural strength of the slurry; measuring the setting time of the slurry; and obtaining the optimal mix proportion of prestressed grouting through a mix proportion test. Through a large number of mix proportion tests, production verification tests and full-proportion grouting tests are completed, and the optimal mix proportion of prestressed grouting is formed, which provides reference for other projects, fills the gap in this field in China, and greatly reduces construction costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0052] Figure 1 It is a schematic flow chart of a method for trial mixing post-tensioned unbonded prestressed grouting mix proportions in an embodiment of the present invention;
[0053] Figure 2 This is a schematic diagram of the completion of the grouting of the core adsorption test in an embodiment of the present invention;
[0054] Figure 3 It is a schematic diagram of the core adsorption test after grouting and water seepage in an embodiment of the present invention;
[0055] Figure 4 A sample diagram of the setting of the inclined tube test in an embodiment of the present invention;
[0056] Figure 5 This is a schematic diagram of top water seepage in an inclined tube test in an embodiment of the present invention;
[0057] Figure 6 Schematic diagram of the internal structure of the inclined tube test in an embodiment of the present invention.
[0058] Description of reference numerals:
[0059] 1-Martens cone; 2-cylindrical sieve; 3-first transparent test tube; 4-steel strand; 5-second transparent test tube; 6-support frame. DETAILED DESCRIPTION
[0060] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, specific embodiments of the present invention are described in detail below with reference to the accompanying drawings.
[0061] The post-tensioning method refers to pouring concrete first, and then flowing out corresponding channels in the component body according to the position of the prestressed tendons. After the concrete strength of the component reaches the specified thickness, the prestressed tendons are inserted into the reserved channels for tensioning, and the prestressed tendons are anchored to the ends of the component with anchors. The prestressed force of the prestressed tendons is transmitted to the concrete by the anchors at the ends of the component, so that it produces pre-compressive stress. Prestressed concrete structure is a structure that is pre-pressed before it is subjected to load, so that the internal force of the concrete in the tension zone under the action of external loads produces compressive stress, which is used to offset or reduce the tensile stress generated by the external load, so that the structure does not produce cracks or cracks later under normal use; then cement slurry is poured into the reserved channels to form a whole with the prestressed tendons and concrete components.
[0062] See also Figure 1-6 As shown, an embodiment of the present invention provides a post-tensioning unbonded prestressed grouting mix ratio trial preparation method, and the prestressed grouting mix ratio trial preparation method comprises the steps of:
[0063] Step 1: slurry screening;
[0064] Pass a certain amount of slurry through the sieve to check for lumps;
[0065] Step 2: Slurry fluidity measurement;
[0066] Under specified conditions, measure the time required for a specified amount of slurry to pass through the bottom hole of the Martens cone to determine the fluidity of the slurry;
[0067] Step 3: Measure the water bleeding rate and volume change of the slurry;
[0068] Step 4: In the presence of steel strands, test the water bleeding performance and volume stability of the slurry;
[0069] Step 5: measuring the mixing ratio of the slurry by mass and volume in a flowing state;
[0070] Step 6: Measure the compressive strength and flexural strength of the slurry;
[0071] Step 7: measuring the setting time of the slurry;
[0072] Step 8: Obtain the optimal mix ratio of prestressed grouting through mix ratio test.
[0073] The finished grouting materials used in the existing unbonded post-tensioned steel strand prestressed grouting system are very expensive and have low economic efficiency. This method has formed the optimal mix ratio of prestressed grouting through a large number of mix ratio tests, production verification tests and full-proportion grouting tests, which can replace the existing special finished grouting materials, greatly reduce the construction cost, and have good economic benefits. It fills the gap in the mix ratio design in the field of domestic unbonded post-tensioned steel strand prestressed grouting system; the cement slurry can maintain fluidity within 25 seconds for at least 6 hours, providing sufficient time guarantee for on-site grouting.
[0074] In one embodiment of the present invention, in step 1, the diameter of the sieve is 145-155 mm, and the pores are ≤ 2 mm. Specifically in this step, the diameter of the sieve is preferably 150 mm, a certain amount of slurry is poured into the sieve, and whether there is agglomeration is checked, and the desired slurry is obtained by screening.
[0075] See also Figure 2 , 3 As shown, in one embodiment of the present invention, in step 2, the specific steps of measuring the slurry fluidity include:
[0076] The Martens cone 1 is installed axially and vertically, and the side of the Martens cone 1 with the largest diameter is installed at the top;
[0077] A cylindrical sieve 2 is placed below the outlet of the Martens cone 1, and the small hole at the bottom of the Martens cone 1 is sealed;
[0078] Slowly inject the slurry into the Malvern cone 1, open the small hole at the bottom of the Malvern cone 1, and start timing with a stopwatch;
[0079] The time it takes for the slurry to completely flow into the container is recorded.
[0080] Specifically, in this embodiment, a 1.7 liter (±10%) "Marsh" cone (Marsh cone 1), a cylindrical sieve 2, a stopwatch and a container with a capacity of 1 liter are preferably used. The cylindrical sieve 2 is connected to the cone outlet of the Marsh cone 1. All surfaces of the Marsh cone 1 should be clean and moist (the surface is moist without residual water), and the bottom hole of the Marsh cone 1 is sealed. The slurry is slowly injected into the Marsh cone 1, and care is taken to prevent air from being entrained; the bottom hole of the Marsh cone 1 is opened, and the stopwatch is started at the same time to record the time for the slurry to flow into the 1 liter container.
[0081] Thus, the fluidity of the slurry is determined (in seconds) by measuring the time required for a specified amount of slurry to pass through the bottom orifice of a Marsh cone 1 ("Marsh" cone) under specified conditions.
[0082] In one embodiment of the present invention, in step 3, the specific steps of measuring the water bleeding rate and volume change of the slurry include:
[0083] The first transparent test tube 3 is fixedly placed vertically and kept open at the top. The first transparent test tube 3 must be stably fixed to avoid displacement or vibration, so as not to affect the measurement results.
[0084] In the steps of this embodiment, the inner diameter of the first transparent test tube 3 is preferably 60 mm to 80 mm, and the length is 1 m. Both ends of the first transparent test tube 3 are also equipped with tube caps.
[0085] The steel strand 4 is placed in the first transparent test tube 3 , with one end of the steel strand 4 fixed to the bottom of the first transparent test tube 3 , and the other end arranged along the vertical center line of the first transparent test tube 3 .
[0086] In the steps of this embodiment, the length of the steel strand 4 is preferably 900 mm. The steel strand 4 is used to penetrate into the first transparent test tube 3, and ensure that one end of the steel strand 4 is fixed to the bottom of the first transparent test tube 3, and the other end of the steel strand 4 is located at the central axis position of the first transparent test tube 3.
[0087] A piece of graph paper is pasted on the upper outer portion of the first transparent test tube 3 so that the top of the graph paper is 25 mm higher than the upper end of the steel strand 4 .
[0088] In the steps of this embodiment, the size of the graph paper is selected to be 60 mm×250 mm, and the top of the graph paper is made 25 mm higher than the upper end of the steel strand 4, for the purpose of facilitating recording.
[0089] Pour the slurry into the first transparent test tube 3 at a steady and slow flow rate until it is 9-11 mm above the upper end of the steel strand 4;
[0090] In the steps of this embodiment, the slurry is injected from the bottom of the first transparent test tube 3 by using a small diameter tube, which can ensure that no air is entrained. The slurry fills the first transparent test tube 3 to a position about 10 mm above the upper end of the steel strand 4.
[0091] Seal the top of the first transparent test tube 3 with a tube cap, and record the temperature of the slurry and the ambient temperature during the test;
[0092] Record the start time t0 and height h0 of grouting on graph paper;
[0093] Within the first hour after the test slurry is poured, record the test slurry height h on graph paper every 15 minutes. g1 and water seepage height h w , then record the grouting height h at the 2nd hour, 3rd hour and 24th hour respectively gi ;
[0094] The inhomogeneity of the slurry observed through the first transparent test tube 3 is recorded. The inhomogeneity of the slurry includes: crystals formed when the slurry bleeds, and stratification of the slurry due to different colors.
[0095] It should be noted that the purpose of recording at different times instead of simply taking the final value is to understand the trend of slurry expansion.
[0096] The specific principle of measuring the water seepage rate and volume change of the slurry is: the water seepage of the slurry is obtained by measuring the volume of the water remaining on the upper part of the slurry (a pipe cap must be installed to prevent the evaporation of the seepage water).
[0097] The volume change of the slurry can be obtained by measuring the percentage change in volume of the slurry at the beginning and end of the test. This test mainly measures the volume change caused by sedimentation or expansion.
[0098] See also Figure 4 As shown, in one embodiment of the present invention, in step 4, the specific steps of testing the water bleeding performance and volume stability of the slurry include:
[0099] Two identical second transparent test tubes 5 are respectively mounted on the support frame 6, and the inclination angle of the second transparent test tubes 5 is set to be 30±2° in the horizontal direction;
[0100] In the steps of this embodiment, the diameter of the two second transparent test tubes 5 is preferably 80 mm and the length is 5 m. The top of the second transparent test tube 5 is provided with a slurry discharge hole through the tube cap, and the bottom of the second transparent test tube 5 is provided with a grouting hole through the tube cap, and the slurry discharge hole, the grouting hole and the tube cap can withstand a pressure of 5 bar.
[0101] Insert 12 steel strands 4 into each second transparent test tube 5, cover the tube cap after the steel strands 4 are inserted, and check whether there is water seepage or air above the slurry in the second transparent test tube 5;
[0102] In the steps of this embodiment, 12 prestressed steel strands 4 are placed in each second transparent test tube 5, that is, the total number of steel strands 4 is 24, each of which is 5 meters long, and the length of the steel strands 4 is exactly the distance between the second transparent test tube 5 and the cap. Two second transparent test tubes 5 are respectively installed on a support frame 6 to prevent deformation of the pipeline. After the steel strands 4 are inserted into the cap, check whether there is water seepage or air above the slurry in the second transparent test tube 5.
[0103] Prepare slurry and collect and measure the fluidity of slurry samples. In this step, a mixer is used to prepare slurry, so the fluidity of slurry samples should be collected from the mixer.
[0104] Performing a grouting test on one of the second transparent test tubes 5;
[0105] The grouting test was performed on another second transparent test tube 5 .
[0106] In the steps of this embodiment, the water bleeding performance and volume stability of the slurry are determined in the presence of the steel strand 4. Note that the pipe cap is covered during the test to prevent evaporation, and the volume of water and air remaining on the top of the slurry is measured.
[0107] In the first stage of the test, the accumulation of bleeding air is determined above the second transparent test tube 5. To avoid water loss by evaporation, the slurry is injected (pressed) into the tube and allowed to solidify.
[0108] In the second phase of the test, the effect of injecting slurry again into the pipe where water and air accumulate in the slurry
[0109] In one embodiment of the present invention, the step of performing a grouting test on one of the second transparent test tubes 5 comprises:
[0110] Start to inject grout into the bottom of one of the second transparent test tubes 5;
[0111] When the slurry of the same consistency as that injected into the bottom flows out of the top slurry outlet of the second transparent test tube 5, close the valve;
[0112] When the pressure reaches 5 Bar, the bottom grouting port of one of the second transparent test tubes 5 is closed, and measurements are taken 30 minutes, 1 hour, 3 hours and 24 hours after grouting.
[0113] In one embodiment of the present invention, the step of performing a grouting test on another second transparent test tube 5 comprises:
[0114] After one of the second transparent test tubes 5 has been grouting for 30 minutes, the grouting port and the grouting discharge port of the other second transparent test tube 5 are opened;
[0115] Start the grouting pump and measure the flow time of the slurry;
[0116] When the slurry flows out from the top slurry discharge port of the other second transparent test tube 5, close the valve;
[0117] When the pressure reaches 5 Bar, close the bottom grouting port of another second transparent test tube 5;
[0118] The liquid level was measured within 0-24 hours after the completion of the initial grouting of the second transparent test tube 5, and the liquid level was measured at 30 minutes, 1 hour, 3 hours and 24 hours after the completion of the subsequent grouting.
[0119] In one embodiment of the present invention, in step 5, a slurry specific gravity scale is used to measure the mixing ratio of the mass and volume of the slurry.
[0120] In one embodiment of the present invention, in step 8, the components in the prestressed grouting are, by weight, 340 parts of water; 1000 parts of cement; 30 parts of water reducer; 4 parts of retarder; and 1 part of stabilizer.
[0121] In the existing post-tensioning method, during the construction of bonded prestressed engineering, although the channel grouting can make the prestressed tendons and concrete components form a whole, in actual operation, pores are inevitably present after the cement slurry solidifies. External moisture and air can easily come into contact with the prestressed tendons through these pores, causing oxidation reactions and thus causing corrosion of the prestressed tendons.
[0122] This prestressed grouting mix ratio trial preparation method can replace the existing special finished grouting materials, greatly reducing the construction cost, with good economic benefits, filling the gap in the mix ratio design in the field of unbonded post-tensioned steel strand 4 prestressed grouting system in the country. The cement slurry can maintain fluidity within 25 seconds for at least 6 hours, providing sufficient time guarantee for on-site grouting.
[0123] Although the invention of the present invention is disclosed as above, the protection scope of the present invention is not limited thereto. Those skilled in the art may make various changes and modifications without departing from the spirit and scope of the present invention, and these changes and modifications will fall within the protection scope of the present invention.
Claims
1. A method for trial mixing post-tensioned unbonded prestressed grouting mix, characterized in that: Includes steps: Step 1: slurry screening; Pass a certain amount of slurry through the sieve to check for lumps; Step 2: Slurry fluidity measurement; Under specified conditions, measure the time required for a specified amount of slurry to pass through the bottom hole of the Martens cone to determine the fluidity of the slurry; Step 3: Measure the water bleeding rate and volume change of the slurry; Step 4: In the presence of steel strands, test the water bleeding performance and volume stability of the slurry; Step 5: measuring the mixing ratio of the slurry by mass and volume in a flowing state; Step 6: Measure the compressive strength and flexural strength of the slurry; Step 7: measuring the setting time of the slurry; Step 8: Obtain the optimal mix ratio of prestressed grouting through mix ratio test.
2. The method for trial mixing post-tensioning unbonded prestressed grouting mix according to claim 1, characterized in that: In step 1, the diameter of the sieve is 145-155 mm, and the pore size is ≤ 2 mm.
3. The method for trial mixing post-tensioning unbonded prestressed grouting mix according to claim 1, characterized in that: In step 2, the specific steps of measuring the slurry fluidity include: The Martens cone is installed axially and vertically, and the side with the largest diameter of the Martens cone is installed at the top; A cylindrical sieve is placed below the outlet of the Martens cone to seal the bottom hole of the Martens cone; Slowly inject the slurry into the Malvern cone, open the small hole at the bottom of the Malvern cone, and start timing with a stopwatch; The time it takes for the slurry to completely flow into the container is recorded.
4. The method for trial mixing post-tensioning unbonded prestressed grouting mix according to claim 1, characterized in that: In step 3, the specific steps of measuring the water bleeding rate and volume change of the slurry include: The first transparent test tube is fixedly placed vertically with the top open; Placing a steel strand in the first transparent test tube, with one end of the steel strand fixed to the bottom of the first transparent test tube and the other end arranged along the vertical center line of the first transparent test tube; A piece of graph paper is pasted on the upper outer part of the first transparent test tube, so that the top of the graph paper is 25 mm higher than the upper end of the steel strand; Pour the slurry into the first transparent test tube at a steady and slow flow rate until it is 9-11 mm above the upper end of the steel strand; Seal the top of the first transparent test tube 3 with a tube cap, and record the temperature of the slurry and the ambient temperature during the test; Record the start time t0 and height h0 of grouting on the graph paper; Within the first hour after the test slurry is poured, record the test slurry height h on graph paper every 15 minutes. g1 and water seepage height h w , then record the grouting height h at the 2nd hour, 3rd hour and 24th hour respectively gi ; The inhomogeneity of the slurry observed through the first transparent test tube was recorded.
5. The method for trial mixing post-tensioning unbonded prestressed grouting mix according to claim 1, characterized in that: In step 4, the specific steps of testing the water bleeding performance and volume stability of the slurry include: Two identical second transparent test tubes are respectively installed on the support frame, and the inclination angle of the second transparent test tubes is set to be 30±2° in the horizontal direction; Insert 12 steel strands into each of the second transparent test tubes, cover the tubes with caps after the steel strands are inserted, and check whether there is water seepage or air above the slurry in the second transparent test tubes; Preparing a slurry, and collecting and measuring the fluidity of the slurry sample; Performing a grouting test on one of the second transparent test tubes; A grouting test was performed on another of the second transparent test tubes.
6. The method for trial mixing post-tensioning unbonded prestressed grouting mix according to claim 5, characterized in that: The step of performing a grouting test on one of the second transparent test tubes comprises: Begin to pressure-inject grout into the bottom of one of the second transparent test tubes; When the slurry with the same consistency as that injected into the bottom flows out of the top slurry outlet of the second transparent test tube, the valve is closed; When the pressure reached 5 Bar, the bottom grouting port of one of the second transparent test tubes was closed, and measurements were taken 30 minutes, 1 hour, 3 hours and 24 hours after grouting.
7. The method for trial mixing post-tensioning unbonded prestressed grouting mix according to claim 5, characterized in that: The step of performing a grouting test on another second transparent test tube comprises: After one of the second transparent test tubes has been grouting for 30 minutes, the grouting port and the grouting discharge port of the other second transparent test tube are opened; Start the grouting pump and measure the flow time of the slurry; When the slurry flows out from the top slurry discharge port of the other second transparent test tube, close the valve; When the pressure reaches 5 Bar, close the bottom grouting port of the other second transparent test tube; The liquid level was measured within 0-24 hours after the initial grouting of the second transparent test tube was completed, and the liquid level was measured at 30 minutes, 1 hour, 3 hours and 24 hours after the subsequent grouting was completed.
8. The method for trial mixing post-tensioning unbonded prestressed grouting mix according to claim 1, characterized in that: In step 5, the mixing ratio of the slurry by mass and volume is measured using a slurry specific gravity scale.
9. The method for trial mixing post-tensioning unbonded prestressed grouting mix according to claim 1, characterized in that: In step 8, the components in the prestressed grouting are, by weight, 340 parts of water; 1000 parts of cement; 30 parts of water reducer; 4 parts of retarder; and 1 part of stabilizer.