Curtain wall engineering building material transfer platform and construction method

By designing a building material transfer platform for curtain wall engineering, using bottom support frames and limit parts to realize batch lifting and transport of curtain wall panels, it solves the problem of time-consuming and labor-intensive lifting in high-rise buildings, and improves construction efficiency and safety.

CN119145657AActive Publication Date: 2024-12-17THE SECOND CONSTR OF CHINA CONSTR EIGHTH ENG DIV
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202411575158.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-06
Publication Date
2024-12-17
Estimated Expiration
2044-11-06

AI Technical Summary

Technical Problem

In high-rise building curtain wall projects, lifting curtain wall panels piece by piece is time-consuming and labor-intensive, and there is a lack of batch lifting and transportation technology.

Method used

A curtain wall engineering building materials transfer platform is designed, including the base support frame and limiting parts. Through the detachable connecting rod and adjustable frame, combined with the binding rope and the hanging lug, the batch lifting and stable fixation of the curtain wall panel is achieved.

Benefits of technology

It realizes batch lifting and transfer of curtain wall panels, improves construction efficiency and safety, and is adapted to panels with different side lengths to ensure stable fixation and lifting safety of panels.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119145657A_ABST
    Figure CN119145657A_ABST
Patent Text Reader

Abstract

The invention discloses a curtain wall engineering building material transfer platform and a construction method, and relates to the technical field of curtain wall construction, and the curtain wall engineering building material transfer platform comprises a bottom bracing frame and a limiting piece; the bottom supporting frame comprises a first frame, a second frame, a first connecting rod and a second connecting rod. The bottom supporting frame is used for supporting a curtain wall panel stack, and the second connecting rod, the first extending part and the second extending part are used for being grabbed by a user so that parking can be facilitated. The first pulling and connecting lug, the second pulling and connecting lug and the concave part are used for stably binding and fixing the curtain wall panel stack; the first lifting lug and the second lifting lug are used for being connected with a lifting hook, so that batch lifting and transferring of curtain wall panels can be achieved; the first frame and the second frame with the adjustable distance can support the ends of the curtain wall panels with different side lengths in a matched mode, the limiting pieces with the adjustable positions can be connected with the curtain wall panels with different side lengths in a matched and clamped mode, and the adaptability to the side length sizes of the curtain wall panels is further enhanced through the replaceable first bottom plate and the replaceable second bottom plate.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of curtain wall construction, and in particular to a curtain wall engineering building material transfer platform and a construction method. Background Art

[0002] The unloading platform is a temporary operating platform set up at the construction site for the turnover of materials. During the construction of the main structure of a high-rise building, the cantilevered unloading platform is a transfer platform for vertical transportation at the construction site. It can temporarily store and transfer building materials and equipment such as scaffolding, formwork, and masonry bricks.

[0003] In curtain wall projects, vacuum suction cups are usually used to lift and install curtain wall panels piece by piece. However, for high-rise buildings, it is obviously time-consuming and labor-intensive to lift curtain wall panels from the ground to the high-rise wall one by one. Therefore, there is a technical demand for batch lifting and transportation of curtain wall panels. Summary of the invention

[0004] In order to meet the technical demand for "batch lifting and transportation of curtain wall panels" in the above background technology, the present invention provides a curtain wall engineering building materials transportation platform and construction method, which lifts the curtain wall panels in batches onto a temporary operating table and then installs them piece by piece.

[0005] The technical solution adopted by the present invention to solve the above technical problems is: A curtain wall engineering building material transfer platform comprises a bottom support frame, wherein the bottom support frame comprises a first frame, a first frame, a first connecting rod and a second connecting rod; the first frame comprises a first main side rod, a first rib rod and a first bottom plate connected to each other, the first main side rod is an L-shaped bending rod structure, the first main side rod comprises a first connecting portion close to a bending position and a first extending portion in principle of a bending position; the first rib rod is provided with a plurality of comb-shaped rib rods arranged at an inner wall position of the first connecting portion; the first bottom plate is arranged on a top surface of the first rib rod and at an inner wall position of the first connecting portion; the second frame comprises a second main side rod, a second rib rod and a second bottom plate fixedly connected to each other, the second main side rod is an L-shaped The bending rod structure, the second main side rod includes a second connecting portion close to the bending position and a second extending portion at the principle bending position; the second rib rods are provided with a plurality of them and are arranged in a comb-tooth shape at the inner wall position of the second connecting portion; the second bottom plate is arranged on the top surface of the second rib rod and the inner wall position of the second connecting portion; the two ends of the first connecting rod are detachably connected to the first rib rod and the second rib rod respectively; the first connecting rod is provided with a plurality of groups; the first connecting rods in the same group have the same length, and the first connecting rods in different groups have different lengths; the two ends of the second connecting rod are detachably connected to the first main side rod and the second main side rod respectively, and the second connecting rods are provided with a plurality of them and have different lengths.

[0006] As a further optimization scheme of the present invention, it also includes a limit piece; the limit piece includes an L-shaped vertical plate, and the bottom end of the outer side wall of the vertical plate is provided with a mounting fin extending horizontally outward, and the mounting fin is in the L shape adapted to the vertical plate; countersunk holes are respectively provided at both ends and the middle of the mounting fin; the first bottom plate and the second bottom plate are respectively provided with a hole array, and the hole array includes a plurality of mounting holes arranged in a matrix shape, and the limit piece can be selectively installed at different positions of the mounting holes, so as to adapt to and clamp curtain wall panels with different side lengths.

[0007] As a further optimization solution of the present invention, a right-angled snap-in groove is provided on the inner wall of the vertical plate.

[0008] As a further optimization solution of the present invention, the three countersunk holes are arranged in a right-angled triangle shape and are adapted to the row width and column width of the hole array.

[0009] As a further optimization scheme of the present invention, the hole array on the first bottom plate and the hole array on the second bottom plate are arranged in an axially symmetrical manner; there are four limit members and they are arranged in pairs on the first bottom plate and the second bottom plate; the four limit members are arranged in a rectangular shape so as to adapt to the rectangular curtain wall panel.

[0010] As a further optimization scheme of the present invention, the side wall of the first connecting part is fixedly installed with at least two first pulling ears for inserting the binding rope, and the first bottom plate and the first connecting ear are respectively arranged on both sides of the first connecting part; the side wall of the second connecting part is fixedly installed with at least two second pulling ears for inserting the binding rope, and the second bottom plate and the second connecting ear are respectively arranged on both sides of the second connecting part.

[0011] As a further optimization solution of the present invention, a recessed portion is provided in the middle of the first connecting rod; the recessed portions of the first connecting rod at both ends are arranged in an open and back-to-back state.

[0012] As a further optimization scheme of the present invention, two first lifting ears are provided on the top surface of the first connecting part, and the two first lifting ears are respectively arranged at both ends of the first connecting part; two second lifting ears are provided on the top surface of the second connecting part, and the two second lifting ears are respectively arranged at both ends of the second connecting part.

[0013] As a further optimization scheme of the present invention, the surface of the second connecting rod is provided with friction lines; the bottom surfaces of the first connecting part and the first extending part are both provided with rollers; the second connecting part and the bottom surfaces of the second connecting part are both provided with rollers.

[0014] A construction method for a curtain wall construction material transfer platform, comprising the following steps: S1, selecting the first connecting rod and the second connecting rod of appropriate length according to the side length of the curtain wall panel, and assembling the first frame, the second frame, the selected first connecting rod and the selected second connecting rod; S2, installing the four limiting members on the first bottom plate and the second bottom plate by bolts, so that the spacing between adjacent limiting members is adapted to the side length of the curtain wall panel; S3, stacking the curtain wall panel on the bottom support frame in a stacked manner, so that the two ends of the curtain wall panel are respectively mounted on the first bottom plate and the second bottom plate, and the curtain wall panel is placed within the range surrounded by the four limiting members; S4, the binding rope comprises a first rope body and a second rope body, the first rope body is used to bind the curtain wall panel to the bottom support frame along the longitudinal direction of the curtain wall panel, and the first rope body is interlaced with the first pull-connecting ear and the second pull-connecting ear; the second rope body is used to bind the curtain wall panel to the bottom support frame along the transverse direction of the curtain wall panel, and the second rope body is crimped into the recessed portion.

[0015] In summary, the present invention is beneficial in that: The present invention has a simple structure and reliable functions. The bottom support frame is used to support the curtain wall panel stack. The second connecting rod, the first extension part and the second extension part are used for users to grab for easy parking. The first pulling ear, the second pulling ear and the recessed part are used to stably bind and fix the curtain wall panel stack. The first lifting ear and the second lifting ear are used to connect the hook to achieve batch lifting and transportation of the curtain wall panels. The first frame and the second frame with adjustable spacing can adapt to support curtain wall panels with different side lengths, the position-adjustable limiter can adapt to clamp curtain wall panels with different side lengths, and the replaceable first bottom plate and the second bottom plate further enhance the adaptability to the side length size of the curtain wall panels. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] The present application is further described below with reference to the accompanying drawings: Figure 1 It is a schematic diagram of the overall structure of the present invention; Figure 2 It is a schematic diagram of the oblique upward view structure of the present invention; Figure 3 It is a schematic diagram of the oblique upward view of the structure of the first frame and the second frame; Figure 4 is a schematic diagram of the oblique top view of the first frame and the second frame; Figure 5 It is the installation position and structural diagram of the limiter; Figure 6 It is a schematic diagram of the top structure of the present invention.

[0017] Description of reference numerals: In the figure, 1. Bottom support frame; 11. First frame; 111. First main side bar; 11101. First connecting portion; 11102. First extension portion; 112. First rib bar; 113. First bottom plate; 114. First pull-connecting ear; 115. First lifting ear; 12. Second frame; 121. Second main side bar; 12101. Second connecting portion; 12102. Second extension portion; 122. Second rib bar; 123. Second bottom plate; 1230. Mounting hole; 124. Second pull-connecting ear; 125. Second lifting ear; 13. First connecting rod; 131. Recessed portion; 14. Second connecting rod; 2. Limiting member; 21. Vertical plate; 211. Snap-in groove; 22. Install fin; 23. Countersunk hole; 3. Curtain wall panel stack. DETAILED DESCRIPTION

[0018] Based on the above structural features of the present application, the implementation methods of the present application are further described: Reference Figure 1-2 The present embodiment provides a curtain wall construction material transfer platform, including a bottom support frame 1, the bottom support frame 1 includes a first frame 11, a first frame 11, a first connecting rod 13 and a second connecting rod 14.

[0019] Reference Figure 2 to Figure 4 The first frame 11 includes a first main side bar 111, a first rib bar 112 and a first bottom plate 113 connected to each other. The first main side bar 111 is an L-shaped bending bar structure. The first main side bar 111 includes a first connecting portion 11101 close to the bending position and a first extending portion 11102 near the bending position. The first rib bar 112 is provided with a plurality of comb-shaped inner wall positions of the first connecting portion 11101. The first bottom plate 113 is arranged on the top surface of the first rib bar 112 and the inner wall position of the first connecting portion 11101. The first connecting portion 11101 and the first extending portion 11102 are arranged in a colinear manner, and the first rib bar 112 and the first connecting portion 11101 are vertically fixedly connected (for example, fixedly connected by bolts or fixedly connected by welding). The second frame 12 includes a second main side bar 121, a second rib bar 122 and a second bottom plate 123 which are fixedly connected to each other. The second main side bar 121 is an L-shaped bending bar structure. The second main side bar 121 includes a second connecting portion 12101 close to the bending position and a second extending portion 12102 at the original bending position. The second rib bar 122 is provided with a plurality of comb-shaped inner wall positions of the second connecting portion 12101. The second bottom plate 123 is arranged on the top surface of the second rib bar 122 and the inner wall position of the second connecting portion 12101. The second connecting portion 12101 and the second extending portion 12102 are arranged in a colinear manner, and the second rib bar 122 and the second connecting portion 12101 are vertically fixedly connected (for example, fixedly connected by bolts or fixedly connected by welding).

[0020] Reference Figure 2 to Figure 4 The first frame 11 and the second frame 12 are respectively arranged on the left and right sides, and the first frame 11 and the second frame 12 are connected by a first connecting rod 13 and a second connecting rod 14.

[0021] Reference Figure 2-3 , the two ends of the first connecting rod 13 are detachably connected to the first rib rod 112 and the second rib rod 122 respectively (for example, detachably connected by bolts); the first connecting rod 13 is provided in a plurality of groups, the first connecting rods 13 in the same group are arranged in parallel with each other and the number is the same as the number of the first rib rods 112 / the second rib rods 122, and the first connecting rods 13 in the same group are connected to the first rib rod 112 and the second rib rod 122 in a one-to-one correspondence. The first connecting rods 13 in the same group have the same length, and the first connecting rods 13 in different groups have different lengths, so that when the first frame 11 and the second frame 12 are adapted to curtain wall panels with different side lengths and a gap is generated, the gap is adapted.

[0022] Reference Figure 2-3 The two ends of the second connecting rod 14 are detachably connected to the first main side rod 111 and the second main side rod 121 respectively (for example, detachably connected by bolts). There are several second connecting rods 14 with different lengths, so as to adapt to the gap when the first frame 11 and the second frame 12 are adapted to curtain wall panels with different side lengths and a gap is generated.

[0023] Reference Figure 2-3 After assembly: the first connecting rod 13 and the corresponding first rib rod 112 and the corresponding second rib rod 122 are in a coaxial state, the second connecting rod 14 and the corresponding end of the first main side rod 111 and the corresponding end of the main side rod are in a coaxial state, so that the curtain wall engineering building materials transfer platform has excellent structural stability.

[0024] Reference Figure 4The curtain wall engineering building materials transfer platform also includes a limit member 2; the limit member 2 includes an L-shaped vertical plate 21, and the bottom end of the outer side wall of the vertical plate 21 is provided with a mounting fin 22 extending horizontally outward, and the mounting fin 22 is adapted to the L shape of the vertical plate 21; countersunk holes 23 are respectively provided at both ends and the middle of the mounting fin 22; the first bottom plate 113 and the second bottom plate 123 are respectively provided with a hole array, and the hole array includes a plurality of mounting holes 1230 arranged in a matrix shape, and the limit member 2 can be selectively installed at different mounting hole 1230 positions, so as to adapt to and connect curtain wall panels with different side lengths. The mounting fin 22 extends horizontally outward at the bottom end of the outer side wall of the vertical plate 21, thereby avoiding the thickness of the mounting fin 22 itself from supporting a gap between the curtain wall panel and the first bottom plate 113 / the second bottom plate 123 (the gap will cause the middle part of the first bottom plate 113 / the second bottom plate 123 to be unable to exert supporting force on the curtain wall panel, resulting in stress concentration at the sharp corners of the curtain wall panel and damage), achieving the fit between the curtain wall panel and the first bottom plate 113 / the second bottom plate 123, and ensuring transportation safety.

[0025] Reference Figure 5 A right-angled snap-in groove 211 is provided on the inner wall of the vertical plate 21 .

[0026] Reference Figure 5 The three countersunk holes 23 are arranged in a right triangle shape and are adapted to the row width and column width of the hole array, so that the limiting member 2 can conveniently select three installation holes 1230 for installation.

[0027] Reference Figure 4 and Figure 5 The hole array on the first bottom plate 113 and the hole array on the second bottom plate 123 are arranged in an axisymmetric shape, which is used for the axisymmetric installation of the limiter 2. There are four limiters 2, which are arranged in pairs on the first bottom plate 113 and the second bottom plate 123; the four limiters 2 are arranged in a rectangular shape to adapt to the rectangular curtain wall panel.

[0028] Reference Figure 6 The first connection part 11101 has at least two first pull-connecting ears 114 fixedly installed on the side wall for inserting the binding rope, and the first bottom plate 113 and the first connection ear are respectively arranged on both sides of the first connection part 11101; the second connection part 12101 has at least two second pull-connecting ears 124 fixedly installed on the side wall for inserting the binding rope, and the second bottom plate 123 and the second connection ear are respectively arranged on both sides of the second connection part 12101. The first pull-connecting ear 114 is fixedly connected to the first connection part 11101 by welding, bolting or integrated fixing; the second pull-connecting ear 124 is fixedly connected to the second connection part 12101 by welding, bolting or integrated fixing. The first pull-connecting ear 114 and the second pull-connecting ear 124 are used to realize the binding of the ends of the binding rope and / or the steering of the middle of the binding rope.

[0029] Reference Figure 6 A recessed portion 131 is provided in the middle of the first connecting rod 13; the recessed portions 131 of the first connecting rod 13 at both ends are arranged in an open state facing each other. The recessed portions 131 are used to limit the binding rope to prevent the binding rope from accidentally sliding, thereby improving the binding stability of the curtain wall panel, preventing the curtain wall panel stack 3 from loosening, and ensuring the safety of hoisting.

[0030] Reference Figure 6 The top surface of the first connection part 11101 is provided with two first lifting ears 115, and the two first lifting ears 115 are respectively provided at both ends of the first connection part 11101; the top surface of the second connection part 12101 is provided with two second lifting ears 125, and the two second lifting ears 125 are respectively provided at both ends of the second connection part 12101. The first lifting ear 115 is fixedly connected to the first connection part 11101 by welding, bolting or integrated fixing; the second lifting ear 125 is fixedly connected to the second connection part 12101 by welding, bolting or integrated fixing.

[0031] The roller includes a first roller and a second roller. The surface of the second connecting rod 14 is provided with friction lines, so as to facilitate the user to grasp. The bottom surface of the first connecting part 11101 and the bottom surface of the first extension part 11102 are both provided with a first roller; the bottom surface of the second connecting part 12101 and the bottom surface of the second connecting part 12101 are both provided with a second roller. There are a number of first rollers which are arranged in a straight line at equal intervals along the bottom surfaces of the first connecting portion 11101 and the first extending portion 11102; there are a number of second rollers which are arranged in a straight line at equal intervals along the bottom surfaces of the second connecting portion 12101 and the second extending portion 12102; the first rollers and the second rollers are used to reduce the friction between the base support frame 1 and the supporting surface, so that when the first extending portion 11102 and the second extending portion 12102 are pressed onto the floor / temporary operating table and the first connecting portion 11101 and the second connecting portion 12101 are in a suspended state, it is convenient for the user to grab the second connecting rod 14 and pull the base support frame 1 laterally so that the first connecting portion 11101 and the second connecting portion 12101 are also pressed onto the floor / temporary operating table.

[0032] A construction method for a curtain wall engineering building material transfer platform, comprising the following steps: S1, selecting a first connecting rod 13 and a second connecting rod 14 of appropriate length according to the side length of the curtain wall panel, and assembling the first frame 11, the second frame 12, the selected first connecting rod 13 and the selected second connecting rod 14; S2, four stoppers 2 are installed on the first bottom plate 113 and the second bottom plate 123 by bolts (the studs of the bolts are placed in the countersunk holes 23, and the nuts matching the bolts are crimped to the lower surface of the first bottom plate 113 / the second bottom plate 123), so that the spacing between adjacent stoppers 2 is adapted to the side length of the curtain wall panel; S3, stacking the curtain wall panels on the bottom support frame 1 in a stacked shape, so that the two ends of the curtain wall panels are respectively mounted on the first bottom plate 113 and the second bottom plate 123, and the curtain wall panels are placed within the range surrounded by the four limit members 2; S4, the binding rope includes a first rope body and a second rope body, the first rope body is used to bind the curtain wall panel to the bottom support frame 1 along the longitudinal direction of the curtain wall panel, and the first rope body is interlaced with the first pull-connecting ear 114 and the second pull-connecting ear 124; the second rope body is used to bind the curtain wall panel to the bottom support frame 1 along the transverse direction of the curtain wall panel, and the second rope body is crimped into the recessed portion 131; S5. Use the hook at the end of the sling to hook the first lifting ear 115 and the second lifting ear 125, then lift the curtain wall construction material transfer platform and the curtain wall panel stack 3 it supports and hoist them to the target position; when the target position is a floor slab or a temporary operating table on a certain floor, it is necessary to control the lifting mechanical arm to rotate the curtain wall construction material transfer platform so that the second connecting rod 14, the first extension part 11102 and the second extension part 12102 are preferentially inserted between the floors, and then slowly lower the curtain wall construction material transfer platform to the first extension part 1 The rollers on the bottom of 1102 and the rollers on the bottom of the second extension 12102 are pressed on the floor / temporary operating table, and the first connection part 11101 and the second connection part 12101 are suspended in the air. Then, the user manually or by using a pulling tool (such as a winch) hooks the second connecting rod 14 and pulls the curtain wall construction material transfer platform inward, so that the rollers on the bottom of the first connection part 11101 and the rollers on the bottom of the second connection part 12101 are pressed on the floor / temporary operating table, so as to realize the parking of the entire curtain wall construction material transfer platform. After the curtain wall construction material transfer platform is parked stably, the hooks on the first lifting lug 115 and the second lifting lug 125 are removed; then the binding rope is untied, and the curtain wall panels are hoisted piece by piece using a vacuum suction cup and installed on the curtain wall keel.

[0033] The first bottom plate 113 is detachably mounted on the upper surface of the first rib 112 by bolts, and the second bottom plate 123 is detachably mounted on the upper surface of the second rib 122 by bolts. When the existing first bottom plate 113 and the second bottom plate 123 cannot fit the sharp corner of the curtain wall panel after the stopper 2 is installed, a new first bottom plate 113 and a new second bottom plate 123 are replaced, and the installation hole 1230 is drilled at a suitable position according to the side length of the curtain wall panel, so that the stopper 2 can fit the sharp corner of the curtain wall panel after being installed at the position of the installation hole 1230, thereby improving the stability of the connection and avoiding safety accidents caused by the sliding of the curtain wall panel during hoisting.

[0034] The present invention has a simple structure and reliable functions. The bottom support frame 1 is used to support the curtain wall panel stack 3. The second connecting rod 14, the first extension portion 11102 and the second extension portion 12102 are used for users to grab for easy parking; the first pulling ear 114, the second pulling ear 124 and the recessed portion 131 are used to stably bind and fix the curtain wall panel stack 3; the first lifting ear 115 and the second lifting ear 125 are used to connect the hook, so that the present invention can realize batch lifting and transportation of curtain wall panels; the first frame 11 and the second frame 12 with adjustable spacing can adapt to support the ends of curtain wall panels with different side lengths, the position-adjustable limiter 2 can adapt to clamp curtain wall panels with different side lengths, and the replaceable first bottom plate 113 and the second bottom plate 123 further enhance the adaptability to the side length size of the curtain wall panels.

[0035] In the description of the present invention, it should be noted that the directions or positional relationships indicated by the terms "up", "down", "left", "right", etc. are based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as a limitation on the present invention.

[0036] In the description of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "install", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection, it can be a mechanical connection, it can be an electrical connection, it can be a direct connection, it can be connected through an intermediate medium, and it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0037] To sum up, for those skilled in the art, according to the guidance of the present invention, without departing from the principles and spirit of the present invention, the changes, modifications, substitutions and deformations made to the present invention still fall within the protection scope of the present invention.

Claims

1. A curtain wall construction material transfer platform, characterized by: The bottom support frame (1) comprises a first frame (11), a first frame (11), a first connecting rod (13) and a second connecting rod (14); The first frame (11) comprises a first main side bar (111), a first rib bar (112) and a first bottom plate (113) which are connected to each other; the first main side bar (111) is an L-shaped bending bar structure; the first main side bar (111) comprises a first connecting portion (11101) close to a bending position and a first extending portion (11102) at a position substantially adjacent to the bending position; the first rib bar (112) is provided with a plurality of ribs which are arranged in a comb-tooth shape at an inner wall position of the first connecting portion (11101); the first bottom plate (113) is arranged at a top surface of the first rib bar (112) and at an inner wall position of the first connecting portion (11101); The second frame (12) comprises a second main side bar (121), a second rib bar (122) and a second bottom plate (123) which are fixedly connected to each other; the second main side bar (121) is an L-shaped bending bar structure; the second main side bar (121) comprises a second connecting portion (12101) close to the bending position and a second extending portion (12102) at the bending position; the second rib bar (122) is provided with a plurality of comb-shaped ribs arranged at the inner wall of the second connecting portion (12101); the second bottom plate (123) is arranged at the top surface of the second rib bar (122) and at the inner wall of the second connecting portion (12101); The two ends of the first connecting rod (13) are respectively detachably connected to the first rib rod (112) and the second rib rod (122); the first connecting rod (13) is provided in a plurality of groups; the first connecting rods (13) in the same group have the same length, and the first connecting rods (13) in different groups have different lengths; Two ends of the second connecting rod (14) are detachably connected to the first main side rod (111) and the second main side rod (121), respectively; a plurality of second connecting rods (14) are provided and have different lengths.

2. The curtain wall construction material transfer platform according to claim 1, characterized in that: The invention also comprises a stopper (2); the stopper (2) comprises an L-shaped vertical plate (21); a mounting fin (22) extending horizontally outward is provided at the bottom end of the outer side wall of the vertical plate (21); the mounting fin (22) is in an L-shape adapted to the vertical plate (21); countersunk holes (23) are respectively provided at both ends and the middle of the mounting fin (22); a hole array is respectively provided on the first bottom plate (113) and the second bottom plate (123); the hole array comprises a plurality of mounting holes (1230) arranged in a matrix shape; the stopper (2) can be selectively installed at different positions of the mounting holes (1230), so as to adapt to and snap-fit ​​curtain wall panels with different side lengths.

3. The curtain wall construction material transfer platform according to claim 2 is characterized in that: A right-angled clamping groove (211) is provided on the inner wall of the vertical plate (21).

4. The curtain wall construction material transfer platform according to claim 3 is characterized by: The three countersunk holes (23) are arranged in a right-angled triangle shape and are adapted to the row width and column width of the hole array.

5. The curtain wall construction material transfer platform according to claim 4 is characterized by: The hole array on the first bottom plate (113) and the hole array on the second bottom plate (123) are arranged in an axisymmetric manner; four limiting members (2) are provided and are arranged in pairs on the first bottom plate (113) and the second bottom plate (123); the four limiting members (2) are arranged in a rectangular shape so as to be adapted to limit a rectangular curtain wall panel.

6. The curtain wall construction material transfer platform according to claim 5, characterized in that: The first connecting portion (11101) has at least two first pulling ears (114) for inserting the binding rope fixedly installed on the side wall, and the first bottom plate (113) and the first connecting ear are respectively arranged on both sides of the first connecting portion (11101); the second connecting portion (12101) has at least two second pulling ears (124) for inserting the binding rope fixedly installed on the side wall, and the second bottom plate (123) and the second connecting ear are respectively arranged on both sides of the second connecting portion (12101).

7. The curtain wall construction material transfer platform according to claim 6, characterized in that: A recessed portion (131) is provided in the middle of the first connecting rod (13); the recessed portions (131) of the first connecting rod (13) at both ends are arranged in an open state facing each other.

8. The curtain wall construction material transfer platform according to claim 7, characterized in that: The top surface of the first connecting portion (11101) is provided with two first lifting ears (115), and the two first lifting ears (115) are respectively arranged at two ends of the first connecting portion (11101); the top surface of the second connecting portion (12101) is provided with two second lifting ears (125), and the two second lifting ears (125) are respectively arranged at two ends of the second connecting portion (12101).

9. The curtain wall construction material transfer platform according to claim 8, characterized in that: The surface of the second connecting rod (14) is provided with friction patterns; the bottom surfaces of the first connecting portion (11101) and the first extending portion (11102) are both provided with rollers; and the bottom surfaces of the second connecting portion (12101) and the second connecting portion (12101) are both provided with rollers.

10. A construction method for a curtain wall construction material transfer platform according to claim 9, characterized in that the steps include: S1. Selecting the first connecting rod (13) and the second connecting rod (14) of appropriate length according to the side length of the curtain wall panel, and assembling the first frame (11), the second frame (12), the selected first connecting rod (13), and the selected second connecting rod (14); S2, mounting the four limiting members (2) on the first bottom plate (113) and the second bottom plate (123) by means of bolts, so that the spacing between adjacent limiting members (2) is adapted to the side length of the curtain wall panel; S3, stacking the curtain wall panels in a stacked manner on the bottom support frame (1), so that the two ends of the curtain wall panels are respectively mounted on the first bottom plate (113) and the second bottom plate (123), and the curtain wall panels are placed within the range surrounded by the four limiting members (2); S4. The binding rope comprises a first rope body and a second rope body. The first rope body is used to bind the curtain wall panel to the bottom support frame (1) along the longitudinal direction of the curtain wall panel, and the first rope body is interlaced with the first pull-connecting ear (114) and the second pull-connecting ear (124). The second rope body is used to bind the curtain wall panel to the bottom support frame (1) along the transverse direction of the curtain wall panel, and the second rope body is crimped into the recessed portion (131).

Citation Information

Patent Citations

  • Integral consignment sliding installation construction method for all-glass curtain wall

    CN114934678A

  • Buffering piece

    CN203047791U

  • Clamping positioning device

    CN206277164U

  • Transportation rack

    CN218930098U

  • Transportation turnover material frame connected through middle screw and adjustable in size

    CN220810462U