Unplanned operation violation identification method and device, computer equipment and storage medium
The method and device identify unplanned power operations by screening and comparing work order details with plan sheets, improving safety and standardization by preventing deviations from planned procedures.
Patent Information
- Application Number
- CN202411185700.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-27
- Publication Date
- 2025-01-03
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Power operations are often performed without following the plan sheet due to management negligence and lack of safety awareness, increasing the risk of accidents and injuries.
A method and device for identifying unplanned operations by obtaining power operation work orders, screening for target work orders based on business type information, querying associated plan sheets, and comparing operation details to identify violations.
Enhances safety and standardization of power operations by identifying and preventing unplanned operations, ensuring compliance with planned procedures.
Smart Images

Figure CN119250501A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of electric power monitoring technology, and in particular to a method, device, computer equipment, storage medium and computer program product for identifying unplanned operation violations. Background Art
[0002] In the power operation management system, some power operations usually require a plan sheet to ensure safety during the operation. The plan sheet can provide clear operation steps and requirements to avoid human errors and accidents. However, due to management negligence and the lack of safety awareness of the work team members, power operations are carried out without following the plan sheet, which increases the risk of accidents and injuries, and there is a problem of low safety. Summary of the invention
[0003] Based on this, it is necessary to provide a method, device, computer equipment, storage medium and computer program product for identifying violations of unplanned operations in response to the above technical problems.
[0004] In a first aspect, the present application provides a method for identifying violations of unplanned operations. The method comprises:
[0005] Obtain multiple power operation work orders from the power grid management platform within a preset time period;
[0006] According to the business type information corresponding to each of the electric power work orders, a target electric power work order that meets the processing conditions of the plan order is selected from the multiple electric power work orders;
[0007] If the target power operation work order has an associated plan sheet, obtaining the associated plan sheet of the target power operation work order;
[0008] According to the associated plan sheet, the unplanned operation violation identification result of the target power operation work sheet is obtained.
[0009] In one of the embodiments, the business type information includes work order status information and power operation classification information; the target power operation work order that meets the plan order processing conditions is screened out from multiple power operation work orders based on the business type information corresponding to each power operation work order, including: obtaining the work order status information and the power operation classification information corresponding to each power operation work order; obtaining the plan order processing information of each power operation work order based on the work order status information and the power operation classification information; if the plan order processing information indicates that the corresponding power operation work order meets the plan order processing conditions, the corresponding power operation work order is determined as the target power operation work order.
[0010] In one of the embodiments, when the target power operation work order has an associated plan sheet, obtaining the associated plan sheet of the target power operation work order includes: obtaining the target power operation information contained in the target power operation work order; querying the associated plan sheet of the target power operation work order based on the target power operation information; and when the target power operation work order has an associated plan sheet, obtaining the associated plan sheet of the target power operation work order.
[0011] In one of the embodiments, querying the associated plan sheet of the target power operation work order based on the target power operation information includes: if the associated plan sheet does not exist for the target power operation work order, obtaining the matching power plan sheet of the target power operation work order in the plan sheet set.
[0012] In one of the embodiments, obtaining the unplanned operation violation identification result of the target power operation work order based on the associated plan sheet includes: obtaining the target power operation information of the target power operation contained in the target power operation work order; obtaining the plan handling information of the target power operation contained in the associated plan sheet; and obtaining the unplanned operation violation identification result of the target power operation work order based on the target power operation information and the plan handling information.
[0013] In one of the embodiments, the unplanned operation violation identification result of the target power operation work order is obtained based on the target power operation information and the planned handling information, including: when the target power operation information and the planned handling information meet at least one of the unplanned operation conditions, the unplanned operation violation identification result of the target power operation work order is determined as an unplanned operation; the unplanned operation conditions include: the handling time information contained in the target power operation information does not match the planned time information contained in the planned handling information; the work content information contained in the target power operation information does not match the planned content information contained in the planned handling information.
[0014] In a second aspect, the present application provides a device for identifying violations of unplanned operations. The device comprises:
[0015] An acquisition module is used to acquire multiple power operation work orders from the power grid management platform within a preset time period;
[0016] A screening module, for screening out target power work orders that meet the processing conditions of the plan order from a plurality of power work orders according to the business type information corresponding to each of the power work orders;
[0017] A query module, configured to obtain the associated plan sheet of the target power operation work order if the target power operation work order has an associated plan sheet;
[0018] The judgment module is used to obtain the unplanned operation violation identification result of the target power operation work order according to the associated plan order.
[0019] In a third aspect, the present application further provides a computer device. The computer device includes a memory and a processor, the memory stores a computer program, and the processor implements the following steps when executing the computer program:
[0020] Obtain multiple power operation work orders from the power grid management platform within a preset time period;
[0021] According to the business type information corresponding to each of the electric power work orders, a target electric power work order that meets the processing conditions of the plan order is selected from the multiple electric power work orders;
[0022] If the target power operation work order has an associated plan sheet, obtaining the associated plan sheet of the target power operation work order;
[0023] According to the associated plan sheet, the unplanned operation violation identification result of the target power operation work sheet is obtained.
[0024] In a fourth aspect, the present application further provides a computer-readable storage medium. The computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the following steps are implemented:
[0025] Obtain multiple power operation work orders from the power grid management platform within a preset time period;
[0026] According to the business type information corresponding to each of the electric power work orders, a target electric power work order that meets the processing conditions of the plan order is selected from the multiple electric power work orders;
[0027] If the target power operation work order has an associated plan sheet, obtaining the associated plan sheet of the target power operation work order;
[0028] According to the associated plan sheet, the unplanned operation violation identification result of the target power operation work sheet is obtained.
[0029] In a fifth aspect, the present application further provides a computer program product. The computer program product includes a computer program, and when the computer program is executed by a processor, the following steps are implemented:
[0030] Obtain multiple power operation work orders from the power grid management platform within a preset time period;
[0031] According to the business type information corresponding to each of the electric power work orders, a target electric power work order that meets the processing conditions of the plan order is selected from the multiple electric power work orders;
[0032] If the target power operation work order has an associated plan sheet, obtaining the associated plan sheet of the target power operation work order;
[0033] According to the associated plan sheet, the unplanned operation violation identification result of the target power operation work sheet is obtained.
[0034] In the above-mentioned unplanned operation violation identification method, device, computer equipment, storage medium and computer program product, multiple power operation work orders of the power grid management platform within a preset time period are obtained; according to the business type information corresponding to each power operation work order, the target power operation work order that meets the plan order processing conditions is screened out from the multiple power operation work orders; in the case that the target power operation work order has an associated plan order, the associated plan order of the target power operation work order is obtained; according to the associated plan order, the unplanned operation violation identification result of the target power operation work order is obtained. In the method provided in the embodiment of the present application, according to the target power operation work order and the associated plan order, the target power operation information contained in the target power operation work order and the plan processing information contained in the associated plan order can be compared, and the unplanned operation violation can be identified for the power operation processing, and it can be determined whether there is unplanned operation behavior and standardized, thereby improving the safety and standardization of power operation processing. BRIEF DESCRIPTION OF THE DRAWINGS
[0035] In order to more clearly illustrate the technical solutions in the embodiments of the present application or related technologies, the drawings required for use in the embodiments of the present application or related technical descriptions will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.
[0036] Figure 1 A flowchart of a method for identifying violations of unplanned operations provided in an embodiment of the present application;
[0037] Figure 2 A schematic diagram of a process for screening target power operation work orders provided in an embodiment of the present application;
[0038] Figure 3 A schematic diagram of a process for obtaining an associated plan sheet provided in an embodiment of the present application;
[0039] Figure 4 A schematic diagram of a process for obtaining an unplanned operation violation identification result provided in an embodiment of the present application;
[0040] Figure 5 A structural block diagram of an unplanned operation violation identification device provided in an embodiment of the present application;
[0041] Figure 6 An internal structure diagram of a computer device provided in an embodiment of the present application. DETAILED DESCRIPTION
[0042] In order to make the purpose, technical solution and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.
[0043] In an exemplary embodiment, Figure 1 As shown, a method for identifying unplanned operation violations is provided. This embodiment uses the method applied to a server as an example for illustration. It can be understood that the method can also be applied to a terminal, and can also be applied to a system including a terminal and a server, and is implemented through the interaction between the terminal and the server. In this embodiment, the method includes the following steps:
[0044] Step 102, obtaining multiple power operation work orders from the power grid management platform within a preset time period.
[0045] Among them, the business monitoring personnel can log in to the power grid management platform on the power operation handling terminal. The business monitoring personnel can trigger a login request on the power operation handling terminal. The power operation handling terminal can display a login interface in response to the login request. The business monitoring personnel can enter a user name and password on the login interface to log in. If the business monitoring personnel logs in successfully, a business handling work order query request for multiple power operations within a preset time period can be triggered through the business handling interface of the power operation handling terminal. The power operation handling terminal responds to the business handling work order query request and can send the business handling work order query request to the system server of the power grid management platform. The system server can obtain multiple power operation work orders of the power grid management platform within the preset time period according to the business handling work order query request. The work order of the power system is a document that records, tracks and completes specific work tasks. Work orders, also known as work orders, are widely used management tools in the fields of production, maintenance, and service. In particular, work orders play a vital role in the operation of power systems. It not only contains detailed information about work tasks, such as work content, required materials, estimated completion time, responsible persons, etc., but also is an important means to ensure smooth work processes and improve work efficiency. The status of a work order usually includes stages such as creation, issuance, technical completion, and business completion. Each stage marks the completion of a part of the work progress. In the power system, the analysis and management of work orders are of great significance to the optimization of power system operation. By collecting, cleaning, and preprocessing work order data, combined with data visualization and statistical analysis methods, the rules and trends in the work order data can be revealed, providing a basis for management decisions. In addition, data-driven methods such as machine learning can also be applied to work order analysis. By building a predictive model, future work orders can be predicted and optimized, thereby improving the operating efficiency and reliability of power equipment, preventing failures and accidents, and ensuring the safe and stable operation of the power system.
[0046] The multiple power operations corresponding to the multiple power operation work orders may include various types of power operations, such as power marketing work orders, distribution network ledger transfer orders, and asset lists of infrastructure projects. In the embodiment of the present application, the power marketing work order, the distribution network ledger transfer order, and the asset list of the infrastructure project are used as examples for explanation. For the power marketing work order, the corresponding work order acquisition path is power marketing system->global navigation->system support->work order process management->work order query path; if the power marketing work order has a directly associated associated plan order, the associated plan order of the power marketing work order can be directly obtained; if the power marketing work order does not have a directly associated associated plan order, the matching plan order of the power marketing work order can be obtained according to the power marketing plan order acquisition path. The matching plan order can also be called an associated plan order, and the power marketing plan order acquisition path can be the smart safety supervision system-plan management-operation plan query path. For the distribution network account transfer form, the corresponding work order acquisition path is the power grid management platform -> production safety application -> distribution network account transfer -> comprehensive query path; the planning order acquisition path for the distribution network account transfer form can be the smart safety supervision system-plan management-operation plan query path. For the asset list of the infrastructure project, the corresponding work order acquisition path is the power grid management platform -> infrastructure management application -> distribution network infrastructure workbench -> project list -> project details -> three, completion acceptance and settlement stage -> asset list confirmation path; the planning order acquisition path for the asset list of the infrastructure project can be the power grid management platform -> infrastructure smart project management -> safety management path.
[0047] Step 104 , based on the business type information corresponding to each power operation work order, select a target power operation work order that meets the plan order processing conditions from multiple power operation work orders.
[0048] Among them, the business type information may include work order status information and / or power operation classification information. For power marketing work orders, the work order status information and power operation classification information corresponding to each power operation work order can be obtained, and the target power operation work order that meets the plan order processing conditions can be screened out from multiple power operation work orders according to the work order status information and the power operation classification information. Specifically, the work order status information corresponding to each power operation work order is obtained, and the work order status information can indicate whether the corresponding power operation work order has been archived or not archived; the business first-level classification information, business second-level classification information, business third-level classification information and work summary corresponding to each power operation work order are obtained. When the work order status information is archived, the business first-level classification information is "operation management", the business second-level classification information is "customer-side electric energy metering device fault handling", the business third-level classification information is "customer-side electric energy metering device fault handling", and the "work summary" does not contain the "fault information source: metering automation system metering work order" character, it is determined that the corresponding power operation work order meets the plan order processing conditions, and the corresponding power operation work order is determined as the target power operation work order. For the distribution network ledger transfer form, the work order status information corresponding to each power operation work order can be obtained, and based on the work order status information, the target power operation work order that meets the plan order processing conditions can be screened out from multiple power operation work orders. Specifically, the work order status information corresponding to each power operation work order is obtained, and the work order status information can indicate whether the corresponding power operation work order is published or not. When the work order status information is published, it is determined that the corresponding power operation work order meets the plan order processing conditions, and the corresponding power operation work order is determined as the target power operation work order. For the asset list of the infrastructure project, the work order status information corresponding to each power operation work order can be obtained, as well as the plan status information of the associated plan table corresponding to each power operation work order. Based on the work order status information and the plan status information, the target power operation work order that meets the plan order processing conditions can be screened out from multiple power operation work orders. Specifically, the work order status information corresponding to each power operation work order is obtained, and the work order status information can indicate whether the corresponding power operation work order is put into operation or not put into operation; the plan status information of the associated plan order corresponding to each power operation work order is obtained, and the plan status information can indicate whether the corresponding associated plan order is completed or not completed. When the work order status information is that the work order status information is put into operation and the plan status information is that the plan status information is completed, it is determined that the corresponding power operation work order meets the plan order processing conditions, and the corresponding power operation work order is determined as the target power operation work order.
[0049] Step 106: if the target power operation work order has an associated plan sheet, obtain the associated plan sheet of the target power operation work order.
[0050] Among them, for the power marketing work order, the associated plan sheet of the target power operation work order can be queried in the following ways. If the "link name" contains "assembly and disassembly task assignment", check whether there is an associated plan sheet in the process, and view the associated plan sheet by clicking the properties in "Initiate Plan" in "Business Details Information"-"Send Job Information". If the power marketing work order has a directly associated associated plan sheet, the associated plan sheet of the power marketing work order can be directly obtained; if the power marketing work order does not have a directly associated associated plan sheet, the matching plan sheet of the power marketing work order can be obtained according to the power marketing plan sheet acquisition path. The matching plan sheet can also be called an associated plan sheet. The power marketing plan sheet acquisition path can be the smart safety supervision system-plan management-operation plan query path. For the distribution network ledger transfer form, the plan sheet acquisition path of the distribution network ledger transfer form can be the smart safety supervision system-plan management-operation plan query path. For the asset list of the infrastructure project, the plan sheet acquisition path of the asset list of the infrastructure project can be the power grid management platform->infrastructure smart project management->safety management path.
[0051] Step 108, obtaining the unplanned operation violation identification result of the target power operation work order according to the associated plan order.
[0052] In this step, the target power operation information of the target power operation contained in the target power operation work order can be obtained; the planned handling information of the target power operation contained in the associated plan order can be obtained; when the target power operation information and the planned handling information meet at least one of the unplanned operation conditions, the unplanned operation violation identification result of the target power operation work order is determined as an unplanned operation; the unplanned operation conditions include: the handling time information contained in the target power operation information does not match the planned time information contained in the planned handling information; the work content information contained in the target power operation information does not match the planned content information contained in the planned handling information. Taking the power marketing work order, the distribution network ledger transfer form and the asset list of the infrastructure project as examples, specifically, for the power marketing work order, if the "link name" of the power marketing work order contains "assembly and disassembly task assignment" and there is no directly associated plan order or the "link name" of the power marketing work order does not contain the "link name", the power marketing work order is matched with the associated plan order. On the one hand, the processing time information contained in the target power operation information is compared with the planned time information contained in the planned processing information, and the "application time" of the power marketing work order is extracted, and the "planned start time" and "planned end time" of the associated plan order are extracted. If the "application time" of the power marketing work order is 15 days before and after the "planned start time" and "planned end time" of the associated plan order, that is, the "application time" of the power marketing work order is greater than or equal to 15 days before the "planned start time" of the associated plan order and less than or equal to 15 days after the "planned end time" of the associated plan order. If this condition is met, it is considered that the time matching of the power marketing work order and the associated plan order is consistent. On the other hand, the work content information contained in the target power operation information is compared with the planned content information contained in the planned processing information, which can include two judgments, judgment 1: extract the key characters of substation, line, branch line, and station in the "work location" and "work content" of the plan order, and judge whether these key characters exist in the "power marketing work order summary" of the power marketing work order. Judgment 2: Extract the key characters of user number, user name, and user address in the "Power Marketing Work Order Summary" of the power marketing work order, and determine whether these key characters exist in the "Work Content" of the plan order. If one of Judgment 1 and Judgment 2 meets the conditions, it is determined that the power work content information matches the plan content information. When the time of the power marketing work order and the associated plan order matches, and the work content information matches the plan content information, the unplanned operation violation identification result of the target power operation work order is determined to be a planned operation, and the power marketing work order, that is, the target power operation work order corresponding to the power operation processing does not have an unplanned operation; otherwise, the unplanned operation violation identification result of the target power operation work order is determined to be an unplanned operation, and the power marketing work order, that is, the target power operation work order corresponding to the power operation processing does not have an unplanned operation.Furthermore, the corresponding unplanned operation warning information can be generated for the unplanned operation violation identification result of the unplanned operation of the target power operation work order, and the unplanned operation warning information may include but is not limited to the target power operation information of the corresponding target power operation work order, the fault cause information and the fault handling information. For the distribution network ledger transfer form, the work area list of the transfer form is obtained, and the records with the "new addition" or "return" quantity not being 0 are screened out. Then, on the one hand, the handling time information contained in the target power operation information is compared with the planned time information contained in the planned handling information, and the "release time" of the transfer form is extracted, and the "planned start time" and "planned end time" of the plan form are extracted. If the "release time" of the transfer form is within 10 days before and after the "planned start time" and "planned end time" of the plan form, it is considered that the time match of the transfer form and the plan form is consistent. On the other hand, the work content information may include work location information, and the plan content information may include planned location information. The work location information contained in the target power operation information is compared with the planned location information contained in the planned handling information, and the "work area path" of the transfer form is extracted. Extract the "work content" and "work location" attributes of the plan sheet. Extract and compare the stations and lines of these attributes respectively. If the stations and lines extracted from the "work area path" attribute of the transfer sheet are consistent with the stations and lines extracted from the "work content" or "work location" attributes of the plan sheet, it is considered that the locations of the transfer sheet and the plan sheet match consistently. When the time matches between the distribution network ledger transfer sheet and the associated plan sheet are consistent, and the work location information matches the planned location information, the unplanned operation violation identification result of the target power operation work order is determined as a planned operation, and the distribution network ledger transfer sheet, that is, the target power operation work order corresponding to the power operation processing does not have an unplanned operation; otherwise, the unplanned operation violation identification result of the target power operation work order is determined as an unplanned operation, and the distribution network ledger transfer sheet, that is, the target power operation work order corresponding to the power operation processing does not have an unplanned operation. For the asset list of the infrastructure project, on the one hand, the processing time information contained in the target power operation information is compared with the planned time information contained in the planned processing information, and the "commissioning date" of the asset list is extracted, and the "planned start time" and "planned end time" of the construction work plan are extracted. If the "commissioning date" of the asset list is between the "planned start time" and the "planned end time" + 2 months of the construction work plan, it is considered that the time match between the asset list and the construction work plan, that is, the associated plan sheet, is consistent. On the other hand, the work content information may include work location information, and the plan content information may include plan location information. The work location information contained in the target power operation information is compared with the plan location information contained in the plan processing information, and the "equipment path" attribute of the asset list is extracted. The "work content" and "work location" of the construction work plan are extracted.If the station and line names extracted from the "equipment path" of the asset list are consistent with the station and line names extracted from the "work content" or "work location" of the construction work plan, then the locations of the asset list and the construction work plan are considered to match each other. On the other hand, the work content information may include work task information, and the plan content information may include plan task information. The work task information contained in the target power operation information is compared with the plan task information contained in the plan handling information, and the "equipment name" of the asset list is extracted. If the equipment name contains "pole", there should be a construction work plan whose work content includes "pole erection". If the equipment name contains "knife switch", there should be a construction work plan whose work content includes "installation of knife switch or iron tower or new pole or frame", as shown in the task comparison table in Table 1. When the time of the asset list of the infrastructure project and the associated plan sheet match consistently, the work location information matches consistently with the planned location information, and the work task information matches consistently with the planned task information, the unplanned operation violation identification result of the target power operation work order is determined as a planned operation, and the asset list of the infrastructure project is determined, that is, there is no unplanned operation in the power operation handling corresponding to the target power operation work order; otherwise, the unplanned operation violation identification result of the target power operation work order is determined as an unplanned operation, and the asset list of the infrastructure project is determined, that is, there is an unplanned operation in the power operation handling corresponding to the target power operation work order.
[0053] Asset List Equipment (left column) Scheduled tasks (right column) Electric pole Pole Knife switch Installation of knife switches, iron towers, new poles, and frames switch Install switches, towers, new poles, frames cable Buried pipes, jacking pipes, cable trenches, cable manholes Junction box, distribution box, tower Base transformer Power distribution room, frame Crossing frame Crossing rack and cable recycling Overhead wire Tower, pole Distribution Box Foundation, frame, pole transformer Power distribution room, frame Switch rack Pole Transformer rack Pole New switch There may be new towers, poles, and structures.
[0054] Table 1 Task comparison table
[0055] In the method of this embodiment, multiple power operation work orders of the power grid management platform within a preset time period are obtained; based on the business type information corresponding to each power operation work order, a target power operation work order that meets the plan order processing conditions is screened out from the multiple power operation work orders; in the case where the target power operation work order has an associated plan order, the associated plan order of the target power operation work order is obtained; based on the associated plan order, the unplanned operation violation identification result of the target power operation work order is obtained. In the method provided by the embodiment of the present application, the target power operation information contained in the target power operation work order and the planned processing information contained in the associated plan order can be compared based on the target power operation work order and the associated plan order, unplanned operation violations can be identified for power operation processing, and it can be determined whether there is unplanned operation behavior and standardized, thereby improving the safety and standardization of power operation processing.
[0056] In an exemplary embodiment, Figure 2 As shown, step 104 may include steps 202 to 206. Among them:
[0057] Step 202: Acquire work order status information and power operation classification information corresponding to each power operation work order.
[0058] Step 204, obtaining the plan order processing information of each power operation work order according to the work order status information and the power operation classification information.
[0059] Step 206: If the plan order processing information indicates that the corresponding power operation work order meets the plan order processing conditions, the corresponding power operation work order is determined as the target power operation work order.
[0060] Among them, the business type information may include work order status information and / or power operation classification information. For power marketing work orders, the work order status information and power operation classification information corresponding to each power operation work order can be obtained, and the target power operation work order that meets the plan order processing conditions can be screened out from multiple power operation work orders according to the work order status information and the power operation classification information. Specifically, the work order status information corresponding to each power operation work order is obtained, and the work order status information can indicate whether the corresponding power operation work order has been archived or not archived; the business first-level classification information, business second-level classification information, business third-level classification information and work summary corresponding to each power operation work order are obtained. When the work order status information is archived, the business first-level classification information is "operation management", the business second-level classification information is "customer-side electric energy metering device fault handling", the business third-level classification information is "customer-side electric energy metering device fault handling", and the "work summary" does not contain the "fault information source: metering automation system metering work order" character, it is determined that the corresponding power operation work order meets the plan order processing conditions, and the corresponding power operation work order is determined as the target power operation work order. For the distribution network ledger transfer form, the work order status information corresponding to each power operation work order can be obtained, and based on the work order status information, the target power operation work order that meets the plan order processing conditions can be screened out from multiple power operation work orders. Specifically, the work order status information corresponding to each power operation work order is obtained, and the work order status information can indicate whether the corresponding power operation work order is published or not. When the work order status information is published, it is determined that the corresponding power operation work order meets the plan order processing conditions, and the corresponding power operation work order is determined as the target power operation work order. For the asset list of the infrastructure project, the work order status information corresponding to each power operation work order can be obtained, as well as the plan status information of the associated plan table corresponding to each power operation work order. Based on the work order status information and the plan status information, the target power operation work order that meets the plan order processing conditions can be screened out from multiple power operation work orders. Specifically, the work order status information corresponding to each power operation work order is obtained, and the work order status information can indicate whether the corresponding power operation work order is put into operation or not put into operation; the plan status information of the associated plan order corresponding to each power operation work order is obtained, and the plan status information can indicate whether the corresponding associated plan order is completed or not completed. When the work order status information is that the work order status information is put into operation and the plan status information is that the plan status information is completed, it is determined that the corresponding power operation work order meets the plan order processing conditions, and the corresponding power operation work order is determined as the target power operation work order.
[0061] In the method of this embodiment, different plan order processing conditions can be set according to different types of power operations, so that target power operation work orders can be screened out from multiple power operation work orders, and different unplanned operation judgment standards can be set for target power operation work orders of different types of power operations, thereby improving the comprehensiveness and accuracy of unplanned operation violation identification.
[0062] In an exemplary embodiment, Figure 3 As shown, step 106 may include steps 302 to 306. Among them:
[0063] Step 302: Obtain target power operation information included in the target power operation work order.
[0064] Step 304: query the associated plan sheet of the target power operation work order according to the target power operation information.
[0065] Step 306: if the target power operation work order has an associated plan sheet, obtain the associated plan sheet of the target power operation work order.
[0066] In an exemplary embodiment, step 304 may further include: when there is no associated plan sheet for the target power operation work order, obtaining a matching power plan sheet of the target power operation work order from the plan sheet set.
[0067] Among them, for the power marketing work order, the associated plan sheet of the target power operation work order can be queried in the following ways. If the "link name" contains "assembly and disassembly task assignment", check whether there is an associated plan sheet in the process, and view the associated plan sheet by clicking the properties in "Initiate Plan" in "Business Details Information"-"Send Job Information". If the power marketing work order has a directly associated associated plan sheet, the associated plan sheet of the power marketing work order can be directly obtained; if the power marketing work order does not have a directly associated associated plan sheet, the matching plan sheet of the power marketing work order can be obtained according to the power marketing plan sheet acquisition path. The matching plan sheet can also be called an associated plan sheet. The power marketing plan sheet acquisition path can be the smart safety supervision system-plan management-operation plan query path. For the distribution network ledger transfer form, the plan sheet acquisition path of the distribution network ledger transfer form can be the smart safety supervision system-plan management-operation plan query path. For the asset list of the infrastructure project, the plan sheet acquisition path of the asset list of the infrastructure project can be the power grid management platform->infrastructure smart project management->safety management path.
[0068] In the method of this embodiment, different methods for obtaining associated plan sheets can be set according to different types of power operations, and it can be queried whether there is a directly associated plan sheet. If so, it can be directly obtained; if not, it can be obtained according to the plan sheet acquisition path, thereby improving the efficiency of identifying violations of unplanned operations.
[0069] In an exemplary embodiment, Figure 4 As shown, step 108 may include steps 402 to 406. Among them:
[0070] Step 402: Acquire target electric power operation information of the target electric power operation included in the target electric power operation work order.
[0071] Step 404, obtaining the planned processing information of the target power operation included in the associated power plan.
[0072] Step 406, obtaining the unplanned operation violation identification result of the target power operation work order according to the target power operation information and the planned processing information.
[0073] In an exemplary embodiment, step 406 may include: when the target power operation information and the planned handling information meet at least one of the unplanned operation conditions, determining the unplanned operation violation identification result of the target power operation work order as an unplanned operation; the unplanned operation conditions include: the handling time information included in the target power operation information does not match the planned time information included in the planned handling information; the work content information included in the target power operation information does not match the planned content information included in the planned handling information. The detailed process of obtaining the unplanned operation violation identification result of the target power operation work order based on the target power operation information and the planned handling information can be referred to the relevant description in step 108, and this application will not repeat it here.
[0074] In the method of this embodiment, the target power operation information contained in the target power operation work order and the planned processing information contained in the associated plan sheet can be compared based on the target power operation work order and the associated plan sheet, and unplanned operation violations can be identified in the power operation processing, and it can be determined whether there is any unplanned operation behavior and standardized, thereby improving the safety and standardization of power operation processing.
[0075] It should be understood that, although the various steps in the flowcharts involved in the above-mentioned embodiments are displayed in sequence according to the indication of the arrows, these steps are not necessarily executed in sequence according to the order indicated by the arrows. Unless there is a clear explanation in this article, the execution of these steps does not have a strict order restriction, and these steps can be executed in other orders. Moreover, at least a part of the steps in the flowcharts involved in the above-mentioned embodiments can include multiple steps or multiple stages, and these steps or stages are not necessarily executed at the same time, but can be executed at different times, and the execution order of these steps or stages is not necessarily to be carried out in sequence, but can be executed in turn or alternately with other steps or at least a part of the steps or stages in other steps.
[0076] Based on the same inventive concept, the embodiment of the present application also provides an unplanned operation violation identification device for implementing the unplanned operation violation identification method involved above. The implementation scheme for solving the problem provided by the device is similar to the implementation scheme recorded in the above method, so the specific limitations in one or more unplanned operation violation identification device embodiments provided below can refer to the limitations of the unplanned operation violation identification method above, and will not be repeated here.
[0077] In one embodiment, Figure 5 As shown, a device for identifying unplanned operation violations is provided, including: an acquisition module 502, a screening module 504, a query module 506 and a judgment module 508, wherein:
[0078] An acquisition module 502 is used to acquire multiple power operation work orders from a power grid management platform within a preset time period;
[0079] A screening module 504 is used to screen out target power work orders that meet the processing conditions of the plan order from the plurality of power work orders according to the business type information corresponding to each of the power work orders;
[0080] A query module 506 is used to obtain the associated power plan sheet of the target power operation work order if the target power operation work order has an associated power plan sheet;
[0081] The judgment module 508 is used to obtain the unplanned operation violation identification result of the target power operation work order according to the associated power plan order.
[0082] In one embodiment, the business type information includes work order status information and power operation classification information; the screening module 504 is also used to: obtain the work order status information and the power operation classification information corresponding to each of the power operation work orders; obtain the plan order processing information of each of the power operation work orders based on the work order status information and the power operation classification information; if the plan order processing information indicates that the corresponding power operation work order meets the plan order processing conditions, the corresponding power operation work order is determined as the target power operation work order.
[0083] In one embodiment, the query module 506 is also used to: obtain the target power operation information contained in the target power operation work order; query the associated power plan sheet of the target power operation work order based on the target power operation information; and obtain the associated power plan sheet of the target power operation work order if the associated power plan sheet exists in the target power operation work order.
[0084] In one embodiment, the query module 506 is further used to: when the target power operation work order does not have the associated power plan sheet, obtain the matching power plan sheet of the target power operation work order in the plan sheet set.
[0085] In one embodiment, the judgment module 508 is also used to: obtain the target power operation information of the target power operation contained in the target power operation work order; obtain the plan processing information of the target power operation contained in the associated power plan order; and obtain the unplanned operation violation identification result of the target power operation work order based on the target power operation information and the plan processing information.
[0086] In one embodiment, the judgment module 508 is also used to: when the target power operation information and the planned processing information meet at least one of the unplanned operation conditions, determine the unplanned operation violation identification result of the target power operation work order as an unplanned operation; the unplanned operation conditions include: the processing time information contained in the target power operation information does not match the planned time information contained in the planned processing information; the work content information contained in the target power operation information does not match the planned content information contained in the planned processing information.
[0087] Each module in the above-mentioned unplanned operation violation identification device can be implemented in whole or in part by software, hardware and their combination. The above-mentioned modules can be embedded in or independent of the processor in the computer device in the form of hardware, or can be stored in the memory of the computer device in the form of software, so that the processor can call and execute the corresponding operations of the above-mentioned modules.
[0088] In one embodiment, a computer device is provided. The computer device may be a server, and its internal structure diagram may be as follows: Figure 6 As shown. The computer device includes a processor, a memory and a network interface connected through a system bus. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The database of the computer device is used to store data related to the identification of unplanned operation violations. The network interface of the computer device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, a method for identifying unplanned operation violations is implemented.
[0089] Those skilled in the art will understand that Figure 6 The structure shown in the figure is only a block diagram of a part of the structure related to the solution of the present application, and does not constitute a limitation on the computer device to which the solution of the present application is applied. The specific computer device may include more or fewer components than those shown in the figure, or combine certain components, or have a different arrangement of components.
[0090] In one embodiment, a computer device is further provided, including a memory and a processor, wherein a computer program is stored in the memory, and the processor implements the steps in the above method embodiments when executing the computer program.
[0091] In one embodiment, a computer-readable storage medium is provided, on which a computer program is stored. When the computer program is executed by a processor, the steps in the above-mentioned method embodiments are implemented.
[0092] In one embodiment, a computer program product is provided, including a computer program, which implements the steps in the above method embodiments when executed by a processor.
[0093] It should be noted that the user information (including but not limited to user device information, user personal information, etc.) and data (including but not limited to data used for analysis, stored data, displayed data, etc.) involved in this application are all information and data authorized by the user or fully authorized by all parties.
[0094] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to the memory, database or other medium used in the embodiments provided in the present application can include at least one of non-volatile and volatile memory. Non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical memory, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetoresistive random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. Volatile memory can include random access memory (RAM) or external cache memory, etc. As an illustration and not limitation, RAM can be in various forms, such as static random access memory (SRAM) or dynamic random access memory (DRAM). The database involved in each embodiment provided in this application may include at least one of a relational database and a non-relational database. Non-relational databases may include distributed databases based on blockchains, etc., but are not limited to this. The processor involved in each embodiment provided in this application may be a general-purpose processor, a central processing unit, a graphics processor, a digital signal processor, a programmable logic device, a data processing logic device based on quantum computing, etc., but are not limited to this.
[0095] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0096] The above-described embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the present application. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the present application shall be subject to the attached claims.
Claims
1. A method for identifying unplanned operation violations, characterized in that: The method comprises: Obtain multiple power operation work orders from the power grid management platform within a preset time period; According to the business type information corresponding to each of the electric power work orders, a target electric power work order that meets the processing conditions of the plan order is selected from the multiple electric power work orders; If the target power operation work order has an associated plan sheet, obtaining the associated plan sheet of the target power operation work order; According to the associated plan sheet, the unplanned operation violation identification result of the target power operation work sheet is obtained.
2. The method according to claim 1, characterized in that: The business type information includes work order status information and power operation classification information; The step of selecting a target power operation work order that meets the plan order processing conditions from a plurality of power operation work orders according to the business type information corresponding to each of the power operation work orders includes: Acquire the work order status information and the power operation classification information corresponding to each of the power operation work orders; According to the work order status information and the power operation classification information, obtaining the plan order processing information of each power operation work order; If the plan order processing information indicates that the corresponding power operation work order meets the plan order processing conditions, the corresponding power operation work order is determined as the target power operation work order.
3. The method according to claim 1, characterized in that When the target power operation work order has an associated plan sheet, obtaining the associated plan sheet of the target power operation work order includes: Acquire target power operation information included in the target power operation work order; According to the target power operation information, query the associated plan sheet of the target power operation work order; In a case where the associated plan sheet exists for the target power operation work order, the associated plan sheet of the target power operation work order is acquired.
4. The method according to claim 3, characterized in that The querying the associated plan sheet of the target power operation work order according to the target power operation information includes: In the case that the associated plan sheet does not exist for the target power operation work order, a matching power plan sheet of the target power operation work order is obtained from a plan sheet set.
5. The method according to claim 1, characterized in that The step of obtaining the unplanned operation violation identification result of the target power operation work order according to the associated plan order includes: Acquire target power operation information of the target power operation included in the target power operation work order; Acquire the plan handling information of the target power operation included in the associated plan sheet; The unplanned operation violation identification result of the target power operation work order is obtained according to the target power operation information and the planned processing information.
6. The method according to claim 5, characterized in that The step of obtaining the unplanned operation violation identification result of the target power operation work order according to the target power operation information and the planned handling information includes: When the target power operation information and the planned handling information meet at least one of the unplanned operation conditions, determining the unplanned operation violation identification result of the target power operation work order as an unplanned operation; The unplanned operation conditions include: The processing time information included in the target power operation information does not match the planned time information included in the planned processing information; The work content information included in the target power operation information does not match the plan content information included in the plan handling information.
7. A device for identifying violations of unplanned operations, characterized in that: The device comprises: An acquisition module, used to acquire multiple power operation work orders from the power grid management platform within a preset time period; A screening module, for screening out target power work orders that meet the processing conditions of the plan order from a plurality of power work orders according to the business type information corresponding to each of the power work orders; A query module, configured to obtain the associated plan sheet of the target power operation work order if the target power operation work order has an associated plan sheet; The judgment module is used to obtain the unplanned operation violation identification result of the target power operation work order according to the associated plan order.
8. A computer device comprising a memory and a processor, wherein the memory stores a computer program, wherein: When the processor executes the computer program, the steps of the method according to any one of claims 1 to 6 are implemented.
9. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 6 are implemented.
10. A computer program product, comprising a computer program, characterized in that When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 6 are implemented.
Citation Information
Patent Citations
Power operation data violation identification method and related device
CN117473132A
Cited By
Violation behavior identification method and system based on operation plan list
CN118863537A