Operation platform for assisting curtain wall installation
By designing an operating platform that assists curtain wall installation, using the combination of shafts and hinges to provide a horizontal foothold, the problems of inconvenience and safety hazards in curtain wall construction are solved, and a more efficient and safe construction process is achieved.
Patent Information
- Application Number
- CN202411429456.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-14
- Publication Date
- 2025-01-07
AI Technical Summary
During the curtain wall construction process, construction workers are inconvenient to operate due to the design of external scaffolding, which affects the construction quality and increases safety hazards, especially in high altitude environments, falling objects are prone to occur.
Design an operating platform for assisting curtain wall installation, including two side panels and a uniform platform panel, rotatably connected to the side panels through a shaft, and a connecting rod and hinge are combined to provide an adjustable upper hook and lower base to ensure The platform board is always level and is suitable for construction at different heights.
It improves the safety and efficiency of construction, reduces accidents, saves labor costs, and improves the quality of construction molding.
Smart Images

Figure CN119266702A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of curtain wall installation, in particular to an operating platform assisting curtain wall installation. Background Art
[0002] Curtain wall engineering refers to a covering layer composed of glass or metal plates installed on the exterior wall of a building. It not only plays the role of aesthetics, lighting, ventilation and thermal insulation, but is also an important part of the building, affecting the safety, durability and function of the building. Curtain wall engineering is widely used in modern buildings, especially large public buildings and office buildings, which often use curtain walls as external decoration and protective structures.
[0003] With the improvement of people's living standards, there are more and more building exterior curtain wall projects, but there are certain problems in the current installation and construction process of exterior curtain walls. In the current exterior curtain wall construction, construction workers usually stand on the external scaffolding to install the curtain wall components, but because there is a certain gap between the external frame and the wall, and the step distance of the external frame does not conform to the modulus of the floor, there are many inconveniences in the construction and installation of the exterior curtain wall components by on-site personnel, which not only affects the construction quality, but also easily causes safety accidents caused by falling objects from high altitude.
[0004] Therefore, a new type of curtain wall installation device is needed to reduce the construction difficulty, improve the curtain wall construction molding quality and improve the construction efficiency. Summary of the invention
[0005] The present invention aims to solve the above problems, thereby providing an operating platform for assisting curtain wall installation.
[0006] The present invention solves the above-mentioned problem by adopting the following technical solution: The utility model discloses an operating platform for assisting the installation of a curtain wall, comprising two side panels arranged opposite to each other and a plurality of platform panels evenly distributed between the two side panels, wherein the platform panels are rotatably connected to the side panels on both sides through an axis rod, the axis rod penetrates the platform panels along the length direction of the platform panels, a same connecting rod is connected between the plurality of platform panels, the platform panels and the connecting rod are hinged through a hinge, upper hooks and lower bases are respectively arranged at the upper and lower ends of the two side panels, the axis rod connecting the platform panel close to the upper hook and the side panel extends outward from the side panel and is rotatably connected to the upper hook, the axis rod connecting the platform panel close to the lower base and the side panel extends outward from the side panel and is rotatably connected to the lower base, the side edges of the platform panel close to the upper hook and the platform panel close to the lower base extend outward from the side panels, and the two ends of the two platform panels are respectively connected to the adjacent upper hook and the adjacent lower base.
[0007] Furthermore, the board surfaces of the plurality of platform boards are parallel to the length direction of the upper hook and the lower base, ensuring that after the lower base is placed on the building floor, the board surfaces of the flat belt boards always remain horizontal.
[0008] Furthermore, the connection points of the plurality of platform panels and the side panels are located on the same straight line.
[0009] Furthermore, the hinged component includes a first ear plate and a second ear plate, the first ear plate is hinged to the second ear plate, the first ear plate is connected to the side of the platform plate, and the second ear plate is connected to the connecting rod.
[0010] Compared with the prior art, the present invention adopting the above technical solution has the following outstanding features: The present invention is easy to move. When in use, it can be quickly hung with the on-site external frame through the upper hook. The hanging height is selected according to needs. The lower base is supported on the building floor. Under the action of the connecting rod, each platform plate is always kept level, providing a horizontal foothold for personnel. It is suitable for use at different heights, is safe and reliable, reduces accidents, and can speed up construction and save labor costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] Figure 1 It is a schematic diagram of the main structure of an embodiment of the present invention; Figure 2 A schematic diagram of a structure of a use state of an embodiment of the present invention; Marked in the figure are: side panel 1, platform panel 2, connecting rod 3, upper hook 4, lower base 5, on-site external frame 6, and building floor slab 7. DETAILED DESCRIPTION
[0012] The present invention will be further described below in conjunction with embodiments, the purpose of which is only to provide a better understanding of the content of the present invention. Therefore, the examples given do not limit the protection scope of the present invention.
[0013] See also Figure 1-Figure 2 , an operating platform for assisting curtain wall installation, comprises two side panels 1 arranged opposite to each other and a plurality of platform panels 2 evenly distributed between the two side panels 1, the platform panels 2 are rotatably connected to the side panels 1 on both sides through an axis rod, the axis rod penetrates the platform panel 2 along the length direction of the platform panel 2, a same connecting rod 3 is connected between the plurality of platform panels 2, the platform panel 2 and the connecting rod 3 are hinged through a hinge, an upper hook 4 and a lower base 5 are respectively arranged at the upper and lower ends of the two side panels 1, the axis rod connecting the platform panel 2 and the side panel 1 near the upper hook 4 extends to the outside of the side panel 2 and is rotatably connected to the upper hook 4, the axis rod connecting the platform panel 2 and the side panel 1 near the lower base 5 extends to the outside of the side panel 2 and is rotatably connected to the lower base 5, the side edges of the platform panel 2 near the upper hook 4 and the platform panel 2 near the lower base 5 extend outward of the side panel 2, and the two ends of the two platform panels 2 are respectively connected to the adjacent upper hook 4 and the adjacent lower base 5.
[0014] Furthermore, the board surfaces of the plurality of platform boards 2 are parallel to the length direction of the upper hook 4 and the lower base 5, ensuring that after the lower base 5 is placed on the building floor 7, the board surfaces of the flat belt boards 2 always remain horizontal.
[0015] Furthermore, the connection points between the plurality of platform panels 2 and the side panels 1 are located on the same straight line.
[0016] Furthermore, the hinged component includes a first ear plate and a second ear plate, the first ear plate is hinged to the second ear plate, the first ear plate is connected to the side of the platform plate 2 , and the second ear plate is connected to the connecting rod 3 .
[0017] When the present invention is used, first, according to the design requirements of the curtain wall and the actual situation of the on-site external frame 6, a section of the platform with the lower base 5 is placed on the building floor 7, and a section with the upper hook 4 is hung on the crossbar of the external frame 6 outside the site; the platform plate 2 is associated with the base through the connecting rod 3, thereby ensuring that the operating platform can ensure that each layer of the platform plate 2 is parallel to the ground at any angle, which is convenient for people to get on and off and can improve the working posture of the staff. Then people can go up and down to install and construct the curtain wall components.
[0018] The present invention is easy to move. When in use, it can be quickly hung with the on-site external frame through the upper hook. The hanging height is selected according to needs. The lower base is supported on the building floor. Under the action of the connecting rod, each platform plate is always kept level, providing a horizontal foothold for personnel. It is suitable for use at different heights, is safe and reliable, reduces accidents, and can speed up construction and save labor costs.
[0019] The above description is only a preferred feasible embodiment of the present invention, and does not limit the scope of rights of the present invention. All equivalent changes made using the contents of the present specification and its drawings are included in the scope of rights of the present invention.
Claims
1. An operating platform for assisting curtain wall installation, characterized in that: The utility model comprises two side panels arranged opposite to each other and a plurality of platform panels evenly distributed between the two side panels, wherein the platform panels are rotatably connected to the side panels on both sides through an axle rod, the axle rod penetrates the platform panels along the length direction of the platform panels, a same connecting rod is connected between the plurality of platform panels, the platform panels and the connecting rod are hinged through a hinge, upper hooks and lower bases are respectively provided at the upper and lower ends of the two side panels, the axle rod connecting the platform panel close to the upper hook and the side panel extends toward the outside of the side panel and is rotatably connected to the upper hook, the axle rod connecting the platform panel close to the lower base and the side panel extends toward the outside of the side panel and is rotatably connected to the lower base, the side edges of the platform panel close to the upper hook and the platform panel close to the lower base extend toward the outside of the side panels, and the two ends of the two platform panels are respectively connected to the adjacent upper hook and the adjacent lower base.
2. The operating platform for assisting curtain wall installation according to claim 1, characterized in that: The plate surfaces of the plurality of platform plates are parallel to the length directions of the upper hook and the lower base.
3. The method for installing and constructing a steel structure high-altitude cable tray according to claim 1 is characterized in that: The connection points of the plurality of platform panels and the side panels are located in the same straight line.
4. The method for installing and constructing a steel structure high-altitude cable tray according to claim 1 is characterized in that: The hinged member comprises a first ear plate and a second ear plate, the first ear plate is hinged to the second ear plate, the first ear plate is connected to the side edge of the platform plate, and the second ear plate is connected to the connecting rod.