Construction equipment for rail top air duct, hydraulic control system and construction method
By designing construction equipment for rail air ducts, and using technical means such as lifting platforms, slewing components and mobile components, the problems of high labor intensity, low efficiency and safety hazards in the existing construction methods are solved, achieving more efficient and safe Construction process.
Patent Information
- Application Number
- CN202510065192.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-16
- Publication Date
- 2025-02-18
AI Technical Summary
The existing rail air duct construction methods have problems such as high labor intensity, low construction efficiency, difficulty in ensuring construction quality and safety hazards.
A construction equipment for rail air ducts is designed, including lifting platform, slewing components, driving mechanism, X-direction moving components, Y-direction moving components and hydraulic control systems. Through the coordinated work of these components, the rail air duct reservation is realized. Butt adjustment between steel bars and installation holes.
It effectively reduces the labor intensity of staff, improves construction efficiency, ensures construction quality, and reduces safety hazards of construction.
Smart Images

Figure CN119461152A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of subway construction, in particular to construction equipment, a hydraulic control system and a construction method for a rail top air duct. Background Art
[0002] The statements in this section merely provide background information related to the present invention and do not necessarily constitute prior art.
[0003] During the construction of subway stations, a track-top air duct is set up on the top of the tunnel. Currently, there are two construction methods for the track-top air duct. One is to use cast-in-place construction, and the other is to set up the track air duct with three prefabricated panels. Whether it is cast-in-place or prefabricated panels, there is a problem of greater construction difficulty.
[0004] For the prefabricated rail top air duct, the current construction method is to build a scaffolding. Because the mass of each prefabricated panel is also relatively large, lifting equipment is used to lift the prefabricated panel and lift it to the top of the scaffolding. Then multiple workers cooperate to insert the reserved steel bars of the prefabricated parts into the installation holes on the top of the tunnel. During the connection process between the prefabricated parts and the installation holes on the top of the tunnel, in order to ensure alignment, the position of the prefabricated parts is mainly controlled by the workers cooperating with each other. This has the characteristics of high labor intensity, low construction efficiency, difficult to guarantee construction quality, and certain safety hazards. Summary of the invention
[0005] In view of the deficiencies in the prior art, the object of the present invention is to provide a construction device for a rail top air duct, so as to reduce the labor intensity of workers and improve construction efficiency.
[0006] In order to achieve the above object, the present invention is implemented through the following technical solutions: A construction device for a rail-top air duct comprises a lifting platform, which is connected to a frame through a slewing assembly, the frame is provided with a traveling mechanism, the top of the lifting platform supports a moving mechanism, the moving mechanism comprises a support frame, a lifting assembly is arranged between the support frame and a supporting base, the support frame is used to support the rail-top air duct, the supporting base is connected to an X-direction moving assembly, the X-direction moving assembly is connected to a Y-direction moving assembly, so that the rail-top air duct is driven by the support frame to realize X-direction, Y-direction and Z-direction movement to realize the docking adjustment of the reserved steel bars of the rail-top air duct and the mounting holes, and the slewing assembly, the X-direction moving assembly, the Y-direction moving assembly, the lifting assembly, the lifting platform and the traveling mechanism are respectively connected to a control assembly separately.
[0007] In the construction equipment for rail top air duct as described above, the support base is provided with multiple first vertical beams, the first vertical beams are hollow, the support frame is provided with second vertical beams, the second vertical beams are inserted into the hollow part of the first vertical beams, and the lifting assembly is arranged between the second vertical beams and the first vertical beams, and the telescopic end of the lifting assembly is connected to the second vertical beam.
[0008] In the construction equipment for rail-top air duct as described above, the control component is remotely connected to the remote controller, which facilitates the control of the construction equipment.
[0009] A construction device for a rail top air duct as described above, wherein the bottom of the support base is connected to the X-direction moving assembly, the X-direction moving assembly comprises an X-direction support beam, the X-direction support beam is arranged along the width direction of the support base, an X-direction linear drive member is connected between the X-direction support beam and the bottom of the support base, and the X-direction linear drive member is connected to the control assembly; The X-axis support beam is arranged beyond the bottom of the support base, and a limiting groove is arranged on the surface of the X-axis support beam to limit the movement of the bottom of the support base.
[0010] As described above, a construction equipment for a rail-top air duct, the Y-axis moving component includes a Y-axis support beam, the Y-axis support beam is fixed to the top of the lifting platform, the Y-axis support beam supports the bottom plate, the bottom plate supports the X-axis support beam, a Y-axis linear drive component is arranged between the Y-axis support beam and the bottom plate, and the Y-axis linear drive component is connected to the control component.
[0011] As described above, a construction equipment for rail top air duct, the lifting platform includes an upper platform and a lower platform, a scissor-type lifting member is arranged between the upper platform and the lower platform, the scissor-type lifting member is connected to the control component, the upper platform supports the Y-direction moving component, and the lower platform is connected to the traveling mechanism.
[0012] As described above, a construction equipment for rail top air duct is provided with a plurality of telescopic legs at the lower platform, the telescopic legs are arranged through the lower platform, the telescopic ends of the telescopic legs are connected to the pads, the pads can contact the ground, and the telescopic legs are connected to the control components.
[0013] In the construction equipment for rail top air duct as described above, an oblique telescopic member is provided between the frame and the traveling mechanism, the two oblique telescopic members are tilted to adjust the inclination of the lifting platform relative to the traveling mechanism, and the oblique telescopic member is connected to the control assembly.
[0014] In a second aspect, the present invention also provides a hydraulic control system for construction equipment of a rail top air duct, comprising an oil tank, which supplies oil to the hydraulic parts of the traveling mechanism, and also supplies oil to the rotating assembly, the X-axis moving assembly, the Y-axis moving assembly, and the lifting assembly, respectively.
[0015] In a third aspect, the present invention further provides a construction method for a construction device for a rail-top air duct, using the construction device for a rail-top air duct, comprising the following contents: The lifting platform is lowered to the lowest position, and the rail top air duct is hoisted to the support frame for support; The control component drives the support frame to rise to a first height through the lifting component, and then drives the support frame to adjust the position of the rail top air duct through the X-axis moving component and the Y-axis moving component, so that the reserved steel bars of the rail top air duct are aligned with the installation holes; The control component mobilizes the support frame to rise to the second height through the lifting component, so that the reserved steel bars of the track air duct are inserted into the installation holes, and the staff locks them to achieve the installation of the track top air duct.
[0016] The beneficial effects of the present invention are as follows: 1) The construction equipment in the present invention includes a frame, and a traveling mechanism is connected to the frame to drive the frame to move on site. The frame supports the lifting platform. After the prefabricated parts of the rail-top air duct are placed on the support frame, the lifting platform can drive the prefabricated parts to lift. After lifting to a set height, the prefabricated parts are driven by the lifting assembly, the X-axis moving assembly and the Y-axis moving assembly to achieve multi-directional movement, so that the reserved steel bars of the rail-top air duct are aligned with the installation holes on the top of the tunnel. There is no need for workers to lift the prefabricated parts by hand for multi-directional adjustment, which effectively reduces labor intensity and improves construction efficiency.
[0017] 2) The supporting base and the supporting frame in the present invention are reasonably arranged in structure. The supporting base is arranged with a first vertical beam, and the first vertical beam is arranged hollow so that the second vertical beam of the supporting frame can be inserted into the first vertical beam. A lifting assembly is arranged between the first vertical beam and the second vertical beam to drive the supporting frame to be lifted and lowered along the height direction of the supporting base.
[0018] 3) In the present invention, the X-direction moving assembly includes an X-direction support beam, and an X-direction linear driving member is connected between the X-direction support beam and the bottom of the support base, thereby driving the support base to realize X-direction movement. The Y-direction support beam supports the X-direction support beam through the bottom plate, and a Y-direction linear driving member is arranged between the Y-direction support beam and the bottom plate, thereby driving the support base to realize Y-direction movement. The staff adjusts the X-direction linear driving member and the Y-direction linear driving member according to the position of the tunnel installation hole, so as to facilitate the rapid adjustment of the position of the rail top air duct prefabricated member.
[0019] 4) In the present invention, the lower platform is provided with telescopic legs, which pass through the lower platform. Thus, during construction, in order to ensure the safety of construction, the telescopic legs can be extended so that the pad is in contact with the ground, thereby ensuring the stability of the entire construction equipment. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] The accompanying drawings in the specification, which constitute a part of the present invention, are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute improper limitations on the present invention.
[0021] Figure 1 It is a schematic diagram of a construction device for a rail top air duct according to one or more embodiments of the present invention.
[0022] Figure 2 The figure is a top view of a support base in a construction device for a rail-top air duct according to one or more embodiments of the present invention.
[0023] Figure 3 It is a front view of the connection between a support base and an X-direction moving component in a construction device for a rail-top air duct according to one or more embodiments of the present invention.
[0024] Figure 4 It is a front view of the connection between a support base and an X-direction moving component and a Y-direction moving component in a construction device for a rail-top air duct according to one or more embodiments of the present invention.
[0025] Figure 5 It is a front view of a support frame in a construction device for a rail-top air duct according to one or more embodiments of the present invention.
[0026] Figure 6 It is a top view of a support frame in a construction device for a rail top air duct according to one or more embodiments of the present invention.
[0027] Figure 7 It is a schematic diagram of a limit pull rod in a construction device for a rail top air duct according to one or more embodiments of the present invention.
[0028] Figure 8 It is a schematic diagram of a hydraulic control system of a construction equipment for a rail top air duct according to one or more embodiments of the present invention.
[0029] In the figure: the distances or sizes between parts are exaggerated to show the positions of various parts, and the schematic diagram is for reference only.
[0030] Among them: 1. Scissor lift, 2. Support base, 3. Lifting assembly, 4. Support frame, 5. X-axis moving assembly, 6. Lower platform, 7. Y-axis moving assembly, 8. Upper platform, 9. Control box, 10. Telescopic legs, 11. Track travel mechanism, 12. Oblique telescopic parts, 13. Pad, 14. Frame, 15. Brake, 16. Left reducer, 17. Right reducer, 18. Pilot valve, 19. Oil tank, 20. Track hydraulic drive, 21. Oil pump, 22. Power take-off, 23. Y-axis drive cylinder, 24. X-axis drive cylinder, 25. Lifting cylinder, 26. Lifting cylinder, 27. Oblique telescopic cylinder, 28. Limit pull rod, 29. Pilot handle, 30. Solenoid valve; 2-1. The first cross beam, 2-2. The first vertical beam, 2-3. The stiffened ribs, 2-4. The third cross beam, 2-5. The second cross beam, 2-6. The fourth cross beam; 4-1. The second vertical beam, 4-2. The sixth horizontal beam, 4-3. The seventh horizontal beam; 5-1.X-axis supporting beam; 7-1.Y-axis supporting beam, 7-2.Fifth cross beam; 28-1. Limiting end, 28-2. Bending end. DETAILED DESCRIPTION
[0031] It should be noted that the following detailed descriptions are illustrative and intended to provide further explanation of the present invention. Unless otherwise specified, all technical and scientific terms used in the present invention have the same meanings as those commonly understood by those skilled in the art to which the present invention belongs.
[0032] It should be noted that the terms used herein are only for describing specific embodiments and are not intended to limit the exemplary embodiments according to the present invention. As used herein, unless otherwise explicitly stated in the present invention, the singular form is also intended to include the plural form. In addition, it should be understood that when the terms "include" and / or "include" are used in this specification, it indicates the presence of features, steps, operations, devices, components and / or combinations thereof; As introduced in the background technology, the construction of the rail top air duct in the prior art is difficult. In order to solve the above technical problems, the present invention proposes a construction equipment for the rail top air duct.
[0033] Embodiment 1 In a typical embodiment of the present invention, reference is made to Figure 1 As shown, a construction equipment for a rail-top air duct comprises a lifting platform, which is connected to a frame 14 through a rotating assembly, the frame 14 is provided with a traveling mechanism, the top of the lifting platform supports a moving mechanism, the moving mechanism comprises a support frame 4, a lifting assembly 3 is arranged between the support frame 4 and a supporting base 2, the support frame 4 is used to support the rail-top air duct, the supporting base 2 is connected to an X-direction moving assembly 5, the X-direction moving assembly 5 is connected to a Y-direction moving assembly 7, so that the rail-top air duct is driven by the support frame 4 to realize X-direction, Y-direction and Z-direction movement to realize the docking adjustment of the reserved steel bars of the rail-top air duct and the mounting holes, the rotating assembly, the X-direction moving assembly 5, the Y-direction moving assembly 7, the lifting assembly 3, the lifting platform and the traveling mechanism are respectively connected to the control assembly separately.
[0034] In this embodiment, the control component is remotely connected to the remote control. The control component can be a PLC controller or other types of controllers. The control component is arranged in a control box 9, and the control box 9 is fixed at the lower platform 6 of the lifting platform. The remote control is provided with operating levers of each component. The control of each component is achieved through the corresponding operating levers, so that the construction equipment can be self-propelled without the need for a cab, and it is convenient for the staff to perform remote control.
[0035] It should be noted that the frame 14 can be a flat plate, which supports the slewing assembly. The slewing assembly can be an existing hydraulic slewing bearing. The hydraulic slewing bearing can drive the lifting platform to rotate relative to the frame 14 to meet the use requirements of the construction equipment.
[0036] refer to Figure 2 and Figure 3 As shown, the support base 2 is frame-shaped, and the support base 2 is provided with four first vertical beams 2-2. The first vertical beams 2-2 are hollowly arranged, and the four first vertical beams 2-2 are located at the four corners of the frame-shaped support base 2. Along the width direction of the support base 2, a first cross beam 2-1 and a second cross beam 2-5 are connected between two adjacent first vertical beams 2-2. The height of the second cross beam 2-5 is greater than the height of the first cross beam 2-1, and the second cross beam 2-5 is located below the first cross beam 2-1; along the length direction of the support base 2, a third cross beam 2-4 and a fourth cross beam 2-6 are connected between two adjacent first vertical beams 2-2. The third cross beam 2-4 is located above the fourth cross beam 2-6. The height of the fourth cross beam 2-6 is greater than the height of the third cross beam 2-4, and a stiffening rib 2-3 is arranged between the first vertical beam 2-2 and the fourth cross beam 2-6 to enhance the strength of the support base 2.
[0037] It is easy to understand that the bottom of the support base 2 is connected to the X-direction moving assembly 5, and the X-direction moving assembly 5 includes an X-direction support beam 5-1, and a plurality of X-direction support beams 5-1 are provided, and two adjacent X-direction support beams 5-1 are arranged at a distance, and the X-direction support beams 5-1 are arranged along the width direction of the support base 2, and an X-direction linear driving member is connected between some or all of the X-direction support beams 5-1 and the bottom of the support base 2, and the X-direction linear driving member is connected to the control assembly, and the X-direction linear driving member is an X-direction driving cylinder 24; The X-direction support beam 5-1 is arranged beyond the bottom of the support base 2, and a limiting groove is arranged on the surface of the X-direction support beam to limit the movement of the bottom of the support base 2; refer to Figure 4 As shown, the Y-axis moving component includes a Y-axis support beam 7-1, which is fixed to the top of the upper platform 8 in the lifting platform. The Y-axis support beam 7-1 supports the bottom plate, and the bottom plate supports the X-axis support beam 5-1. A Y-axis linear drive component is arranged between the Y-axis support beam 7-1 and the bottom plate. The Y-axis linear drive component is a Y-axis drive cylinder 23, and the Y-axis linear drive component is connected to the control component.
[0038] The length of the Y-direction support beam 7-1 is less than the length of the fourth cross beam 2-6, and the adjacent two Y-direction support beams 7-1 are arranged at a distance, and the ends of the multiple Y-direction support beams 7-1 are provided with a fifth cross beam 7-2, and the fifth cross beam 7-2 is connected to the Y-direction support beams 7-1; refer to Figure 5 and Figure 6As shown, the support frame 4 includes multiple second vertical beams 4-1, the positions of the second vertical beams 4-1 correspond one to one with the positions of the first vertical beams 2-2, the second vertical beams 4-1 are inserted into the hollow of the first vertical beams 2-2, and a lifting component is arranged between the second vertical beams 4-1 and the first vertical beams 2-2, the lifting component 3 is specifically a lifting cylinder 25, the fixed end of the lifting cylinder 25 is fixed to the outer side of the first vertical beam 2-2, and the telescopic end of the lifting cylinder 25 is fixed to the second vertical beam 4-1.
[0039] It is easy to understand that the support frame 4 supports the transverse frame through the second vertical beam 4-1, and the transverse frame includes a sixth beam 4-2 and a seventh beam 4-3. The sixth beam 4-2 is arranged along the length direction of the support frame 4, and the sixth beam 4-2 on both sides supports multiple seventh beams 4-3. The width of the sixth beams 4-2 on both sides, that is, the support frame 4 is smaller than the width of the track air duct, and the lower protruding side of the track top air duct is placed on one side of the support frame 4 in the width direction, so as to avoid interference between the lower protruding side of the track top air duct and the support frame 4.
[0040] In this embodiment, the lifting platform includes an upper platform 8 and a lower platform 6. A scissor-type lifting component 1 is arranged between the upper platform 8 and the lower platform 6. The scissor-type lifting component 1 is an existing scissor-type lifting mechanism. The scissor-type lifting component 1 has a lifting cylinder 26. The lifting cylinder 26 is connected to the control component. The upper platform 8 supports the Y-axis moving component. A hydraulic slewing bearing is arranged between the lower platform 6 and the frame 14.
[0041] In addition, a plurality of limit rods 28 are provided between the scissor lift 1 and the lower platform 6. One end of the limit rod 28 is fixed to the bottom side of the scissor lift 1. The limit rod 28 is retractable and rotatable relative to the scissor lift 1. Figure 7 As shown, the limit rod 28 is located at one end of the scissor lift 1 and a limit end 28-1 is set to prevent the limit rod 28 from being pulled out of the scissor lift 1. The other end of the limit rod 28 is bent to form a bent end 28-2. In this way, when the scissor lift 1 is retracted, the limit rod 28 is rotated relative to the scissor lift and pushed toward the center position of the construction equipment so that the bent end 28-2 of the limit rod is located on the lower side of the lower platform 6 to lock the scissor lift 1.
[0042] It is easy to understand that the length of the lower platform 6 is longer than that of the upper platform 8. A control box 9 is set at the lower platform 6. Taking into account the need for workers to stand on the upper platform 8, guardrails are set on the sides of the upper platform 8 to ensure work safety. A telescopic ladder is set on one side of the upper platform 8 or the control box 9. The telescopic ladder is an existing structure. After the telescopic ladder is extended, it is convenient for workers to go up to the upper platform 8.
[0043] Taking into account that the construction environment is uneven and the mass of the rail top air duct is heavy, in order to ensure stable construction, a plurality of telescopic legs 10 are arranged at the lower platform 6, specifically, four telescopic legs 10 are arranged, and the four telescopic legs 10 are placed under the four corners of the upper platform 8. The telescopic legs 10 are arranged through the lower platform 6, and the shell of the telescopic legs 10 is fixed to the lower platform 6. The telescopic end of the telescopic leg 10 is connected to the pad 13, and the pad 13 can contact the ground. The telescopic leg 10 is an existing telescopic oil cylinder, and the telescopic leg 10 is connected to the control component.
[0044] It should be noted that an oblique telescopic member 12 is provided between the frame 14 and the traveling mechanism. The oblique telescopic member 12 is provided on both sides of the lower surface of the frame, and two oblique telescopic members 12 are provided on each side. The telescopic ends of the oblique telescopic members 12 on both sides of each side are inclined toward the direction of the lifting platform. The two oblique telescopic members 12 are inclined to adjust the inclination of the lifting platform relative to the traveling mechanism to achieve the forward tilt of the lifting platform. The oblique telescopic member 12 is specifically an oblique telescopic cylinder 27, and the oblique telescopic member is connected to the control component.
[0045] The traveling mechanism is specifically a crawler traveling mechanism 11, and a driving member of the crawler traveling mechanism 11 is connected to a control assembly.
[0046] The construction equipment provided in this embodiment has a traveling mechanism connected to a frame 14 to drive the frame 14 to move on site, and the frame 14 supports the lifting platform. After the prefabricated parts of the rail-top air duct are placed on the support frame 4, the lifting platform can drive the prefabricated parts to lift. After lifting to a set height, the prefabricated parts are driven by the lifting assembly 3, the X-axis moving assembly 5 and the Y-axis moving assembly 7 to achieve multi-directional movement, so that the reserved steel bars of the rail-top air duct are aligned with the installation holes on the top of the tunnel. There is no need for workers to lift the prefabricated parts by hand for multi-directional adjustment, which effectively reduces labor intensity and improves construction efficiency.
[0047] Embodiment 2 This embodiment provides a hydraulic control system for construction equipment of a rail top air duct, referring to Figure 8 As shown, the oil tank 19 includes an oil tank 19, which supplies oil to a pilot handle 29 of the traveling mechanism through an oil pump 21 and a power take-off 22, and supplies oil to a crawler hydraulic drive 20 through the pilot handle 29. The crawler hydraulic drive 20 is respectively connected to the left reducer 16 and the right reducer 17 to drive the crawler forward and backward, etc., and also supplies oil to the rotary assembly, the X-axis moving assembly 5, the Y-axis moving assembly 7, and the lifting assembly 3 through the corresponding solenoid valve 30, wherein oil is supplied to the corresponding solenoid valve 30 through the pilot valve 18, and then oil is supplied to the hydraulic rotary bearing, the X-axis driving cylinder 24, the Y-axis driving cylinder 23, the lifting cylinder 26, and the lifting cylinder 25 through the corresponding solenoid valve 30, the hydraulic rotary bearing has a brake 15, and supplies oil to the oblique telescopic cylinder 27.
[0048] It should be noted that the pilot handle 29 and the crawler hydraulic drive member 20 are both prior art and will not be described in detail.
[0049] Embodiment 3 This embodiment provides a construction method for a construction device for a rail-top air duct, using the construction device for a rail-top air duct described in Embodiment 1, and includes the following contents: The lifting platform is lowered to the lowest position, and the prefabricated parts of the rail top air duct are hoisted to the support frame 4 for support; The control component drives the support frame 4 to rise to a first height through the lifting component 3, and then drives the support frame to adjust the position of the rail top air duct through the X-axis moving component 5 and the Y-axis moving component 7, so that the reserved steel bars of the rail top air duct are aligned with the installation holes on the top of the tunnel; The control component mobilizes the support frame 4 to rise to the second height through the lifting component 3, so that the reserved steel bars of the track air duct are inserted into the installation holes, and the staff locks them to achieve the installation of the track top air duct.
[0050] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A construction device for rail top air duct, characterized in that: It includes a lifting platform, which is connected to a frame through a slewing assembly. The frame is provided with a traveling mechanism. The top of the lifting platform supports a moving mechanism. The moving mechanism includes a support frame. A lifting assembly is arranged between the support frame and a supporting base. The support frame is used to support a rail top air duct. The supporting base is connected to an X-direction moving assembly. The X-direction moving assembly is connected to a Y-direction moving assembly. In this way, the rail top air duct is driven by the support frame to realize X-direction, Y-direction and Z-direction movement to realize the docking adjustment of the reserved steel bars of the rail top air duct and the mounting holes. The slewing assembly, the X-direction moving assembly, the Y-direction moving assembly, the lifting assembly, the lifting platform and the traveling mechanism are respectively connected to the control assembly separately.
2. The construction equipment for rail top air duct according to claim 1, characterized in that: The support base is provided with a plurality of first vertical beams, which are hollow. The support frame is provided with second vertical beams, which are inserted into the hollow parts of the first vertical beams, and the lifting assembly is provided between the second vertical beams and the first vertical beams.
3. The construction equipment for rail top air duct according to claim 1, characterized in that: The control component is remotely connected to the remote controller.
4. The construction equipment for rail top air duct according to claim 1, characterized in that: The bottom of the support base is connected to the X-direction moving assembly, the X-direction moving assembly includes an X-direction support beam, the X-direction support beam is arranged along the width direction of the support base, an X-direction linear drive member is connected between the X-direction support beam and the bottom of the support base, and the X-direction linear drive member is connected to the control assembly; The X-axis support beam is arranged beyond the bottom of the support base, and a limiting groove is arranged on the surface of the X-axis support beam to limit the movement of the bottom of the support base.
5. The construction equipment for rail top air duct according to claim 4, characterized in that: The Y-axis moving component includes a Y-axis support beam, which is fixed to the top of the lifting platform. The Y-axis support beam supports the bottom plate, and the bottom plate supports the X-axis support beam. A Y-axis linear drive component is arranged between the Y-axis support beam and the bottom plate, and the Y-axis linear drive component is connected to the control component.
6. The construction equipment for rail top air duct according to claim 1, characterized in that: The lifting platform includes an upper platform and a lower platform, a scissor-type lifting member is arranged between the upper platform and the lower platform, the scissor-type lifting member is connected to the control component, the upper platform supports the Y-direction moving component, and the lower platform is connected to the traveling mechanism.
7. The construction equipment for rail top air duct according to claim 6, characterized in that: A plurality of telescopic legs are arranged at the lower platform, the telescopic legs are arranged through the lower platform, the telescopic ends of the telescopic legs are connected to the pads, the pads can contact the ground, and the telescopic legs are connected to the control components.
8. The construction equipment for rail top air duct according to claim 1, characterized in that: An oblique telescopic member is provided between the frame and the traveling mechanism. The two oblique telescopic members are arranged obliquely to adjust the inclination of the lifting platform relative to the traveling mechanism. The oblique telescopic member is connected to the control component.
9. A hydraulic control system for construction equipment for rail top air duct according to any one of claims 1 to 8, characterized in that: The utility model comprises an oil tank, which supplies oil to the hydraulic parts of the traveling mechanism, and also supplies oil to the rotating assembly, the X-axis moving assembly, the Y-axis moving assembly and the lifting assembly respectively.
10. A construction method for construction equipment of rail top air duct, characterized in that: A construction device for a rail top air duct according to any one of claims 1 to 8, comprising the following contents: The lifting platform is lowered to the lowest position, and the rail top air duct is hoisted to the support frame for support; The control component drives the support frame to rise to a first height through the lifting component, and then drives the support frame to adjust the position of the rail top air duct through the X-axis moving component and the Y-axis moving component, so that the reserved steel bars of the rail top air duct are aligned with the installation holes; The control component mobilizes the support frame to rise to the second height through the lifting component, so that the reserved steel bars of the track air duct are inserted into the installation holes, and the staff locks them to achieve the installation of the track top air duct.
Citation Information
Patent Citations
Multipurpose tunnel operating vehicle
CN102410030A
Rail top air duct movable formwork trolley synchronously constructed with shield and using method thereof
CN116624180A
Fabricated rail top air duct intelligent splicing device and using method thereof
CN118998436A
Subway station rail top air duct mounting device
CN221299224U
Method for adjusting variable section of adjustable lining trolley
WO2021196704A1