Downward horizontal non-explosion mining system and mining method for 7-shaped shield support
By using a 7-type cover bracket under the horizontal non-explosive mining system in non-coal mines and using a chisel to perform mechanized mining, the problems of high safety risks, frequent process conversions and low production efficiency in the existing technology are solved, and efficient and safe mining is achieved.
Patent Information
- Application Number
- CN202411747729.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-02
- Publication Date
- 2025-03-04
- Estimated Expiration
- 2044-12-02
AI Technical Summary
The existing non-coal mining methods have problems such as high safety risks, frequent process conversions, low production efficiency and low mechanization.
The 7-type cover bracket is used to carry out horizontal non-explosive mining system. By designing external channels, internal channels, transit channels and connection channels, mechanized mining is carried out using a chisel to replace the traditional blasting mining method.
It has improved the safety guarantee level of the mining system, reduced blasting costs and labor costs, simplified the mining process, improved the mechanization level and mine-falling efficiency, achieved continuous operations, improved the production efficiency of ore blocks and lowered the cost of tonnes of ore.
Smart Images

Figure CN119554026A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of ore body mining, and relates to an ore body mining system and a mining method, in particular to a 7-type shield support downward horizontal non-explosive mining system and a mining method. Background Art
[0002] The vast majority of domestic metal and non-metal broken thin ore body mines are mined using methods such as ore retention and wall cutting and filling. The recovery methods adopted are all traditional blasting and ore-dropping technologies, which have great support difficulties and low filling efficiency. In addition, the technology also has problems such as high safety risks, low ore-dropping efficiency, inability to operate continuously, high blasting costs, high depletion loss rates, and inability to achieve mechanization and intelligent requirements. Under the influence of these problems, it has caused many points and wide areas, human sea tactics, low production efficiency of individual ore blocks, high ton of ore costs, and a sharp increase in safety risks, which restrict the sustainable development of mining enterprises. Difficulties and bottlenecks.
[0003] In order to reduce the occurrence of roof falls and slab collapse, the main type of accidents in the safety management of non-coal mines, and at the same time improve the operating efficiency indicators of mining enterprises, it is necessary to provide a mining system and method using special protective supports to solve the problems of high safety risks, frequent process changes, low production efficiency, and low degree of mechanization in the mining process.
[0004] By using a chisel and a "7" type shield support, we jointly designed and invented a downward horizontal non-explosive mining method using a "7" type shield support, which can effectively solve problems such as high safety risks, frequent process changes, low production efficiency, and low degree of mechanization. Summary of the invention
[0005] The purpose of the present invention is to provide a method for horizontal non-explosive mining with a 7-type shield support, so as to solve the technical problems existing in the prior art of non-coal mines in the production process, such as high safety risks, frequent process conversion, low degree of mechanization and low production efficiency.
[0006] To achieve the above purpose, the specific technical solutions of the present invention are as follows:
[0007] A 7-type shield support downward horizontal non-explosive mining system, which includes an outer vein channel, an inner vein channel, a vein-penetrating tunnel and a communication channel, wherein the inner vein channel is distributed in the ore vein and is used for support, support installation, mining and ventilation;
[0008] The extra-vein passage is distributed in the middle of the long-wall ore body outside the ore vein and runs through each section of the long-wall ore body. It is used for equipment entry and exit, parking, personnel entry and exit of the mining area, material transportation and ventilation.
[0009] The communication channels are arranged at intervals in the height direction of the longwall ore body, and the two ends are connected to the inner-vein mining area and the outer-vein channel respectively;
[0010] The vein-penetrating tunnels are respectively arranged at the upper end and the lower end outside the ore vein, located between the outer-vein channel and the inner-vein channel, and connecting the outer-vein channel and the inner-vein channel.
[0011] The outer vein channel includes an outer vein transport lane, an ore chute and an inclined ramp distributed along the length direction of the longwall ore body. The outer vein transport lane is horizontally arranged and includes an upper middle section outer vein transport lane and a lower middle section outer vein transport lane. The upper middle section outer vein transport lane and the lower middle section outer vein transport lane are respectively connected to the inner vein channel of the longwall ore body through the through-vein lane;
[0012] The ore chute passes through each segment of the longwall ore body and forms an obtuse angle with the horizontal plane. Each segment of the ore chute is connected to the ramp respectively.
[0013] The ramp passes through each section of the longwall ore body, and the upper and lower ends of the ramp are respectively connected to the vein tunnel.
[0014] The intra-vein channel includes an upper-middle section along-vein laneway and an upper-vein laneway. The upper-middle section along-vein laneway is horizontally arranged and extends along the strike direction of the longwall ore body, and is connected to the extra-vein channel through a through-vein laneway.
[0015] The vein-going uphill includes the east side vein-going uphill and the west side vein-going uphill which are respectively arranged at both ends of the ore body along the dip direction of the longwall ore body. The vein-going uphill is arranged along the dip extension direction of the longwall ore body, passing through the upper and lower ends of the longwall ore body, and the upper ends are respectively connected with the upper and middle sections of the vein-going tunnels.
[0016] The vein-penetrating tunnel comprises an upper middle section vein-penetrating tunnel located at the upper end outside the ore vein and a lower middle section vein-penetrating tunnel located at the lower end outside the ore vein.
[0017] The communication passage includes a mine communication passage and a chute communication passage. The number of the mine communication passages and the chute communication passages are respectively multiple and evenly distributed along the height direction of the longwall ore body. The two ends of the mine communication passage are respectively connected to the mine and the ramp of the longwall ore body, and the two ends of the chute communication passage are respectively connected to the ramp and the ore chute.
[0018] A mining method of a 7-type shield support downward horizontal non-explosive mining system, comprising the following steps:
[0019] S1, install brackets in the upper middle section of the lane along the vein, and the brackets are arranged in series from the east side along the vein uphill to the west side along the vein uphill through the support beams;
[0020] S2, after installation and layout, start from the middle position along the vein to both ends, use the chisel to perform backward downhill drilling, and mine at an angle of 15° to both sides. After mining to a vertical height drop of 1m, drill horizontally backward for 1m. During this period, the scraper follows to carry out slag in and out, transfer ore to the ramp, and then transfer it to the ore chute through the ore chute connecting road, unload it into the ore chute, until the end of the drilling is only about 4m of the machine body length left, turn the chisel in the mining field connecting road, and drill the remaining 4m at the end. The chiseled part of the ore is unloaded along the vein at both ends of the longwall ore body. During the downward drilling, the support is adjusted and lowered simultaneously;
[0021] S3, when both ends of the longwall ore body are mined and lowered by 1m, step S2 is filled again from the bottom of the 15° slope along the vein, and step S2 is repeated twice on the basis of step S2, and finally the horizontal shield support is lowered by 3m, and the middle part of the support forms a 15° arch;
[0022] S4, transport ore from the upper middle section along the vein roadway to lay waste rock with a height of about 1m on the upper support. After 2-3 times of laying, stop, and form a 2-3m waste rock cover cushion above the support to reduce the impact of rock collapse on the support during subsequent mining, and complete the mining preparation;
[0023] S5, excavate new stope connection road and chute connection road from the ramp. The new stope connection road is parallel to the upper and middle sections of the vein tunnel, and the height difference between adjacent stope connection roads is 4m. The new chute connection road is parallel to the upper and middle sections of the vein tunnel, and the height difference between adjacent chute connection roads is 8m. After the stope connection road exposes the vein of the longwall ore body, the chisel drills the ore body in the 15° arch area backward and downward until the 15° arch area becomes horizontal. During this period, the method of drilling, mining and adjusting the frame is still adopted;
[0024] S6, after the mining of the arched area is completed, the entire horizontal rock is drilled down by 1m along the vein. After descending 1m, the ramp and the mining area connecting road are newly excavated, and the drilling, mining and frame adjustment are continued downward according to steps S2, S3, S5 and S6. After the 3m cycle is completed, step S6 is repeated from the new mining area connecting road of the next section, and the cycle is repeated until the first layer of the vein is reached.
[0025] In the steps S5 and S6, after the connecting road is newly excavated and before continuing to be put into production, the previous connecting road needs to be blocked with a blocking wall to prevent the upper waste rock from being unloaded from there and to increase the stress points of the support at that location.
[0026] Every time a longwall ore body is mined downwards by 8m, it is necessary to penetrate the ore chute to the next layer point by digging a chute connecting road in the ramp.
[0027] All mining and cutting works before the stope is ready for formal mining are carried out by blasting, and steps S1 to S6 along the vein are mined by chiseling machines without blasting;
[0028] The vein-going uphill is arranged in the middle position of the end of the upper middle section of the vein-crossing tunnel. Ventilators are arranged in the east vein-going uphill and the west vein-going uphill, and the ventilation mode in the mining field can be flexibly changed according to the mining direction of the chiseling machine.
[0029] In the steps S5 and S6, the stope connecting roads can be constructed in advance, and each time the connecting roads are arranged, they need to be staggered with the previous two connecting roads and not on the same vertical plane.
[0030] The beneficial effects of the present invention are as follows: the present invention provides a 7-type shield support downward horizontal non-explosive mining system and mining method, and by designing an outer vein channel, an inner vein channel, a through-vein tunnel and a connecting channel, provides a safe mining space for mechanized mining using a chisel, thereby improving the safety level of the mining system. At the same time, by providing a mining method, making full use of the flexibility of the special support and the characteristics of the scraper, mechanical mining is used to replace explosive mining, which greatly reduces the blasting cost and labor cost. At the same time, it also reduces the difficulty of support and the risk factor in the mining process, simplifies the mining process, improves the mechanization level of the mining process and the ore-dropping efficiency, and can achieve continuous operation, thereby effectively improving the production efficiency of the ore block and reducing the ton ore cost. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] Figure 1 It is a schematic diagram of the main structure of the system of the present invention;
[0032] Figure 2 for Figure 1 Schematic diagram of the structure in the middle AA direction;
[0033] Figure 3 for Figure 2 Partial front view at B in the middle;
[0034] Figure 4 for Figure 1 Top view at center C;
[0035] Figure 5 This is a schematic diagram of the main structure of the "7" type shielding support used in the present invention;
[0036] Figure 6 for Figure 5 Bottom view of .
[0037] Explanation of markings in the figure: 1. Upper middle section along the vein tunnel, 2. Upper middle section through the vein tunnel, 3. Upper middle section outside the vein transport tunnel, 4. Lower middle section through the vein tunnel, 5. Lower middle section outside the vein transport tunnel, 6. Ramp, 7. Ore chute, 8. Mining connecting road, 9. Go up the mountain along the vein on the east side, 10. Go up the mountain along the vein on the west side, 11. "7" type protective support, 12. Waste rock protective cushion layer, 13. Mining preparation stage, 14. Normal mining stage, 15. Collapse area, 16. Ore chute connecting road. DETAILED DESCRIPTION
[0038] In order to better understand the purpose, structure and function of the present invention, the present invention is further described in detail below in conjunction with the accompanying drawings.
[0039] like Figures 1 to 4 As shown, a type 7 shield support downward horizontal non-explosive mining system, the system of this embodiment is used in a longwall ore body, which specifically includes an outer vein channel, an inner vein channel, a through-vein tunnel and a connecting channel. The inner vein channel is distributed in the ore vein and is used for support, support installation, mining and ventilation; the outer vein channel is distributed in the middle of the longwall ore body outside the ore vein, and runs through each section of the longwall ore body, and is used for equipment entry and exit, parking, personnel entry and exit of the mining area safe passage, material transportation and ventilation; the connecting channel is arranged at intervals in the height direction of the longwall ore body, and the two ends are respectively connected to the mining area inside the vein and the outer vein channel; the through-vein tunnel is respectively arranged at the upper end and the lower end outside the ore vein, located between the outer vein channel and the inner vein channel, and connects the outer vein channel and the inner vein channel.
[0040] Specifically, Figure 1 , Figure 2 As shown, the extra-vein channel includes an extra-vein transport lane, an ore chute 7 and a ramp 6 distributed along the length direction of the longwall ore body. The extra-vein transport lane is horizontally arranged and includes an upper middle section extra-vein transport lane 3 and a lower middle section extra-vein transport lane 5. The upper middle section extra-vein transport lane 3 and the lower middle section extra-vein transport lane 5 are respectively connected with the intra-vein channel of the longwall ore body through the through-vein lane; the ore chute 7 runs through each section of the longwall ore body and forms an obtuse angle with the horizontal plane. Each section of the ore chute 7 is respectively connected with the ramp 6, and the mined ore is transported to the chute through the ramp 6; the ramp 6 runs through each section of the longwall ore body, and the upper and lower ends of the ramp 6 are respectively connected with the through-vein lane.
[0041] The intra-vein channel includes an upper-middle section vein tunnel 1 and a vein uphill. The upper-middle section vein tunnel 1 is horizontally arranged and extends along the strike direction of the longwall ore body, and is connected with the outer-vein channel through a through-vein tunnel; the vein uphill includes an east-side vein uphill 9 and a west-side vein uphill 10 respectively arranged at both ends of the ore body along the dip direction of the longwall ore body. The vein uphill is arranged along the dip extension direction of the longwall ore body, passes through the upper and lower ends of the longwall ore body, and the upper ends are respectively connected with the upper-middle section vein tunnel 1.
[0042] The vein-penetrating tunnel comprises an upper middle section vein-penetrating tunnel 2 located at the upper end outside the ore vein and a lower middle section vein-penetrating tunnel 4 located at the lower end outside the ore vein.
[0043] The communication passage includes a mine communication passage 8 and a chute communication passage 16. The mine communication passage 8 and the chute communication passage 16 are respectively multiple in number and evenly distributed along the height direction of the longwall ore body. The two ends of the mine communication passage 8 are respectively connected to the mine and the ramp 6 of the longwall ore body, and the two ends of the chute communication passage 16 are respectively connected to the ramp 6 and the ore chute 7.
[0044] A mining method of a 7-type shield support downward horizontal non-explosive mining system, comprising the following steps:
[0045] S1, mining preparation stage 13, the installation support is arranged in the upper middle section of the vein tunnel 1, and the support is arranged in series from the east side of the vein uphill 9 to the west side of the vein uphill 10 through the support beam. It should be noted that the support used in this embodiment is a special support for metal and non-metal broken thin ore body mines - "7" type shielding support 11, and its specific structure is as follows Figure 5 As shown;
[0046] S2, after the installation and layout is completed, the chisel is used to perform backward downhill drilling from the middle position along the vein to both ends, and mining is carried out on both sides at an angle of 15°. This mining method can ensure that the slope connecting roads can be arranged at intervals, so as to provide space for the scraper to move and discharge slag. When the mining reaches a vertical height of 1m, the horizontal backward drilling is performed for 1m. During this period, the scraper follows to carry out slag in and out operations, transport ore to the ramp 6, and then transport it to the ore chute 7 through the ore chute connecting road 16, and unload it into the ore chute 7. When the drilling reaches the end, only about 4m of the machine body length is left. The chisel is turned around in the mining field connecting road 8, and the remaining 4m of the end is drilled forward. Part of the ore that has been chiseled off is unloaded along the vein at both ends of the longwall ore body. During the downward drilling, the support is adjusted and lowered synchronously;
[0047] S3, when both ends of the longwall ore body are mined and lowered by 1m, step S2 is filled again from the bottom of the 15° slope along the vein, and step S2 is repeated twice on the basis of step S2, and finally the horizontal shield support is lowered by 3m, and the middle part of the support forms a 15° arch;
[0048] S4, transport ore from the upper middle section along the vein roadway 1 to lay waste rock with a height of about 1m on the upper support. After 2-3 times of laying, stop, and a 2-3m waste rock protection cushion layer 12 is formed above the support. In this embodiment, the waste rock is laid 3 times to form a 3m waste rock protection cushion layer 12 above the support to reduce the impact of rock collapse on the support during subsequent mining, and complete the mining preparation;
[0049] S5, normal mining stage 14: excavate new mine contact roads 8 and mine chute contact roads 16 from the ramp 6, the new mine contact roads 8 are parallel to the upper and middle section vein tunnels 2, and the height difference between adjacent mine contact roads 8 is 4m, the new mine chute contact roads 16 are parallel to the upper and middle section vein tunnels 2, and the height difference between adjacent mine chute contact roads 16 is 8m, that is, every time the longwall ore body is mined 8m downward, it is necessary to dig the mine chute contact road 16 in the ramp 6 to connect the ore chute 7 to the next layer point. It should be noted that the mine contact road 8 can be constructed in advance, and each time the mine contact road 8 and the mine chute contact road 16 are arranged, they need to be staggered with their own contact roads in the previous two times and not on the same vertical plane to ensure the stability and safety of the entire system. After the stope contact road 8 exposes the vein of the longwall ore body, the chisel drills the ore body in the 15° arch area backward and downward until the 15° arch area becomes horizontal. During this period, the drilling, ore removal and frame adjustment are still adopted;
[0050] S6, after the arch area is mined, the entire horizontal vein is drilled down by 1m, and after descending 1m, the ramp 6 and the stope connection road 8 are newly excavated, and the steps S2, S3, S5, and S6 are continued to be cyclically drilled, mined, and adjusted until the 3m cycle is completed, and then step S6 is repeated from the next segment of the new stope connection road 8, and the cycle is repeated until it reaches Figure 1 The first layer along the vein is located below the bottom of the ore body to be mined and adjacent to the bottom of the ore body to be mined.
[0051] Furthermore, in the steps S5 and S6, after the new excavation of the connecting road is completed and before continuing the production, the previous connecting road needs to be blocked with a blocking wall to prevent the upper waste rock from being unloaded from there and to increase the stress points of the support at that location.
[0052] It should be noted that the mining and cutting works before the stope mining preparation stage 13 are all carried out by blasting, and the steps S1 to S6 along the vein recovery are all carried out by non-explosive rock drilling with a chisel;
[0053] Furthermore, the vein-going uphill is arranged in the middle position of the end of the upper middle section of the vein-crossing tunnel 2, and ventilators are arranged in the east vein-going uphill 9 and the west vein-going uphill 10, so as to flexibly change the ventilation mode in the mining field according to the mining direction of the drilling machine.
[0054] It is to be understood that the present invention is described by some embodiments, and it is known to those skilled in the art that various changes or equivalent substitutions may be made to these features and embodiments without departing from the spirit and scope of the present invention. In addition, under the teachings of the present invention, these features and embodiments may be modified to adapt to specific circumstances and materials without departing from the spirit and scope of the present invention. Therefore, the present invention is not limited by the specific embodiments disclosed herein, and all embodiments falling within the scope of the claims of this application are within the scope of protection of the present invention.
Claims
1. A 7-type shield support downward horizontal non-explosive mining system, characterized in that: It includes an extra-vein channel, an intra-vein channel, a through-vein tunnel and a communication channel. The intra-vein channel is distributed in the ore vein and is used for support, bracket installation, mining and ventilation. The extra-vein passage is distributed in the middle of the long-wall ore body outside the ore vein and runs through each section of the long-wall ore body. It is used for equipment entry and exit, parking, personnel entry and exit of the mining area, material transportation and ventilation. The communication channels are arranged at intervals in the height direction of the longwall ore body, and the two ends are connected to the inner-vein mining area and the outer-vein channel respectively; The vein-penetrating tunnels are respectively arranged at the upper end and the lower end outside the ore vein, located between the outer-vein channel and the inner-vein channel, and connecting the outer-vein channel and the inner-vein channel.
2. According to claim 1, a 7-type shield support downward horizontal non-explosive mining system is characterized in that: The vein-out channel includes a vein-out transport lane, a ore chute (7) and a ramp (6) distributed along the length direction of the longwall ore body. The vein-out transport lane is horizontally arranged and includes an upper middle section vein-out transport lane (3) and a lower middle section vein-out transport lane (5). The upper middle section vein-out transport lane (3) and the lower middle section vein-out transport lane (5) are respectively connected to the vein-in channel of the longwall ore body through a through-vein lane; The ore chute (7) penetrates through each segment of the longwall ore body and forms an obtuse angle with the horizontal plane. Each segment of the ore chute (7) is connected to the ramp (6) respectively. The ramp (6) passes through each segment of the longwall ore body, and the upper and lower ends of the ramp (6) are respectively connected to the vein tunnel.
3. According to claim 1, a type 7 shield support downward horizontal non-explosive mining system is characterized by: The intra-vein channel comprises an upper middle section along-vein laneway (1) and an uphill along-vein laneway, wherein the upper middle section along-vein laneway (1) is arranged horizontally and extends along the strike direction of the longwall ore body, and is connected to the extra-vein channel through a through-vein laneway; The vein-going uphill includes an east vein-going uphill (9) and a west vein-going uphill (10) respectively arranged at both ends of the ore body along the inclination direction of the longwall ore body. The vein-going uphill is arranged along the inclination extension direction of the longwall ore body and passes through the upper end and the lower end of the longwall ore body, and the upper end is respectively connected to the upper middle section vein-going tunnel (1).
4. According to claim 1, a 7-type shield support downward horizontal non-explosive mining system is characterized in that: The vein-penetrating tunnel comprises an upper middle section vein-penetrating tunnel (2) located at the upper end outside the ore vein and a lower middle section vein-penetrating tunnel (4) located at the lower end outside the ore vein.
5. According to claim 2, a type 7 shield support downward horizontal non-explosive mining system is characterized in that: The communication passage comprises a mine contact passage (8) and a mine chute contact passage (16). The mine contact passage (8) and the mine chute contact passage (16) are respectively multiple in number and evenly distributed along the height direction of the longwall ore body. The two ends of the mine contact passage (8) are respectively connected to the mine and the ramp (6) of the longwall ore body, and the two ends of the mine chute contact passage (16) are respectively connected to the ramp (6) and the ore chute (7).
6. A mining method for a 7-type shield support downward horizontal non-explosive mining system according to any one of claims 1 to 5, characterized in that: It includes the following steps, S1, installing brackets in the upper middle section of the vein laneway (1), the brackets are arranged in series from the east side of the vein uphill (9) to the west side of the vein uphill (10) through supporting beams; S2, after the installation and layout is completed, the chisel is used to perform backward downhill drilling from the middle position along the vein to both ends, and mining is carried out at an angle of 15° to both sides. After the vertical height is reduced by 1m, the horizontal backward drilling is performed for 1m. During this period, the scraper follows to carry out slag in and out operations, transport ore to the ramp (6), and then transport it to the ore chute (7) through the ore chute connecting road (16), and unload it into the ore chute (7). When the drilling is completed to the end, only about 4m of the machine body length is left. The chisel is turned around in the mining field connecting road (8), and the remaining 4m of the end is drilled forward. Part of the ore that has been chiseled is unloaded along the vein at both ends of the longwall ore body. During the downward drilling, the support is adjusted and lowered simultaneously; S3, when both ends of the longwall ore body are mined and lowered by 1m, step S2 is filled again from the bottom of the 15° slope along the vein, and step S2 is repeated twice on the basis of step S2, and finally the horizontal shield support is lowered by 3m, and the middle part of the support forms a 15° arch; S4, transport ore from the upper middle section along the vein tunnel (1) to lay waste rock with a height of about 1m on the upper support. After 2-3 times of laying, stop, and form a 2-3m waste rock cover cushion (12) above the support to reduce the impact of rock collapse on the support during subsequent mining, and complete the mining preparation; S5, excavating a new stope connection road (8) and a chute connection road (16) from the ramp (6), the new stope connection road (8) being parallel to the upper middle section through-vein roadway (2), the height difference between adjacent stope connection roads (8) being 4m, the new chute connection road (16) being parallel to the upper middle section through-vein roadway (2), the height difference between adjacent chute connection roads (16) being 8m, after the stope connection road (8) exposes the vein of the longwall ore body, the chisel drills the ore body in the 15° arch area backward downward until the 15° arch area becomes horizontal, during which the drilling, ore removal and frame adjustment and lowering are still adopted; S6, after the arch area is mined, the entire horizontal vein is drilled down by 1m. After descending 1m, the ramp (6) and the mining area connecting road (8) are newly excavated, and the drilling, mining and frame adjustment are continued downward according to steps S2, S3, S5 and S6. After the 3m cycle is completed, step S6 is repeated from the next segment new mining area connecting road (8), and the cycle is repeated until the first layer of the vein is reached.
7. The mining method of the 7-type shield support downward horizontal non-explosive mining system according to claim 6 is characterized in that: In the steps S5 and S6, after the connecting road is newly excavated and before continuing to be put into production, the previous connecting road needs to be blocked with a blocking wall to prevent the upper waste rock from being unloaded from there and to increase the stress points of the support at that location.
8. The mining method of the 7-type shield support downward horizontal non-explosive mining system according to claim 6 is characterized by: Every time the longwall ore body is mined downward by 8m, it is necessary to penetrate the ore chute (7) to the next layer point by digging a chute connecting road (16) in the ramp (6).
9. The mining method of the 7-type shield support downward horizontal non-explosive mining system according to claim 6 is characterized by: All mining and cutting works before the stope is ready for formal mining are carried out by blasting, and steps S1 to S6 along the vein are mined by chiseling machines without blasting; The vein-going uphill is arranged at the middle position of the end of the upper middle section vein-crossing tunnel (2), and ventilators are arranged in the east vein-going uphill (9) and the west vein-going uphill (10), so as to flexibly change the ventilation mode in the mining field according to the mining direction of the chiseling machine.
10. The mining method of the 7-type shield support downward horizontal non-explosive mining system according to claim 6 is characterized by: In the steps S5 and S6, the stope connecting roads (8) can be constructed in advance, and each time the connecting roads are arranged, they need to be staggered with the previous two connecting roads and not on the same vertical plane.
Citation Information
Patent Citations
Method for continuously propelling and cooperatively mining by fully mechanized mining to filling
CN111364994A
Thin ore body mining method based on remote intelligent heading machine
CN113803071A
Downward layered drift filling mining method for extremely-broken thick and large ore body
CN114592909A
Downward layered drift filling mining method based on large structure parameters
CN116877080A
Gangue blocking support for fully mechanized caving gob-side entry retaining
CN221879452U