Clamp device and clamping method for quick reloading of anodizing and paint spraying of aircraft panel
By designing fixtures and clamping methods for quick replacement of aircraft wall panel anodization and painting, problems such as insufficient anodization and complex painting process in traditional processes are solved, and production efficiency and product quality are improved.
Patent Information
- Application Number
- CN202411691087.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-25
- Publication Date
- 2025-03-07
AI Technical Summary
The traditional aircraft siding anodization and painting process have problems such as insufficient anodization, uneven film layer, a lot of space and time taken up during painting, complex worker operations and easy to lead to poor product quality.
A clamp device and clamping method for quick replacement of aircraft wall panel anodization and painting. Through the layout of the clamp device and the use of lower assembly holes, the switching of anodization and painting functions and multiple clamping are realized, and vertical spraying is adopted to save space and time.
This method shortens the production rhythm of wall panel parts, improves the anodized groove rate, saves the occupancy of wall panels in space and ovens, improves production efficiency and improves product quality.
Smart Images

Figure CN119571407A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of aircraft wall panel anodizing and quick painting changeover, in particular to a clamp device and a clamping method for aircraft wall panel anodizing and quick painting changeover. Background Art
[0002] Aircraft siding is a key structural component in the overall structure of the aircraft. It bears the important task of bearing flight loads and aerodynamic loads. Anodizing is usually used to enhance the corrosion resistance and paint adhesion of siding, and spray painting is used to increase oil resistance and pollution resistance on the basis of obtaining the appearance. Due to the many features of siding parts, large area and thinness, and many depressions and grooves, it is easy to have accidents such as bumps and falls during the manufacturing process.
[0003] The traditional anodizing method is to use a single bell-shaped hanger to hang on a conductive rod, and after anodizing, the parts are removed and placed flat on a bracket with a matching shape for manual spraying of paint; if multiple wall panels need to be processed at the same time, the anodizing will be insufficient and the anodized film will be uneven due to the mutual obstruction between the wall panels, which will greatly affect the corrosion resistance and paint adhesion.
[0004] In the traditional flat painting method, after one side of the wall panel is painted, it must wait for it to dry before painting the other side, which takes up the painting space and oven space, and has low turnover efficiency, which is not in line with the concept of lean production. In addition, flat spraying requires higher control of the painting environment and the workers' painting skills, because flat laying makes it easier for small particles such as dust in the painting environment to settle on the surface. Workers must carefully handle sinking and grooves to prevent overspray, which will have a certain impact on product quality control. In the process of anodizing and painting, manual handling is frequently required. If there is no protection, parts will fall, resulting in damage to the size of the parts or scrapping, and there will be a risk of worker injury. Summary of the invention
[0005] In order to solve the above-mentioned technical problems existing in the prior art, the present invention provides a fixture device and a clamping method for rapid switching between anodizing and painting of aircraft wall panels. By increasing or decreasing the layout of the fixture device and using the lower-level assembly holes (surfaces) that do not require anodizing and painting, the anodizing function and the painting function can be switched conveniently and mutually auxiliary, multiple clamping can be achieved, the production cycle of wall panel parts can be shortened, the anodizing loading rate can be improved, the space and oven occupancy of the wall panels can be saved through vertical spraying, and the production efficiency can be effectively improved.
[0006] The present invention provides the following technical solution: a fixture device for rapid replacement of anodizing and painting of aircraft wall panels, comprising: A wall panel anodizing frame assembly, the wall panel anodizing frame assembly comprises an anodizing frame, an upper movable crossbeam and a lower movable crossbeam are arranged on the anodizing frame, a movable support seat is arranged on the lower movable crossbeam, a first cushion block is arranged on one side of the upper end of the movable support seat, a fixed clamping plate is arranged in the middle of the upper movable crossbeam, an external cathode plate is arranged between the upper movable crossbeam and the lower movable crossbeam, the external cathode plate is connected and fixed to the upper movable crossbeam and the lower movable crossbeam through an external insulated wire, and a hook is also arranged on the anodizing frame; A wall panel spray painting support frame, the wall panel spray painting support frame comprises a spray painting frame and a positioning support rod, the spray painting frame and the positioning support rod are fixedly connected by positioning bolts, a second connecting hole is opened on the wall panel spray painting support frame, and a wall panel fixing assembly is arranged on the positioning support rod; The turnover vehicle is provided with a trailer frame, a handrail is provided on one side of the trailer frame, and universal wheels are provided at the four corners below the trailer frame.
[0007] Preferably, the lower movable crossbeam and the anodized frame are fixedly connected by a first bolt, the upper movable crossbeam and the anodized frame are fixedly connected by a third bolt, the first pad and the movable support seat are fixedly connected by a second bolt, the upper movable crossbeam and the fixed clamping plate are fixedly connected by a fourth bolt, and connecting rods are fixed on both sides of the upper end of the anodized frame, and both ends of the connecting rods are provided with a first connecting pin and a first nut.
[0008] Preferably, the wall panel fixing assembly includes a positioning sleeve and a second cushion block, a rubber gasket is arranged on the inner side of the positioning sleeve, a positioning pin is arranged inside the positioning sleeve, a gasket is arranged on the outer side of the second cushion block, and a handle is installed on the outer end of the gasket.
[0009] Preferably, all structures on the wall panel painting support frame except the wall panel fixing components are coated with rubber.
[0010] A clamping method for rapid replacement of anodizing and painting of aircraft wall panels comprises the following steps: Step 1: According to the size of the wall plate, adjust the position of the lower movable beam and the upper movable beam in the anodizing frame and fix the lower movable beam with the first bolts on both sides to ensure that the distance between the lower movable beam and the upper movable beam is slightly greater than the height of the wall plate. At the same time, fix the external cathode plate and install the wire; Step 2: After fixing the movable support seat to the lower movable crossbeam with the second bolt, place the lower edge of the wall panel on the first pad of the movable support seat, ensure that the center of gravity of the wall panel is on the central vertical line of the two first pads, adjust the position of the upper movable crossbeam and fix it with the third bolts on both sides, so that the fixed clamping plate is pressed against the upper edge of the wall panel; Step 3: Install the wall panel on the opposite side in the same way.
[0011] Preferably, it also includes: Step 4: Use the hook on the top of the anodizing frame to vertically lift the entire siding anodizing frame assembly from the top opening of the siding spray painting support frame. When the first connection hole on the top of the anodizing frame and the second connection hole on the top of the siding spray painting support frame coincide with each other, use the first connection pin and the first nut to connect and fix them. According to the horizontal position of the lower assembly hole of the siding, adjust the position of the positioning support rod on the spray painting frame and fix it to the spray painting frame with the positioning bolts. Step 5: According to the vertical position of the lower assembly hole of the wall panel, use the positioning pin to install the washer and the second pad on the positioning support rod, so that the second pad can slightly fit the lower assembly hole, and then use the handle to pass through the washer and the positioning sleeve and tighten it to ensure that the second pad and the positioning sleeve tightly clamp the wall panel; Step 6: Use the same method to secure the siding on the opposite side to the spray-painted frame.
[0012] Preferably, the method further includes step seven: placing the siding anodizing frame assembly and siding painting support frame fixed together together with the siding into an anodizing tank through the hooks on the top of the anodizing frame for anodizing treatment; after the anodizing treatment is completed, transferring the siding anodizing frame assembly and siding painting support frame together with the siding to a turnover vehicle through the hooks, and when the second connecting hole at the bottom of the siding painting support frame coincides with the third connecting hole on the trailer frame, the second connecting pin and the second nut are used to fix the two together.
[0013] Preferably, the method further includes step eight: reconfirming the degree of clamping of the wall panel by the wall panel spray paint support frame, and re-fixing it if necessary; then unlocking the third bolts on both sides and lifting the upper movable beam to separate the fixed clamping plate from the upper edge of the wall panel.
[0014] Preferably, it also includes step nine: after unlocking the first bolts on both sides, move the lower movable cross beam downward so that the first pad is completely separated from the lower edge of the wall panel, and then unlock the second bolt on the movable support seat and push the movable support seat to the left and right sides respectively to ensure that the distance between the two movable support seats is greater than the length of the wall panel; after releasing the first connecting pin and the first nut connecting the wall panel anodizing frame assembly and the top of the wall panel painting support frame, lift the wall panel anodizing frame assembly vertically from the top of the wall panel painting support frame by hook until it is completely removed.
[0015] Preferably, the method further includes step ten: transferring the wall panel spray painting support frame with the wall panels mounted on the turnover vehicle into a spray painting workshop, and after spray painting, transferring the frame into an oven to dry the paint layer.
[0016] Compared with the prior art, the present invention provides a fixture device and a clamping method for rapid replacement of anodizing and painting of aircraft wall panels, which has the following beneficial effects: The fixture device and clamping method for rapid switching between anodizing and painting of aircraft wall panels realizes convenient and mutually auxiliary switching of anodizing and painting functions by increasing or decreasing the layout of the fixture device and making use of lower-level assembly holes (surfaces) that do not require anodizing and painting. The multi-block clamping method shortens the production cycle of wall panel parts and improves the anodizing loading rate. The vertical spraying method also saves the space and oven occupancy of the wall panels, effectively improving production efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a schematic diagram of the overall structure of the present invention; Figure 2 This is a schematic diagram of the anodized frame structure of the wallboard of the present invention; Figure 3 This is a schematic diagram of the structure of the wall panel spray painting support frame of the present invention; Figure 4 This is a schematic diagram of the structure of the turnover vehicle of the present invention; Figure 5 For the present invention Figure 3 Schematic diagram of the wall panel fixing component structure.
[0018] In the figure: 1, wall panel anodizing frame assembly; 11, anodizing frame; 12, lower movable crossbeam; 13, first bolt; 14, movable support seat; 15, first cushion block; 16, second bolt; 17, fixed card plate; 18, third bolt; 19, upper movable crossbeam; 20, fourth bolt; 21, external cathode plate; 22, wire; 23, hook; 24, first connecting pin; 25, first nut; 26, first connecting hole; 27 , connecting rod; 4, wall panel painting support frame; 40, painting frame; 41, positioning support rod; 42, positioning sleeve; 43, second cushion block; 44, handle; 45, gasket; 46, second connecting hole; 47, second connecting pin; 48, second nut; 49, positioning pin; 5, wall panel fixing assembly; 50, washer; 51, positioning bolt; 6, turnover vehicle; 61, trailer frame; 62, universal wheel; 63, third connecting hole; 64, handrail. DETAILED DESCRIPTION
[0019] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0020] like Figure 1-2As shown, a fixture device for rapid replacement of anodizing and painting of aircraft wall panels includes a wall panel anodizing frame assembly 1, which is connected to a wall panel painting support frame 4 through a first connecting pin 24, a first nut 25, a first connecting hole 26, and a second connecting hole 46; the wall panel painting support frame 4 is connected to a turnover vehicle 6 through a second connecting hole 46, a second connecting pin 47, a second nut 48, and a third connecting hole 63; The anodized frame 11, the lower movable crossbeam 12, the movable support seat 14, and the upper movable crossbeam 19 are welded with titanium alloy square tubes with a specification of 20*20mm, the first cushion block 15 and the fixed card plate 17 are made of cast aluminum or titanium alloy, the external cathode plate 21 is made of 304 stainless steel plate or lead plate, the wire 22 is made of copper wire and is coated with rubber to ensure external insulation, and the hook 23, the first bolt 13, the second bolt 16, the third bolt 18, the fourth bolt 20, the first connecting pin 24, and the first nut 25 are made of titanium alloy; like Figure 3 As shown, the spray painting frame 40 and the positioning support rod 41 are welded with a titanium alloy square tube of specification 25*25mm or a Q235 stainless steel square tube, the positioning sleeve 42 and the second cushion block 43 are made of nylon, the handle 44, the gasket 45, and the positioning pin 49 are made of 7000 series aluminum alloy, the washer 50 is made of rubber, and the second connecting pin 47 and the second nut 48 are made of titanium alloy. The integral wall panel spray painting support frame 4 is coated with rubber except for the positioning sleeve 42, the second cushion block 43, the handle 44, the gasket 45, and the positioning pin 49; like Figure 4 As shown, the trailer frame 61 and the handrail 64 are welded with Q235 stainless steel pipes and are both spray-painted for protection.
[0021] like Figure 1 and Figure 2 As shown, the positions of the lower movable cross beam 12 and the upper movable cross beam 19 in the wall panel anodizing frame assembly 1 are adjusted, wherein the lower movable cross beam 12 is kept at a distance from the bottom of the wall panel anodizing frame assembly 1 and is fixed with the first bolts 13 on both sides, and the distance between the lower movable cross beam 12 and the upper movable cross beam 19 is slightly greater than the height of the wall panel. At the same time, the external cathode plate 21 is fixed and the wire 22 is installed; After fixing the movable support seat 14 to the lower movable crossbeam 12 with the second bolt 16, place the lower edge of the wall panel on the first pad 15 of the movable support seat 14, ensure that the center of gravity of the wall panel is on the central vertical line of the two first pads 15, adjust the position of the upper movable crossbeam 19 and fix it with the third bolts 18 on both sides, so that the fixed clamping plate 17 is pressed against the upper edge of the wall panel; Install the other siding on the opposite side in the same way; The entire wall panel anodizing frame assembly 1 is hoisted by the hook 23 at the top of the anodizing frame 11, and is vertically hoisted into the top opening of the wall panel spray painting support frame 4, and the first connecting hole 26 and the second connecting hole 46 at the top of the anodizing frame 11 and the wall panel spray painting support frame 4 are overlapped, and then the first connecting pin 24 and the first nut 25 are used to connect and fix; According to the horizontal position of the lower assembly hole of the wall panel, adjust the position of the positioning support rod 41 in the painting frame 40 and fix it to the painting frame 40 with the positioning bolt 51; According to the vertical position of the lower assembly hole surface of the wall panel, such as Figure 5 As shown, the washer 50 and the second cushion block 43 are installed on the positioning support rod 41 using the positioning pin 49, so that the second cushion block 43 can slightly fit the lower assembly hole surface, and then the handle 44 is used to pass through the gasket 45 and the positioning sleeve 42 and tighten them to ensure that the second cushion block 43 and the positioning sleeve 42 are tightly clamped on the wall panel; Fix the other wall panel on the opposite side to the painting frame 40 in the same way; The entire wall panel anodizing frame assembly 1 and the wall panel spray painting support frame 4 that have been fixed together are transferred through the hook 23 on the top of the anodizing frame 11, and are placed together with the wall panel into the anodizing tank for anodizing treatment; After the anodizing treatment is completed, the wall panel anodizing frame assembly 1 and the wall panel spray painting support frame 4 are transferred to the turnover vehicle 6 together with the wall panel through the hook 23 on the top of the anodizing frame 11, and after the second connecting hole 46 and the third connecting hole 63 at the bottom of the wall panel spray painting support frame 4 and the trailer frame 61 are overlapped, the second connecting pin 47 and the second nut 48 are used to fix the two together; Confirm the clamping firmness of the wall panel spray paint support frame 4 on the wall panel again, and re-fix it if necessary; then unlock the third bolts 18 on both sides of the upper movable crossbeam 19 and lift the upper movable crossbeam 19 to separate the fixed clamping plate 17 from the upper edge of the wall panel; After unlocking the first bolts 13 on both sides of the lower movable crossbeam 12, move the lower movable crossbeam 12 downward to completely separate the first cushion block 15 from the lower edge of the wall panel. Then, after unlocking the second bolts 16 on the movable support seat 14, push the movable support seat 14 to the left and right sides to ensure that the distance between the two movable support seats 14 is greater than the length of the wall panel. After removing the first connecting pin 24 and the first nut 25 connecting the top and bottom of the wall panel anodizing frame assembly 1 and the wall panel spray painting support frame 4, the wall panel anodizing frame assembly 1 is vertically lifted from the top of the wall panel spray painting support frame 4 through the hook 23 at the top of the anodizing frame 11 until it is completely removed. The final state is as follows: Figure 4 As shown; The wallboard spray painting support frame 4 with the wallboard mounted thereon is pushed into the spray painting workshop by the turnover vehicle 6 using the handrail 64. After the universal wheel 62 is locked, two wallboards can be sprayed vertically at the same time. The position where the wallboard anodizing frame assembly 1 is removed can be used as an aisle for spray painting operations. After the painting is completed, the wall panel painting support frame 4 equipped with the wall panel is pushed into the oven through the turnover vehicle 6 by using the handrail 64 to dry the paint layer.
[0022] like Figure 1 As shown, the quick-change fixture device designed in the present invention solves the production needs of anodizing, vertical painting and turnover at the same time, compared with the traditional process scheme, it greatly improves the production efficiency in terms of increasing the anodizing loading rate, reducing the paint spraying and drying time, etc., reduces the operation of manual handling, converts the horizontal space occupancy into the use of vertical space, and at the same time improves the appearance quality of the paint, all of which are in line with the lean production concept.
[0023] like Figure 1 As shown, the main structures of multiple quick-change fixture devices designed in the present invention can be replicated and arranged according to actual production needs. After being connected using a special device, the purpose of processing multiple wall panels at the same time can be achieved.
[0024] In summary, the fixture device and clamping method for rapid switching between anodizing and painting of aircraft wall panels realizes convenient and mutually auxiliary switching of anodizing and painting functions by increasing or decreasing the layout of the fixture device and using lower-level assembly holes (surfaces) that do not require anodizing and painting. Multiple clamps shorten the production cycle of wall panel parts and improve the anodizing loading rate. Vertical spraying saves the space and oven occupancy of the wall panels, effectively improving production efficiency.
[0025] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.
[0026] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A fixture device for rapid replacement of aircraft wall panel anodizing and painting, characterized in that: include: A wall panel anodizing frame assembly (1), the wall panel anodizing frame assembly (1) comprising an anodizing frame (11), the anodizing frame (11) being provided with an upper movable crossbeam (19) and a lower movable crossbeam (12), the lower movable crossbeam (12) being provided with a movable support seat (14), a first cushion block (15) being provided on one side of the upper end of the movable support seat (14), a fixed clamping plate (17) being provided in the middle of the upper movable crossbeam (19), an external cathode plate (21) being provided between the upper movable crossbeam (19) and the lower movable crossbeam (12), the external cathode plate (21) being connected and fixed to the upper movable crossbeam (19) and the lower movable crossbeam (12) via an external insulated wire (22), and a hook (23) being further provided on the anodizing frame (11); A wall panel spray painting support frame (4), the wall panel spray painting support frame (4) comprising a spray painting frame (40) and a positioning support rod (41), the spray painting frame (40) and the positioning support rod (41) being fixedly connected via positioning bolts (51), a second connecting hole (46) being provided on the wall panel spray painting support frame (4), and a wall panel fixing assembly (5) being provided on the positioning support rod (41); A turnover vehicle (6), wherein the turnover vehicle (6) is provided with a trailer frame (61), a handrail (64) is provided on one side of the trailer frame (61), and universal wheels (62) are provided at four corners below the trailer frame.
2. The fixture device for rapid anodizing and painting of aircraft wall panels according to claim 1 is characterized in that: The lower movable cross beam (12) and the anodizing frame (11) are fixedly connected by a first bolt (13), the upper movable cross beam (19) and the anodizing frame (11) are fixedly connected by a third bolt (18), the first cushion block (15) and the movable support seat (14) are fixedly connected by a second bolt (16), the upper movable cross beam (19) and the fixed clamping plate (17) are fixedly connected by a fourth bolt (20), and connecting rods (27) are fixed on both sides of the upper end of the anodizing frame (11), and both ends of the connecting rods (27) are provided with a first connecting pin (24) and a first nut (25).
3. The fixture device for rapid anodizing and painting of aircraft wall panels according to claim 1 is characterized in that: The wall panel fixing assembly (5) comprises a positioning sleeve (42) and a second cushion block (43); a rubber gasket (50) is arranged inside the positioning sleeve (42); a positioning pin (49) is arranged inside the positioning sleeve (42); a gasket (45) is arranged outside the second cushion block (43); and a handle (44) is installed at the outer end of the gasket (45).
4. The fixture device for rapid anodizing and painting of aircraft wall panels according to claim 3 is characterized in that: The structures on the wall panel painting support frame (4) except the wall panel fixing assembly (5) are all coated with rubber.
5. A clamping method for rapid replacement of anodizing and painting of aircraft wall panels, characterized in that: The following steps are involved: Step 1: According to the size of the wall panel, adjust the position of the lower movable beam (12) and the upper movable beam (19) in the anodizing frame (11) and fix the lower movable beam (12) with the first bolts (13) on both sides to ensure that the distance between the lower movable beam (12) and the upper movable beam (19) is slightly greater than the height of the wall panel. At the same time, fix the external cathode plate (21) and install the wire (22); Step 2: After fixing the movable support seat (14) to the lower movable crossbeam (12) with the second bolt (16), place the lower edge of the wall panel on the first pad (15) of the movable support seat (14), ensure that the center of gravity of the wall panel is on the central vertical line of the two first pads (15), adjust the position of the upper movable crossbeam (19) and fix it with the third bolts (18) on both sides, so that the fixed clamping plate (17) is pressed tightly against the upper edge of the wall panel; Step 3: Install the wall panel on the opposite side in the same way.
6. A clamping method for rapid changeover of anodizing and painting of aircraft wall panels according to claim 5, characterized in that: Also includes: Step 4: vertically hoist the wall panel anodizing frame assembly (1) from the top opening of the wall panel spray painting support frame (4) through the hook (23) on the top of the anodizing frame (11); when the first connection hole (26) on the top of the anodizing frame (11) and the second connection hole (46) on the top of the wall panel spray painting support frame (4) overlap, use the first connection pin (24) and the first nut (25) to connect and fix; according to the horizontal position of the lower assembly hole (surface) of the wall panel, adjust the position of the positioning support rod (41) on the spray painting frame (40) and fix it to the spray painting frame (40) with the positioning bolt (51); Step 5: According to the vertical position of the lower assembly hole (surface) of the wall panel, use the positioning pin (49) to install the washer (50) and the second cushion block (43) on the positioning support rod (41), so that the second cushion block (43) can slightly fit the lower assembly hole (surface), and then use the handle (44) to pass through the gasket (45) and the positioning sleeve (42) and tighten them to ensure that the second cushion block (43) and the positioning sleeve (42) are tightly clamped to the wall panel; Step 6: Use the same method to fix the wall panel on the opposite side to the spray painting frame (40).
7. A clamping method for rapid changeover of anodizing and painting of aircraft wall panels according to claim 6, characterized in that: The method also includes step seven: placing the wall panel anodizing frame assembly (1) and the wall panel spray painting support frame (4) fixed together together with the wall panel into an anodizing tank for anodizing treatment through the hook (23) on the top of the anodizing frame (11); after the anodizing treatment is completed, transferring the wall panel anodizing frame assembly (1) and the wall panel spray painting support frame (4) together with the wall panel to a turnover vehicle (6) through the hook (23); when the second connecting hole (46) at the bottom of the wall panel spray painting support frame (4) and the third connecting hole (63) on the trailer frame (61) overlap, the second connecting pin (47) and the second nut (48) are used to fix the two.
8. A clamping method for rapid changeover of anodizing and painting of aircraft wall panels according to claim 7, characterized in that: The method also includes step eight: re-confirming the degree of firmness of the wall panel spray paint support frame (4) clamping the wall panel, and re-fixing it if necessary; then unlocking the third bolts (18) on both sides and lifting the upper movable cross beam (19) to separate the fixed clamping plate (17) from the upper edge of the wall panel.
9. A clamping method for rapid changeover of anodizing and painting of aircraft wall panels according to claim 8, characterized in that: The method also includes step nine: after unlocking the first bolts (13) on both sides, the lower movable cross beam (12) is moved downward so that the first pad (15) is completely separated from the lower edge of the wall panel, and then the second bolts (16) on the movable support seat (14) are unlocked and the movable support seat (14) is pushed to the left and right sides respectively to ensure that the distance between the two movable support seats (14) is greater than the length of the wall panel; after releasing the first connecting pin (24) and the first nut (25) connecting the wall panel anodizing frame assembly (1) and the top of the wall panel spray painting support frame (4), the wall panel anodizing frame assembly (1) is vertically lifted from the top of the wall panel spray painting support frame (4) by the hook (23) until it is completely removed.
10. A clamping method for rapid changeover of anodizing and painting of aircraft wall panels according to claim 9, characterized in that: The method also includes step ten: transferring the wall panel spray paint support frame (4) with the wall panels mounted on it and fixed on the turnover vehicle (6) into a spray paint workshop, and after spray painting, transferring it into a drying oven to dry the paint layer.