Fabricated edge component and connecting method
By adopting prefabricated edge members and reserved channel grouting connection technology, the problem of low construction efficiency of cast-in-place edge members in existing building construction is solved, and a more efficient construction process and more stable structural performance is achieved.
Patent Information
- Application Number
- CN202411860150.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-17
- Publication Date
- 2025-03-14
AI Technical Summary
In existing construction, the edge components of the shear wall are cast in the form of cast-in-place, resulting in low construction efficiency, impact on project progress, and high construction cost.
Prefabricated edge members are adopted, including vertical steel bars, edge member stirrups and concrete bodies, and quick connection is achieved through reserved holes and grouting technology to reduce the complexity and working hours of on-site steel bar binding.
It improves construction efficiency, shortens construction period, enhances the stability and seismic resistance of the structure, and reduces construction costs and quality hazards.
Smart Images

Figure CN119616130A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of assembled building systems, and in particular relates to an assembled edge component and a connection method. Background Art
[0002] In the existing construction method, the edge components of the shear wall are mostly cast-in-place, and the connection details are complicated. The connection between the cast-in-place edge components and the assembled prefabricated components requires careful design and construction. Due to the high construction precision requirements, the installation accuracy of the prefabricated components and the construction quality of the cast-in-place parts directly affect the performance of the overall structure, so they need to be strictly controlled.
[0003] The edge components of cast-in-place need to be reinforced, supported and poured with concrete at the construction site, which results in a large number of workers on site. Since many types of work are involved, coordination and communication are more difficult. In addition, human resource management is difficult, construction efficiency is low, and improper allocation of materials and equipment will also increase safety risks, thus affecting project progress and increasing construction costs.
[0004] Therefore, the present application proposes an assembled edge component and a connection method to solve the above problems. Summary of the invention
[0005] The purpose of the present invention is to solve the problem that the construction efficiency of the edge components in the form of cast-in-place is low in the current construction process, which affects the progress of the project and increases the cost of construction. A brief overview of the present invention is given below to provide a basic understanding of certain aspects of the present invention. It should be understood that this overview is not an exhaustive overview of the present invention. It is not intended to identify the key or important parts of the present invention, nor is it intended to limit the scope of the present invention.
[0006] The technical solution of the present invention:
[0007] Solution 1: An assembled edge member, including an assembled edge member and beam reinforcement, the side wall of the assembled edge member is connected with the beam reinforcement, the assembled edge member includes vertical steel bars, edge member stirrups and a concrete entity, the concrete entity is provided with vertical steel bars and edge member stirrups, and the vertical steel bars are connected with the edge member stirrups.
[0008] Furthermore, a plurality of beam reinforcement holes are processed on the side wall of the concrete entity, and the beam reinforcement is connected to the concrete entity through the beam reinforcement holes. A second grouting hole and a second exhaust hole are processed on the concrete entity, and the second grouting hole and the second exhaust hole are connected to the beam reinforcement holes.
[0009] Furthermore, a plurality of ground reinforcement reserved holes are provided at the bottom of the concrete entity, and the ground reinforcement is connected to the concrete entity through the ground reinforcement reserved holes. A first grouting hole and a first exhaust hole are processed on the lower half of the concrete entity, and the first exhaust hole is arranged above the first grouting hole. The first exhaust hole and the first grouting hole are connected to the ground reinforcement reserved holes.
[0010] Furthermore, a staggered platform is arranged on the upper end surface of the concrete entity.
[0011] Furthermore, a reserved connecting bar is arranged on the concrete entity, one end of the reserved connecting bar is connected to the vertical steel bar in the concrete entity, and the other end of the reserved connecting bar passes through the concrete entity and is arranged on the outside of the concrete entity.
[0012] Solution 2: A method for connecting a prefabricated edge component, which is implemented based on the prefabricated edge component described in Solution 1, and comprises the following steps:
[0013] Step 1: Tie and connect the vertical steel bars with the edge member stirrups to form a steel skeleton of the assembled edge member, place the steel skeleton in the assembled edge member template, embed multiple sleeves or core molds in the lower half of the concrete entity to form a ground reinforcement reserved hole, connect the first grouting hole at the lower part of the sleeve or core mold, and connect the first exhaust hole at the upper part, embed the sleeve or core mold in the side wall of the assembled edge member to form a beam reinforcement reserved hole, and connect the second grouting hole and the second exhaust hole at an appropriate position, set supporting embedded parts and hoisting embedded parts, pour concrete, vibrate and maintain, and complete the processing of the assembled edge member;
[0014] Step 2: transport the assembled edge component to the construction site, adjust the position and verticality of the lower ground reinforcement, hoist the assembled edge component above the lower ground reinforcement, ensure that the ground reinforcement enters the reserved hole for the ground reinforcement, adjust the elevation and verticality of the assembled edge component, and set up support, inject grouting material through the first grouting hole, wait for the grouting material to overflow from the first exhaust hole, and complete the connection between the ground reinforcement and the concrete entity;
[0015] Step 3: Insert the beam reinforcement into the reserved hole for the beam reinforcement, inject the grouting material through the second grouting hole, and wait for the grouting material to overflow from the second exhaust hole to complete the connection between the beam reinforcement and the concrete entity.
[0016] The present invention has the following beneficial effects:
[0017] 1. The prefabricated edge component of the present invention adopts a variety of component forms. The prefabricated edge component can be made into a variety of shapes such as a straight line and an L shape to meet different architectural design requirements, provide greater design flexibility and practicality, and can meet various complex requirements; adopt factory production to reduce the time and process of on-site concrete pouring, significantly improve construction efficiency, and the top of the vertical steel bar is arranged through the concrete entity, making the connection between components simpler and faster, shortening the construction period.
[0018] 2. The assembled edge component of the present invention ensures a tight connection between components through the corresponding design of the protruding vertical steel bars on the top and the reserved holes for the ground reinforcement at the bottom, thereby enhancing the stability and seismic resistance of the overall structure. In addition, the reserved grouting holes and exhaust holes can effectively ensure the density and uniformity of the grouting in the connecting holes, thereby improving the connection strength and durability.
[0019] 3. Through the pre-embedded beam reinforcement reserved holes and grouting holes, the construction process can achieve rapid connection, reducing the complexity and working hours of on-site steel bar binding, thereby improving construction efficiency. Through grouting technology, the grouting material can fully fill the beam reinforcement reserved holes to ensure the tight connection between the beam reinforcement and the concrete entity. This grouting connection method can effectively eliminate the gaps and unevenness problems in the traditional binding method, and enhance the integrity and tensile strength of the structure. The design of the reserved holes optimizes the bonding force between the beam reinforcement and the concrete, so that the beam reinforcement can give full play to its force performance, thereby improving the stability and seismic performance of the entire structure. The pre-embedded beam reinforcement reserved holes and grouting system can reduce the risks of manual intervention and steel bar binding in on-site construction, avoid quality risks caused by improper operation of workers, and thus improve construction safety and reliability. This pre-embedded channel and grouting connection technology enables the prefabricated edge components to complete part of the steel bar connection when they are prefabricated in the factory, and only simple hoisting and grouting are required on site, which greatly shortens the construction period and improves the construction adaptability of prefabricated components. The design of beam reinforcement and beam reinforcement reserved holes can flexibly adapt to the conditions of different construction sites, especially in complex construction environments, which can effectively simplify the construction process and reduce the difficulty of on-site construction. The use of grouting to connect beam reinforcement can not only ensure the accuracy and quality of the connection, but also effectively control the rework costs caused by on-site construction errors, which helps to optimize the project budget and improve economic benefits. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is a schematic diagram of the overall structure of an assembled edge component;
[0021] Figure 2 It is a schematic diagram of an assembled edge member with reserved connecting ribs installed;
[0022] Figure 3 It is a schematic diagram of an assembled edge member with a staggered installation;
[0023] Figure 4 It is a schematic diagram of the connection relationship between vertical reinforcement, reserved connection reinforcement and edge member stirrups;
[0024] Figure 5 It is a schematic diagram of an L-shaped fabricated edge member;
[0025] Figure 6 It is a schematic diagram of an L-shaped assembled edge member with a staggered platform;
[0026] Figure 7 It is a schematic diagram of an L-shaped assembled edge member with reserved connecting ribs;
[0027] Figure 8 It is a schematic diagram of the interior of an L-shaped fabricated edge member;
[0028] Fig. 9 It is a schematic diagram of the connection relationship between beam reinforcement and the reserved holes of beam reinforcement;
[0029] Fig.10 It is a schematic diagram of the connection relationship between the ground reinforcement and the reserved holes for the ground reinforcement.
[0030] In the figure: 1-prefabricated edge member, 2-vertical reinforcement, 3-reserved connecting reinforcement, 4-edge member stirrups, 5-concrete solid, 6-reserved holes for beam reinforcement, 7-first grouting hole, 8-first exhaust hole, 9-second grouting hole, 10-second exhaust hole, 11-staggered, 12-beam reinforcement, 13-reserved holes for ground reinforcement, 14-ground reinforcement. DETAILED DESCRIPTION
[0031] In order to make the purpose, technical scheme and advantages of the present invention clearer, the present invention is described below by the specific embodiments shown in the accompanying drawings. However, it should be understood that these descriptions are only exemplary and are not intended to limit the scope of the present invention. In addition, in the following description, the description of well-known structures and technologies is omitted to avoid unnecessary confusion of the concept of the present invention.
[0032] The connection mentioned in the present invention is divided into fixed connection and detachable connection. The fixed connection (i.e., non-detachable connection) includes but is not limited to conventional fixed connection methods such as folding connection, rivet connection, bonding connection and welding connection. The detachable connection includes but is not limited to conventional detachable methods such as threaded connection, snap connection, pin connection and hinge connection. When the specific connection method is not clearly defined, it is assumed that at least one connection method can always be found in the existing connection methods to achieve the function. Those skilled in the art can choose according to their needs. For example: welding connection is selected for fixed connection, and hinge connection is selected for detachable connection.
[0033] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0034] Embodiment 1, combination Figure 1-Figure 4 , Figure 9-10 The present embodiment is described. An assembled edge member of the present embodiment comprises an assembled edge member 1, beam reinforcement 12 and ground reinforcement 14. The beam reinforcement 12 is connected to the side wall of the assembled edge member 1. The bottom of the assembled edge member 1 is connected to the ground through the ground reinforcement 14. The assembled edge member 1 comprises vertical steel bars 2, reserved connecting bars 3, edge member stirrups 4 and a concrete entity 5. The concrete entity 5 is provided with vertical steel bars 2, reserved connecting bars 3 and edge member stirrups 4. One end of the reserved connecting bar 3 passes through the concrete entity 5 and is arranged on the outside of the concrete entity 5. A plurality of vertical steel bars 2 are connected to the edge member stirrups 4.
[0035] The assembled edge member 1 of this embodiment is a straight-line assembled edge member. First, in the factory, according to the shape of the edge member, a plurality of edge member stirrups 4 are mounted on the vertical steel bars 2, and each vertical steel bar 2 is tied or welded to the edge member stirrups 4, and then, as needed, the reserved connecting bars 3 are fixed to the vertical steel bars 2 to complete the installation of the internal steel bar skeleton of the assembled edge member 1. Figure 4 As shown;
[0036] Concrete is poured on the formed internal steel bar skeleton to form a concrete entity 5, and the concrete entity 5, the vertical steel bars 2, the reserved connecting bars 3 and the edge member stirrups 4 form a straight-line assembled edge member 1, the upper end of the vertical steel bars 2 passes through the concrete entity 5 and is exposed to the outside, and one end of the reserved connecting bar 3 passes through the concrete entity 5 and is exposed to the outside, so as to facilitate connection with other assembled members;
[0037] A staggered platform 11 is provided on the upper end surface of the concrete entity 5. The function of the staggered platform 11 is to avoid the support of the formwork in the floor range and reduce the construction process;
[0038] A beam reinforcement hole 6 is reserved on the side wall of the concrete entity 5. According to the construction requirements, the beam reinforcement 12 can be selectively connected to the concrete entity 5 through the beam reinforcement hole 6. A second grouting hole 9 and a second exhaust hole 10 are processed on the upper end surface of the concrete entity 5. The second grouting hole 9 and the second exhaust hole 10 are connected to the beam reinforcement hole 6. The second grouting hole 9 is arranged at the proximal end of the beam reinforcement hole 6, and the second exhaust hole 10 is arranged at the distal end of the beam reinforcement hole 6.
[0039] A ground reinforcement reserved hole 13 is processed at the bottom of the concrete entity 5, and the ground reinforcement 14 is connected to the concrete entity 5 through the ground reinforcement reserved hole 13. A first grouting hole 7 and a first exhaust hole 8 are processed on the concrete entity 5, and the first grouting hole 7 is arranged below the first exhaust hole 8. The first grouting hole 7 and the first exhaust hole 8 are connected to the ground reinforcement reserved hole 13.
[0040] The prefabricated edge member 1 processed in the factory is transported to the construction site, the ground reinforcement 14 is inserted into the ground reinforcement reserved hole 13, and the grouting material is poured into the first grouting hole 7. When the grouting material is continuously discharged from the first exhaust hole 8, the ground reinforcement 14 is fixedly connected to the concrete entity 5. As needed, the beam reinforcement 12 is inserted into the beam reinforcement reserved hole 6, and the grouting material is poured into the second grouting hole 9 until the grouting material is continuously discharged from the second exhaust hole 10, and the connection between the beam reinforcement 12 and the concrete entity 5 is completed.
[0041] Embodiment 2, combined Figure 5-Figure 10 To illustrate this embodiment, an assembled edge member of this embodiment adopts an L-shaped assembled edge member 1. A group of vertical steel bars 2 are made in the factory and arranged at a vertical angle to another group of vertical steel bars 2. Then, each group of vertical steel bars 2 is used as a unit and a plurality of edge member stirrups 4 are respectively set and tied or welded to each vertical steel bar 2. The vertical steel bars 2 or the edge member stirrups 4 are fixed with the reserved connecting bars 3 to form a steel bar skeleton of the L-shaped assembled edge member 1. Figure 8 As shown; pouring concrete on the steel frame to form a concrete entity 5, as shown in the attached Figure 5 shown.
[0042] According to the construction requirements, a staggered platform 11 is arranged on the upper end surface of the concrete entity 5, and the staggered platform 11 eliminates the need to support the formwork in the floor range, thereby reducing the construction process;
[0043] The processing positions of the beam reinforcement reserved holes 6 and the ground reinforcement reserved holes 13 on the L-shaped assembled edge component 1 are the same as those of the I-shaped assembled edge component in Example 1, and the setting principles of the first grouting hole 7, the first exhaust hole 8, the second grouting hole 9 and the second exhaust hole 10 are the same; after processing, it is transported to the construction site for assembly.
[0044] The L-shaped assembled edge component 1 is installed in the same manner as the I-shaped assembled edge component 1 during construction. First, after the ground reinforcement 14 enters the concrete entity 5, grouting material is poured into the first grouting hole 7 until grouting material is continuously discharged from the first exhaust hole 8, thereby completing the fixed connection between the assembled edge component 1 and the ground; the beam reinforcement 12 is inserted into the beam reinforcement reserved hole 6, and grouting material is poured through the second grouting hole 9 until grouting material is continuously discharged from the second exhaust hole 10, thereby completing the connection between the beam reinforcement 12 and the concrete entity 5.
[0045] Embodiment 3, combined Figure 1-Figure 10 This embodiment describes a method for connecting an assembled edge member, which includes the following steps:
[0046] Step 1: Tie and connect the vertical steel bars 2 and the edge member stirrups 4 to form a steel skeleton of the assembled edge member 1, place the steel skeleton in the template of the assembled edge member 1, embed multiple sleeves or core molds in the lower half of the concrete entity 5 to form a ground reinforcement reserved hole 13, connect the first grouting hole 7 at the lower part of the sleeve or core mold, and connect the first exhaust hole 8 at the upper part, embed the sleeve or core mold in the side wall of the assembled edge member 1 to form a beam reinforcement reserved hole 6, and connect the second grouting hole 9 and the second exhaust hole 10 at appropriate positions, set supporting embedded parts and hoisting embedded parts, pour concrete, vibrate and maintain, and complete the processing of the assembled edge member 1;
[0047] Step 2: transport the assembled edge member 1 to the construction site, adjust the position and verticality of the lower ground reinforcement 14, hoist the assembled edge member 1 to the top of the lower ground reinforcement 14, ensure that the ground reinforcement 14 enters the ground reinforcement reserved hole 13, adjust the elevation and verticality of the assembled edge member 1, and set support, inject grouting material through the first grouting hole 7, wait for the grouting material to overflow from the first exhaust hole 8, and complete the connection between the ground reinforcement 14 and the concrete entity 5;
[0048] Step 3: Insert the beam reinforcement 12 into the beam reinforcement reserved hole 6, inject grouting material through the second grouting hole 9, and wait for the grouting material to overflow from the second exhaust hole 10 to complete the connection between the beam reinforcement 12 and the concrete entity 5.
[0049] This embodiment is only an exemplary description of the present invention and does not limit its protection scope. Those skilled in the art may also make partial changes thereto. As long as they do not exceed the spirit of the present invention, they are within the protection scope of the present invention.
Claims
1. An assembled edge member, characterized in that: The invention comprises an assembled edge member (1) and beam reinforcement (12), wherein the side wall of the assembled edge member (1) is connected to the beam reinforcement (12), and the assembled edge member (1) comprises vertical steel bars (2), edge member stirrups (4) and a concrete entity (5), wherein the vertical steel bars (2) and the edge member stirrups (4) are arranged in the concrete entity (5), and the vertical steel bars (2) are connected to the edge member stirrups (4).
2. The assembled edge member according to claim 1, characterized in that: A plurality of beam reinforcement pre-reserved holes (6) are processed on the side wall of the concrete entity (5), the beam reinforcement (12) is connected to the concrete entity (5) through the beam reinforcement pre-reserved holes (6), and a second grouting hole (9) and a second exhaust hole (10) are processed on the concrete entity (5), and the second grouting hole (9) and the second exhaust hole (10) are connected to the beam reinforcement pre-reserved holes (6).
3. The assembled edge member according to claim 2, characterized in that: The bottom of the concrete entity (5) is provided with a plurality of ground reinforcement pre-reserved holes (13), the ground reinforcement (14) is connected to the concrete entity (5) through the ground reinforcement pre-reserved holes (13), the lower half of the concrete entity (5) is processed with a first grouting hole (7) and a first exhaust hole (8), the first exhaust hole (8) is arranged above the first grouting hole (7), and the first exhaust hole (8) and the first grouting hole (7) are connected to the ground reinforcement pre-reserved holes (13).
4. The assembled edge member according to claim 3, characterized in that: A staggered platform (11) is provided on the upper end surface of the concrete entity (5).
5. The assembled edge member according to claim 4, characterized in that: The concrete entity (5) is provided with a reserved connecting bar (3), one end of which is connected to the vertical steel bar (2) in the concrete entity (5), and the other end of which passes through the concrete entity (5) and is arranged outside the concrete entity (5).
6. A method for connecting a fabricated edge component, the method being implemented based on the fabricated edge component of claim 5, characterized in that: The following steps are involved: Step 1: Bind and connect the vertical steel bars (2) and the edge member stirrups (4) to form a steel skeleton of the assembled edge member (1), place the steel skeleton in the template of the assembled edge member (1), embed a plurality of sleeves or core molds in the lower half of the concrete entity (5) to form a ground reinforcement reserved hole (13), connect the first grouting hole (7) at the lower part of the sleeve or core mold, and connect the first exhaust hole (8) at the upper part, embed a sleeve or core mold in the side wall of the assembled edge member (1) to form a beam reinforcement reserved hole (6), and connect the second grouting hole (9) and the second exhaust hole (10) at appropriate positions, set supporting embedded parts and hoisting embedded parts, pour concrete, vibrate and maintain, and complete the processing of the assembled edge member (1); Step 2: transport the assembled edge component (1) to the construction site, adjust the position and verticality of the lower ground reinforcement (14), hoist the assembled edge component (1) above the lower ground reinforcement (14), ensure that the ground reinforcement (14) enters the ground reinforcement reserved hole (13), adjust the elevation and verticality of the assembled edge component (1), and set up supports, inject grouting material through the first grouting hole (7), and wait for the grouting material to overflow from the first exhaust hole (8), thereby completing the connection between the ground reinforcement (14) and the concrete entity (5); Step 3: insert the beam reinforcement (12) into the beam reinforcement reserved hole (6), inject grouting material through the second grouting hole (9), and wait for the grouting material to overflow from the second exhaust hole (10), thereby completing the connection between the beam reinforcement (12) and the concrete entity (5).