Laminated slab hoisting structure for multi-layer frame structure and hoisting method of laminated slab hoisting structure

By setting up a cantilever section and a trolley transportation system in the multi-layer frame structure, combined with the lifting device of fixed pulleys and moving pulleys, the problems of narrow lifting space and uneven lifting points in traditional stacking plate installation are solved, and safe and stable stacking plate installation is achieved.

CN119637691APending Publication Date: 2025-03-18CHINA CONSTR EIGHT ENG DIV CORP LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411573866.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-06
Publication Date
2025-03-18

AI Technical Summary

Technical Problem

In a multi-layer frame structure, the traditional stacked plate installation method is prone to cracking due to the narrow lifting space and uneven lifting points, which makes the prefabricated bottom plate prone to cracking, making it difficult to lift.

Method used

By setting up the cantilever section of the transport track, it is allowed to lift the laminated plate outside the frame structure, and the laminated plate is transported into the frame structure by using a trolley. At the same time, a lifting device combining a fixed pulley and a moving pulley is used to ensure that each lifting point is subjected to a uniform force.

Benefits of technology

It effectively avoids the problem of narrow lifting space in the frame structure, reduces the risk of cracking of prefabricated base plates, reduces the difficulty of lifting, and ensures the stable installation of the laminated plates.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119637691A_ABST
    Figure CN119637691A_ABST
Patent Text Reader

Abstract

The invention discloses a laminated slab hoisting structure for a multi-layer frame structure and a hoisting method of the laminated slab hoisting structure, the hoisting structure comprises a transportation rail, a hoisting device and a hoisting device, the transportation rail is laid on one layer of the multi-layer frame structure, and one end of the transportation rail extends out of the multi-layer frame structure and forms a cantilever section; the trolley is used for transporting the laminated slabs, and the trolley is connected to the transportation track in a sliding mode; the pulling rope is used for pulling the trolley to move, and one end of the pulling rope is connected to the trolley; and the hoisting device is used for hoisting the laminated slabs on the trolley, the hoisting device is connected to the second layer of the multi-layer frame structure, and the construction efficiency is improved by arranging the hoisting structure.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of building construction, and in particular to a composite plate hoisting structure for a multi-layer frame structure and a hoisting method thereof. Background Art

[0002] In recent years, composite panels have been widely used in prefabricated buildings due to their high production efficiency, convenient construction, and environmental protection. Conventional prefabricated steel frame structure composite panels are installed using a forward installation construction process, which has relatively high requirements for the stacking, transportation, and installation of site components. However, for projects with tight schedules, the frame structure is often constructed first, and the space inside the frame structure is small, which is not convenient for the transportation and lifting of composite panels within the frame structure. In addition, the traditional installation method uses multiple lifting points for installation, which is prone to cracking of the prefabricated base plate due to uneven force on the lifting points, making lifting difficult. Summary of the invention

[0003] The purpose of the present invention is to overcome the defects of the prior art and provide a composite plate lifting structure and a lifting method for a multi-story frame structure. By setting a cantilever section of the transport track, it is convenient to lift the composite plates outside the frame structure and use a trolley to transport the composite plates into the frame structure, thereby avoiding the problem of narrow lifting space inside the frame structure.

[0004] To achieve the above-mentioned purpose, the technical solution adopted by the present invention is a composite plate hoisting structure for a multi-layer frame structure, comprising:

[0005] A transport track, wherein the transport track is laid on the to-be-constructed layer of the multi-layer frame structure, and one end of the transport track extends out of the multi-layer frame structure to form a cantilever section;

[0006] A trolley for transporting the laminated panels, the trolley being slidably connected to the transport track;

[0007] A traction rope for towing the trolley to move, one end of the traction rope being connected to the trolley;

[0008] A lifting device for lifting the composite plate on the trolley is connected to a layer above the layer to be constructed.

[0009] A further improvement of the composite plate lifting structure for multi-story frame structure of the present invention is that it also includes a support assembly for supporting the cantilever section, including a support column arranged at the bottom of the cantilever section, one end of the support column is supported to the ground, and the other end is detachably connected to the cantilever section.

[0010] A further improvement of the composite plate lifting structure for multi-story frame structure of the present invention is that the support assembly also includes a steel cable, the top of the cantilever section is connected to a first cable buckle for connecting the steel cable, and the top of the multi-story frame structure is connected to a second cable buckle for connecting the steel cable, and when the steel cable is connected to the first cable buckle and the second cable buckle, the steel cable is in a taut state.

[0011] A further improvement of the composite plate lifting structure for multi-story frame structure of the present invention is that the transport track includes a base plate and two baffles vertically connected to both sides of the base plate, the two baffles are connected to guide slide grooves on their relative inner sides, and both sides of the trolley are connected to sliders corresponding to the guide slide grooves.

[0012] A further improvement of the composite plate hoisting structure for a multi-layer frame structure of the present invention is that the hoisting device comprises:

[0013] A rectangular hanging frame arranged in a horizontal direction, the rectangular hanging frame comprising two main beams arranged in parallel and spaced apart from each other and a plurality of secondary beams spaced apart and connected between the two main beams;

[0014] Two lifting ring groups respectively connected to the bottom of the two main beams, each of the lifting ring groups includes a plurality of lifting rings, the plurality of lifting rings are arranged at intervals along the length direction of the main beam, and the lifting rings in the two lifting ring groups correspond to each other one by one;

[0015] Two fixed pulley blocks are respectively arranged at the bottom of the two lifting ring groups, each of the fixed pulley blocks includes a plurality of fixed pulleys, and in each lifting ring group, except for the two outermost lifting rings, the bottoms of all the remaining lifting rings are connected to the fixed pulleys;

[0016] Two movable pulley blocks are respectively arranged at the bottom of the two fixed pulley blocks, each of the movable pulley blocks includes a plurality of movable pulleys, and the movable pulleys are staggered between two adjacent fixed pulleys in each fixed pulley block, and the bottom of each movable pulley is connected to a hook;

[0017] Two lifting ropes are respectively arranged at the bottom of the two main beams, and each of the lifting ropes is sequentially wound around all the fixed pulleys and movable pulleys in the corresponding fixed pulley group and the corresponding movable pulley group. The two ends of each lifting rope are respectively connected to the two outermost lifting rings. When the composite plate is hoisted, each movable pulley can realize adaptive movement relative to the lifting rope under the action of the gravity of the composite plate.

[0018] A method for hoisting a composite plate for a multi-layer frame structure, comprising the steps of:

[0019] Step 1: Provide the above-mentioned composite plate hoisting structure for the multi-layer frame structure and install it in place;

[0020] Step 2: Move the trolley to the cantilever section and lift the composite slab onto the trolley;

[0021] Step 3: Use a traction rope to pull the trolley to the construction area of ​​the composite board;

[0022] Step 4: Use a lifting device to lift the composite plate on the trolley and install it in place.

[0023] Compared with the prior art, the advantages of the present invention are:

[0024] 1. By setting up a transport track and a cantilevered section extending out of the multi-layer frame structure, it is convenient to lift the composite board outside the multi-layer frame structure and use a trolley to transport the composite board into the multi-layer frame structure, thereby avoiding the problem of narrow lifting space in the multi-layer frame structure.

[0025] 2. The lifting device is formed by combining a fixed pulley and a movable pulley, so that each lifting point is evenly loaded, thereby avoiding damage to the composite plate during lifting and installation. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0027] Figure 1 The present invention is a schematic diagram of a transport track for a composite plate hoisting structure of a multi-story frame structure.

[0028] Figure 2 The present invention is a schematic structural diagram of the use state of the composite plate hoisting structure used in a multi-story frame structure.

[0029] Figure 3 The present invention is a schematic diagram of the structure of a trolley for hoisting a composite plate of a multi-layer frame structure.

[0030] Figure 4 It is a schematic diagram of a rectangular hanging frame structure of a composite plate hanging structure used for a multi-story frame structure of the present invention.

[0031] Figure 5 The present invention is a schematic structural diagram of a lifting device for a composite plate lifting structure of a multi-story frame structure.

[0032] In the figure: 1. transport track; 101. bottom plate; 102. baffle; 103. guide slide; 2. trolley; 3. support column; 4. first cable buckle; 5. second cable buckle; 6. steel cable; 7. multi-layer frame structure; 8. slider; 9. main beam; 10. secondary beam; 11. lifting ring; 12. fixed pulley; 13. movable pulley; 14. hook; 15. lifting rope. DETAILED DESCRIPTION

[0033] The following describes the embodiments of the present invention through specific examples, and those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification. The present invention can also be implemented or applied through other different specific embodiments, and the details in this specification can also be modified or changed in various ways based on different viewpoints and applications without departing from the spirit of the present invention.

[0034] The composite plate hoisting structure and hoisting method for a multi-story frame structure of the present invention are further described in detail below in conjunction with the accompanying drawings and specific embodiments.

[0035] See also Figure 1 to Figure 5 As shown, the composite plate hoisting structure for multi-story frame structure includes:

[0036] A transport track 1, wherein the transport track 1 is laid on the to-be-constructed layer of the multi-layer frame structure 7, and one end of the transport track 1 extends out of the multi-layer frame structure 7 to form a cantilevered section;

[0037] A trolley 2 for transporting the laminated panels, the trolley 2 being slidably connected to the transport track 1;

[0038] A traction rope for towing the trolley 2 to move, one end of the traction rope being connected to the trolley 2;

[0039] A lifting device for lifting the composite plate on the trolley 2 is connected to the upper layer of the layer to be constructed.

[0040] By setting up a transport track 1 and a cantilevered section extending out of the multi-layer frame structure 7, it is convenient to lift the composite panels outside the multi-layer frame structure 7 and use the trolley 2 to transport the composite panels into the multi-layer frame structure 7, thereby avoiding the problem of narrow lifting space inside the multi-layer frame structure 7.

[0041] Preferably, it further comprises a support assembly for supporting the cantilever section, comprising a support column 3 arranged at the bottom of the cantilever section, one end of the support column 3 is supported to the ground, and the other end is detachably connected to the cantilever section.

[0042] Specifically, the support column 3 and the cantilever section are connected by bolts.

[0043] By providing the support column 3, a supporting force is provided for the cantilever section, thereby ensuring the stability of the cantilever section.

[0044] Specifically, the support column 3 is a telescopic rod.

[0045] By providing the telescopic rod, the length of the telescopic rod can be adaptively adjusted as the height of the installation layer of the transport track 1 changes, thereby always satisfying the supporting effect and improving practicality.

[0046] Preferably, the supporting assembly also includes a steel cable 6, the top of the cantilever section is connected with a first cable buckle 4 for connecting the steel cable 6, the top of the multi-layer frame structure 7 is connected with a second cable buckle 5 for connecting the steel cable 6, and when the steel cable 6 is connected to the first cable buckle 4 and the second cable buckle 5, the steel cable 6 is in a taut state.

[0047] By setting the steel cable 6 to pull the cantilever section, when the trolley 2 is located in the cantilever section, the cantilever section tends to move downward due to gravity. The steel cable 6 provides an upward pulling force, which relieves the bearing capacity of the support column 3 and further improves the stability of the cantilever section.

[0048] Preferably, the transport track 1 includes a base plate 101 and two baffles 102 vertically connected to both sides of the base plate 101, and the two baffles 102 are connected to the inner sides of each other with guide grooves 103, and both sides of the trolley 2 are connected with sliders 8 corresponding to the guide grooves 103.

[0049] Specifically, a pulley block is connected to the bottom of the trolley 2 , and the pulley block is slidably supported on the bottom plate 101 .

[0050] By arranging the sliding block 8 to cooperate with the guiding slide groove 103 , the moving stability of the trolley 2 on the transport track 1 is ensured.

[0051] Preferably, the lifting device comprises:

[0052] A rectangular hanging frame arranged in the horizontal direction, the rectangular hanging frame comprising two main beams 9 arranged in parallel and spaced apart from each other and a plurality of secondary beams 10 spaced apart and connected between the two main beams 9;

[0053] Two lifting ring groups respectively connected to the bottom of the two main beams 9, each of the lifting ring groups includes a plurality of lifting rings 11, and the plurality of lifting rings 11 are arranged at intervals along the length direction of the main beam 9, and the lifting rings 11 in the two lifting ring groups correspond to each other one by one;

[0054] Two fixed pulley blocks are respectively arranged at the bottom of the two lifting ring groups, each of the fixed pulley blocks includes a plurality of fixed pulleys 12, and in each of the lifting ring groups, except for the two outermost lifting rings 11, the bottoms of all the remaining lifting rings 11 are connected to the fixed pulleys 12;

[0055] Two movable pulley blocks are respectively arranged at the bottom of the two fixed pulley blocks, each of the movable pulley blocks includes a plurality of movable pulleys 13, and the movable pulleys 13 are staggered between two adjacent fixed pulleys 12 in each fixed pulley block, and the bottom of each movable pulley 13 is connected to a hook 14;

[0056] Two lifting ropes 15 are respectively arranged at the bottom of the two main beams 9, and each of the lifting ropes 15 is sequentially wound around all the fixed pulleys 12 and movable pulleys 13 in the corresponding fixed pulley group and the corresponding movable pulley group. The two ends of each lifting rope 15 are respectively connected to the two outermost lifting rings 11. When the composite plate is hoisted, each movable pulley 13 can be adaptively moved relative to the lifting rope 15 under the action of the gravity of the composite plate.

[0057] Specifically, the distance between the two main beams 9 is matched with the distance between the truss bars on the composite plate, and the hooks 14 are connected to the corresponding truss bars.

[0058] By providing the movable pulley 13, the fixed pulley 12 and the lifting rope 15, when the composite plate is hoisted, the movable pulley 13 will adaptively adjust its position so that each lifting point is evenly stressed, thereby avoiding damage to the composite plate during hoisting.

[0059] A method for hoisting a composite plate for a multi-layer frame structure, comprising the steps of:

[0060] Step 1: Provide the above-mentioned composite plate hoisting structure for the multi-layer frame structure and install it in place;

[0061] Step 2: Move the trolley 2 to the cantilever section and lift the composite plate onto the trolley 2;

[0062] Step 3: Use a traction rope to pull the trolley 2 to the construction area of ​​the composite board;

[0063] Step 4: Use a lifting device to lift the composite plate on the trolley 2 and install it in place.

[0064] It should be noted that the structures, proportions, sizes, etc. illustrated in the drawings of this specification are only used to match the contents disclosed in the specification for people familiar with this technology to understand and read, and are not used to limit the limiting conditions for the implementation of the present invention, so they have no substantial technical significance. Any modification of the structure, change of the proportion relationship or adjustment of the size should still fall within the scope of the technical content disclosed by the present invention without affecting the effects and purposes that can be achieved by the present invention. At the same time, the terms such as "upper", "lower", "left", "right", "middle" and "one" quoted in this specification are only for the convenience of description, and are not used to limit the scope of the implementation of the present invention. The change or adjustment of their relative relationship should also be regarded as the scope of the implementation of the present invention without substantially changing the technical content.

[0065] The above is only a preferred embodiment of the present invention, and does not limit the present invention in any form. Although the present invention has been disclosed as a preferred embodiment as above, it is not used to limit the present invention. Any technician familiar with this profession can make some changes or modifications to equivalent embodiments of equivalent changes using the technical contents disclosed above without departing from the scope of the technical solution of the present invention. However, any simple modification, equivalent change and modification made to the above embodiments based on the technical essence of the present invention without departing from the content of the technical solution of the present invention still fall within the scope of the technical solution of the present invention.

Claims

1. A composite plate hoisting structure for a multi-layer frame structure, characterized in that: include: A transport track, wherein the transport track is laid on the to-be-constructed layer of the multi-layer frame structure, and one end of the transport track extends out of the multi-layer frame structure to form a cantilever section; A trolley for transporting the laminated panels, the trolley being slidably connected to the transport track; A traction rope for towing the trolley to move, one end of the traction rope being connected to the trolley; A lifting device for lifting the composite plate on the trolley is connected to a layer above the layer to be constructed.

2. The composite plate hoisting structure for a multi-story frame structure according to claim 1, characterized in that: It also includes a support assembly for supporting the cantilever section, including a support column arranged at the bottom of the cantilever section, one end of the support column is supported to the ground, and the other end is detachably connected to the cantilever section.

3. The composite plate hoisting structure for a multi-story frame structure according to claim 1, characterized in that: The support assembly also includes a steel cable, a first cable buckle for connecting the steel cable is connected to the top of the cantilever section, and a second cable buckle for connecting the steel cable is connected to the top of the multi-layer frame structure. When the steel cable is connected to the first cable buckle and the second cable buckle, the steel cable is in a taut state.

4. The composite plate hoisting structure for a multi-story frame structure according to claim 1, characterized in that: The transport track includes a base plate and two baffles vertically connected to the two sides of the base plate respectively. The two baffles are connected to the inner sides thereof with guide slide grooves. Both sides of the trolley are connected with sliders matched with the corresponding guide slide grooves.

5. The composite plate hoisting structure for a multi-story frame structure according to claim 1, characterized in that: The lifting device comprises: A rectangular hanging frame arranged in a horizontal direction, the rectangular hanging frame comprising two main beams arranged in parallel and spaced apart from each other and a plurality of secondary beams spaced apart and connected between the two main beams; Two lifting ring groups respectively connected to the bottom of the two main beams, each of the lifting ring groups includes a plurality of lifting rings, the plurality of lifting rings are arranged at intervals along the length direction of the main beam, and the lifting rings in the two lifting ring groups correspond to each other one by one; Two fixed pulley blocks are respectively arranged at the bottom of the two lifting ring groups, each of the fixed pulley blocks includes a plurality of fixed pulleys, and in each lifting ring group, except for the two outermost lifting rings, the bottoms of all the remaining lifting rings are connected to the fixed pulleys; Two movable pulley blocks are respectively arranged at the bottom of the two fixed pulley blocks, each of the movable pulley blocks includes a plurality of movable pulleys, and the movable pulleys are staggered between two adjacent fixed pulleys in each fixed pulley block, and the bottom of each movable pulley is connected to a hook; Two lifting ropes are respectively arranged at the bottom of the two main beams, and each of the lifting ropes is sequentially wound around all the fixed pulleys and movable pulleys in the corresponding fixed pulley group and the corresponding movable pulley group. The two ends of each lifting rope are respectively connected to the two outermost lifting rings. When the composite plate is hoisted, each movable pulley can realize adaptive movement relative to the lifting rope under the action of the gravity of the composite plate.

6. A method for hoisting a composite plate for a multi-layer frame structure, characterized in that: Includes steps: Step 1: Provide the composite plate hoisting structure for the multi-story frame structure as claimed in claim 1 and install it in place; Step 2: Move the trolley to the cantilever section and lift the composite slab onto the trolley; Step 3: Use a traction rope to pull the trolley to the construction area of ​​the composite board; Step 4: Use a lifting device to lift the composite plate on the trolley and install it in place.