Tunnel lining maintenance water spraying device

By introducing a hydraulic lifting platform and a spiral mixing rotor into the tunnel lining maintenance water spraying device, real-time adjustment of the maintenance water ratio and precise control of the spray volume are achieved, solving the problem of low maintenance quality in the existing technology and improving The protective effect of tunnel lining is improved.

CN221838345UActive Publication Date: 2024-10-15JIANGXI PROVINCIAL TRANSPORTATION ENG GRP +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420450400.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-08
Publication Date
2024-10-15
Estimated Expiration
2034-03-08

AI Technical Summary

Technical Problem

The existing tunnel maintenance trolley cannot adjust the maintenance water ratio in real time and cannot spray water individually or alternately, resulting in low lining maintenance quality and easy to cause shrinkage cracks and obvious water marks on the concrete surface.

Method used

A tunnel lining maintenance water spraying device is designed, including a hydraulic lifting platform, first and second supports, water supply tank, protective agent water tank, pipes, nozzles, pressure pump and spiral mixing rotor, which can monitor temperature and humidity in real time , adjust the water ratio and spray volume to achieve comprehensive maintenance of the cave wall and road surface.

Benefits of technology

It achieves high-quality maintenance of the tunnel lining structure, reduces the problem of later expansion and contraction cracks, improves the concrete protection effect, and ensures uniform spraying and precise control through the combination of pressure spiral nozzles and pressurized pumps.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221838345U_ABST
    Figure CN221838345U_ABST
Patent Text Reader

Abstract

The utility model discloses a tunnel lining maintenance water spraying device which comprises a trolley, a spraying system and a hydraulic lifting platform, the spraying system and the hydraulic lifting platform are arranged on the trolley, the spraying system comprises a spraying head, a pipeline, a water supply tank and a protective agent water tank, and the pipeline is arranged along two supports with different heights. Water pumped out of the water supply tank and a protective agent pumped out of the protective agent water tank are mixed in the pipeline, and an operator controls the pressure, start and stop of the pump by controlling an operation table of the hydraulic lifting platform, so that parameters such as the proportion and the speed of the maintenance water sprayed out of the spray head are controlled according to requirements. And comprehensive maintenance of the top wall and the pavement of the tunnel is completed through high-low-position spraying.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of road engineering, in particular to a tunnel lining maintenance water spraying device. Background Art

[0002] During the construction of tunnels and pits, the initial support and surrounding rock are subjected to stress together, and are generally composed of steel frames, anchors, steel mesh and shotcrete. The initial support is often called "primary lining", and the "secondary lining" of the same vein refers to the secondary reinforcement work carried out around the reinforced pit. During tunnel construction, ensuring the maintenance quality of the "primary lining" and "secondary lining" concrete is crucial to ensuring the quality of lining concrete during pit construction.

[0003] Due to the different soil and rock conditions at the tunnel site, and the limitations of many factors such as machinery and equipment, process methods, climate and site, the quality of lining construction is often different from expectations. In the later maintenance, it is necessary to evenly spray concrete protective agent on its surface in order to achieve the best effect. Therefore, in order to ensure the maintenance quality of shotcrete in the above structure, the conventional method currently used is to use a large maintenance trolley to spray maintenance water on the tunnel wall and road surface. The general maintenance trolley is equipped with a pressure device, a water pumping device, a working platform, etc. Its working principle is: the maintenance trolley is equipped with a water spraying device, a pressure device and supporting pipes to evenly spray the maintenance water on the tunnel lining, and the curing work is completed after repeated spraying.

[0004] However, in actual construction operations, the use of large-scale maintenance trolleys still has some shortcomings and is difficult to adjust: the existing maintenance trolleys are all single-height single arc-shaped bracket structures, the total amount of sprayed maintenance water is constant, and the maintenance water is added at one time, and it is impossible to complete the mid-course adjustment of the protective agent ratio, separate water spraying, alternate spraying of water and maintenance water, etc. Therefore, it is impossible to control the spraying amount, spraying times, spraying area temperature and humidity, etc., resulting in low lining maintenance quality, which is easy to cause shrinkage cracks on the concrete surface and obvious water marks in the later stage.

[0005] Therefore, a tunnel wall and pavement maintenance system that can adjust the curing water ratio in real time should be developed to achieve high-quality curing of the tunnel lining structure. Summary of the invention

[0006] The purpose of the present invention is to provide a tunnel lining maintenance water spraying device, which can adjust the proportion of maintenance liquid at any time during operation according to needs, and rely on high and low position spraying to complete the comprehensive maintenance of the tunnel wall and road surface.

[0007] The utility model discloses a tunnel lining maintenance water spraying device, which is composed of a trolley and a spraying system arranged on the trolley, a hydraulic lifting platform, a first bracket and a second bracket:

[0008] The trolley is a load-bearing platform provided with tires, the hydraulic lifting platform is arranged in the middle of the trolley, and an operating table for controlling the trolley, the lifting platform and the spraying system is arranged on the hydraulic lifting platform;

[0009] The first bracket and the second bracket are arranged on the trolley and are arranged on both sides of the hydraulic platform. The height of the first bracket is lower than that of the second bracket.

[0010] The spraying system includes a water supply tank, a retention tank, a protective agent water tank, a pipeline, a nozzle, a first booster pump, and a second booster pump. The water supply tank, the retention tank, and the protective agent water tank are arranged on a trolley. The water supply tank and the retention tank are connected by a pipeline. The nozzle is arranged on the pipeline. The pipeline is arranged along the top of the first bracket and the second bracket. The pipeline is bifurcated on the side close to the water supply tank and connected to the protective agent water tank. The first booster pump is arranged at the connection between the water supply tank and the pipeline. The second booster pump is arranged at the connection between the protective agent water tank and the pipeline. The water drawn from the water supply tank is mixed with the protective agent drawn from the protective agent water tank and is sprayed out through the nozzle.

[0011] The spraying system further comprises a spiral mixing rotor, which is arranged in the pipeline. The spiral mixing rotor rotates along with the flow of the liquid and can evenly mix the protective agent flowing into the pipeline.

[0012] The spiral mixing rotor is arranged between the connection between the protective agent water tank and the pipeline and the first nozzle along the pipeline, so that the protective agent and water are evenly mixed before being sprayed out from the nozzle.

[0013] In order to monitor the temperature and humidity in the tunnel in real time, adjust the operating frequency, operating speed and other conditions according to the monitoring results, help the construction to make quick water maintenance decisions, and determine the water spraying amount and maintenance time interval for each water maintenance, the spraying system also includes a temperature sensor and a humidity sensor, and the temperature sensor and humidity sensor are arranged on the second bracket.

[0014] In order to ensure uniform spraying of the liquid, the tops of the two brackets are both set to be high in the middle and low on both sides, so that the top connection line forms an arc, that is, the tops of the first bracket and the second bracket support the pipeline in an arc shape.

[0015] Preferably, the nozzle is a pressure spiral nozzle, which will not spray out from the pipeline when the water pressure does not meet the standard. Water can be run in the pipeline in advance, and the inside of the pipe can be pressurized when spraying is needed, which can speed up the opening speed of the entire device and prevent delayed reaction caused by the overall length of the pipeline.

[0016] The operating console is provided with an engine for starting the trolley, a controller for adjusting the start and stop and pressure of the first boosting pump and the second boosting pump, and a display for displaying real-time temperature and humidity.

[0017] The pipeline between the first bracket and the second bracket is arranged on the surface where the trolley is located, that is, the pipeline is built from the plane of the trolley to ensure the safety of pipeline fixation.

[0018] In addition, a pressure pump can be fixed at the connection between the pipeline and the retention box to achieve the effect of filling water into the pipeline more quickly.

[0019] Compared with the existing maintenance vehicles, the device described in the utility model takes water pressure factors into consideration in the design height of the trolley body, and sprays water with a constant pressure value through a pressure pump to the spraying device, which can achieve stable quantitative output and make the lining concrete saturated with water to the maximum extent. The pressure spiral nozzle can start spraying after the pressure in the pipeline reaches the set value, reaching a spraying angle of 70-100°, ensuring the quality of curing, realizing the uniform spraying of the concrete surface protective agent on the lining structure, greatly improving the protective effect of cement concrete, and reducing problems such as expansion cracks in the later stage.

[0020] Double brackets are designed in front and back of the hydraulic lifting platform, making the overall structure more balanced and stable, making it easier for construction technicians to observe, maintain and adjust the status of the brackets on both sides and the pipelines installed on the brackets, observe the internal diseases of the tunnel, or check the spraying of the tunnel wall. The operating table on the hydraulic lifting platform can display and adjust the spraying pressure of the protective agent, the water supply pressure of the water tank, and the temperature and humidity of the working area, which can help the construction to make quick water maintenance decisions and determine the water spraying amount and maintenance time interval for each water maintenance. The pressure and start and stop of the two booster pumps can be adjusted according to construction needs to achieve the effect of precise control and precise spraying.

[0021] The tops of the two brackets are supported in an arc shape, so that one pipeline forms two spraying lines of different heights, with a wider and more uniform spraying range. The combination of the pressure spiral nozzle, the pressure pump with adjustable pressure, and the retention box can save the amount of curing water. The surplus curing water stored in the retention box can also be used for the maintenance of the road surface around the tunnel. When the pressure spiral nozzle is connected to the pressure sensor, the nozzle can also be digitally controlled.

[0022] The facility equipment provided by the utility model also has other functions. When the dust in the tunnel is too heavy, only the pressure pump connected to the water supply tank can be turned on to perform dust reduction operations on the tunnel. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 It is a schematic diagram of the overall structure of the tunnel lining maintenance water spraying device.

[0024] Figure 2 Schematic diagram of the structure of the first bracket.

[0025] Figure 3 It is a partial structural schematic diagram of the second bracket.

[0026] Figure 4 It is a structural diagram of a hydraulic lifting platform.

[0027] Figure 5 It is a schematic diagram of the structure of a spiral mixing rotor.

[0028] Figure 6 It is a structural diagram of the water supply tank and the protective agent tank.

[0029] Among them, 1-trolley, 2-spraying system, 3-first bracket, 4-hydraulic lifting platform, 5-second bracket, 6-water supply tank, 7-retention tank, 8-protective agent water tank, 9-pipeline, 10-spray head, 11-first booster pump, 12-second booster pump, 13-spiral mixing rotor, 14-temperature sensor, 15-humidity sensor, 16-operating table. DETAILED DESCRIPTION

[0030] The technical solution of the utility model will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0031] In the description of the present invention, it should be noted that if the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc. appear, the orientation or position relationship indicated is based on the orientation or position relationship shown in the drawings, which is only for the convenience of describing the present invention and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore cannot be understood as a limitation on the present invention. In addition, if the terms "first", "second", "third" appear, they are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.

[0032] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0033] like Figure 1The tunnel lining maintenance water spraying device shown in the figure is composed of a trolley 1 and a spraying system 2 fixed on the trolley 1, a hydraulic lifting platform 4, a first bracket 3, and a second bracket 5. Among them, the spraying system 2 includes a water supply tank 6, a retention tank 7, a protective agent water tank 8, a pipeline 9, a nozzle 10, a first booster pump 11, a second booster pump 12, a spiral mixing rotor 13, a temperature sensor 13, and a humidity sensor 15.

[0034] The trolley 1 is a load-bearing platform with tires fixed at the four corners of the bottom. Figure 1 It can be seen that Figure 4 The hydraulic lifting platform 4 is fixed to the middle of the trolley 1, and an operating table 16 for controlling the trolley 1, the lifting platform and the spraying system 2 is fixed on the hydraulic lifting platform 4. Specifically, the operating table 16 is provided with a controller for starting the engine of the trolley 1, adjusting the start and stop and pressure of the first booster pump 11 and the second booster pump 12, and a display for displaying real-time temperature and humidity.

[0035] Figure 2 The first bracket 3 and Figure 3 The second bracket 5 shown is fixed on the trolley 1 and arranged on both sides of the hydraulic platform. The height of the first bracket 3 is lower than that of the second bracket 5. The tops of the two brackets are both high in the middle and low on both sides, so that the top connection line forms an arc, that is, the tops of the first bracket 3 and the second bracket 5 support the pipeline 9 in an arc shape. Figure 1 As shown, the pipeline between the first bracket 3 and the second bracket 5 is arranged on the surface where the trolley 1 is located, that is, the pipeline is built from the plane of the trolley 1. Figure 3 As shown, the temperature sensor 13 and the humidity sensor 15 are fixed on the second bracket 5 .

[0036] The water supply tank 6, the retention tank 7 and the protective agent water tank 8 are fixed on the trolley 1. The water supply tank 6 and the retention tank 7 are connected by a pipe 9. The pipe 9 extends from the water supply tank 6 and is fixed along the top of the first bracket 3 and the second bracket 5, and finally reaches the retention tank 7. Figure 6 As shown, the pipeline 9 is bifurcated on the side close to the water supply tank 6 and connected to the protective agent water tank 8. The first booster pump 11 is fixed at the connection between the water supply tank 6 and the pipeline 9, and the second booster pump 12 is fixed at the connection between the protective agent water tank 8 and the pipeline 9. The water drawn from the water supply tank 6 is mixed with the protective agent drawn from the protective agent water tank 8 and is sprayed out through the nozzle 10. Figure 5 The spiral mixing rotor 13 is located in the pipeline 9 and is fixed between the connection between the protective agent water tank 8 and the pipeline 9 and the first nozzle 10 along the pipeline 9, so that the protective agent and water are evenly mixed before being sprayed out from the nozzle 10. The spiral mixing rotor 13 rotates with the flow of the liquid and can evenly mix the protective agent flowing into the pipeline 9.

[0037] Figure 2 and Figure 3The nozzles 10 shown are fixed on the pipe 9 at intervals. The nozzles 10 used in this embodiment are pressure spiral nozzles. When the water pressure does not meet the standard, it will not spray out from the pipeline. Water can be pre-flown in the pipeline 9, and the inside of the pipe can be pressurized when spraying is needed. This can speed up the opening speed of the entire device and prevent delayed reaction caused by the overall length of the pipeline.

[0038] use Figure 1 Before the device is installed, first select the protective agent according to the construction site conditions in the tunnel, add it to the protective agent water tank 8, and add water to the water supply tank 6. Before the device enters the tunnel, first start the first booster pump 11 to fill water into the pipe 9, and then start the second booster pump 12 to make the total pressure in the pipe 9 less than the opening pressure of the pressure spiral nozzle. At this time, the protective agent is pumped into the pipe 9 at a certain speed and proportion, and mixed with water. After passing through the spiral mixing rotor 13, it is further mixed and flows along the pipe 9 to the retention box 7. When the device enters the tunnel, the pressure of the first booster pump 11 and the second booster pump 12 is increased, and the curing water with a uniform ratio in the pipe 9 is sprayed out from the nozzle 10.

[0039] The operating console 16 is equipped with a display for controlling the diesel engine of the control vehicle 1, a display of the temperature sensor 13, a humidity sensor 15, and a controller for adjusting the pressure of the first booster pump 11 and the second booster pump 12. When it is detected that the temperature and humidity are not suitable for spraying curing water, the operator adjusts the pressure of the first booster pump 11 and the second booster pump 12 to restore the total pressure in the pipeline 9 to a pressure less than the opening pressure of the pressure spiral nozzle, and the device no longer sprays water into the tunnel.

[0040] When only clean water needs to be sprayed, first adjust the first pressure pump 11 and stop the second pressure pump 12 from the operating table 16 so that the nozzle 10 stops spraying water. When the curing water containing the protective agent in the pipeline 9 is gradually converted into clean water, the pressure of the first pressure pump 11 is increased, and the device starts to spray clean water without the protective agent.

[0041] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the utility model, rather than to limit it. Although the utility model has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solution recorded in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solution to deviate from the scope of the technical solution of the embodiments of the utility model.

Claims

1. A tunnel lining maintenance water spraying device, characterized in that: It consists of a trolley and a spraying system arranged on the trolley, a hydraulic lifting platform, a first bracket and a second bracket: The trolley is a load-bearing platform provided with tires, the hydraulic lifting platform is arranged in the middle of the trolley, and an operating table for controlling the trolley, the lifting platform and the spraying system is arranged on the hydraulic lifting platform; The first bracket and the second bracket are arranged on the trolley and are arranged on both sides of the hydraulic platform. The height of the first bracket is lower than that of the second bracket. The spraying system includes a water supply tank, a retention tank, a protective agent water tank, a pipeline, a nozzle, a first booster pump, and a second booster pump. The water supply tank, the retention tank, and the protective agent water tank are arranged on a trolley. The water supply tank and the retention tank are connected by a pipeline. The nozzle is arranged on the pipeline. The pipeline is arranged along the top of the first bracket and the second bracket. The pipeline is bifurcated on the side close to the water supply tank and connected to the protective agent water tank. The first booster pump is arranged at the connection between the water supply tank and the pipeline. The second booster pump is arranged at the connection between the protective agent water tank and the pipeline. The water drawn from the water supply tank is mixed with the protective agent drawn from the protective agent water tank and is sprayed out through the nozzle.

2. The tunnel lining maintenance water spraying device according to claim 1 is characterized in that The spraying system further comprises a spiral mixing rotor, which is arranged in the pipeline.

3. The tunnel lining maintenance water spraying device according to claim 2 is characterized in that The spiral mixing rotor is arranged between the connection between the protective agent water tank and the pipeline and the first spray head along the pipeline.

4. The tunnel lining maintenance water spraying device according to claim 1 is characterized in that The spraying system further comprises a temperature sensor and a humidity sensor, and the temperature sensor and the humidity sensor are arranged on the second bracket.

5. The tunnel lining maintenance water spraying device according to claim 1 is characterized in that The tops of the two brackets are both arranged to be high in the middle and low at both sides, so that the top connection line forms an arc, that is, the tops of the first bracket and the second bracket support the pipeline in an arc shape.

6. The tunnel lining maintenance water spraying device according to claim 1 is characterized in that The nozzle is a pressure spiral nozzle.

7. The tunnel lining maintenance water spraying device according to claim 1 is characterized in that The operating console is provided with an engine for driving the trolley, a controller for adjusting the start and stop and pressure of the first boosting pump and the second boosting pump, and a display for displaying real-time temperature and humidity.

8. The tunnel lining maintenance water spraying device according to claim 1 is characterized in that The pipeline between the first bracket and the second bracket is arranged on the surface where the trolley is located.