Retest mechanism for center position of pre-embedded cable guide pipe anchor backing plate at beam end of concrete cable-stayed bridge
By designing a re-measurement mechanism for the center position of the anchor pad with embedded cable ducts at the end of the concrete cable-stayed bridge, using wire rope rulers and positioning steel plates, combined with total station measurements, the problem of difficulty in measuring the center coordinates of the anchor pad after concrete pouring was solved, and the Fast, accurate position retesting.
Patent Information
- Application Number
- CN202420499858.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-15
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2034-03-15
AI Technical Summary
In the construction of concrete cable-stayed bridges, after the concrete pouring is completed, the center coordinates of the anchor pad of the embedded cable duct cannot be effectively measured, and it is difficult to accurately re-measure this position with the existing technology.
A mechanism for re-testing the center position of the embedded cable duct anchor pad at the end of a concrete cable-stayed bridge is designed, which includes a positioning steel plate, a wire rope ruler, a limit plate and a tie column. The wire rope ruler passes through the center of the embedded cable duct anchor plate. , combined with the flower basket elasticizer and total station and small prism measurement, to achieve accurate coordinate re-measurement.
It does not require complicated instruments and is easy to operate. It can quickly and accurately measure the center position of the embedded cable duct anchor pad, which solves the problem that conventional measurement methods cannot measure and provides a simple and effective re-measurement method.
Smart Images

Figure CN221840431U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of bridge construction, in particular to a central position re-measurement mechanism for a pre-buried cable guide pipe anchor pad at an end of a concrete cable-stayed bridge. Background Art
[0002] With the continuous increase in bridge engineering construction projects in my country in recent years, bridge construction technology has been innovatively developed and the construction level has been greatly improved. Against this background, cable-stayed bridges have developed rapidly with their complete functions and harmony with the environment, and have occupied an important position in the field of bridge construction.
[0003] Cable duct installation is an important process in the construction of cable-stayed bridges. The installation accuracy directly affects the subsequent hanging and tensioning of the cable. The cable duct positioning and installation generally adopts process control, such as total station positioning, rigid frame fixation, etc. However, after the concrete pouring is completed, the cable duct position may move. Therefore, before the installation of the cable, it is necessary to use measuring instruments to accurately re-measure the center coordinates of the cable duct opening and the anchor pad. The center coordinates of the cable duct opening can be directly measured by a total station with a small prism, but the center coordinates of the cable duct anchor pad cannot be directly measured by a total station with a small prism because it is located at the bottom of the beam or in the box. Therefore, it is very necessary to explore the method of re-measuring the center coordinates of the cable duct anchor pad.
[0004] Chinese utility model patent CN107090775A discloses a method for positioning the cable guide tube at the end of a full-frame support space beam. The principle is to lay out the central axis position of the cable guide tube and the position of the upper end of the cable guide tube on the positioning bracket and install the upper end of the cable guide tube in place; use a high-precision total station in conjunction with an auxiliary disc to check the position of the anchor point of the lower end of the cable guide tube and fix the cable guide tube to the positioning bracket. This utility model method for positioning the cable guide tube at the end of a full-frame support space beam is a method for positioning and reinforcing the cable guide tube at the end of the beam before the concrete of the beam body is poured, and the total station is used in conjunction with an auxiliary disc to directly measure the position of the anchor point of the lower end of the cable guide tube. However, after the concrete is poured, the above method cannot measure the position of the anchor point of the lower end of the cable guide tube. Utility Model Content
[0005] The utility model aims to solve the problem that the center coordinates of the anchor pads of the pre-embedded cable guide tubes at the ends of beams cannot be measured by conventional measurement methods after the concrete pouring of the beam body is completed, and provides a mechanism for re-measuring the center position of the anchor pads of the pre-embedded cable guide tubes at the ends of concrete cable-stayed bridges.
[0006] The technical scheme adopted by the utility model to achieve the above-mentioned purpose is: a central position re-measurement mechanism for the anchor pad of the embedded cable conduit at the end of a concrete cable-stayed bridge, characterized in that it includes a positioning steel plate, a wire rope ruler, a limiting plate, and a tie column, the bottom triangular support of the tie column is fixed to the top surface of the beam, a plurality of hooks are connected at equal intervals to the upper part of the main body, the hook is connected to the connector at the top of the wire rope ruler through a basket tensioner, a circular hole is opened in the center of the positioning steel plate, a central cross line mark is engraved on the surface of the positioning steel plate with the center of the circular hole as the base point, the cross line of the limiting plate coincides with the cross line of the positioning steel plate and is fixed by spot welding, the length of the wire rope ruler is greater than the length of the embedded cable conduit, the bottom end of the wire rope ruler penetrates from the central position of the anchor pad of the embedded cable conduit at the end of the beam, passes through the central circular hole of the positioning steel plate, the top end of the wire rope ruler penetrates from the top of the embedded cable conduit, the exposed end of the wire rope ruler is connected to the connector, and the wire rope ruler is adjusted by the basket tensioner to make the wire rope ruler in a tensioned state.
[0007] The length of the wire rope ruler is the length of the embedded cable guide tube plus 1.8m. A lock buckle and a limit plate are set at the bottom, and scale marks are set every 100mm on the wire rope ruler.
[0008] The positioning steel plate is circular and is made according to the inner diameter of the anchor plate. The thickness of the positioning steel plate is 5mm, and the diameter is 20mm larger than the inner diameter of the anchor plate. A Φ10mm circular hole is opened in the center to facilitate the passage of the wire rope ruler with a connector.
[0009] The main body of the tie column is made of Φ63×3.2mm steel pipe with a height of 1.8m. A triangular brace is welded at the bottom of the steel pipe and fixed to the top surface of the beam by expansion bolts. A hook is welded every 10cm in the height direction of the steel pipe.
[0010] The beneficial effects of the utility model are:
[0011] 1. This organization solves the problem that conventional measurement methods such as total station combined with small prisms cannot measure the coordinates of the center point of the anchor pad of the pre-buried cable guide at the end of a concrete cable-stayed bridge, and can provide a reference for the re-measurement method of the center position of the pre-buried cable guide at the end of a concrete cable-stayed bridge.
[0012] 2. This mechanism does not require the use of complex instruments and tooling. It has a simple principle and is easy to operate. It can quickly re-measure the center position of the anchor pad of the pre-buried cableway pipe at the end of the concrete cable-stayed bridge. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 It is a schematic diagram of the overall structure of the utility model.
[0014] Figure 2 yes Figure 1 Enlarged view of point D in the middle.
[0015] Figure 3 It is a connection relationship diagram of the utility model mechanism.
[0016] In the figure: 1 beam body, 2 embedded cable guide tube, 3 anchor plate, 4 positioning steel plate, 5 wire rope scale, 6 limit plate, 7 lock, 8 connector, 9 flower basket tensioner, 10 anchor column, 11 beam top surface, 12 beam bottom surface. DETAILED DESCRIPTION
[0017] The method of the utility model is described below in conjunction with the accompanying drawings and embodiments.
[0018] The preferred embodiments of the present invention are described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present invention, and are not used to limit the present invention.
[0019] Example 1
[0020] like Figure 1-Figure 3 As shown, the center position re-measurement mechanism of the anchor pad plate of the embedded cable guide at the end of the concrete cable-stayed bridge includes a positioning steel plate 4, a wire rope scale 5, a limit plate 6, and a tie column 10. The bottom triangular support of the tie column 10 is fixed to the top surface 11 of the beam, and a plurality of hooks are connected to the upper part of the main body at equal intervals. The hooks are connected to the connector 8 at the top of the wire rope scale 5 through a basket tensioner 9. A circular hole is opened in the center of the positioning steel plate 4. The center cross line is engraved on the surface of the positioning steel plate 4 with the center of the circular hole as the base point. The mark, the cross line of the limit plate 6 coincides with the cross line of the positioning steel plate 4 and is spot welded to fix, the length of the wire rope ruler 5 is greater than the length of the embedded cable guide tube 2, the bottom end of the wire rope ruler 5 penetrates from the center position of the anchor plate 3 of the embedded cable guide tube 2 at the beam end, passes through the central circular hole of the positioning steel plate 4, and the top end of the wire rope ruler 5 passes through the top of the embedded cable guide tube 2, the exposed end of the wire rope ruler 5 is connected to the connector 8, and the wire rope ruler 5 is adjusted by the basket tensioner 9 to make the wire rope ruler 5 in a tensioned state.
[0021] The length of the steel wire rope ruler 5 is the length of the embedded cable guide tube 2 plus 1.8m, a lock buckle 7 and a limit plate 6 are arranged at the bottom, and scale marks are arranged on the steel wire rope ruler 5 at intervals of 100mm.
[0022] The positioning steel plate 4 is circular and is made according to the inner diameter of the anchor plate 3. The positioning steel plate 4 is 5 mm thick and 20 mm larger in diameter than the inner diameter of the anchor plate 3. A Φ10 mm circular hole is opened in the center to facilitate the passage of the wire rope ruler 5 with the connector 8.
[0023] The main body of the tie column 10 is made of Φ63×3.2mm steel pipe with a height of 1.8m. A triangular brace is welded at the bottom of the steel pipe and fixed to the top surface 11 of the beam by expansion bolts. A hook is welded every 10cm in the height direction of the steel pipe.
[0024] Example 2
[0025] The method for re-measuring the center position of the anchor pad of the pre-embedded cable guide pipe at the end of a concrete cable-stayed bridge using the mechanism described in Example 1 comprises the following steps:
[0026] S1. Make a wire rope ruler 5. According to the angle of the pre-buried cable conduit 2 at the beam end and the length of the wire rope ruler 5, place a temporary tie column 10 at a position not less than 2.0m from the center of the top of the pre-buried cable conduit 2 along the direction of the wire rope ruler 5. The bottom of the tie column 10 is fixed to the top surface 11 of the beam body by expansion bolts.
[0027] S2, mark the cross line of the anchor plate 3 according to the center of the anchor plate 3 of the pre-embedded cable conduit 2 at the beam end, and temporarily spot weld the positioning steel plate 4 to the anchor plate 3, so that the center cross line of the positioning steel plate 4 coincides with the cross line of the anchor plate 3 of the pre-embedded cable conduit 2;
[0028] S3, the wire rope ruler 5 is inserted from the center of the anchor plate 3 of the embedded cable conduit 2 at the beam end, passes through the central circular hole of the positioning steel plate 4, the cross line of the limit plate 6 coincides with the cross line of the positioning steel plate 4 and is fixed by spot welding, the top of the wire rope ruler 5 passes through the top of the embedded cable conduit 2, the exposed wire rope ruler 5 end connector 8 is connected to the hook on the temporary tie column 10 through the flower basket tensioner 9, and the wire rope ruler 5 is adjusted through the flower basket tensioner 9 to make the wire rope ruler 5 in a tensioned state;
[0029] S4. Select two points A and B on the exposed 1.8m range of the wire rope ruler 5. Point A is the upper end of the wire rope ruler 5, and point B is the intersection of the wire rope ruler 5 and the top section of the embedded cable conduit 2. The distance between points A and B is not less than 1.5m. Use a total station with a small prism to measure the three-dimensional coordinates of points A and B respectively (X A , Y A , H A )、(X B , Y B , H B );
[0030] S5. Use a steel tape measure in combination with the scale marks on the wire rope ruler 5 at intervals of 10 cm to accurately measure the distance from point B to the center of the anchor plate 3;
[0031] S6. According to the three-dimensional coordinates of points A and B and the distance from point B to the center of the anchor pad 3, the center coordinates (X C , Y C , H C ):
[0032]
[0033]
[0034]
[0035] Among them, X A : X coordinate of point A, Y A : Y coordinate of point A, H A : A point elevation, X B : X coordinates of point B, Y B : Y coordinate of point B, H B : elevation of point B, S: distance S from point B to the center of the anchor pad;
[0036] When X B <X A When calculating the coordinate azimuth, it is necessary to add 180 degrees to the quadrant angle;
[0037] To make the value accurate, the calculated H C Subtract 1 / 2 of the wire rope gauge 5 diameter.
[0038] The length of the wire rope ruler 5 is the length of the embedded cable guide tube 2 plus 1.8m. A wire rope lock buckle 7 and a limit plate 6 are arranged at the bottom. Graduation marks are arranged at intervals of 100mm on the wire rope ruler 5. A connector 8 is arranged at the top for connecting a flower basket tensioner 9.
[0039] The positioning steel plate 4 is circular and is made according to the inner diameter of the anchor plate 3. The thickness of the positioning steel plate 4 is 5 mm, and the diameter is 20 mm larger than the inner diameter of the anchor plate 3. A Φ10 mm circular hole is opened in the center to facilitate the passage of the wire rope ruler 5 with the connector 8. The center cross line mark is engraved on the surface of the positioning steel plate 4 with the center of the circular hole as the base point.
[0040] The tie column 10 is made of Φ63×3.2mm steel pipe with a height of 1.8m. A triangular support is welded at the bottom of the steel pipe, and a hook is welded every 10cm in the height direction of the steel pipe to connect with the top connector of the wire rope scale 5 through the basket tensioner 9.
[0041] In this embodiment, the intersection point B of the steel wire rope scale 5 and the top section of the pre-buried cable conduit 2 is the center point of the top of the pre-buried cable conduit 2.
[0042] Example 3
[0043] The method for re-measuring the center position of the anchor pad of the embedded cable guide tube at the end of the concrete cable-stayed bridge described in this embodiment is the same as that in Example 2 in each step, except that the intersection point B of the wire rope ruler 5 and the top section of the embedded cable guide tube 2 in this embodiment is any intersection point within the top section of the wire rope ruler 5 and the embedded cable guide tube 2 except the center point.
[0044] Finally, it should be noted that the above are only preferred embodiments of the present invention and are not intended to limit the present invention. Although the present invention has been described in detail with reference to the above embodiments, those skilled in the art can still modify the technical solutions described in the above embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. Mechanism for re-measuring the center position of the anchor pad of the pre-buried cable guide at the end of the concrete cable-stayed bridge. It is characterized in that It includes a positioning steel plate, a wire rope ruler, a limiting plate, and a tie column. The triangular support at the bottom of the tie column is fixed to the top surface of the beam. A plurality of hooks are connected to the upper part of the main body at equal intervals. The hooks are connected to the connector at the top of the wire rope ruler through a basket tensioner. A circular hole is opened in the center of the positioning steel plate. A center cross line mark is engraved on the surface of the positioning steel plate with the center of the circular hole as the base point. The cross lines of the limiting plate coincide with the cross lines of the positioning steel plate and are spot welded and fixed. The length of the wire rope ruler is greater than the length of the embedded cable conduit. The bottom end of the wire rope ruler penetrates from the center position of the anchor plate of the embedded cable conduit at the end of the beam and passes through the center circular hole of the positioning steel plate. The top end of the wire rope ruler penetrates from the top of the embedded cable conduit. The exposed end of the wire rope ruler is connected to the connector. The wire rope ruler is adjusted by the basket tensioner to keep the wire rope ruler in a tensioned state.
2. The center position re-measurement mechanism of the pre-buried cable guide anchor pad at the end of a concrete cable-stayed bridge according to claim 1, It is characterized in that The length of the wire rope ruler is the length of the embedded cable guide tube plus 1.8m. A lock buckle and a limit plate are set at the bottom, and scale marks are set every 100mm on the wire rope ruler.
3. The center position re-measurement mechanism of the pre-buried cable guide anchor pad at the end of a concrete cable-stayed bridge according to claim 1, It is characterized in that The positioning steel plate is circular and is made according to the inner diameter of the anchor plate. The thickness of the positioning steel plate is 5mm, and the diameter is 20mm larger than the inner diameter of the anchor plate. A Φ10mm circular hole is opened in the center to facilitate the passage of the wire rope ruler with a connector.
4. The center position re-measurement mechanism of the pre-buried cable guide anchor pad at the end of a concrete cable-stayed bridge according to claim 1, It is characterized in that The main body of the tie column is made of Φ63×3.2mm steel pipe with a height of 1.8m. A triangular brace is welded at the bottom of the steel pipe and fixed to the top surface of the beam by expansion bolts. A hook is welded every 10cm in the height direction of the steel pipe.