Foundation treatment structure for preloading drainage consolidation

By arranging the drainage system within the overall ballast system composed of temporary retaining wall units and pile carriers during foundation treatment, the problems of unstable drainage systems and large amounts of materials in traditional foundation preloading treatment are solved, and effective drainage and solidification of the foundation are achieved. The improvement of knotting and construction efficiency has environmental advantages.

CN221919347UActive Publication Date: 2024-10-29CHINA RAILWAY SHANGHAI DESIGN INST GRP CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420277433.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-05
Publication Date
2024-10-29
Estimated Expiration
2034-02-05

AI Technical Summary

Technical Problem

In the traditional foundation preloading treatment method, the effectiveness of the drainage system is limited by flexible bulk materials, resulting in poor drainage of pore water. Moreover, the project area is large and the amount of materials is large, which is prone to local collapse and construction problems.

Method used

The drainage system is arranged in the overall ballast system composed of temporary retaining wall units and stack carriers, including vertical drainage wells, horizontal drainage structures and sand cushions. It is connected through flexible mesh and permeable mesh, and is separated by permeable membranes to achieve Stable operation and uniform collection of drainage systems.

Benefits of technology

It reduces the need to increase the thickness of the sand cushion, reduces uneven settlement, improves the stability and construction efficiency of the drainage system, and the materials are recyclable, meeting environmental protection goals.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221919347U_ABST
    Figure CN221919347U_ABST
Patent Text Reader

Abstract

The utility model relates to a preloading drainage consolidation foundation treatment structure, a ballast system comprises a temporary retaining wall unit and a stacking body, the temporary retaining wall unit is arranged at the side position of the stacking body and used for supporting and retaining the stacking body, and the temporary retaining wall unit is inserted into a foundation to be treated through a soil layer anchor rod; the drainage system comprises a vertical drainage well, a horizontal drainage structure and sand cushion layers, the sand cushion layers are laid at the inner bottom positions of the temporary retaining wall units and the bottom position of the stacking body respectively, and the horizontal drainage structure is embedded in the sand cushion layers; and the vertical drainage well is arranged between the sand cushion layer and the foundation to be treated and is connected with the horizontal drainage structure. The utility model has the advantages that: the load difference between the preloading stacking area and the temporary retaining wall is small, the differential settlement is reduced, and the stable operation of the drainage system is effectively guaranteed; drained water in the foundation treatment process can be conveniently and uniformly collected and guided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of foundation treatment engineering, in particular to a foundation treatment structure with preloading, drainage and consolidation. Background Art

[0002] my country has a vast territory, with many cities and populations distributed along the coast, along rivers, and along rivers. These areas are widely distributed with soft clay strata deposited in marine, lacustrine and river phases. Soft clay strata have the characteristics of poor permeability, high compressibility, low strength, high water content, and are generally buried at a shallow depth. When the thickness of the stratum is large, the structures on it are prone to large settlement and differential settlement, and the duration of settlement is often long, which significantly affects the durability of the building and reduces the normal service life of the building.

[0003] Modern buildings have the need to increase in size and design service life, but the strength, foundation bearing capacity and stability of clay soil often cannot meet the needs of new buildings. Therefore, it is necessary to treat the foundation, and drainage consolidation method is a commonly used soft clay foundation treatment measure. The principle is to set up drainage structures such as sand wells and drainage belts in the foundation, load preload above the foundation soil, so that the water in the foundation soil is discharged, the soil layer gradually settles and consolidates, and the strength of the soil layer is increased. Not only can the foundation settlement be basically completed during the ballasting stage, meeting the settlement and differential settlement limits of the building during the use stage, but also the bearing capacity and stability of the soil layer can meet the requirements of the building.

[0004] The two major components of the drainage consolidation method are the pressurization system and the drainage system. The drainage system is designed to change the original drainage boundary conditions of the foundation and provide a drainage channel for the pore water in the compressed and consolidated soil layer. It is generally composed of a vertical drainage well in the soil layer and a horizontal drainage cushion layer on the top of the horizontal soil layer.

[0005] In the traditional preloading treatment of foundation, in addition to the vertical drainage wells and horizontal drainage cushions that need to be set up within the preloading area, the drainage cushion needs to be extended to a far distance outside the loading area, and drainage ditches need to be set up outside the drainage cushion to collect water. The scope of the project land is large, which is not conducive to the intensive use of the site. In addition, when the traditional drainage consolidation method is used to treat the foundation, the horizontal drainage cushion generally uses medium and coarse sand, and its mud content needs to be strictly controlled to ensure that the permeability coefficient meets the requirements. Therefore, the cushion edge stacking angle is small, the structure is loose, and local collapse is prone to occur. In addition, the large amount of sand used in the traditional drainage solution will also bring various situations that are not conducive to construction.

[0006] The principle of preloading method for treating foundation determines that ensuring the effectiveness of drainage system during reinforcement is the key of the method. The horizontal drainage cushion layer adopts flexible bulk material, which has poor ability to resist uneven deformation and its distribution range needs to exceed the preloading area. If the uneven deformation of foundation is too large, the cushion layer may be disconnected and discontinuous, and its drainage performance will be invalid, resulting in the inability to discharge pore water in the foundation smoothly. It is often necessary to thicken the sand cushion layer additionally. Summary of the invention

[0007] The purpose of the utility model is to provide a foundation treatment structure with preloading, drainage and consolidation based on the above-mentioned deficiencies of the prior art. By arranging a drainage system in the overall ballast system composed of a temporary retaining wall unit and a pile carrier, the preloading, drainage and consolidation of the foundation to be treated is achieved, and at the same time it is convenient to uniformly collect and guide the drainage in the foundation treatment process.

[0008] The purpose of this utility model is achieved by the following technical solutions:

[0009] A foundation treatment structure with preloading, drainage and consolidation, a ballast system arranged above the foundation to be treated and a drainage system arranged in the ballast system, characterized in that:

[0010] The ballast system comprises a temporary retaining wall unit and a pile carrier, wherein the temporary retaining wall unit is arranged at the side of the pile carrier and supports the pile carrier, wherein the temporary retaining wall unit is inserted into the foundation to be treated through a soil anchor rod;

[0011] The drainage system includes a vertical drainage well, a horizontal drainage structure and a sand cushion layer. The sand cushion layer is laid on the inner bottom position of the temporary retaining wall unit and the bottom position of the pile carrier respectively. The horizontal drainage structure is buried in the sand cushion layer. The vertical drainage well is arranged between the sand cushion layer and the foundation to be treated and is connected to the horizontal drainage structure.

[0012] The temporary retaining wall unit includes a flexible mesh, soil anchor rods and a permeable mesh, wherein a plurality of the soil anchor rods are connected by the flexible mesh to form a whole and enclose a filling space, a pile carrier is filled in the filling space, the sand cushion layer is laid at a position below the pile carrier, and the permeable mesh is arranged on the flexible mesh at a position corresponding to the sand cushion layer.

[0013] The pile carrier and the sand cushion layer are separated by a permeable coiled material.

[0014] The lower end of the soil anchor rod has a cone tip and is sleeved with a tubular support, and the flexible mesh is connected to the tubular support.

[0015] A plurality of the temporary retaining wall units can be stacked in the horizontal direction or in the height direction within the scope of the foundation to be treated.

[0016] Along the height direction, a plurality of the horizontal drainage structures are arranged at intervals in the sand cushion layer of the temporary retaining wall unit and the pile carrier.

[0017] The horizontal drainage structure arranged in the temporary retaining wall unit is a horizontal drainage blind pipe, one end of which extends into the range of the stack carrier, and the other end extends out of the temporary retaining wall unit.

[0018] The horizontal drainage blind pipe extends out of the temporary retaining wall unit and is provided with a horizontal water collection pipe or a wall-side water collection ditch on one side.

[0019] The horizontal drainage structure arranged in the stack carrier is a drainage blind pipe or a blind ditch.

[0020] A plurality of the vertical drainage wells are provided in a range corresponding to the temporary retaining wall unit and the stack carrier, and the plurality of the vertical drainage wells are arranged in an array.

[0021] The advantages of the utility model are:

[0022] 1) Only the cushion thickness inside the temporary retaining wall is increased, and the thickness of the horizontal sand cushion layer under the preloaded soil does not need to be increased to resist uneven deformation.

[0023] 2) The retaining wall is also part of the ballast system. Compared with the general slope reduction scheme, the load difference between the pre-loading area and the temporary retaining wall is smaller, which reduces uneven settlement and effectively ensures the stable operation of the drainage system.

[0024] 3) The drainage cushion layer is covered with backfill and constrained within the range of the temporary retaining wall, and a partition is set between the backfill layer, which solves the problem of sand layer loss during foundation treatment.

[0025] 4) Horizontal drainage pipes or wall drainage ditches can collect drainage and are close to temporary retaining wall units, so the drainage system occupies very little land.

[0026] 5) Use a large number of drainage blind pipes to ensure smooth drainage. When the drainage volume is large or some drainage blind pipes fail and need to be repaired, pipes can be inserted into the horizontal holes in the completed temporary retaining wall.

[0027] 6) The drainage system is compatible with the temporary retaining wall. When the temporary slope retaining wall is repaired and updated, the drainage system can be replaced at the same time.

[0028] 7) The reinforcement and densification of the temporary retaining wall mesh caused by the setting of the drainage structure and the partial replacement of the permeable mesh can be uniformly processed in the factory, folded and transported to the site for unfolding and positioning, and the retaining wall frame construction can be completed, with high construction efficiency.

[0029] 8) All materials used can be recycled and reused, and the fill in the retaining wall can even be made from local materials; it has the advantages of significant energy saving, environmental protection and pollution reduction, and is in line with the national carbon peak and carbon neutrality goals.

[0030] 9) After the foundation treatment is completed, the drainage blind pipes in the temporary retaining wall unit can be removed first for recycling. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] Figure 1 It is a three-dimensional structural schematic diagram of the utility model;

[0032] Figure 2 It is a cross-sectional schematic diagram of the utility model;

[0033] Figure 3 It is a schematic diagram of the use elevation of the utility model;

[0034] Figure 4 It is a plan view of the use of the utility model. DETAILED DESCRIPTION

[0035] The following is a further detailed description of the features of the present invention and other related features through embodiments in conjunction with the accompanying drawings to facilitate understanding by technicians in the same industry:

[0036] like Figure 1-4 As shown in the figure, marks 1-17 respectively represent: flexible mesh 1, tubular support 2, mesh reinforcement ribs 3, soil layer anchor rods 4, backfill 5 in retaining wall, loaded soil 6, temporary retaining wall unit 7, vertical drainage well 8, internal sand cushion layer 9, horizontal drainage blind pipe 10, horizontal water collection pipe 11, bottom loaded soil 12, permeable mesh 13, drainage blind pipe or blind ditch 14, horizontal sand cushion layer 15, pre-compression area 16, wall side water collection ditch 17.

[0037] Example: Figures 1 to 4 As shown, the foundation treatment structure with preloading and drainage consolidation in this embodiment is used to perform preloading on the soft foundation, thereby achieving the drainage and consolidation effect, realizing the treatment of the soft foundation to improve its bearing capacity.

[0038] Combination Figures 1 to 4 As shown, the foundation treatment structure in this embodiment includes a temporary retaining wall unit 7 set within the range of the soft foundation and a pile of soil 6 as a pile carrier, both of which are used as a ballast system to press weight on the soft foundation to perform preloading. Among them, the temporary retaining wall unit 7 is mainly set at the boundary range of the soft foundation. On the one hand, it performs pile loading and weighting on the soft foundation, and on the other hand, it supports the pile of soil 6 inside it, and the pile of soil 6, as a preloading area 16, only performs pile loading and weighting on the foundation to be treated.

[0039] Specifically, the temporary retaining wall unit 7 mainly includes four soil anchor rods 4, a flexible mesh 1, four tubular supports 2 and mesh reinforcement ribs 3. Among them, the four soil anchor rods 4 are respectively inserted into the four tubular supports 2, and the bottom of the soil anchor rod 4 is provided with a cone tip to facilitate its insertion into the stratum and ensure its uprightness. A flexible mesh 1 is provided between two adjacent tubular supports 2 to connect the four tubular supports 2 and the four soil anchor rods 14 into an integral structure and enclose a filling space for the retaining wall inner fill 5. When in use, the flexible mesh 1 has a restraining effect on the inner retaining wall inner fill 5 to prevent the inner retaining wall fill 5 from leaking out, and the four soil anchor rods 4 are used to fix the temporary retaining wall unit 7 as a whole in the soil. In order to further improve the structural strength and restraint performance of the flexible mesh 1, mesh reinforcement ribs 3 arranged in a criss-cross pattern are provided in the width of the flexible mesh 1.

[0040] like Figure 3 As shown, a horizontal sand cushion layer 15 is laid at the bottom area of ​​the backfill soil 6. The horizontal sand cushion layer 15 is laid between the bottom backfill soil 12 and the top backfill soil 6, and the backfill soil on both sides is used to avoid the loss of the horizontal sand cushion layer 15 as much as possible. A number of vertical drainage wells 8 are arranged below the horizontal sand cushion layer 15. The vertical drainage wells 8 are arranged in a uniform array and connect the soft foundation to be treated and the horizontal sand cushion layer 15 to form a vertical drainage channel between the soft foundation and the horizontal sand cushion layer 15. A number of drainage blind pipes or blind ditches 14 are buried in the horizontal sand cushion layer 15 at intervals along the height direction. The drainage blind pipes or blind ditches 14 serve as horizontal drainage channels to drain water in the soft foundation along a horizontal path.

[0041] In this embodiment, a drainage blind pipe or blind ditch 14 at the bottom is connected to each vertical drainage well 8 to gather the water in each vertical drainage channel to the horizontal drainage channel, and transport the water to the temporary retaining wall unit 7 through each drainage blind pipe or blind ditch 14 in the horizontal sand cushion layer 15. Figure 3 As shown, each drainage blind pipe or blind ditch 14 is arranged at a certain angle, which improves the drainage efficiency while ensuring the drainage effect.

[0042] Combination Figure 2 and Figure 3 As shown, an internal sand cushion layer 9 is laid under the retaining wall backfill 5 of the temporary retaining wall unit 7, and a permeable roll is laid between the internal sand cushion layer 9 and the retaining wall backfill 5 to avoid sand layer loss during foundation treatment. The thickness of the internal sand cushion layer 9 exceeds the thickness of the horizontal sand cushion layer 15 in the preloading area 16, so that it can meet the later differential settlement requirements, and at the same time further ensure that the load difference between the preloading area 16 and the temporary retaining wall unit 1 is small, reducing uneven settlement, and effectively ensuring the stable operation of the drainage system, especially ensuring that the pore water in the foundation can be discharged smoothly during the subsequent settlement and deformation process.

[0043] A vertical drainage well 8 serving as a vertical drainage channel for the soft foundation is also provided below the internal sand cushion layer 9, and a plurality of horizontal drainage blind pipes 10 serving as horizontal drainage channels are buried inside the internal sand cushion layer 9. One end of each horizontal drainage blind pipe 10 extends into the range of the backfilled soil 6 and is connected to each drainage blind pipe or blind ditch 14 one by one, and the other end of each horizontal drainage blind pipe 10 extends outward from the temporary retaining wall unit 7, so as to further discharge the water within the range of the backfilled soil 6 through the temporary retaining wall unit 7.

[0044] In this embodiment, if Figure 1 As shown, a permeable mesh 13 is provided on the flexible mesh 1 corresponding to the range of the horizontal drainage blind pipe 10. The permeable mesh 13 is arranged on the flexible mesh 1 at both ends of the horizontal drainage blind pipe 10. The horizontal drainage blind pipe 10 can pass through the permeable mesh 13 to facilitate drainage.

[0045] like Figure 3 As shown, at the position where the horizontal drainage blind pipe 10 extends out from the temporary retaining wall unit 7, a horizontal water collection pipe 11 and a wall-side water collection ditch 17 are externally connected, both of which play a role in further converging water, converging the water discharged from each horizontal drainage blind pipe 10 and discharging it uniformly.

[0046] like Figure 3 As shown, since an important function of the temporary retaining wall unit 7 is to support the backlog soil 6 inside it, it should match the loading range of the backlog soil 6 in the horizontal direction and the height direction. Therefore, the temporary retaining wall unit 7 in this embodiment has extensibility, which means that according to the range of the pre-compression area 16 of the backlog soil 6, an adaptive temporary retaining wall unit 7 structure can be conveniently built at the boundary position of the foundation to be treated.

[0047] Specifically, in this embodiment, the coordination between the temporary retaining wall units 7 can be mainly achieved in the following forms:

[0048] 1) Horizontal extension: Horizontally adjacent temporary retaining wall units 7 can share soil anchor rods 4 and tubular supports 2. As long as flexible mesh sheets 1 are provided between adjacent tubular supports 2, the division of temporary retaining wall units can be achieved; while improving the integrity of the temporary retaining wall units 7, the construction cost can be effectively reduced. In some cases, each temporary retaining wall unit 7 can also be made more independent, and then connecting pieces can be provided between the tubular supports 2 of adjacent temporary retaining wall units 7 to ensure the integrity of each temporary retaining wall unit 7.

[0049] When the temporary retaining wall unit 7 extends in the horizontal direction, the temporary retaining wall unit 7 adopts a modular unit structure, so its structure is relatively independent. At this time, the horizontal drainage blind pipe 10 can adopt an integral whole drainage blind pipe to penetrate multiple temporary retaining wall units 7 for drainage, or the horizontal drainage blind pipe 10 adopts a segmented structure, that is, a drainage blind pipe is set in each temporary retaining wall unit 7, and then the drainage blind pipes in each temporary retaining wall unit 7 are connected to form a through horizontal drainage channel.

[0050] 2) Accumulation and stacking in height direction: The positions of the tubular supports 2 of the upper and lower adjacent temporary retaining wall units 7 are matched, and the soil anchor rods 4 of the required length are inserted into the through-through tubular supports 2, so that the tubular supports 2 can be connected into an integral structure, thereby connecting several temporary retaining wall units 7 into an integral structure in height direction. In some cases, temporary retaining wall units 7 can also be stacked in pairs, for example: a certain gap is left at the top of the tubular supports 2 of the temporary retaining wall units 7 of the lower layer, and the bottom of the soil anchor rod 4 of the upper temporary retaining wall unit 7 is inserted into the tubular support 2 of the temporary retaining wall unit 7 of the lower layer, and the soil anchor rod 4 of the temporary retaining wall unit 7 of the lower layer is directly inserted into the soil. In this way, the temporary retaining wall units 7 can also be stacked in height direction.

[0051] When applied, this embodiment mainly includes the following functions:

[0052] The temporary retaining wall unit 7 and the pre-compression area 16 form a ballast system to pre-compress and load the foundation to be treated. The water generated when the foundation to be treated is drained and consolidated is discharged to the outside through the vertical drainage well 8 and the horizontal drainage structure.

[0053] In the specific implementation of this embodiment, the flexible mesh sheets are connected in pairs to form a bag-like structure, and the surrounding parts are provided with tubular supports 2 that can rotate on the soil anchor rods 4 to achieve the shape change adjustment of the temporary retaining wall unit 7, for example, Figure 4 In the embodiment, by rotating the tubular support 2, a plurality of temporary retaining wall units 7 can form an arc-shaped corner when connected.

[0054] The vertical drainage well 8 can be an ordinary sand well, a bagged sand well or a plastic drainage well.

[0055] The mesh reinforcement ribs 3 at the position of the water-permeable mesh 13 are densely arranged.

[0056] All major components of the temporary retaining wall unit 7 can be uniformly processed in the factory, folded and transported to the site for unfolding and positioning, and the retaining wall frame construction can be completed, with high construction efficiency.

[0057] Although the above embodiments have described the concepts and embodiments of the purpose of the utility model in detail with reference to the accompanying drawings, ordinary technicians in this field can recognize that various improvements and modifications can still be made to the utility model without departing from the scope of the claims, so they are not described one by one here.

Claims

1. A foundation treatment structure with preloading, drainage and consolidation, comprising a ballast system arranged above the foundation to be treated and a drainage system arranged in the ballast system, characterized in that: The ballast system comprises a temporary retaining wall unit and a pile carrier, wherein the temporary retaining wall unit is arranged at the side of the pile carrier and supports the pile carrier, wherein the temporary retaining wall unit is inserted into the foundation to be treated through a soil anchor rod; The drainage system includes a vertical drainage well, a horizontal drainage structure and a sand cushion layer. The sand cushion layer is laid on the inner bottom position of the temporary retaining wall unit and the bottom position of the pile carrier respectively. The horizontal drainage structure is buried in the sand cushion layer. The vertical drainage well is arranged between the sand cushion layer and the foundation to be treated and is connected to the horizontal drainage structure.

2. The foundation treatment structure of preloading and drainage consolidation according to claim 1 is characterized by: The temporary retaining wall unit includes a flexible mesh, soil anchor rods and a permeable mesh, wherein a plurality of the soil anchor rods are connected by the flexible mesh to form a whole and enclose a filling space, a pile carrier is filled in the filling space, the sand cushion layer is laid at a position below the pile carrier, and the permeable mesh is arranged on the flexible mesh at a position corresponding to the sand cushion layer.

3. The foundation treatment structure of preloading and drainage consolidation according to claim 2 is characterized by: The pile carrier and the sand cushion layer are separated by a permeable coiled material.

4. The foundation treatment structure of preloading and drainage consolidation according to claim 2 is characterized by: The lower end of the soil anchor rod has a cone tip and is sleeved with a tubular support, and the flexible mesh is connected to the tubular support.

5. The foundation treatment structure of preloading and drainage consolidation according to claim 3 is characterized by: A plurality of the temporary retaining wall units can be stacked in the horizontal direction or in the height direction within the scope of the foundation to be treated.

6. The foundation treatment structure of preloading and drainage consolidation according to claim 1 is characterized by: Along the height direction, a plurality of the horizontal drainage structures are arranged at intervals in the sand cushion layer of the temporary retaining wall unit and the pile carrier.

7. The foundation treatment structure of preloading and drainage consolidation according to claim 6 is characterized by: The horizontal drainage structure arranged in the temporary retaining wall unit is a horizontal drainage blind pipe, one end of which extends into the range of the stack carrier, and the other end extends out of the temporary retaining wall unit.

8. The foundation treatment structure of preloading and drainage consolidation according to claim 7 is characterized by: The horizontal drainage blind pipe extends out of the temporary retaining wall unit and is provided with a horizontal water collection pipe or a wall-side water collection ditch on one side.

9. The foundation treatment structure of preloading and drainage consolidation according to claim 6 is characterized by: The horizontal drainage structure arranged in the stack carrier is a drainage blind pipe or a blind ditch.

10. The foundation treatment structure of preloading and drainage consolidation according to claim 1, characterized in that: A plurality of the vertical drainage wells are provided in a range corresponding to the temporary retaining wall unit and the stack carrier, and the plurality of the vertical drainage wells are arranged in an array.

Citation Information

Cited By

  • Foundation treatment method for preloading drainage consolidation

    CN118065338A