System for utilizing large slag waste heat of coal-fired power plant boiler
By installing a tubular heat exchanger in the coal-fired power station boiler, the heat of the large slag is used to heat the cold primary and secondary air, which solves the problems of waste heat waste and air preheater blockage prevention, and improves the efficiency of the boiler and the economy of the entire plant. performance, improving the load carrying capacity of the steam turbine.
Patent Information
- Application Number
- CN202420228523.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-30
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2034-01-30
AI Technical Summary
The waste heat of large slag in coal-fired power station boilers has not been effectively utilized, resulting in low boiler efficiency and low economic efficiency of the entire plant. At the same time, there is a problem of air preheater anti-blocking. Commonly used air heaters heat cold air and occupy steam, reducing the load capacity of the steam turbine. .
A tubular heat exchanger is installed below the boiler furnace to exchange the heat of the large slag with the cooling water. After the temperature rises, the cold primary and secondary air is heated, reducing the amount of steam extracted by the turbine, improving the load capacity of the unit, and returning the heat to the jellyfish. Pipes and variable frequency water pumps realize water circulation.
It effectively utilizes the heat of large slag, improves boiler efficiency and overall plant economy, improves the load capacity of the steam turbine, and reduces steam usage.
Smart Images

Figure CN221923570U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the field of coal burning, and in particular relates to a system for utilizing waste heat from large slag of a coal-fired power station boiler. Background Art
[0002] The slag generated by the combustion of pulverized coal in coal-fired power plant boilers falls from the furnace to the slag picker and is taken away after cooling. Before entering the slag picker, its temperature is 600-800℃. After entering the slag picker, it will be cooled to 60-80℃ by air or water and then taken away by the slag picker chain. Therefore, the heat carried by the slag is not used and discharged. This part of heat is included in the physical heat loss of the slag in the process of boiler efficiency calculation. Therefore, making good use of this part of heat can improve the boiler efficiency and improve the economy of the whole plant.
[0003] Preventing blockage of air preheaters in coal-fired power plants is also a key task. Currently, the commonly used method is to install a heater in front of the air preheater to heat the cold air to 40℃ to 50℃. The heating steam source is the auxiliary steam header or five-stage extraction steam, which occupies the steam entering the turbine and reduces the unit's load capacity. Summary of the invention
[0004] The utility model aims to provide a system for utilizing waste heat from large slag of coal-fired power station boilers, thereby solving the defect of waste heat from large slag of existing coal-fired power station boilers.
[0005] In order to achieve the above purpose, the technical solution adopted by the utility model is:
[0006] The utility model provides a system for utilizing waste heat from large slag of a coal-fired power station boiler, comprising a tubular heat exchanger, which is arranged at a cold ash hopper below the furnace of the boiler and arranged along the left and right directions of the bottom of the cold ash hopper;
[0007] The cooling water outlet of the tubular heat exchanger is connected to a heat exchange component for exchanging heat with primary air and secondary air.
[0008] Preferably, the heat exchange component includes a primary air heater and a secondary air heater, wherein the primary air heater is arranged in the connecting air duct from the primary fan outlet to the air preheater inlet; the secondary air heater is placed in the connecting air duct from the secondary fan outlet to the air preheater inlet.
[0009] Preferably, the cooling water outlet of the tubular heat exchanger is connected to the primary air heater and the secondary air heater respectively through a water supply main pipe.
[0010] Preferably, the cooling water inlet of the tubular heat exchanger is connected to the water injection pipeline through a return water main pipe.
[0011] Preferably, a variable frequency water pump is provided on the water return main pipe.
[0012] Preferably, an electric water injection door is provided on the water injection pipeline.
[0013] Preferably, a water discharge pipe is also provided on the water return main pipe.
[0014] Preferably, a water discharge pipe electric door is provided on the water discharge pipe.
[0015] Preferably, the tubular heat exchanger comprises an inlet header, heat exchange tubes and an outlet header, wherein:
[0016] The heat exchange tubes are provided in plurality, and the plurality of heat exchange tubes are evenly distributed on the inlet header and communicated with the inlet header; the free ends of the heat exchange tubes are communicated with the outlet header;
[0017] The inlet header is connected to a water return main pipe, and the outlet header is connected to a water supply main pipe.
[0018] Compared with the prior art, the beneficial effects of the utility model are:
[0019] The utility model provides a system for utilizing waste heat from large slag in a coal-fired power station boiler. The system utilizes a tubular heat exchanger installed at a cold ash hopper to perform heat exchange processing on the heat carried by the large slag discharged from the boiler, and then utilizes the heated cooling water to heat the cold primary and secondary air, thereby reducing the steam extraction of the steam turbine, allowing more steam to enter the steam turbine to do work, and effectively improving the load-carrying capacity of the unit; at the same time, the heat carried by the large slag in the boiler is utilized, and the economy of the entire plant is improved. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 This is a schematic diagram of the structure of the slag waste heat utilization system of the embodiment of this patent;
[0021] Figure 2 This is a schematic diagram of the structure of the tubular heat exchanger of this patent;
[0022] In the figure: 1-furnace; 2-tubular heat exchanger; 3-frequency conversion water pump; 4-return main pipe; 5-water supply main pipe; 6-primary air heater water inlet pipe; 7-secondary air heater water inlet pipe; 8-primary air heater; 9-secondary air heater; 10-primary air heater water outlet pipe; 11-secondary air heater water outlet pipe; 12-cold primary air; 13-hot primary air; 14-cold secondary air; 15-hot secondary air; 16-water injection pipe; 17-water injection pipe electric door; 18-drain pipe; 19-drain pipe electric door; 20-primary heater emptying electric door; 21-secondary air heater emptying electric door; 22-inlet header; 23-heat exchange tube; 24-outlet header. DETAILED DESCRIPTION
[0023] In the following description, specific details such as specific system structures and technologies are provided for the purpose of illustration rather than limitation, so as to provide a thorough understanding of the embodiments of the present application. However, it should be clear to those skilled in the art that the present application may also be implemented in other embodiments without these specific details. In other cases, detailed descriptions of well-known systems, devices, and circuits are omitted to prevent unnecessary details from obstructing the description of the present application.
[0024] Example 1
[0025] like Figure 1 and Figure 2 As shown, the present embodiment provides a system for utilizing waste heat from large slag of a coal-fired power plant boiler, comprising a tubular heat exchanger 2, a variable frequency water pump 3, a return water main pipe 4, a water supply main pipe 5, a primary air heater water inlet main pipe 6, a secondary air heater water inlet main pipe 7, a primary air heater 8, a secondary air heater 9, a primary air heater outlet pipe 10, a secondary air heater outlet pipe 11, cold primary air 12, hot primary air 13, cold secondary air 14, hot secondary air 15, a water injection pipe 16, a water injection pipe electric door 17, a water discharge pipe 18, a water discharge pipe electric door 19, a primary air heater emptying electric door 20 and a secondary air heater emptying electric door 21, wherein:
[0026] The tubular heat exchanger 2 is arranged at the cold ash hopper below the furnace 1, and the tubular heat exchanger 2 is arranged along the left and right direction of the bottom of the cold ash hopper.
[0027] The tubular heat exchanger 2 is connected to a water supply main pipe 5 and a water return main pipe 4 respectively, and a variable frequency water pump 3 is installed on the water return main pipe 4 .
[0028] The water outlet in the water supply main pipe 5 is connected to the primary air heater 8 and the secondary air heater 9 through the primary air heater water inlet pipe 6 and the secondary air heater water inlet pipe 7 respectively, so that the cold primary air 12 and the cold secondary air 14 are heated into hot primary air 13 and hot secondary air 15.
[0029] The primary air heat exchanger and the secondary air heat exchanger are respectively arranged in the connecting air duct from the primary air fan outlet to the air preheater inlet and the connecting air duct from the secondary air fan outlet to the air preheater inlet.
[0030] The water inlet of the return water main pipe 4 is connected to a water injection pipe 16 , and the water injection pipe 16 is provided with a water injection electric door 17 .
[0031] The return water main pipe 4 is also provided with a drain pipe 18 , and the drain pipe 18 is provided with a drain pipe electric door 19 .
[0032] A primary air heater vent door 20 is arranged at a high point of the primary air heater 8 , and a secondary air heater vent door 21 is arranged at a high point of the secondary air heater 9 .
[0033] The operation mode of this embodiment is as follows:
[0034] Before the boiler is ignited, the drain electric door 19 is closed, the primary air heater drain door 20, the secondary air heater drain door 21 and the water injection electric door 17 are opened, and the entire system is filled with water through the water injection pipe 16, and then the primary air heater drain door 20, the secondary air heater drain door 21 and the water injection electric door 16 are closed, and the variable frequency water pump 3 is started to establish a water circulation system;
[0035] After the boiler is ignited, the boiler slag falls through the gap between the heat exchange tubes of the tubular heat exchanger 2 and enters the slag remover. The high-temperature slag exchanges heat with the cooling water to form high-temperature hot water, which passes through the water supply main pipe 5 and enters the primary air heater water inlet pipe 6 and the secondary air heater water inlet pipe 7 respectively. Then, it enters the primary air heater 8 and the secondary air heater 9 again to exchange heat with the cold primary air 12 and the cold secondary air 14. After the heat exchange, it becomes low-temperature water, which passes through the primary air heater water outlet pipe 10 and the secondary air heater water outlet pipe 11 and enters the return water main pipe 4 respectively. After being pressurized by the variable frequency water pump 3, it enters the tubular heat exchanger again to be heated by the high-temperature slag.
[0036] The primary air and the secondary air are heated through the water supply main pipe 5, the primary air heater water inlet pipe 6 and the secondary air heater water inlet pipe 7 to form a circulation. The cold primary air 12 is heated by the primary air heater 8 to become the hot primary air 13 for the boiler, and the cold secondary air 14 is heated by the secondary air heater 9 to become the hot secondary air 15 for the boiler.
[0037] After the boiler is shut down or the heater is shut down for various reasons, open the primary air heater vent door 20, the secondary air heater vent door 21, and the drain pipe electric door 19 to drain the water in the system.
[0038] Example 2
[0039] On the basis of Example 1, this embodiment provides a system for utilizing waste heat from large slag of a coal-fired power station boiler, wherein the tubular heat exchanger 2 includes an inlet header 22, heat exchange tubes 23 and an outlet header 24, wherein:
[0040] A plurality of heat exchange tubes 23 are provided, and the plurality of heat exchange tubes are evenly distributed on the inlet header 22 and communicated with the inlet header 22 ; the free ends of the heat exchange tubes are communicated with the outlet header 24 .
[0041] The inlet header 22 is connected to the water return main pipe 4 , and the outlet header 24 is connected to the water supply main pipe 5 .
[0042] The embodiments described above are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, a person skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application, and should all be included in the protection scope of the present application.
Claims
1. A system for utilizing waste heat from large slag of coal-fired power station boilers, characterized in that: It includes a tubular heat exchanger, which is arranged at the cold ash hopper below the boiler furnace and arranged along the left and right directions of the bottom of the cold ash hopper; The cooling water outlet of the tubular heat exchanger is connected to a heat exchange component for exchanging heat with primary air and secondary air.
2. A system for utilizing waste heat from large slag of a coal-fired power station boiler according to claim 1, characterized in that: The heat exchange component includes a primary air heater and a secondary air heater, wherein the primary air heater is arranged in the connecting air duct from the primary fan outlet to the air preheater inlet; the secondary air heater is placed in the connecting air duct from the secondary fan outlet to the air preheater inlet.
3. A system for utilizing waste heat from large slag of a coal-fired power station boiler according to claim 2, characterized in that: The cooling water outlet of the tubular heat exchanger is respectively connected to the primary air heater and the secondary air heater through the water supply main pipe.
4. The system for utilizing waste heat from large slag of a coal-fired power station boiler according to claim 1 is characterized in that: The cooling water inlet arranged on the tubular heat exchanger is connected to the water injection pipeline through the return water main pipe.
5. A system for utilizing waste heat from large slag of a coal-fired power station boiler according to claim 4, characterized in that: The return water main pipe is provided with a variable frequency water pump.
6. The system for utilizing waste heat from large slag of a coal-fired power station boiler according to claim 4 is characterized in that: The water injection pipeline is provided with a water injection electric door.
7. The system for utilizing waste heat from large slag of a coal-fired power station boiler according to claim 4 is characterized in that: The return water main pipe is also provided with a water discharge pipe.
8. The system for utilizing waste heat from large slag of a coal-fired power station boiler according to claim 7 is characterized in that: The drain pipe is provided with a drain pipe electric door.
9. The system for utilizing waste heat from large slag of a coal-fired power station boiler according to claim 1, characterized in that: The tubular heat exchanger comprises an inlet header, heat exchange tubes and an outlet header, wherein: The heat exchange tubes are provided in plurality, and the plurality of heat exchange tubes are evenly distributed on the inlet header and communicated with the inlet header; the free ends of the heat exchange tubes are communicated with the outlet header; The inlet header is connected to a water return main pipe, and the outlet header is connected to a water supply main pipe.
Citation Information
Cited By
System and method for utilizing large slag waste heat of coal-fired power plant boiler
CN117948611A
