Conveying structure and paint spraying system
By designing an automated conveying structure and painting system, the problems of large working strength and discontinuous feeding caused by manual handling in brake valve processing are solved, automatic loading and unloading and continuous feeding are realized, and work efficiency and space utilization are improved. efficiency.
Patent Information
- Application Number
- CN202420017340.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-03
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2034-01-03
AI Technical Summary
During the processing of brake valves, manual handling leads to high working strength and the inability to ensure continuous feeding, which affects efficiency.
A conveying structure is designed, including docking conveying devices and annular conveying devices, forming a conveying line for automatic loading and unloading, and combining a paint spraying robot and a drying room to realize automated painting and drying, ensuring continuous feeding and efficient transportation.
It reduces the intensity of human work, improves work efficiency, ensures continuous material supply, avoids the problem of unblocked material flow caused by untimely manual handling, and optimizes the space layout and equipment footprint.
Smart Images

Figure CN221951487U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of paint spraying equipment, in particular to a conveying structure and a paint spraying system. Background Art
[0002] Brake valves are essential equipment for safe railway operation. The function of brake valves is to force the moving train to take emergency brakes to avoid traffic accidents caused by emergencies. Painting is one of the important steps in the brake valve processing process. Usually, the brake valve is manually moved to the workbench, which not only has high labor intensity, but also cannot ensure continuous material supply, affecting work efficiency. Utility Model Content
[0003] The embodiment of the utility model provides a conveying structure and a paint spraying system, which can realize automatic loading and unloading, which not only reduces the intensity of manual work and improves work efficiency, but also ensures continuous feeding.
[0004] In a first aspect, an embodiment of the utility model provides a conveying structure, comprising:
[0005] A docking conveying device, the docking conveying device comprising a first conveying assembly and a second conveying assembly spaced apart in a height direction, the first conveying assembly being located above the second conveying assembly and parallel to the second conveying assembly, and a loading station and an unloading station being arranged on the first conveying assembly;
[0006] An annular conveying device, wherein the annular conveying device has a painting station, a material receiving station and a material feeding station, and the painting station is located between the material receiving station and the material feeding station;
[0007] Among them, part of the conveying section of the first conveying component, part of the conveying section of the annular conveying device and the second conveying component together form a loading conveying line to convey the objects to be transported through the unloading station and the receiving station to the painting station, and another part of the conveying section of the second conveying component and another part of the conveying section of the annular conveying device together form a unloading conveying line to convey the objects to be transported after painting to the outside through the feeding station and the loading station.
[0008] In one embodiment, the conveying structure also includes a return plate lifting device, which is arranged at one end of the docking conveying device. The return plate lifting device can drive the object to be transported to move in the height direction so that the object to be transported can be transferred between the first conveying component and the second conveying component.
[0009] In one embodiment, the conveying structure also includes a loading and unloading material transfer device, which is arranged between the docking conveying device and the annular conveying device, and the loading and unloading material transfer device can transfer the objects to be transported between the unloading station and the receiving station, and between the feeding station and the loading station.
[0010] In one embodiment, the first conveying assembly and the second conveying assembly both include:
[0011] An external butt-jointed conveying section extending in the length direction;
[0012] A transition conveying section, parallel to the outer docking conveying section;
[0013] A lifting and transferring mechanism is arranged on the outer docking conveying section and the transition conveying section, and the lifting and transferring mechanism can transfer the object to be transported between the outer docking conveying section and the transition conveying section;
[0014] An inner docking conveying section is arranged on an end of the transition conveying section away from the lifting and transferring mechanism, and the inner docking conveying section is parallel to the width direction;
[0015] Wherein, the return plate lifting device is arranged on one end of the inner docking conveying section away from the transition conveying section, and the loading station and the unloading station are both arranged on the inner docking conveying section of the first conveying component.
[0016] In one embodiment, the annular conveying device comprises:
[0017] A material transfer and docking conveying section parallel to the width direction;
[0018] A paint spraying conveying section is arranged opposite to the material transfer and docking conveying section in the length direction, and the paint spraying conveying section is parallel to the width direction;
[0019] An identification transition conveying section, the two ends of which are respectively connected to the material transfer and docking conveying section and the paint spraying conveying section, the identification transition conveying section is parallel to the length direction, and a visual identification station is arranged on the identification transition conveying section;
[0020] A reflux docking conveying section, both ends of which are respectively connected to the material transfer docking conveying section and the paint spraying conveying section, the reflux docking conveying section is parallel to the length direction, and a paint film detection station is arranged on the reflux docking conveying section;
[0021] Among them, the painting station is arranged on the painting conveying section, and the material receiving station and the material feeding station are both arranged on the material transfer and docking conveying section.
[0022] In one embodiment, the loading conveyor line includes the identification transition conveying section, the paint conveying section located between the material receiving station and the identification transition conveying section, the inner docking conveying section located between the unloading station and the return plate lifting device, and the paint conveying section located between the paint station and the identification transition conveying section.
[0023] In a second aspect, an embodiment of the utility model provides a paint spraying system, comprising the conveying structure as described above.
[0024] In one embodiment, the painting system further comprises:
[0025] A painting robot is arranged on one side of the painting conveying section to paint the object to be transported on the painting station;
[0026] A drying room is arranged at one side of the painting station, and is used for drying the paint sprayed on the object to be transported.
[0027] In one embodiment, the paint spraying system further comprises a paint spraying room arranged on the paint spraying station, and the paint spraying room can recover paint mist in the paint spraying.
[0028] In one embodiment, the paint spraying system further comprises a paint mist treatment device disposed above the paint spraying room, wherein the paint mist treatment device is disposed above the paint spraying room and is in communication with the paint spraying room.
[0029] Compared with the prior art, the advantages of the embodiments of the utility model are that, by setting the loading and unloading conveying lines formed by the docking conveying device and the annular conveying device, the automatic loading and unloading of the objects to be transported are realized, which not only reduces the intensity of manual work and improves work efficiency, but also ensures continuous feeding, avoiding the problem of unsmooth material flow caused by untimely manual handling leading to untimely flow of the objects to be transported. By setting the first conveying assembly and the second conveying assembly arranged at intervals in the height direction, the space is reasonably utilized and the spatial layout is optimized, which not only reduces the floor space of the conveying structure, but also facilitates the continuous operation and cyclic communication between the various painting processes. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] The present invention will be described in more detail below based on embodiments and with reference to the accompanying drawings.
[0031] Figure 1 It is a three-dimensional structural schematic diagram of a paint spraying system provided by an embodiment of the utility model;
[0032] Figure 2 yes Figure 1 A top view of a paint spraying system provided in an embodiment;
[0033] Figure 3 It is a three-dimensional structural schematic diagram of a conveying structure provided by another embodiment of the utility model;
[0034] Figure 4 yes Figure 3 A top view of the conveying structure provided in the embodiment.
[0035] Reference numerals:
[0036] 10. Docking conveying device; 110. First conveying assembly; 1101. Loading station; 1102. Unloading station; 120. Second conveying assembly; 130. External docking conveying section; 140. Transition conveying section; 150. Lifting and transferring mechanism; 160. Internal docking conveying section;
[0037] 20. Annular conveying device; 210. Painting station; 220. Material receiving station; 230. Material feeding station; 240. Material transfer and docking conveying section; 250. Painting conveying section; 260. Identification and transition conveying section; 270. Reflux docking conveying section; 280. Visual recognition station; 290. Paint film inspection station;
[0038] 30. Return plate lifting device;
[0039] 40. Loading and unloading material transfer device;
[0040] 50. Painting robot;
[0041] 60. Drying room;
[0042] 70. Paint spraying room;
[0043] 80. Paint mist treatment device. DETAILED DESCRIPTION
[0044] The utility model will be further described below in conjunction with the accompanying drawings.
[0045] Brake valves are essential equipment for safe railway operation. The function of brake valves is to force the moving train to take emergency brakes to avoid traffic accidents caused by emergencies. Painting is one of the important steps in the brake valve processing process. Usually, the brake valve is manually moved to the workbench, which not only has high labor intensity, but also cannot ensure continuous material supply, affecting work efficiency.
[0046] like Figure 3 , Figure 4As shown, in order to solve the above technical problems, at least one embodiment of the utility model provides a conveying structure, including a docking conveying device 10 and an annular conveying device 20; the docking conveying device 10 includes a first conveying assembly 110 and a second conveying assembly 120 arranged at intervals in the height direction, the first conveying assembly 110 is located above the second conveying assembly 120 and parallel to the second conveying assembly 120, and the first conveying assembly 110 is provided with a loading station 1101 and a unloading station 1102; the annular conveying device is provided with a painting station 210, a receiving station 220 and a feeding station 230, and the painting station 210 is located between the receiving station 220 and the feeding station 230;
[0047] Among them, part of the conveying section of the first conveying component 110, part of the conveying section of the annular conveying device 20 and the second conveying component 120 together form a loading conveying line to convey the objects to be transported to the painting station 210, and another part of the conveying section of the second conveying component 120 and another part of the conveying section of the annular conveying device 20 together form a unloading conveying line to convey the objects to be transported to the outside.
[0048] As can be seen from the above, by setting the loading and unloading conveying lines formed by the docking conveying device 10 and the annular conveying device 20, automatic loading and unloading of the objects to be transported are realized, which not only reduces the intensity of manual work and improves work efficiency, but also ensures continuous feeding, avoiding the problem of unsmooth material flow caused by untimely manual handling leading to untimely flow of the objects to be transported. By setting the first conveying assembly 110 and the second conveying assembly 120 arranged at intervals in the height direction, the space is reasonably utilized and the spatial layout is optimized, which not only reduces the floor space of the conveying structure, but also facilitates continuous operation and cyclic communication between the various painting processes.
[0049] It should be noted that the first conveying component 110 and the second conveying component 120 include but are not limited to belt conveyors, chain conveyors, and chain conveyors. The structures and working principles of the first conveying component 110 and the second conveying component 120 are all existing technologies and are not limited in this application.
[0050] It should also be noted that if Figure 3 As shown, the height direction is parallel to the Z direction, the length direction is parallel to the Y direction, and the width direction is parallel to the X direction.
[0051] It should also be noted that by setting up the loading station 1101, the unloading station 1102, the painting station 210, the receiving station 220 and the feeding station 230, different operations are performed on the transported objects to ensure the continuous operation of each painting process.
[0052] It should also be noted that the objects to be transported include but are not limited to brake valves.
[0053] It should also be noted that the conveying directions of the first conveying component 110 and the second conveying component 120 can be the same or opposite, and can be set specifically according to actual transportation needs.
[0054] like Figure 3 , Figure 4 As shown, the conveying structure includes a docking conveying device 10 and an annular conveying device 20; the docking conveying device 10 includes a first conveying assembly 110 and a second conveying assembly 120 arranged at intervals in the height direction, the first conveying assembly 110 is located above the second conveying assembly 120 and is parallel to the second conveying assembly 120, and the first conveying assembly 110 is provided with a loading station 1101 and a unloading station 1102; the annular conveying device is provided with a painting station 210, a receiving station 220 and a feeding station 230, and the painting station 210 is located between the receiving station 220 and the feeding station 230;
[0055] Among them, part of the conveying section of the first conveying component 110, part of the conveying section of the annular conveying device 20 and the second conveying component 120 together form a loading conveying line to convey the objects to be transported to the painting station 210, and another part of the conveying section of the second conveying component 120 and another part of the conveying section of the annular conveying device 20 together form a unloading conveying line to convey the objects to be transported to the outside.
[0056] By setting the loading and unloading conveying lines formed by the docking conveying device 10 and the annular conveying device 20, automatic loading and unloading of the objects to be transported are realized, which not only reduces the intensity of manual work and improves work efficiency, but also ensures continuous feeding, avoiding the problem of unsmooth material flow caused by untimely manual handling leading to untimely flow of the objects to be transported. By setting the first conveying assembly 110 and the second conveying assembly 120 arranged at intervals in the height direction, the space is reasonably utilized and the spatial layout is optimized, which not only reduces the floor space of the conveying structure, but also facilitates continuous operation and cyclic communication between the various painting processes.
[0057] It should be noted that the first conveying component 110 and the second conveying component 120 include but are not limited to belt conveyors, chain conveyors, and chain conveyors. The structures and working principles of the first conveying component 110 and the second conveying component 120 are all existing technologies and are not limited in this application.
[0058] It should also be noted that if Figure 3 As shown, the height direction is parallel to the Z direction, the length direction is parallel to the Y direction, and the width direction is parallel to the X direction.
[0059] It should also be noted that by setting up the loading station 1101, the unloading station 1102, the painting station 210, the receiving station 220 and the feeding station 230, different operations are performed on the transported objects to ensure the continuous operation of each painting process.
[0060] It should also be noted that the objects to be transported include but are not limited to brake valves.
[0061] It should also be noted that the conveying directions of the first conveying component 110 and the second conveying component 120 can be the same or opposite, and can be set specifically according to actual transportation needs.
[0062] like Figure 3 , Figure 4 As shown, in some embodiments, the conveying structure also includes a return plate lifting device 30, which is arranged at one end of the docking conveying device 10. The return plate lifting device 30 can drive the object to be transported to move in the height direction so that the object to be transported can be transferred between the first conveying component 110 and the second conveying component 120.
[0063] By providing the return plate lifting device 30 to drive the objects to be transported to move between the first conveying assembly 110 and the second conveying assembly 120, the objects to be transported can be transferred and transported in the height direction, thereby improving the transport efficiency of the conveying structure.
[0064] It should be noted that the return plate lifting device 30 includes but is not limited to a lift, and the specific structure and working principle of the lift are prior art, which will not be described in detail in this application. For example, the return plate lifting device 30 is a fork lift with good lifting stability; in addition, a translation cylinder can be set on the lifting platform of the lift, and when the lifting platform of the lift is lifted to the height of the first conveying assembly 110 or the second conveying assembly 120, the telescopic rod of the translation cylinder pushes the object to be transported on the lifting platform to the first conveying assembly 110 or the second conveying assembly 120.
[0065] like Figure 3 , Figure 4 As shown, in some embodiments, the conveying structure also includes a loading and unloading transfer device 40, which is arranged between the docking conveying device 10 and the annular conveying device 20. The loading and unloading transfer device 40 can transfer the objects to be transported between the unloading station 1102 and the receiving station 220, and between the feeding station 230 and the loading station 1101.
[0066] By setting up a loading and unloading transfer device 40, the objects to be transported are driven to move between the docking conveying device 10 and the annular conveying device 20 to ensure continuous transportation and improve the transportation efficiency of the conveying structure; the objects to be transported that are to be painted are transferred from the docking conveying device 10 to the annular conveying device 20 through the unloading station 1102 and the receiving station 220 to prepare for painting; the objects to be transported that have been painted are transferred from the annular conveying device 20 to the docking conveying device 10 through the feeding station 230 and the loading station 1101 to prepare for transportation to the next process.
[0067] It should be noted that the loading and unloading material transfer device 40 includes but is not limited to a multi-axis robot with multiple degrees of freedom; the specific structure and working principle of the multi-axis robot are existing technologies and will not be repeated in this application.
[0068] like Figure 3 , Figure 4 As shown, in some embodiments, the first conveying assembly 110 and the second conveying assembly 120 both include an outer docking conveying section 130, a transition conveying section 140, a lifting and transferring mechanism 150, and an inner docking conveying section 160; the outer docking conveying section 130 extends along the length direction; the transition conveying section 140 is parallel to the outer docking conveying section 130; the lifting and transferring mechanism 150 is arranged on the outer docking conveying section 130 and the transition conveying section 140, and the lifting and transferring mechanism 150 can transfer the objects to be transported between the outer docking conveying section 130 and the transition conveying section 140; the inner docking conveying section 160 is arranged on one end of the transition conveying section 140 away from the lifting and transferring mechanism 150, and the inner docking conveying section 160 is parallel to the width direction;
[0069] Among them, the return plate lifting device 30 is arranged on one end of the inner docking conveying section 160 away from the transition conveying section 140, and the loading station 1101 and the unloading station 1102 are both arranged on the inner docking conveying section 160 of the first conveying component 110.
[0070] By setting the outer butt conveying section 130 and the transition conveying section 140 extending in the length direction and the inner butt conveying section 160 extending in the width direction, the site is fully utilized for reasonable layout, and the material flow in the production process is guaranteed. The lifting and transferring mechanism 150 is used to transfer the objects to be transported in the transition conveying section 140 and the inner butt conveying section 160, thereby improving the transportation efficiency and automation of the conveying structure.
[0071] It should be noted that the lifting and transferring mechanism 150 is used to change the conveying direction of the articles and has the characteristics of simple structure, stability and reliability. The specific structure and working principle of the lifting and transferring mechanism 150 are both existing technologies and will not be repeated in this application.
[0072] It should also be noted that an inner turning conveyor is provided at one end of the inner docking conveying section 160 close to the transition conveying section 140. The inner turning conveyor includes but is not limited to a lifting and transferring machine, a turning belt conveyor, and a roller turning conveyor, thereby changing the conveying direction of the objects to be transported and achieving a turn, so that the objects to be transported can be smoothly changed in direction from the transition conveying section 140 to the inner docking conveying section 160.
[0073] like Figure 3 , Figure 4 As shown, in some embodiments, the annular conveying device 20 includes a material transfer docking conveying section 240, a paint spraying conveying section 250, an identification transition conveying section 260, and a reflux docking conveying section 270; the material transfer docking conveying section 240 is parallel to the width direction; the paint spraying conveying section 250 and the material transfer docking conveying section 240 are arranged opposite to each other in the length direction, and the paint spraying conveying section 250 is parallel to the width direction; the two ends of the identification transition conveying section 260 are respectively connected to the material transfer docking conveying section 240 and the paint spraying conveying section 250, and the identification transition conveying section 260 is connected to the material transfer docking conveying section 240 and the paint spraying conveying section 250. The conveying section 260 is parallel to the length direction, and a visual recognition station 280 is arranged on the identification transition conveying section 260; the two ends of the reflux docking conveying section 270 are respectively connected to the material transfer docking conveying section 240 and the paint spraying conveying section 250, and the reflux docking conveying section 270 is parallel to the length direction, and a visual recognition station 280 is arranged on the reflux docking conveying section 270; among them, the paint spraying station 210 is arranged on the paint spraying conveying section 250, and the material receiving station 220 and the feeding station 230 are both arranged on the material transfer docking conveying section 240.
[0074] By setting up a material transfer and docking conveying section 240, a paint spraying conveying section 250, an identification transition conveying section 260, and a reflux docking conveying section 270, a ring conveying device 20 is formed to save layout space, and different workstations are set on each conveying section to complete different processes, thereby realizing automatic transportation of the objects to be conveyed in each process, ensuring stable and continuous operation of the paint spraying system, and balancing the production rhythm.
[0075] It should be noted that the material transfer and docking conveying section 240, the paint spraying conveying section 250, the identification and transition conveying section 260, and the reflux docking conveying section 270 all include but are not limited to belt conveyors, chain conveyors, and chain conveyors. The structures and working principles of the material transfer and docking conveying section 240, the paint spraying conveying section 250, the identification and transition conveying section 260, and the reflux docking conveying section 270 are all existing technologies and are not limited in this application.
[0076] It should also be noted that the material transfer docking conveying section 240 can be connected to the identification transition section and the reflux docking conveying section 270 through a first turning machine. The first turning machine includes but is not limited to a lifting transfer machine, a turning belt conveyor, and a roller turning conveyor, thereby changing the conveying direction of the objects to be transported and realizing the turning of the objects to be transported.
[0077] It should also be noted that the visual recognition station 280 is a station used to identify the number and / or coding information on the object to be transported before painting; the visual recognition station 280 is a station used to detect the paint film thickness of the object to be transported after painting.
[0078] like Figure 3 , Figure 4 As shown, in some embodiments, the loading conveyor line includes an identification transition conveying section 260, a paint conveying section 250 located between the material receiving station 220 and the identification transition conveying section 260, an internal docking conveying section 160 located between the unloading station 1102 and the return plate lifting device 30, and a paint conveying section 250 located between the painting station 210 and the identification transition conveying section 260.
[0079] It should be noted that the loading conveyor line also includes a second conveyor component 120 .
[0080] The conveying process of the utility model:
[0081] The object to be transported flows into the outer docking conveying section 130 of the second conveying assembly 120, is sent to the transition conveying section 140 of the second conveying assembly 120 through the lifting and transferring mechanism 150, and is then sent to the inner docking conveying section 160 of the second conveying assembly 120 through the inner turning conveyor, and is transported to the return plate lifting device 30. The return plate lifting device 30 transfers the object to be transported to the inner docking conveying section 160 of the first conveying assembly 110. When the object to be transported is transported to the unloading station 1102, the loading and unloading transfer device 40 transfers the object to be transported to the receiving station 220. The material transfer docking conveying section 240, the identification transition conveying section 260, and the painting conveying section 250 sequentially transport the object to be transported to the painting station 210.
[0082] After painting is completed at the paint spraying station 210, the paint spraying conveying section 250 continues to convey the object to be transported to the reflux docking conveying section 270, the reflux docking conveying section 270 and the material transfer docking conveying section 240 successively convey the object to be transported to the feeding station 230, the loading and unloading material transfer device 40 transfers the object to be transported to the loading station 1101, and the inner docking conveying section 160, the transition conveying section 140, and the outer docking conveying section 130 of the first conveying component 110 successively convey the object to be transported to the next stage of the process.
[0083] like Figure 1 , Figure 2 As shown, at least one embodiment of the utility model further provides a paint spraying system, including the conveying structure of any embodiment of the utility model, and thus having all the technical effects brought by the technical solutions of the above embodiments.
[0084] like Figure 1 , Figure 2As shown, in some embodiments, the paint spraying system also includes a paint spraying robot 50 and a drying room 60; the paint spraying robot 50 is arranged on one side of the paint spraying conveying section 250 to spray paint the objects to be transported on the paint spraying station 210; the drying room 60 is arranged on one side of the paint spraying station 210, and the drying room 60 is used to dry the paint sprayed on the objects to be transported.
[0085] Automatic painting is achieved by setting up a painting robot 50, thereby improving painting efficiency and painting quality; the objects to be transported after painting are dried in a drying room 60, so that the paint sprayed on the objects to be transported can be dried quickly.
[0086] It should be noted that there can be multiple paint spraying robots 50 and multiple drying rooms 60 .
[0087] It should also be noted that the painting system also includes an auxiliary room, and the painting robot 50 is arranged in the auxiliary room.
[0088] like Figure 1 , Figure 2 As shown, in some embodiments, the paint spraying system further includes a paint spraying room 70 disposed on the paint spraying station 210, and the paint spraying room 70 can recycle paint mist in the paint spraying.
[0089] By providing the paint spraying room 70, the paint mist during the painting process is prevented from spreading, and the waste gas and paint mist during the painting process are easily recovered.
[0090] It should be noted that there may be multiple paint spraying rooms 70 , and the multiple paint spraying rooms 70 and the multiple drying rooms 60 are arranged alternately in the length direction.
[0091] like Figure 1 , Figure 2 As shown, in some embodiments, the paint spraying system further includes a paint mist treatment device 80 disposed above the paint spraying room 70 , and the paint mist treatment device 80 is disposed above the paint spraying room 70 and is connected to the paint spraying room 70 .
[0092] By setting up a paint treatment device, the paint mist generated during the painting process can be treated and purified so that it meets environmental protection requirements before being discharged.
[0093] It should be noted that the paint mist treatment device 80 uses electrostatic force to separate particles from airflow to purify the oil mist; the specific structure and working principle of the paint mist treatment device 80 are existing technologies and will not be repeated in this application.
[0094] Although the present invention has been described with reference to preferred embodiments, various modifications may be made thereto and parts thereof may be replaced with equivalents without departing from the scope of the present invention. In particular, the various technical features mentioned in the various embodiments may be combined in any manner as long as there is no structural conflict. The present invention is not limited to the specific embodiments disclosed herein, but includes all technical solutions falling within the scope of the claims.
Claims
1. A conveying structure, characterized in that: include: A docking conveying device, the docking conveying device comprising a first conveying assembly and a second conveying assembly spaced apart in a height direction, the first conveying assembly being located above the second conveying assembly and parallel to the second conveying assembly, and a loading station and an unloading station being arranged on the first conveying assembly; An annular conveying device, wherein the annular conveying device has a painting station, a material receiving station and a material feeding station, and the painting station is located between the material receiving station and the material feeding station; Among them, part of the conveying section of the first conveying component, part of the conveying section of the annular conveying device and the second conveying component together form a loading conveying line to convey the objects to be transported through the unloading station and the receiving station to the painting station, and another part of the conveying section of the second conveying component and another part of the conveying section of the annular conveying device together form a unloading conveying line to convey the objects to be transported after painting to the outside through the feeding station and the loading station.
2. The conveying structure according to claim 1, characterized in that: The conveying structure also includes a return plate lifting device, which is arranged at one end of the docking conveying device. The return plate lifting device can drive the object to be transported to move in the height direction so that the object to be transported can be transferred between the first conveying component and the second conveying component.
3. The conveying structure according to claim 1, characterized in that: The conveying structure also includes a loading and unloading transfer device, which is arranged between the docking conveying device and the annular conveying device. The loading and unloading transfer device can transfer the objects to be transported between the unloading station and the receiving station, and between the feeding station and the loading station.
4. The conveying structure according to claim 2, characterized in that: The first conveying assembly and the second conveying assembly both include: An external butt-jointed conveying section extending in the length direction; A transition conveying section, parallel to the outer docking conveying section; A lifting and transferring mechanism is arranged on the outer docking conveying section and the transition conveying section, and the lifting and transferring mechanism can transfer the object to be transported between the outer docking conveying section and the transition conveying section; An inner docking conveying section is arranged on an end of the transition conveying section away from the lifting and transferring mechanism, and the inner docking conveying section is parallel to the width direction; Wherein, the return plate lifting device is arranged on one end of the inner docking conveying section away from the transition conveying section, and the loading station and the unloading station are both arranged on the inner docking conveying section of the first conveying component.
5. The conveying structure according to claim 4, characterized in that: The annular conveying device comprises: A material transfer and docking conveying section parallel to the width direction; A paint spraying conveying section is arranged opposite to the material transfer and docking conveying section in the length direction, and the paint spraying conveying section is parallel to the width direction; An identification transition conveying section, the two ends of which are respectively connected to the material transfer and docking conveying section and the paint spraying conveying section, the identification transition conveying section is parallel to the length direction, and a visual identification station is arranged on the identification transition conveying section; A reflux docking conveying section, both ends of which are respectively connected to the material transfer docking conveying section and the paint spraying conveying section, the reflux docking conveying section is parallel to the length direction, and a paint film detection station is arranged on the reflux docking conveying section; Among them, the painting station is arranged on the painting conveying section, and the material receiving station and the material feeding station are both arranged on the material transfer and docking conveying section.
6. The conveying structure according to claim 5, characterized in that: The loading conveyor line includes the identification transition conveying section, the paint conveying section located between the material receiving station and the identification transition conveying section, the inner docking conveying section located between the unloading station and the return plate lifting device, and the paint conveying section located between the paint station and the identification transition conveying section.
7. A paint spraying system, characterized in that: Comprising the conveying structure as described in any one of claims 1-6.
8. The paint spraying system according to claim 7, characterized in that: The painting system also includes: A painting robot is arranged on one side of the painting conveying section to paint the object to be transported on the painting station; A drying room is arranged at one side of the painting station, and is used to dry the paint sprayed on the object to be transported.
9. The paint spraying system according to claim 7, characterized in that: The paint spraying system also includes a paint spraying room arranged on the paint spraying station, and the paint spraying room can recover paint mist in the paint spraying.
10. The paint spraying system according to claim 9, characterized in that: The paint spraying system further comprises a paint mist treatment device arranged above the paint spraying room. The paint mist treatment device is arranged above the paint spraying room and is connected to the paint spraying room.
