Heavy load container

By setting up the main frame, reserved holes and platform components in the container, the problem of insufficient bearing capacity of the standard container is solved, the weight and heat storage of solid electric heat storage equipment are improved, and the unevenness is adapted when multiple boxes are installed in combination. Loading to prevent structural damage.

CN221955044UActive Publication Date: 2024-11-05SHENYANG SHIJIE ELECTRIC
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420579208.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-25
Publication Date
2024-11-05
Estimated Expiration
2034-03-25

AI Technical Summary

Technical Problem

The bearing capacity of existing standard containers is insufficient, which limits the weight and heat storage capacity of solid heat storage bodies in solid electric heat storage equipment, and cannot adapt to uneven loads when multiple containers are installed in combination, resulting in damage to the box structure.

Method used

A heavy-duty container was designed to increase the bearing capacity of the box by setting the main frame assembly, reserved hole assembly and platform assembly in the box, and the structures such as bolted steel beams, fixed bolts and bolted steel columns are bolted. Support to adapt to uneven loads and prevent damage to the box structure.

Benefits of technology

Improve the bearing capacity of the container, avoid the limit on the weight of the solid heat storage body in solid electric heat storage equipment, enhance the heat storage capacity of the skid-mounted electric heat storage equipment, and provide adaptation to uneven loads when multiple containers are installed in combination. fulcrum to prevent damage to the box structure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221955044U_ABST
    Figure CN221955044U_ABST
Patent Text Reader

Abstract

The utility model provides a heavy-load container, and relates to the technical field of containers. The heavy load container comprises a container body, the container body is defined by a skin, the heavy load container further comprises a main body frame assembly, a reserved hole assembly and a platform assembly, the main body frame assembly is arranged in the container body, the bearing capacity of the container body is increased, the situation that the weight of a solid heat storage body in the solid electric heat storage equipment is limited is avoided, and the heat storage capacity of the skid-mounted solid electric heat storage equipment is reduced is avoided. Moreover, a reserved hole assembly is arranged on the box body, a platform assembly is connected to the box body, that is, a fixed bolting piece is located at the bottom of the long side edge of the box body, a bolting steel beam is connected with the fixed bolting piece and the box body through bolts, a bottom plate is arranged on the upper portion of the bolting steel beam, and the bolting steel beam is supported and fixed through a bolting steel column. When a plurality of container spaces are built, combined and installed, each container body is provided with a bearing fulcrum adapting to uneven load of the solid heat accumulator, and the situation that the structure of the container body is damaged after long-term use is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of containers, in particular to a heavy-load container. Background Art

[0002] Containers play an important role in the modern logistics industry. Their structural form and dimensions have formed a unified specification, and they are a tool for packaging and transporting general products that meet domestic and international standards. In recent years, a skid-mounted solid electric thermal storage device with a standard container as the shell has emerged, which has achieved standardized transportation of the whole equipment and convenient on-site installation, which not only saves more on-site installation costs, but also greatly shortens the equipment installation cycle.

[0003] However, the standard container used in the prior art has the defect of insufficient bearing capacity, which limits the weight of the solid heat storage body in the solid electric heat storage device and reduces the heat storage capacity of the skid-mounted solid electric heat storage device. In addition, when multiple containers are required to be assembled and installed, the standard container does not have a load-bearing fulcrum that can adapt to the uneven load of the solid heat storage body, and long-term use will damage the box structure.

[0004] Therefore, the above-mentioned technical problems need to be further solved. Summary of the invention

[0005] The purpose of the embodiment of the utility model is to provide a heavy-duty container to increase the bearing capacity of the container, avoid limiting the weight of the solid heat storage body in the solid electric heat storage device, and avoid reducing the heat storage capacity of the skid-mounted solid electric heat storage device. In addition, when multiple containers are assembled and installed, each container has a load-bearing fulcrum that adapts to the uneven load of the solid heat storage body, avoiding damage to the container structure due to long-term use.

[0006] In order to solve the above technical problems, the present utility model provides the following technical solutions:

[0007] The first aspect of the utility model provides a heavy-duty container, comprising a box body, the box body being surrounded by a skin, and further comprising:

[0008] A main frame assembly connected to the box;

[0009] A reserved hole component is arranged on the box body;

[0010] A platform component connected to the box;

[0011] The platform components include:

[0012] A bolted steel beam connected to the fixed bolted member and the box body by bolts;

[0013] A fixed bolting member, which is arranged between the bolted steel beam and the box body, and is connected to the box body and the bolted steel beam at the same time;

[0014] A bottom plate is arranged on the upper part of the bolted steel beam and connected to the bolted steel beam;

[0015] The bolted steel column is connected to one end of the bolted steel beam away from the adjacent box body side, and the end of the bolted steel column away from the bolted steel beam side is connected to the adjacent bolted steel column or foundation embedded part below it.

[0016] Furthermore, the main frame assembly includes:

[0017] A first frame assembly is arranged on a long side of the box body;

[0018] A second frame assembly is arranged on another long side of the box body;

[0019] First bearing members are respectively arranged at the bottom of two long sides of the box body;

[0020] The second bearing members are respectively arranged at the bottom of the two short sides of the box body and connected to the first bearing members;

[0021] third bearing members, respectively arranged between the first bearing members and connected to the first bearing members;

[0022] A first top beam, respectively arranged on the top of two long sides of the box body;

[0023] The second top beams are respectively arranged on the tops of the two short sides of the box body and are connected to the first top beams.

[0024] Furthermore, the first frame assembly includes:

[0025] A first load-bearing column is arranged at one end of a long side of the box body and is connected to the first bearing member, the first top beam, the second bearing member and the second top beam at the same time, and hoisting holes are arranged at both ends of the first load-bearing column;

[0026] A second load-bearing column is arranged at the other end of the long side of the box body on the side of the first load-bearing column, and is connected to the first bearing member, the first top beam, the second bearing member and the second top beam at the same time, and both ends of the second load-bearing column are provided with lifting holes;

[0027] A third load-bearing column, disposed between the first load-bearing column and the second load-bearing column, close to the first load-bearing column, and connected to the first bearing member and the first top beam;

[0028] The fourth load-bearing column is arranged between the first load-bearing column and the second load-bearing column and is close to the second load-bearing column, and is connected to the first bearing member and the first top beam.

[0029] Furthermore, the second frame assembly includes:

[0030] a fifth load-bearing column, arranged at one end of the other long side of the box body and located on the opposite side of the first load-bearing column, the fifth load-bearing column being connected to the first bearing member, the first top beam, the second bearing member and the second top beam at the same time, and having hoisting holes at both ends of the fifth load-bearing column;

[0031] A sixth load-bearing column, which is arranged at the other end of the long side of the box body on the side of the fifth load-bearing column and is located on the opposite side of the second load-bearing column, the sixth load-bearing column is connected to the first bearing member, the first top beam, the second bearing member and the second top beam at the same time, and hoisting holes are arranged at both ends of the sixth load-bearing column;

[0032] a seventh load-bearing column, disposed between the fifth load-bearing column and the sixth load-bearing column and located on the opposite side of the third load-bearing column, the seventh load-bearing column being connected to the first bearing member and the first top beam at the same time;

[0033] The eighth load-bearing column is arranged between the fifth load-bearing column and the sixth load-bearing column and is located on the opposite side of the fourth load-bearing column. The eighth load-bearing column is connected to the first bearing member and the first top beam at the same time.

[0034] Furthermore, the main frame assembly also includes:

[0035] first grooves, respectively disposed on the outer sides of the first bearing member and the second bearing member;

[0036] The connecting ribs are respectively arranged in the first grooves.

[0037] Furthermore, the reserved hole assembly includes:

[0038] A power connection port is arranged on a long side of the box body;

[0039] A pipeline connection port is arranged on a long side of the box body;

[0040] An air inlet is arranged on a long side of the box body;

[0041] An exhaust port is arranged on another long side of the box body, and exhausts air through an exhaust fan arranged at the exhaust port;

[0042] The waterproof protective plate is respectively connected with the power connection port, the pipeline connection port, the air inlet and the air outlet.

[0043] Furthermore, the box body also includes:

[0044] First box doors are respectively arranged on two short sides of the box body;

[0045] The second box door is arranged on a long side of the box body.

[0046] Furthermore, the platform component also includes:

[0047] A bolted fence is connected to the ends of the bolted steel posts away from the ground.

[0048] Furthermore, the platform component also includes:

[0049] The ladder is arranged between the adjacent bolted steel beams in the longitudinal direction and connected to the bolted steel beams.

[0050] Furthermore, the fixed bolt connection, the bolted steel beam, the bottom plate and the connecting rib plate are respectively provided with through holes for bolts to pass through.

[0051] Compared with the prior art, the heavy-duty container provided by the first aspect of the utility model has a main frame assembly arranged inside the box, which increases the bearing capacity of the box, avoids limiting the weight of the solid heat storage body in the solid electric heat storage device, and avoids reducing the heat storage capacity of the skid-mounted solid electric heat storage device. In addition, a reserved hole assembly is arranged on the box, and a platform assembly is connected to the box, that is, the fixed bolt connection is located at the bottom of the long side of the box, the bolted steel beam is connected to the fixed bolt connection and the box by bolts, a bottom plate is arranged on the upper part of the bolted steel beam, and the bolted steel column supports and fixes the bolted steel beam, so that when multiple container spaces are assembled and installed, each box has a load-bearing fulcrum that adapts to the uneven load of the solid heat storage body, avoiding damage to the box structure due to long-term use. BRIEF DESCRIPTION OF THE DRAWINGS

[0052] By reading the detailed description below with reference to the accompanying drawings, the above and other purposes, features and advantages of the exemplary embodiments of the present invention will become easy to understand. In the accompanying drawings, several embodiments of the present invention are shown in an exemplary and non-limiting manner, and the same or corresponding reference numerals represent the same or corresponding parts, wherein:

[0053] Figure 1 A schematic diagram of a side view of a plurality of heavy-load containers being installed in combination is shown;

[0054] Figure 2 The schematic diagram shows the main view of the combined installation of multiple heavy-load containers;

[0055] Figure 3 A schematic diagram of a front view of a heavily loaded container is shown;

[0056] Figure 4 Schematically shows a rear view of a heavily loaded container;

[0057] Figure 5 Schematically shows a side view of a heavily loaded container;

[0058] Figure 6 Schematically shows a top view of a heavily loaded container;

[0059] Figure 7 schematically shows a partial cross-sectional view of a heavily loaded container;

[0060] Figure 8 A schematic diagram of a fixed bolt connection is shown schematically;

[0061] Fig. 9 The schematic diagram shows a top view of a plurality of heavy-load containers installed in combination;

[0062] Description of Figure Numbers:

[0063] 1-1, box body; 1-2, first bearing member; 1-3, third bearing member; 1-4, first top beam; 1-5, connecting rib plate; 1-6, second bearing member; 1-7, second top beam;

[0064] 2-1, load-bearing plate; 2-2, first box door; 2-3, second box door;

[0065] 3-1, power connection port; 3-2, pipe connection port; 3-3, air inlet; 3-4, air outlet;

[0066] 4. Platform components; 4-1. Bolted steel beams; 4-2. Bolted steel columns; 4-3. Bolted fences; 4-4. Bottom plate; 4-5. Fixed bolts; 4-6. Ladder;

[0067] 5. First frame assembly; 5-1. First load-bearing column; 5-2. Second load-bearing column; 5-3. Third load-bearing column; 5-4. Fourth load-bearing column;

[0068] 6. Second frame assembly; 6-1. Fifth load-bearing column; 6-2. Sixth load-bearing column; 6-3. Seventh load-bearing column; 6-4. Eighth load-bearing column. DETAILED DESCRIPTION

[0069] The exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. Although the exemplary embodiments of the present disclosure are shown in the accompanying drawings, it should be understood that the present disclosure can be implemented in various forms and should not be limited by the embodiments described herein. On the contrary, these embodiments are provided in order to enable a more thorough understanding of the present disclosure and to fully convey the scope of the present disclosure to those skilled in the art. If not specifically stated, the technical means used in the embodiments are conventional means well known to those skilled in the art.

[0070] It should be noted that, unless otherwise specified, the technical terms or scientific terms used in the present invention should be the common meanings understood by the technicians in the field to which the present invention belongs. In this article, relational terms such as "first" and "second" are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Terms such as "connection" and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral body; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium. The terms "include", "comprise" or any other variant thereof are intended to cover non-exclusive inclusion, so that the process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of more restrictions, the elements defined by the sentence "include..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.

[0071] The utility model embodiment provides a heavy-duty container, combined with Figure 1 , Figure 2 and Figure 8The heavy-load container includes a box body 1-1, which is surrounded by a skin and also includes a main frame assembly, a reserved hole assembly and a platform assembly 4. The main frame assembly is connected to the box body 1-1. The reserved hole assembly is arranged on the box body 1-1. The platform assembly 4 is connected to the box body 1-1. Among them, the platform assembly 4 includes a fixed bolt 4-5, a bolted steel beam 4-1, a bottom plate 4-4 and a bolted steel column 4-2. The fixed bolt 4-5 is arranged between the bolted steel beam 4-1 and the box body 1-1, and is connected to the box body 1-1 and the bolted steel beam 4-1 at the same time. The bolted steel beam 4-1 is connected to the fixed bolt 4-5 and the box body 1-1 by bolts. The bottom plate 4-4 is arranged on the upper part of the bolted steel beam 4-1 and is connected to the bolted steel beam 4-1. The bolted steel column 4-2 is connected to one end of the bolted steel beam 4-1 away from the adjacent box body 1-1, and the end of the bolted steel column 4-2 away from the bolted steel beam 4-1 is connected to the adjacent bolted steel column 4-2 or foundation embedded parts below it.

[0072] In this embodiment, a main frame assembly is provided in the box 1-1, which increases the bearing capacity of the box 1-1, avoids limiting the weight of the solid heat storage body in the solid electric heat storage device, and avoids reducing the heat storage capacity of the skid-mounted solid electric heat storage device. In addition, a reserved hole assembly is provided on the box 1-1, and a platform assembly 4 is connected to the box 1-1, that is, the fixed bolts 4-5 are respectively located at the bottom of the long side and the short side of the box 1-1, and the bolted steel beam 4-1 is connected to the fixed bolts 4-5 and the box 1-1 through bolts. The upper part of the bolted steel beam 4-1 is provided with a bottom plate 4-4, and the bolted steel column 4-2 supports and fixes the bolted steel beam 4-1, so that when multiple container spaces are assembled and installed, each box 1-1 has a load-bearing fulcrum that adapts to the uneven load of the solid heat storage body, avoiding damage to the box 1-1 structure due to long-term use.

[0073] In a specific embodiment, in combination Figure 3 , Figure 4 , Figure 5 , Figure 6 and Figure 7The main frame assembly includes a first frame assembly 5, a second frame assembly 6, a first bearing member 1-2, a second bearing member 1-6, a third bearing member 1-3, a first top beam 1-4 and a second top beam 1-7. The first bearing member 1-2 is respectively arranged at the bottom of the two long sides of the box body 1-1. The second bearing member 1-6 is respectively arranged at the bottom of the two short sides of the box body 1-1 and is connected to the first bearing member 1-2. The third bearing member 1-3 is respectively arranged between the first bearing member 1-2 and is connected to the first bearing member 1-2. The first top beam 1-4 is respectively arranged at the top of the two long sides of the box body 1-1. The second top beam 1-7 is respectively arranged at the top of the two short sides of the box body 1-1 and is connected to the first top beam 1-4. The first frame assembly 5 is arranged at one long side of the box body 1-1. The second frame assembly 6 is arranged at the other long side of the box body 1-1.

[0074] In this embodiment, the first bearing member 1-2 and the second bearing member 1-6 together form a rectangular bearing member at the bottom of the box 1-1, and the third bearing member 1-3 performs auxiliary bearing at the bottom of the box 1-1. The first frame assembly 5 and the second frame assembly 6 are respectively supported on the two long sides of the box 1-1. Thus, the bearing capacity of the box 1-1 is increased, the weight of the solid heat storage body in the solid electric heat storage device is avoided to be limited, and the heat storage capacity of the skid-mounted solid electric heat storage device is avoided to be reduced.

[0075] The first top beam 1-4 and the second top beam 1-7 together form a rectangular beam at the top of the box body 1-1 to increase the rigidity of the top of the box body 1-1.

[0076] As a possible embodiment, a bearing plate 2-1 is also laid on the third bearing member 1-3, thereby further strengthening the bearing capacity in the box body 1-1.

[0077] In a specific embodiment, in combination Figure 3 , Figure 5 , Figure 6 and Figure 7The first frame assembly 5 includes a first load-bearing column 5-1, a second load-bearing column 5-2, a third load-bearing column 5-3 and a fourth load-bearing column 5-4. The first load-bearing column 5-1 is arranged at one end of a long side of the box body 1-1, and is connected to the first bearing member 1-2, the first top beam 1-4, the second bearing member 1-6 and the second top beam 1-7 at the same time, and the first load-bearing column 5-1 is provided with hanging holes at both ends. The second load-bearing column 5-2 is arranged at the other end of the long side of the box body 1-1 on the side of the first load-bearing column 5-1, and is connected to the first bearing member 1-2, the first top beam 1-4, the second bearing member 1-6 and the second top beam 1-7 at the same time, and the second load-bearing column 5-2 is provided with hanging holes at both ends. The third load-bearing column 5-3 is arranged between the first load-bearing column 5-1 and the second load-bearing column 5-2, and is close to the first load-bearing column 5-1, and is connected to the first bearing member 1-2 and the first top beam 1-4 at the same time. The fourth load-bearing column 5-4 is disposed between the first load-bearing column 5-1 and the second load-bearing column 5-2 and is close to the second load-bearing column 5-2, and is connected to the first bearing member 1-2 and the first top beam 1-4.

[0078] In this embodiment, the first load-bearing column 5-1 and the second load-bearing column 5-2 are respectively located at two ends of a long side of the box body 1-1, and the third load-bearing column 5-3 and the fourth load-bearing column 5-4 are both located between the first load-bearing column 5-1 and the second load-bearing column 5-2. Thus, the vertical bearing capacity of the long side is increased. In turn, the bearing capacity of the box body 1-1 is increased.

[0079] In a specific embodiment, in combination Figure 4 , Figure 5 , Figure 6 and Figure 7The second frame assembly 6 includes a fifth load-bearing column 6-1, a sixth load-bearing column 6-2, a seventh load-bearing column 6-3 and an eighth load-bearing column 6-4. The fifth load-bearing column 6-1 is arranged at one end of the other long side of the box body 1-1 and is located on the opposite side of the first load-bearing column 5-1. The fifth load-bearing column 6-1 is connected to the first bearing member 1-2, the first top beam 1-4, the second bearing member 1-6 and the second top beam 1-7 at the same time. Lifting holes are arranged at both ends of the fifth load-bearing column 6-1. The sixth load-bearing column 6-2 is arranged at the other end of the long side of the box body 1-1 on the side of the fifth load-bearing column 6-1 and is located on the opposite side of the second load-bearing column 5-2. The sixth load-bearing column 6-2 is connected to the first bearing member 1-2, the first top beam 1-4, the second bearing member 1-6 and the second top beam 1-7 at the same time. Lifting holes are arranged at both ends of the sixth load-bearing column 6-2. The seventh load-bearing column 6-3 is arranged between the fifth load-bearing column 6-1 and the sixth load-bearing column 6-2, and is located on the opposite side of the third load-bearing column 5-3. The seventh load-bearing column 6-3 is connected to the first bearing member 1-2 and the first top beam 1-4. The eighth load-bearing column 6-4 is arranged between the fifth load-bearing column 6-1 and the sixth load-bearing column 6-2, and is located on the opposite side of the fourth load-bearing column 5-4. The eighth load-bearing column 6-4 is connected to the first bearing member 1-2 and the first top beam 1-4.

[0080] In this embodiment, the fifth load-bearing column 6-1 and the sixth load-bearing column 6-2 are respectively located at the two ends of the other long side of the box body 1-1, and the seventh load-bearing column 6-3 and the eighth load-bearing column 6-4 are both located between the fifth load-bearing column 6-1 and the sixth load-bearing column 6-2. Thus, the vertical bearing capacity of the long side is increased. In turn, the bearing capacity of the box body 1-1 is increased.

[0081] In a specific embodiment, in combination Figure 4 and Figure 5 The main frame assembly also includes a first groove and a connecting rib plate 1-5. The first groove is respectively arranged on the outer side of the first bearing member 1-2 and the second bearing member 1-6. The connecting rib plate 1-5 is respectively arranged in the first groove.

[0082] In this embodiment, the first bearing member 1-2 and the second bearing member 1-6 are both channel steel or C-shaped steel, the first groove is located outside the first bearing member 1-2 and the second bearing member 1-6, and the connecting ribs 1-5 are respectively arranged in the first grooves. Thus, the connecting ribs 1-5 are connected with the fixed bolts 4-5 and the bolted steel beam 4-1, and the bearing capacity of the first bearing member 1-2 and the second bearing member 1-6 is further strengthened. In addition, the bearing capacity of the box body 1-1 is increased.

[0083] In a specific embodiment, in combination Figure 3 and Figure 4The reserved hole assembly includes a power connection port 3-1, a pipe connection port 3-2, an air inlet 3-3, an air outlet 3-4 and a waterproof protective plate. The power connection port 3-1 is arranged on a long side of the box body 1-1. The pipe connection port 3-2 is arranged on a long side of the box body 1-1. The air inlet 3-3 is arranged on a long side of the box body 1-1. The air outlet 3-4 is arranged on another long side of the box body 1-1, and exhaust is performed by an exhaust fan arranged at the air outlet 3-4. The waterproof protective plate is respectively connected to the power connection port 3-1, the pipe connection port 3-2, the air inlet 3-3 and the air outlet 3-4.

[0084] In this embodiment, the power connection port 3-1 is used for power access of later external electrical facilities, the pipe connection port 3-2 is used for pipe access of later external HVAC facilities, and the air inlet 3-3 and the air outlet 3-4 are used for the internal environment permeability of the later box body 1-1.

[0085] The power connection port 3-1, the pipe connection port 3-2, the air inlet 3-3 and the air outlet 3-4 also ensure the environmental conditions for the long-term use of the box body 1-1.

[0086] The waterproof protective plate prevents external water from entering the box body 1-1 when the box body 1-1 is being transported. After the box body 1-1 is transported, the waterproof protective plate is removed from the box body 1-1.

[0087] In a specific embodiment, in combination Figure 3 , Figure 5 and Figure 6 The box body 1-1 further comprises a first box door 2-2 and a second box door 2-3. The first box door 2-2 is respectively arranged on two short sides of the box body 1-1. The second box door 2-3 is arranged on one long side of the box body 1-1.

[0088] In order to further strengthen the protection of the box 1-1 and improve the safety of the staff on the bottom plate 4-4, in a specific embodiment, Figure 1 and Figure 2 The platform assembly 4 further includes a bolted fence 4-3. The bolted fence 4-3 is connected to the end of the bolted steel column 4-2 away from the ground.

[0089] In order to further improve the safety of workers going to the second and more layers of the box 1-1 on the bottom plate 4-4, in a specific embodiment, as shown in FIG. Figure 1 As shown, the platform assembly 4 further includes a ladder 4-6. The ladder 4-6 is disposed between adjacent bolted steel beams 4-1 in the longitudinal direction and connected to the bolted steel beams 4-1.

[0090] For example, when multiple container spaces need to be assembled and installed, and multiple boxes 1-1 are assembled into a stable space structure:

[0091] First, the first-layer box 1-1 is installed and fixed according to the design requirements, and then the second-layer box 1-1 is placed on the first-layer box 1-1, and the first frame assembly 5 and the second frame assembly 6 of each box 1-1 are matched one by one and fixed.

[0092] Secondly, the bolted steel beam 4-1 is matched with the connection rib 1-5 at the bottom of the second-layer box 1-1, and fixedly connected by the fixed bolt 4-5. The bolted steel column 4-2 is matched with one end of the bolted steel beam 4-1 away from the adjacent box 1-1, and fixedly connected by the fixed bolt 4-5.

[0093] Finally, the base plate 4-4 and the bolted fence 4-3 are installed respectively, and the ladder 4-6 for the staff to use is installed.

[0094] Combination Figure 1 and Figure 2 The present invention schematically provides a combined installation example of a 2×2 box structure. According to different application requirements, an independent fixed long-term installation structure with less than six vertical layers and nine horizontal columns can be realized, and it has the ability to resist natural disasters such as wind, earthquake, rain and snow.

[0095] In order to further enable the through holes to pass bolts to realize the connection between the fixed bolt 4-5 and the bolted steel beam 4-1 and the box body 1-1, the connection between the bolted steel beam 4-1 and the bottom plate 4-4, and the connection between the bolted steel beam 4-1 and the bolted steel column 4-2. Through holes for the bolts to pass through are respectively provided on the fixed bolt 4-5, the bolted steel beam 4-1, the bottom plate 4-4 and the connecting rib plate 1-5.

[0096] In the present invention, by replacing the bolted steel beam 4-1 of the target length, the distance adjustment between the horizontally adjacent boxes 1-1 and the distance adjustment between the bolted steel beam 4-1 and the bolted steel column 4-2 are achieved.

[0097] It should be noted that all structures in the present invention are made of steel.

[0098] The above is only a specific implementation of the utility model, but the protection scope of the utility model is not limited thereto. Any technician familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed by the utility model, which should be included in the protection scope of the utility model. Therefore, the protection scope of the utility model should be based on the protection scope of the claims.

Claims

1. A heavy-duty container, comprising a box body, the box body being surrounded by a skin, characterized in that: Also includes: A main frame assembly connected to the box; A reserved hole component is arranged on the box body; A platform component connected to the box; The platform components include: A bolted steel beam connected to the fixed bolted member and the box body by bolts; The fixed bolting member is arranged between the bolted steel beam and the box body, and is connected to the box body and the bolted steel beam at the same time; A bottom plate is arranged on the upper part of the bolted steel beam and connected to the bolted steel beam; The bolted steel column is connected to one end of the bolted steel beam away from the adjacent box body side, and the end of the bolted steel column away from the bolted steel beam side is connected to the adjacent bolted steel column or foundation embedded part below it.

2. The heavy-load container according to claim 1, characterized in that: The main frame assembly includes: A first frame assembly is arranged on a long side of the box body; The second frame assembly is arranged on the other long side of the box body First bearing members are respectively arranged at the bottom of two long sides of the box body; The second bearing members are respectively arranged at the bottom of the two short sides of the box body and connected to the first bearing members; third bearing members, respectively arranged between the first bearing members and connected to the first bearing members; A first top beam, respectively arranged on the top of two long sides of the box body; The second top beams are respectively arranged on the tops of the two short sides of the box body and are connected to the first top beams.

3. The heavy-load container according to claim 2, characterized in that: The first frame assembly comprises: A first load-bearing column is arranged at one end of a long side of the box body and is connected to the first bearing member, the first top beam, the second bearing member and the second top beam at the same time, and hoisting holes are arranged at both ends of the first load-bearing column; A second load-bearing column is arranged at the other end of the long side of the box body on the side of the first load-bearing column, and is connected to the first bearing member, the first top beam, the second bearing member and the second top beam at the same time, and both ends of the second load-bearing column are provided with lifting holes; A third load-bearing column, disposed between the first load-bearing column and the second load-bearing column, close to the first load-bearing column, and connected to the first bearing member and the first top beam; The fourth load-bearing column is arranged between the first load-bearing column and the second load-bearing column and is close to the second load-bearing column, and is connected to the first bearing member and the first top beam.

4. The heavy-load container according to claim 3, characterized in that: The second frame assembly comprises: a fifth load-bearing column, arranged at one end of the other long side of the box body and located on the opposite side of the first load-bearing column, the fifth load-bearing column being connected to the first bearing member, the first top beam, the second bearing member and the second top beam at the same time, and having hoisting holes at both ends of the fifth load-bearing column; A sixth load-bearing column, which is arranged at the other end of the long side of the box body on the side of the fifth load-bearing column and is located on the opposite side of the second load-bearing column, the sixth load-bearing column is connected to the first bearing member, the first top beam, the second bearing member and the second top beam at the same time, and hoisting holes are arranged at both ends of the sixth load-bearing column; a seventh load-bearing column, disposed between the fifth load-bearing column and the sixth load-bearing column and located on the opposite side of the third load-bearing column, the seventh load-bearing column being connected to the first bearing member and the first top beam at the same time; The eighth load-bearing column is arranged between the fifth load-bearing column and the sixth load-bearing column and is located on the opposite side of the fourth load-bearing column. The eighth load-bearing column is connected to the first bearing member and the first top beam at the same time.

5. The heavy-load container according to claim 2, characterized in that: The main frame assembly also includes: first grooves, respectively disposed on the outer sides of the first bearing member and the second bearing member; The connecting ribs are respectively arranged in the first grooves.

6. The heavy-load container according to claim 1, characterized in that: The reserved hole component comprises: A power connection port is arranged on a long side of the box body; A pipeline connection port is arranged on a long side of the box body; An air inlet is arranged on a long side of the box body; An exhaust port is arranged on another long side of the box body, and exhausts air through an exhaust fan arranged at the exhaust port; The waterproof protective plate is respectively connected with the power connection port, the pipeline connection port, the air inlet and the air outlet.

7. The heavy-load container according to claim 6, characterized in that: The box also includes: First box doors are respectively arranged on two short sides of the box body; The second box door is arranged on a long side of the box body.

8. The heavy-load container according to claim 1, characterized in that: The platform components also include: A bolted fence is connected to the ends of the bolted steel posts away from the ground.

9. The heavy-load container according to claim 1, characterized in that: The platform components also include: The ladder is arranged between the adjacent bolted steel beams in the longitudinal direction and connected to the bolted steel beams.

10. The heavy-load container according to claim 5, characterized in that: The fixed bolted parts, the bolted steel beams, the bottom plate and the connecting ribs are respectively provided with through holes for bolts to pass through.

Citation Information

Cited By

  • Combined container based on skid-mounted solid electric heat storage furnace and mounting method of combined container

    CN119284376A