Concrete cofferdam type raft

By using concrete cofferdam rafts in the cross-river water intake pipeline design and using block stone and steel mesh structures, the problems of increased investment and temperature-controlled cracks have been solved, and cost reduction and safety improvement have been achieved.

CN221956770UActive Publication Date: 2024-11-05POWERCHINA HEBEI ELECTRIC POWER SURVEY & DESIGN INST CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420462455.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-11
Publication Date
2024-11-05
Estimated Expiration
2034-03-11

AI Technical Summary

Technical Problem

In the design of cross-river water intake pipelines, in order to cope with water flow erosion and bridge piers, the base size and thickness of the raft slabs are often increased, resulting in increased investment and temperature-controlled cracks.

Method used

A concrete cofferdam type raft is used to replace part of the concrete by filling blocks of stone, and a splitting mechanism and a reinforced mesh structure are set up to enhance the strength and safety of the raft and cofferdam, and extend the service life through anti-corrosion coating.

Benefits of technology

It reduces the cost, avoids the occurrence of temperature-controlled cracks of large-volume concrete, improves the friction and safety between the raft slab and the foundation, and extends the service life.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221956770U_ABST
    Figure CN221956770U_ABST
Patent Text Reader

Abstract

The utility model provides a concrete cofferdam type raft, which belongs to the technical field of rafts and comprises piers used for supporting pipelines, the piers are supported on a foundation through raft bodies, cofferdam bodies are arranged on the peripheral edges of the raft bodies, and the cofferdam bodies are perpendicular to the raft bodies. Wherein the cofferdam body and the raft body form a first filling cavity; a flow dividing mechanism is arranged on the side, facing the water flow direction, of the cofferdam body and comprises two plate bodies arranged in a conical shape. A second filling cavity is formed between the flow dividing mechanism and the cofferdam body, and the first filling cavity and the second filling cavity are both filled with block stones. By means of the flow dividing mechanism, the scouring effect of water flow can be effectively reduced, and the safety of the raft plate body and the safety of the cofferdam body are improved; meanwhile, filling block stones can replace part of concrete, and therefore the manufacturing cost is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of raft slabs, in particular to the field of raft slab protection, and specifically relates to a concrete cofferdam type raft slab. Background Art

[0002] In the process of designing water intake (drainage) pipelines, river crossing sections are often encountered. Some design schemes will adopt an overhead form, especially when the geological conditions of the river channel are good, and the natural foundation with a small investment scale will become the preferred option. In the design process, it is inevitable to consider the scouring of the bridge piers by the water flow and the thickness of the raft. In the past, the increase in the size and thickness of the bottom plate often resulted in increased investment, and the increase of large-volume concrete led to problems such as temperature control cracks. Utility Model Content

[0003] The utility model provides a concrete cofferdam raft slab to solve the problem of increasing investment due to increasing the size and thickness of the base plate in the prior art, and to solve the problem of temperature control cracks caused by adding large-volume concrete. The utility model can replace part of the concrete by filling blocks, thereby reducing the cost; at the same time, the utility model can avoid the appearance of large-volume caps during use, thereby avoiding the occurrence of temperature control cracks in large-volume concrete.

[0004] The technical solution adopted by the concrete cofferdam type raft slab of the utility model is:

[0005] The utility model provides a concrete cofferdam type raft, comprising a pier for supporting a pipeline, the pier is supported on a foundation through a raft body, the edges of the raft body are all provided with a cofferdam body, and the cofferdam body is perpendicular to the raft body; wherein the cofferdam body and the raft body form a first filling cavity;

[0006] A diversion mechanism is arranged on the side of the cofferdam body facing the water flow direction, and the diversion mechanism includes two conically arranged plates, the sides of the two plates being close to each other are connected together, and the sides of the two plates being far away from each other are respectively connected to the cofferdam body; wherein a second filling cavity is formed between the diversion mechanism and the cofferdam body, and both the first filling cavity and the second filling cavity are filled with stone blocks.

[0007] In this further technical solution, by setting up a diversion mechanism, the scouring effect of the water flow can be more effectively reduced, thereby improving the safety of the raft body and the cofferdam body; at the same time, by filling with blocks of stone, part of the concrete can be replaced, thereby reducing the cost; at the same time, the blocks of stone can increase the overall weight, thereby increasing the friction between the raft body and the foundation, avoiding the appearance of large-volume pedestals, thereby avoiding the occurrence of large-volume concrete temperature control cracks.

[0008] Furthermore, the raft body includes a first steel mesh, the cofferdam body includes a second steel mesh connected to the first steel mesh, and concrete is poured on both the first steel mesh and the second steel mesh.

[0009] In this further technical solution, by providing the first steel mesh and the second steel mesh, the strength of the raft body and the cofferdam body can be enhanced to prevent the raft body and the cofferdam body from collapse, cracking, etc.

[0010] Furthermore, a connecting piece is provided on one side of the second steel mesh facing the water flow direction, and the plate body is connected to the cofferdam body through the connecting piece.

[0011] In this further technical solution, the plate body and the cofferdam body are connected together, and the cofferdam body can provide sufficient supporting force for the plate body to prevent the plate body from being damaged due to excessive impact force of water flow.

[0012] Furthermore, an anti-corrosion coating is provided on the plate body and the connecting parts.

[0013] In this further technical solution, the service life of the utility model can be extended by providing an anti-corrosion coating.

[0014] Furthermore, a vertical third steel bar is arranged in the bridge pier, and the bottom end of the third steel bar extends downward to the bottom of the bridge pier.

[0015] In this further technical solution, by connecting the bottom end of the third steel bar to the first steel mesh, the bridge pier and the raft body can be firmly connected together, preventing the bridge pier from tipping over due to the impact force of water flow.

[0016] Furthermore, the height of the stones filled in the first filling cavity and the second filling cavity is not less than 1000 mm, and the weight of a single stone is not less than 25 kg.

[0017] Furthermore, the thickness of the raft body is not less than 500 mm, and the wall thickness of the cofferdam body is not less than 250 mm.

[0018] The beneficial effects of the utility model are:

[0019] 1. In the concrete cofferdam raft slab, the overall weight can be increased by filling the first filling cavity and the second filling cavity with blocks of stone, thereby increasing the friction between the raft slab body and the foundation, avoiding the appearance of a large-volume pedestal, and thus avoiding the occurrence of large-volume concrete temperature control cracks.

[0020] 2. In the concrete cofferdam type raft slab, part of the concrete in the first filling cavity and the second filling cavity can be replaced by filling with blocks of stone, thereby reducing the overall cost of the utility model.

[0021] 3. In the concrete cofferdam type raft, the diversion mechanism is set to more effectively reduce the scouring effect of the water flow and improve the safety of the raft body and the cofferdam body. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 It is a structural schematic diagram of a concrete cofferdam type raft provided by an embodiment of the utility model;

[0023] Figure 2 It is a structural schematic diagram of a concrete cofferdam type raft bridge pier provided by an embodiment of the utility model;

[0024] Figure 3 It is a structural schematic diagram of a concrete cofferdam type raft slab cofferdam body and a raft slab body connected to each other provided by an embodiment of the utility model;

[0025] Figure 4 It is a structural schematic diagram of the connection between a concrete cofferdam type raft bridge pier and a raft body provided by an embodiment of the utility model.

[0026] In the attached drawings: 1, bridge pier; 2, raft body; 3, cofferdam body; 4, first filling cavity; 5, diversion mechanism; 6, second filling cavity; 7, stone blocks; 8, first steel mesh; 9, second steel mesh; 10, connecting piece; 11, third steel bar. DETAILED DESCRIPTION

[0027] In order to make the purpose, technical solution and advantages of the utility model clearer, the utility model is further described in detail below in combination with specific implementation methods and with reference to the accompanying drawings. In the following description, the description of the known structure and technology is omitted to avoid unnecessary confusion of the concept of the utility model.

[0028] First reference Figure 1 ,according to Figure 1 It can be seen that the utility model includes a raft body 2, which is horizontally fixed on the foundation of the river channel, and the raft body 2 is fixedly connected with a vertical cofferdam body 3 on all sides, and a first filling cavity 4 is formed between the raft body 2 and the cofferdam body 3; Figure 1 The present application also includes a pier 1 for supporting a water intake (discharge) pipeline, wherein the bottom end of the pier 1 is located in the first filling cavity 4 and is fixedly connected to the raft body 2 .

[0029] The utility model of the bridge pier 1 can be referred to in the specific setting Figure 2 ,according to Figure 2 It can be seen that a vertical third steel bar 11 is arranged in each bridge pier 1 , and the bottom end of the third steel bar 11 extends downward to the bottom of the corresponding bridge pier 1 .

[0030] The raft body 2 and the cofferdam body 3 in the utility model can be referred to in the specific arrangement Figure 3 ,according to Figure 3 It can be seen that a first steel mesh 8 is arranged in the raft body 2, and a second steel mesh 9 is arranged in the cofferdam body 3. The second steel mesh 9 is welded or bundled with the first steel mesh 8, and then concrete is poured on the first steel mesh 8 and the second steel mesh 9 to form the raft body 2 and the cofferdam body 3, and at the same time, the cofferdam body 3 is fixedly connected to the raft body 2. In the utility model, the thickness of the raft body 2 is not less than 500 mm, and the wall thickness of the cofferdam body 3 is not less than 250 mm.

[0031] When the bridge pier 1 and the raft body 2 are connected in the utility model, reference can be made to Figure 4 ,according to Figure 4 It can be seen that the bottom end of the third steel bar 11 in the pier 1 is welded or tied together with the first steel mesh 8 in the raft body 2, so that the pier 1 and the raft body 2 are fixedly connected together.

[0032] Continue to refer Figure 1 In the utility model, a diversion mechanism 5 is fixedly connected to the side of the cofferdam body 3 facing the water flow, and the diversion mechanism 5 includes two conical plate bodies, each of which is connected to the cofferdam body 3 through a connecting piece 10, and a second filling cavity 6 is formed between the diversion mechanism 5 and the cofferdam body 3; continue to refer to Figure 1 It can be seen that the first filling cavity 4 and the second filling cavity 6 are filled with stones 7. At the same time, in order to avoid the stone 7 being too small and the water flow speed being too high, the weight of the stone 7 is not less than 25 kg. In order to ensure sufficient friction between the raft body 2 and the foundation, the height of the stone 7 should be not less than 1000 mm.

[0033] The working principle of the concrete cofferdam raft is as follows: when the utility model is used, the foundation is firstly cleared at the place where the bridge pier 1 is to be built by the cofferdam method, and then the length and width of the raft body 2 are reasonably calculated according to the weight of the bridge pier 1 and the pipe to be supported, and the first steel mesh 8 is built according to the calculated length and width, and then the second steel mesh 9 is built around the first steel mesh 8, and the bottom end of the second steel mesh 9 is welded or tied to the first steel mesh 8, and the bridge pier 1 is placed in the first filling cavity 4 so that the bottom end of the third steel bar 11 is welded or tied to the first steel mesh 8; at the same time, a connector 10 is welded or tied on the side of the second steel mesh 9 facing the water flow, and the connector 10 can also be made of steel bars; then concrete is poured on the first steel mesh 8 and the second steel mesh 9 to form the raft body 2 and the cofferdam body 3, and at the same time, the concrete further fixes and connects the bridge pier 1 and the raft body 2, the connector 10 and the cofferdam body 3 together.

[0034] Then the diverter mechanism 5 and the connecting piece 10 are fixedly welded together. The plate body in the diverter mechanism 5 of the utility model can be made of steel plates commonly used in the prior art. After welding, an anti-corrosion coating is applied on the diverter mechanism 5 and the connecting piece 10. The material of the anti-corrosion coating can be polyurethane, epoxy, acrylic and other materials.

[0035] Then, the first filling cavity 4 and the second filling cavity 6 are filled with stones 7 of a suitable height, and then the cofferdams on the periphery of the utility model are removed, thereby completing the setting of the utility model.

[0036] In the above embodiment, the utility model provides a concrete cofferdam type raft. The diversion mechanism set in the utility model can more effectively reduce the scouring effect of the water flow and improve the safety of the raft body and the cofferdam body; at the same time, by filling blocks, part of the concrete can be replaced, thereby reducing the cost; at the same time, the blocks can increase the overall weight, thereby increasing the friction between the raft body and the foundation, avoiding the appearance of large-volume pedestals, thereby avoiding the occurrence of large-volume concrete temperature control cracks.

[0037] The above-described embodiments are merely descriptions of preferred implementations of the present invention, and are not intended to limit the concept and scope of the present invention. Without departing from the design concept of the present invention, various modifications and improvements made by ordinary personnel in the field to the technical solution of the present invention should fall within the protection scope of the present invention, and the technical contents of the present invention for protection have been fully recorded in the claims.

Claims

1. A concrete cofferdam raft, comprising a pier (1) for supporting a pipeline, characterized in that: The bridge pier (1) is supported on a foundation by a raft body (2), and a cofferdam body (3) is arranged on all four edges of the raft body (2), and the cofferdam body (3) is perpendicular to the raft body (2); wherein the cofferdam body (3) and the raft body (2) form a first filling cavity (4); A diversion mechanism (5) is provided on the side of the cofferdam body (3) facing the water flow direction, and the diversion mechanism (5) comprises two conically arranged plates, the sides of the two plates being close to each other are connected together, and the sides of the two plates being far away from each other are respectively connected to the cofferdam body (3); wherein a second filling cavity (6) is formed between the diversion mechanism (5) and the cofferdam body (3), and both the first filling cavity (4) and the second filling cavity (6) are filled with stone blocks (7).

2. A concrete cofferdam raft according to claim 1, characterized in that: The raft body (2) comprises a first steel mesh (8), and the cofferdam body (3) comprises a second steel mesh (9) connected to the first steel mesh (8), and concrete is poured on both the first steel mesh (8) and the second steel mesh (9).

3. A concrete cofferdam raft according to claim 2, characterized in that: A connecting piece (10) is provided on the side of the second steel mesh (9) facing the water flow direction, and the plate body is connected to the cofferdam body (3) via the connecting piece (10).

4. A concrete cofferdam raft according to claim 3, characterized in that: The plate body and the connecting piece (10) are both provided with an anti-corrosion coating.

5. The concrete cofferdam raft according to claim 1, characterized in that: A vertical third steel bar (11) is arranged in the bridge pier (1), and the bottom end of the third steel bar (11) extends downward to below the bridge pier (1).

6. A concrete cofferdam raft according to claim 1, characterized in that: The height of the blocks (7) filled in the first filling cavity (4) and the second filling cavity (6) is not less than 1000 mm, and the weight of a single block (7) is not less than 25 kg.

7. The concrete cofferdam raft according to claim 1, characterized in that: The thickness of the raft body (2) is not less than 500 mm, and the wall thickness of the cofferdam body (3) is not less than 250 mm.