Anchor rod back pressure type foundation capable of enabling piled raft to slightly deform under circulating upward pulling acting force

By using the backpressure foundation of the anchor rod in the track foundation of the high-speed maglev train, the prestressed anchor rod is used to transmit downward prestress and enhance the soil's pull-out resistance, it solves the difficulty of controlling the track flatness of the traditional foundation in the high-speed maglev test bench. The problem is that the millimeter-level deformation control of the track foundation is realized.

CN221956773UInactive Publication Date: 2024-11-05CHINA CONSTR EIGHTH ENG BUREAU HUAZHONG CONSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420373786.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-28
Publication Date
2024-11-05
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Under the low circumference and reciprocating force of the track foundation of the high-speed maglev train, the traditional foundation design is difficult to meet the millimeter-level flatness requirements, resulting in the track deformation exceeding the control range.

Method used

The anchor backpressure foundation with extremely slightly deformed pile raft under cycle pulling force is adopted. By setting up multiple prestressed anchors on the foundation raft, the lower end of the anchor rod is anchored in the underground anchor hole to transmit the downward prestress. , enhance the soil's ability to pull out and reduce the upward deformation of the raft.

Benefits of technology

It effectively reduces the deformation of the track foundation when under stress, reduces the displacement to the millimeter level, improves the resistance to pull-out deformation, and meets the flatness requirements of the high-speed maglev test bench.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221956773U_ABST
    Figure CN221956773U_ABST
Patent Text Reader

Abstract

The utility model provides an anchor rod back pressure type foundation capable of enabling a piled raft to slightly deform under circulating upward pulling acting force, and relates to track foundation construction. The equipment foundation is arranged on the foundation raft; the uplift piles are arranged in two rows in the length direction of the foundation raft, and the foundation raft is supported on the two rows of uplift piles; the lower end of each pre-stressed anchor rod is anchored in an underground anchor hole, and the upper end of each pre-stressed anchor rod is fixedly connected with the foundation raft plate. The anti-pulling structure has the advantages that the foundation raft plate and the underground soil body are connected into a whole through the pre-stressed anchor rods, downward pre-stress of the pre-stressed anchor rods can preferentially generate the anti-pulling effect, and after the pre-stress is counteracted, the anti-pulling pile can play the anti-pulling effect; when the upward pulling force is larger than the sum of the pulling resistance of the foundation raft and the prestress of the prestress anchor rod, the foundation raft starts to deform, the pulling deformation resistance is improved, and the deformation amount is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of track foundation construction, in particular to an anchor rod counter-pressure type foundation with extremely slight deformation of a pile raft under cyclic uplift force. Background Art

[0002] In recent years, with the research and development of maglev technology, the layout and test line construction of high-speed maglev trains have gradually been carried out. The structural force form of the track foundation of high-speed maglev trains during train operation is a low-cycle reciprocating uplift force. Therefore, each component of the foundation will also be subjected to an upward uplift force. Under the force, the components will be deformed. The traditional foundation design measures to resist the uplift force are to reinforce the plastic zone of the soil at the top of the anti-uplift pile through the pile end post-grouting and pile side post-grouting process, enhance the soil side friction, and solidify the pile bottom sediment. As an auxiliary measure, the pile foundation deformation is qualitatively reduced. In order to ensure the stability of the track, a downward force must be applied to the track to resist the uplift force; secondly, the deadweight of the raft is a favorable load under the test condition, which can make the uplift load transmitted to the pile top smaller, which is conducive to controlling the overall deformation of the structure. Therefore, by expanding the cross-section of the raft, increasing the deadweight of the raft, and increasing the characteristics of resisting uplift force.

[0003] When testing high-speed maglev trains, it is necessary to build a high-speed maglev test bench. The high-speed maglev test bench has extremely high requirements for track flatness, usually requiring the flatness change to be controlled at the millimeter level or even the decimeter level to ensure the stability and comfort of the test vehicle during high-speed driving. At present, the pull-out resistance of the pile foundation and the raft slab in the traditional foundation is usually controlled by the bond strength between the steel bar and the concrete, the pile's own weight, and the pile's bearing capacity. However, the pull-out resistance of the pile foundation itself is 100mm according to the specification, which is far greater than the millimeter-level deformation control requirement of the high-speed maglev test bench. Utility Model Content

[0004] In view of this, in order to resist the uplift force on the raft foundation in the track foundation of the high-speed maglev test bench and reduce the upward deformation of the raft foundation, an embodiment of the utility model provides an anchor rod back-pressure foundation with extremely slight deformation of the pile raft under cyclic uplift force.

[0005] The embodiment of the utility model provides an anchor rod back pressure type foundation with extremely slight deformation of pile raft under cyclic uplift force, comprising:

[0006] foundation raft;

[0007] An equipment foundation, which is arranged on the foundation raft;

[0008] A plurality of pull-out piles, all of which are arranged in two rows along the length direction of the foundation raft, and the foundation raft is supported on the two rows of pull-out piles;

[0009] And a plurality of prestressed anchor rods, all of which are vertically arranged between two rows of pull-out piles and arranged in a row, the lower end of each prestressed anchor rod being anchored in an underground anchor hole, and the upper end being fixedly connected to the foundation raft slab to apply downward prestress to the foundation raft slab.

[0010] Furthermore, all prestressed anchor rods are arranged between the two rows of pull-out piles.

[0011] Furthermore, each of the prestressed anchor rods is arranged on the central axis of the equipment foundation.

[0012] Furthermore, the prestressed anchor rod includes multiple strands of steel strands, multiple expansion rings, multiple hoops, a guide head and an anchor, each of the expansion rings is arranged at intervals in the anchor hole, each of the steel strands passes through each of the expansion rings in turn to separate the steel strands from each other, each of the hoops is arranged in the anchor hole, each of the hoops is arranged between two adjacent expansion rings, each of the steel strands passes through each of the hoops, and the hoops make the parts of each of the steel strands located between two adjacent expansion rings relatively gather, the lower ends of all the steel strands are connected to the guide head, the upper ends pass through the foundation raft and are locked by the anchor, and the parts of all the steel strands located in the anchor holes are anchored by grouting.

[0013] Furthermore, the prestressed anchor rod also includes a primary grouting pipe and a secondary grouting pipe, and all the steel strands located inside the anchor hole are successively grout-anchored twice through the primary grouting pipe and the secondary grouting pipe.

[0014] Furthermore, the primary grouting pipe passes through the periphery of each expansion ring, the secondary grouting pipe passes through the middle of each expansion ring, and the extension depth of the primary grouting pipe is greater than the extension depth of the secondary grouting pipe.

[0015] Furthermore, the guide head is a steel pipe guide cap with a conical front end.

[0016] Furthermore, the expansion ring is in a disc shape, and is provided with a plurality of wire holes, and the wire holes are evenly distributed around the axis of the expansion ring.

[0017] Furthermore, a plurality of notches are provided on the edge of the expansion ring.

[0018] Furthermore, the anchor comprises a clip, an anchor ring and a pad, wherein the pad is arranged on the upper surface of the foundation raft, the anchor ring is arranged on the pad, and the upper end of each steel strand passes through the pad and the anchor ring and is locked by the clip.

[0019] The technical solution provided by the embodiment of the utility model has the following beneficial effects: an anchor rod counter-pressure foundation of the utility model with extremely slight deformation of the pile raft under cyclic uplift force, a row of prestressed anchor rods is added at the center line position of the foundation raft plate, and a downward prestress is applied to the foundation raft plate by the prestressed anchor rods, and the prestress is transmitted to the underground through the prestressed anchor rods, so that the pull-out connection between the underground soil and the foundation raft plate is reinforced, and the foundation raft plate and the underground soil are connected into a whole by the prestressed anchor rods; in actual use, the downward prestress of the prestressed anchor rods will preferentially produce a pull-out effect, and theoretically, the pull-out piles will play a pull-out effect only after the prestress of the prestressed anchor rods is offset, which greatly reduces the possibility of excessive deformation of the foundation raft plate when it is subjected to force; when the uplift force is greater than the sum of the pull-out force of the foundation raft plate itself and the prestress of the prestressed anchor rods, the foundation raft plate begins to deform upward, which increases the pull-out deformation capacity of the foundation raft plate, reduces the deformation, and can reduce the displacement of the track foundation when it is subjected to force to the millimeter level. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is a schematic diagram of an anchor rod back pressure type foundation of the utility model in which the pile raft is extremely slightly deformed under the cyclic uplift force;

[0021] Figure 2 It is a schematic diagram of the foundation raft and equipment foundation;

[0022] Figure 3 is a schematic diagram of a prestressed anchor rod;

[0023] Figure 4 yes Figure 3 AA section diagram in;

[0024] Figure 5 yes Figure 3 Schematic diagram of the BB cross section.

[0025] In the figure: 1. foundation raft; 2. equipment foundation; 3. pull-out pile; 4. train track; 5. prestressed anchor rod; 501. expansion ring; 502. steel strand; 503. guide head; 504. anchor; 505. pad; 506. hoop; 507. primary grouting pipe; 508. secondary grouting pipe; 509. notch. DETAILED DESCRIPTION

[0026] In order to make the purpose, technical solution and advantages of the utility model clearer, the following will further describe the implementation of the utility model in conjunction with the accompanying drawings. The following is a preferred embodiment of the utility model among multiple possible embodiments, which is intended to provide a basic understanding of the utility model, but is not intended to confirm the key or decisive elements of the utility model or limit the scope of protection.

[0027] In all examples shown and discussed herein, any specific values ​​should be interpreted as merely exemplary and not as limiting. Therefore, other examples of the exemplary embodiments may have different values.

[0028] Technologies, methods, and equipment known to ordinary technicians in the relevant art may not be discussed in detail, but where appropriate, the technologies, methods, and equipment should be considered as part of the specification.

[0029] It should be noted that similar reference numerals and letters represent similar items in the following drawings, so once an item is defined in one drawing, it does not need to be further discussed in the subsequent drawings. At the same time, it should be understood that for ease of description, the sizes of the various parts shown in the drawings are not drawn according to the actual proportional relationship.

[0030] It should be noted that, unless otherwise clearly specified and limited, the terms "installation" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in this utility model can be understood according to specific circumstances.

[0031] Please refer to Figure 1 An embodiment of the utility model provides an anchor rod back pressure type foundation with extremely slight deformation of the pile raft under cyclic uplift force, comprising a foundation raft plate 1, an equipment foundation 2, a plurality of uplift piles 3, and a plurality of prestressed anchor rods 5.

[0032] Recombination Figure 2 As shown, the basic raft 1 is used to arrange the equipment foundation 2, and the equipment foundation 2 is generally arranged directly on the basic raft 1. The equipment foundation 2 can be directly arranged with equipment such as train tracks 4.

[0033] The anti-pulling piles 3 are used to support the foundation raft 1. Specifically, all the anti-pulling piles 3 are arranged in two rows along the length direction of the foundation raft 1, and the foundation raft 1 is supported on the two rows of anti-pulling piles 3. The two sides of the bottom of the foundation raft 1 are respectively connected with two rows of anti-pulling piles 3, so that the foundation raft 1 is stably supported.

[0034] The lower ends of all the pull-out piles 3 are arranged in the underground soil, so that the lower ends of the pull-out piles 3 are fixed in the soil. The foundation raft 1, the equipment foundation 2 and the pull-out piles 3 are generally concrete cast structures.

[0035] In addition, a plurality of anchor holes are provided in the underground soil. The anchor holes are generally vertically arranged with a diameter not greater than 200 mm. The axis of each anchor hole is located on the mid-plane of the foundation raft 1 .

[0036] The number of the prestressed anchor rods 5 can be arranged in multiples according to actual needs, and all the prestressed anchor rods 5 are arranged in a row between two rows of the pull-out piles 3, and the lower end of each prestressed anchor rod 5 is anchored in one of the anchor holes, and the upper end is fixedly connected to the foundation raft 1. The foundation raft 1 and the underground soil are combined by the prestressed anchor rods 5, so that the foundation raft 1 applies an upward prestress to the prestressed anchor rods 5, and when subjected to an upward pull force, the deformation between the pull-out piles 3 and the foundation raft 1 is smaller.

[0037] In order to ensure that the foundation raft 1 is stably stressed during train operation, all prestressed anchor rods 5 are arranged between two rows of pull-out piles 3 , and each prestressed anchor rod 5 is arranged on the central axis of the equipment foundation 2 .

[0038] like Figure 3 and 4 As shown, the prestressed anchor rod 5 specifically includes a plurality of steel strands 502 , a plurality of expansion rings 501 , a plurality of hoops 506 , a guide head 503 and an anchor 504 .

[0039] Each of the expansion rings 501 is arranged in the anchor hole at intervals, and each of the steel strands 502 passes through each of the expansion rings 501 in sequence to separate the steel strands 502 from each other. Each of the hoop rings 506 is arranged in the anchor hole, and each of the hoop rings 506 is arranged between two adjacent expansion rings 501. Each of the steel strands 502 passes through each of the hoop rings 506, and the hoop rings 506 make the parts of each of the steel strands 502 located between two adjacent expansion rings 501 relatively gather.

[0040] The lower ends of all the steel strands 502 are connected to the guide head 503, and the upper ends pass through the foundation raft 1 and are locked by the anchor 504. The parts of all the steel strands 502 located in the anchor holes are anchored by grouting.

[0041] The guide head 503 is a steel pipe guide cap with a conical front end. The guide head 503 is made of a steel pipe. The lower end of each of the steel strands 502 is inserted into the guide head 503 and fixedly connected to the guide head 503 .

[0042] The expansion ring 501 plays a role in centering and dividing. The expansion ring 501 generally adopts a gear-shaped structure. For example, in this embodiment, the expansion ring 501 is in a disc shape, and a plurality of wire holes are provided on the expansion ring 501, and each of the wire holes is evenly distributed around the axis of the expansion ring 501. Each of the steel strands 502 can pass through one of the wire holes.

[0043] When the expansion ring 501 is placed in the anchor hole, the edge of each expansion ring 501 contacts the inner wall of the anchor hole. In order to facilitate the expansion ring 501 to be inserted into the anchor hole, a plurality of notches 509 are provided on the edge of the expansion ring 501. Each of the steel strands 502 passes through two wire holes on the two adjacent expansion rings 501, which are opposite to each other. This ensures that each of the steel strands 502 is surrounded by a grouting body of a certain thickness during subsequent grouting.

[0044] The upper ends of all the steel strands 502 of each of the prestressed anchor rods 5 pass through the foundation raft 1. The anchor 50 specifically includes a clip, an anchor ring and a pad. The pad is arranged on the upper surface of the foundation raft 1, and the anchor ring is arranged on the pad. The upper ends of the steel strands 502 pass through the pad and the anchor ring, and after tension is applied to each of the steel strands 502, they are locked by the clips.

[0045] Preferably, a PVC pipe may be arranged in the foundation raft 1, so that the upper end of each of the steel strands 502 passes through the PVC pipe, and a waterproof grouting material with a strength not less than C40 is filled in the PVC pipe.

[0046] All the steel strands 502 of each prestressed anchor rod 5 are partially anchored by grouting in the anchor hole. Specifically, the prestressed anchor rod 5 also includes a primary grouting pipe 507 and a secondary grouting pipe 508, wherein the primary grouting pipe 507 passes through the periphery of each expansion ring 501, and the secondary grouting pipe 508 passes through the middle of each expansion ring 501, and the extension depth of the primary grouting pipe 507 is greater than the extension depth of the secondary grouting pipe 508. All the steel strands 502 are located inside the anchor hole and are anchored by grouting twice, successively through the primary grouting pipe 507 and the secondary grouting pipe 508. The secondary grouting is to wait for a certain period of time after the primary grouting, and then inject cement slurry again to fill the gaps in the primary grouting process, thereby improving the anchoring force of the anchor rod.

[0047] The utility model discloses an anchor rod counter-pressure foundation with extremely slight deformation of pile raft under cyclic uplift force, wherein a row of prestressed anchor rods 5 are added at the center line position of the foundation raft slab 1, and a downward prestress is applied to the foundation raft slab 1 by the prestressed anchor rods 5, and the prestress is transmitted to the underground soil through the prestressed anchor rods 5, so that the pull-out resistance connection between the underground soil and the foundation raft slab 1 is reinforced, and the foundation raft slab 1 and the underground soil are connected into a whole through the prestressed anchor rods 5.

[0048] When the anchor rod counter-pressure foundation with extremely slight deformation of the pile raft under the cyclic uplift force is actually working, the downward prestress of the prestressed anchor rod 5 will preferentially produce an anti-pullout effect. Theoretically, the anti-pullout pile 3 will play an anti-pullout role only after the prestress of the prestressed anchor rod 5 is offset, which greatly reduces the possibility of excessive deformation of the foundation raft 1 when it is subjected to stress; when the uplift force is greater than the sum of the anti-pullout force of the foundation raft 1 itself and the prestress of the prestressed anchor rod 5, the foundation raft 1 begins to deform upward, which increases the anti-pullout deformation capacity of the foundation raft 1 and reduces the deformation, so that the displacement of the track foundation when subjected to stress can be reduced to millimeter level.

[0049] In this article, the directional words such as front, back, top, and bottom involved are defined by the positions of the parts in the drawings and the positions of the parts relative to each other, just for the sake of clarity and convenience in expressing the technical solution. It should be understood that they are relative concepts and can change accordingly according to different ways of use and placement, and the use of the directional words should not limit the scope of protection claimed in this application.

[0050] In the absence of conflict, the above embodiments and features in the embodiments can be combined with each other. The above description is only a preferred embodiment of the utility model and is not intended to limit the utility model. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.

Claims

1. An anchor rod back pressure foundation with minimal deformation of pile raft under cyclic uplift force, characterized in that: include: foundation raft; An equipment foundation, which is arranged on the foundation raft; A plurality of pull-out piles, all of which are arranged in two rows along the length direction of the foundation raft, and the foundation raft is supported on the two rows of pull-out piles; And a plurality of prestressed anchor rods, all of which are vertically arranged between two rows of pull-out piles and arranged in a row, the lower end of each prestressed anchor rod being anchored in an underground anchor hole, and the upper end being fixedly connected to the foundation raft slab to apply downward prestress to the foundation raft slab.

2. An anchor rod back pressure type foundation with extremely slight deformation of pile raft under cyclic uplift force as claimed in claim 1, characterized in that: All prestressed anchor rods are arranged between the two rows of anti-pulling piles.

3. The anchor rod back pressure type foundation with extremely slight deformation of pile raft under cyclic uplift force as claimed in claim 1, characterized in that: Each of the prestressed anchor rods is arranged on the central axis of the equipment foundation.

4. The anchor rod back pressure type foundation with extremely slight deformation of pile raft under cyclic uplift force as claimed in claim 1, characterized in that: The prestressed anchor rod includes multiple strands of steel strands, multiple expansion rings, multiple hoops, a guide head and an anchor. The expansion rings are arranged at intervals in the anchor hole. Each steel strand passes through the expansion rings in turn to separate the steel strands from each other. Each hoop is arranged in the anchor hole. Each hoop is arranged between two adjacent expansion rings. Each steel strand passes through the hoops. The hoops make the parts of each steel strand located between two adjacent expansion rings relatively gather. The lower ends of all steel strands are connected to the guide head, and the upper ends pass through the foundation raft and are locked by the anchor. The parts of all steel strands located in the anchor holes are anchored by grouting.

5. An anchor rod back pressure type foundation with extremely slight deformation of pile raft under cyclic uplift force as claimed in claim 4, characterized in that: The prestressed anchor rod also includes a primary grouting pipe and a secondary grouting pipe. All steel strands located inside the anchor hole are successively grout-anchored twice through the primary grouting pipe and the secondary grouting pipe.

6. An anchor rod back pressure type foundation with extremely slight deformation of pile raft under cyclic uplift force as claimed in claim 5, characterized in that: The primary grouting pipe passes through the periphery of each expansion ring, and the secondary grouting pipe passes through the middle of each expansion ring. The extension depth of the primary grouting pipe is greater than the extension depth of the secondary grouting pipe.

7. An anchor rod back pressure type foundation with extremely slight deformation of pile raft under cyclic uplift force as claimed in claim 4, characterized in that: The guide head is a steel pipe guide cap with a conical front end.

8. The anchor rod back pressure type foundation with extremely slight deformation of pile raft under cyclic uplift force as claimed in claim 4, characterized in that: The expansion ring is in a disc shape and is provided with a plurality of wire holes, each of which is evenly distributed around the axis of the expansion ring.

9. The anchor rod back pressure type foundation with extremely slight deformation of pile raft under cyclic uplift force as claimed in claim 4, characterized in that: A plurality of notches are arranged on the edge of the expansion ring.

10. An anchor rod back pressure type foundation with extremely slight deformation of pile raft under cyclic uplift force as claimed in claim 4, characterized in that: The anchor comprises a clip, an anchor ring and a pad, wherein the pad is arranged on the upper surface of the foundation raft, the anchor ring is arranged on the pad, and the upper end of each steel strand passes through the pad and the anchor ring and is locked by the clip.