Compression-resistant supporting structure of underground pipe gallery

By designing the support structure of thickened plates and curved keels in the underground pipe corridor, combining prestressed concrete and aluminum alloy materials to absorb ground loads and disperse stress, the problems of deformation and rupture of the pipe corridor are solved, and stability and safety are improved and facilitate maintenance through vertical ventilation ducts and ladders, achieving higher structural safety and space utilization.

CN221956786UActive Publication Date: 2024-11-05HANGZHOU WUTONG CONSTR ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420427703.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-06
Publication Date
2024-11-05
Estimated Expiration
2034-03-06

AI Technical Summary

Technical Problem

Existing underground pipelines are prone to deformation and displacement when subjected to pressure from soil, groundwater and other external loads, especially when geological conditions are poor or loads are large, and may be affected by earthquakes, resulting in paralysis of urban infrastructure.

Method used

A compressive support structure including transverse pipe gallery and vertical pipe gallery was designed. Thickened plates and support mechanisms were installed on the top of the transverse pipe gallery. The support mechanism consists of mounting frames, connecting columns, arcuate keels and prestressed concrete. Thickened plates are composed of which absorb vibration and load through springs and pressure-bearing rods, and ventilation channels and ladders are installed in the vertical pipe corridor for maintenance.

Benefits of technology

It effectively improves the overall stability and compressive resistance of underground pipe corridors, prevents deformation and rupture, extends service life, and improves structural safety and space utilization.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221956786U_ABST
    Figure CN221956786U_ABST
Patent Text Reader

Abstract

The utility model discloses a compression-resistant supporting structure of an underground pipe gallery, and relates to the field of pipe gallery reinforcing structures. The pipe rack comprises the transverse pipe rack, the thickening plate is arranged on the top of the transverse pipe rack, the supporting mechanism is arranged on the outer side of the transverse pipe rack and the outer side of the thickening plate, and through the arrangement of the supporting mechanism, after the transverse pipe rack and the vertical pipe rack are installed, a plurality of placing racks and the transverse pipe rack can be installed and fixed; a plurality of first keels and a plurality of second keels can be welded on a placing frame, and through the sleeves and the springs, the support can effectively disperse and bear loads from the upper side, such as soil, water or traffic loads. Therefore, deformation or displacement of the box culvert is prevented, stress concentration is reduced, the service life of the box culvert is prolonged, and the overall structural safety of the box culvert is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of pipeline gallery reinforcement structures, in particular to a compression-resistant supporting structure of an underground pipeline gallery. Background Art

[0002] Underground pipe gallery, also known as urban underground pipeline integrated pipe gallery, is a large tunnel space built underground in the city. This tunnel space is mainly used to accommodate two or more types of urban engineering pipelines, including municipal, power, communication, radio and television, gas, heat, water supply and drainage and other pipelines and their ancillary facilities.

[0003] The existing compression support structure of underground pipe corridors will be buried in the underground soil after installation. At this time, when the underground pipe corridor is under the pressure of soil, groundwater and other external loads, it is easy to produce large deformation and displacement, affecting its overall stability, especially in the case of poor geological conditions or heavy loads, it is more prone to damage. In addition, there may be natural disasters such as earthquakes during use, which makes it easy to be damaged, leading to the paralysis of urban infrastructure and difficulties in residents' lives. When designing underground pipe corridors, it is necessary to provide a novel compression support structure for underground pipe corridors to improve the overall safety. Utility Model Content

[0004] Based on this, the purpose of the utility model is to provide a compression-resistant support structure for an underground pipeline corridor to solve the technical problem that traditional underground pipeline corridors may be damaged during long-term use due to pressure from soil, groundwater and other external loads, as well as earthquakes.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a compressive support structure of an underground pipe gallery, comprising a transverse pipe gallery, a thickened plate is arranged on the top of the transverse pipe gallery, a support mechanism is arranged on the outer side of the transverse pipe gallery and the thickened plate, the support mechanism comprises a mounting frame, a plurality of mounting frames are arranged in a linear array with equal distances, and the plurality of mounting frames are fixedly connected by connecting columns;

[0006] A sleeve is arranged on the top of the thickened plate, a spring is arranged inside the sleeve, and a pressure bearing rod is slidably engaged inside the sleeve;

[0007] There are a plurality of connecting columns, and the connecting columns are arranged in a rectangular array along the four corners of the mounting frame. The first keel and the second keel are welded to the connecting columns.

[0008] By adopting the above technical solution, since a thickened plate is provided on the top of the transverse pipe gallery, a supporting mechanism is provided on the outer side of the transverse pipe gallery and the thickened plate, and the supporting mechanism includes a mounting frame. A plurality of mounting frames are provided, and the plurality of mounting frames are equidistantly arranged in a linear array. The plurality of mounting frames are fixedly connected by connecting columns, and the plurality of mounting frames can be effectively connected in series through the connecting columns, thereby improving the overall stability.

[0009] Furthermore, the first keel and the second keel are arranged in an arc-shaped structure, and the overall material of the supporting mechanism is aluminum alloy.

[0010] By adopting the above technical solution, since the first keel and the second keel are arranged in an arc-shaped structure, the first keel and the second keel provide solid external support, which can effectively disperse and bear the load from above, such as soil, water or traffic load, thereby preventing the box culvert from deformation or displacement.

[0011] Furthermore, a plurality of the first keels and the second keels are provided, and the plurality of the first keels and the second keels are arranged in a linear array.

[0012] By adopting the above technical solution, since a plurality of first keels and second keels are provided, the plurality of first keels and second keels can effectively provide support.

[0013] Furthermore, the thickened plate is arranged in a body-shaped structure, and the material of the thickened plate is prestressed concrete.

[0014] By adopting the above technical solution, since the thickened plate is arranged in a body-shaped structure, this thickening treatment enables the box culvert to have better compression and bending resistance when bearing upper loads, thereby effectively preventing deformation or cracking of the top.

[0015] Furthermore, vertical pipe galleries are arranged on both sides of the transverse pipe gallery, a first corridor is arranged inside the transverse pipe gallery, and the vertical pipe galleries are mirror-arranged along the length center line of the transverse pipe gallery.

[0016] By adopting the above technical solution, vertical pipe galleries are arranged on both sides of the horizontal pipe gallery, and a first corridor is arranged inside the horizontal pipe gallery. Gas, electricity and other pipelines can be effectively installed through the first corridor, and people can pass through it for easy maintenance.

[0017] Furthermore, a second corridor is arranged inside the vertical pipe gallery, and the first corridor and the second corridor are interconnected.

[0018] By adopting the above technical solution, since the second corridor is provided inside the vertical pipe gallery, people can effectively move downward through the second corridor, and at the same time, a good ventilation effect can be achieved.

[0019] Furthermore, a ladder is provided inside the second corridor, and the ladder is made of stainless steel.

[0020] By adopting the above technical solution, since a ladder is provided inside the second corridor, the staff can conveniently enter the corridor for inspection and maintenance through the ladder.

[0021] Furthermore, the inner wall of the first corridor is detachably connected with a placement rack through a mounting hole, the placement rack is provided with multiple layers, and each layer is respectively installed with an air pipeline and an electrical pipeline.

[0022] By adopting the above technical solution, since the inner wall of the first corridor is detachably connected with the placement rack through the installation hole, different pipelines can be effectively installed through the placement rack.

[0023] Furthermore, the horizontal pipe gallery and the vertical pipe gallery are both arranged in a rectangular structure.

[0024] By adopting the above technical solution, the space utilization rate of the horizontal pipe gallery and the vertical pipe gallery is high, and the internal space thereof can be fully utilized for pipeline layout and maintenance work, thereby reducing space waste.

[0025] Furthermore, a plurality of the mounting holes are provided, and the plurality of the mounting holes are evenly arranged.

[0026] By adopting the above technical solution, since a plurality of mounting holes are provided, the placement rack can be effectively installed and fixed through the plurality of mounting holes.

[0027] In summary, the utility model mainly has the following beneficial effects:

[0028] 1. The utility model provides a supporting mechanism. After the installation of the transverse pipe gallery and the vertical pipe gallery is completed, a plurality of placement racks can be installed and fixed to the transverse pipe gallery. Then, the pressure-bearing rod can be placed inside the sleeve, and the spring can be ensured to resist. Then, a plurality of first keels and second keels can be welded to the placement rack. The sleeve and the spring are used as supporting elements to effectively absorb and buffer vibrations, impacts and small displacements from the ground. This is for protecting the pipe gallery, especially preventing it from being subjected to external dynamic loads such as traffic vibrations, seismic waves, etc., and the first keel and the second keel provide solid external support. This support can effectively disperse and bear loads from above, such as soil, water or traffic loads, thereby preventing the box culvert from deformation or displacement. Moreover, the design of the first keel and the second keel helps to distribute the load more evenly to the outer wall of the box culvert, reducing stress concentration, which helps to extend the service life of the box culvert and improve its overall structural safety.

[0029] 2. The utility model can significantly increase the structural strength of the top of the underground pipe gallery by arranging a thickened plate. This thickening treatment enables the box culvert to have better compression and bending resistance when bearing the upper load, thereby effectively preventing the top from being deformed or broken. Moreover, since the material of the thickened plate is prestressed concrete, the thickened plate has excellent compression and bending resistance. By pre-applying pressure to the concrete, the bearing capacity of the structure can be significantly improved. The design of the trapezoidal thickened plate combined with the prestressed concrete material makes the top of the pipe gallery more solid and stable when bearing loads, effectively preventing the top from being deformed or damaged. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] Figure 1 It is a three-dimensional structural schematic diagram of the utility model;

[0031] Figure 2 It is a schematic diagram of the front cross-sectional three-dimensional structure of the utility model;

[0032] Figure 3 It is a schematic diagram of a side-view cross-sectional three-dimensional structure of the utility model;

[0033] Figure 4 For this utility model Figure 3 Schematic diagram of the structure enlarged at point A in the middle.

[0034] In the figure: 1. horizontal pipe gallery; 2. vertical pipe gallery; 3. ladder; 4. first corridor; 5. placement rack; 6. air pipeline; 7. electrical pipeline; 8. thickened plate; 9. support mechanism; 901. mounting frame; 902. pressure rod; 903. sleeve; 904. spring; 905. first keel; 906. second keel; 907. connecting column; 10. second corridor; 11. mounting hole. DETAILED DESCRIPTION

[0035] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. The embodiments described below with reference to the drawings are exemplary and are only used to explain the utility model, and cannot be understood as limiting the utility model.

[0036] The following describes an embodiment of the utility model based on its overall structure.

[0037] Embodiment 1:

[0038] A compressive support structure for an underground pipe gallery, such as Figure 1-Figure 4As shown, it includes a transverse pipe gallery 1, a thickened plate 8 is arranged on the top of the transverse pipe gallery 1, and a support mechanism 9 is arranged on the outside of the transverse pipe gallery 1 and the thickened plate 8. The support mechanism 9 includes a mounting frame 901, and a plurality of mounting frames 901 are arranged, and the plurality of mounting frames 901 are arranged equidistantly in a linear array. The plurality of placement frames 5 are fixedly connected by connecting columns 907. A sleeve 903 is arranged on the top of the thickened plate 8, and a spring 904 is arranged inside the sleeve 903. A pressure rod 902 is engaged and slidably inside the sleeve 903. The connecting column 907 is provided. There are multiple connecting columns 907 arranged in a rectangular array along the four corners of the mounting frame 901, and the first keel 905 and the second keel 906 are welded to the multiple connecting columns 907. The multiple mounting frames 901 can be effectively connected in series through the connecting columns 907, thereby improving the overall stability. In addition, the design of the first keel 905 and the second keel 906 helps to distribute the load more evenly to the outer wall of the box culvert, reducing stress concentration, which helps to extend the service life of the box culvert and improve its overall structural safety.

[0039] See also Figure 1 , Figure 2 , Figure 3 , Figure 4 The first keel 905 and the second keel 906 are arranged in an arc-shaped structure. The overall material of the support mechanism 9 is aluminum alloy. Therefore, the first keel 905 and the second keel 906 provide solid external support. This support can effectively disperse and withstand the load from above, such as soil, water or traffic load, thereby preventing the box culvert from deformation or displacement. In addition, the support mechanism 9 can reduce the deadweight of the overall structure, which reduces the pressure on the foundation accordingly, which is beneficial to the stability of the foundation and reduces the risk of settlement.

[0040] See also Figure 1 , Figure 2 , Figure 3 , Figure 4 There are multiple first keels 905 and second keels 906, and the multiple first keels 905 and second keels 906 are arranged in a linear array, so the multiple first keels 905 and second keels 906 can effectively support, and the first keels 905 and second keels 906 will not interfere with each other.

[0041] Embodiment 2:

[0042] See also Figure 1 , Figure 2 , Figure 3 , Figure 4The thickened plate 8 is arranged in a body-shaped structure. The material of the thickened plate 8 is prestressed concrete. Therefore, this thickening treatment enables the box culvert to have better compression and bending resistance when bearing the upper load, thereby effectively preventing the top from deforming or breaking. Moreover, the thickened plate 8 has excellent compression and bending resistance. By pre-applying pressure to the concrete, the bearing capacity of the structure can be significantly improved. The design of the trapezoidal thickened plate 8 combined with the prestressed concrete material makes the top of the pipe gallery more solid and stable when bearing load, effectively preventing the top from deforming or damaging.

[0043] See also Figure 1 , Figure 2 , Figure 3 , Figure 4 Vertical pipe galleries 2 are arranged on both sides of the horizontal pipe gallery 1, and a first corridor 4 is arranged inside the horizontal pipe gallery 1. The vertical pipe gallery 2 is mirrored along the length center line of the horizontal pipe gallery 1. The first corridor 4 can be used to effectively install gas, electricity and other pipelines, and people can pass through it for maintenance. Both ends of the horizontal pipe gallery 1 can be used for people to enter and exit.

[0044] See also Figure 1 , Figure 2 , Figure 3 , Figure 4 A second corridor 10 is arranged inside the vertical pipe gallery 2, and the first corridor 4 and the second corridor 10 are interconnected. The second corridor 10 can effectively allow people to move downward, and at the same time can achieve a good ventilation effect, and the first corridor 4 can be entered through the second corridor 10.

[0045] See also Figure 1 , Figure 2 , Figure 3 A ladder 3 is provided inside the second corridor 10. The ladder 3 is made of stainless steel. The ladder 3 allows workers to enter the corridor for inspection and maintenance. Stainless steel has high strength and excellent durability. Even after long-term use, it is not easy to deform or damage, which makes the stainless steel ladder a very sturdy and durable choice.

[0046] See also Figure 1 , Figure 2 , Figure 3 The inner wall of the first corridor 4 is detachably connected to a placement rack 5 through an installation hole 11. The placement rack 5 is provided with multiple layers, and each layer is respectively installed with an air pipeline 6 and an electrical pipeline 7. Different pipelines can be effectively installed through the placement rack 5, and the placement rack 5 can be installed with the air pipeline 6 and the electrical pipeline 7, and at the same time, the safety of the air pipeline 6 and the electrical pipeline 7 can be ensured.

[0047] See also Figure 1 , Figure 2 , Figure 3The horizontal pipe gallery 1 and the vertical pipe gallery 2 are both arranged in a rectangular structure, so the space utilization rate of the horizontal pipe gallery 1 and the vertical pipe gallery 2 is high, and their internal space can be fully utilized for pipeline layout and maintenance work, reducing space waste, and the horizontal pipe gallery 1 and the vertical pipe gallery 2 can reduce costs in large-scale production, and are also beneficial to later maintenance and repair work.

[0048] See also Figure 1 , Figure 2 , Figure 3 A plurality of mounting holes 11 are provided, and the plurality of mounting holes 11 are evenly arranged. The placement rack 5 can be effectively installed and fixed through the plurality of mounting holes 11. In addition to the installation function, the mounting holes 11 can also effectively dissipate heat.

[0049] The implementation principle of the utility model is as follows: first, the horizontal pipe gallery 1 and the vertical pipe gallery 2 are placed in the pre-buried pit, and then a plurality of placement racks 5 need to be installed and fixed to the horizontal pipe gallery 1, and then the pressure rod 902 can be placed inside the sleeve 903, and it is ensured that the spring 904 can resist, and then a plurality of first keels 905 and second keels 906 can be welded to the placement rack 5 to enhance the stability of the underground pipe gallery;

[0050] After that, manual personnel can first enter the first corridor 4 and then install the air pipeline 6 and the electrical pipeline 7 on the placement rack 5. When manual maintenance is performed later, it is only necessary to pass through the first corridor 4 to quickly enter the second corridor 10.

[0051] Parts not involved in the present invention are the same as the prior art or can be implemented by using the prior art, and will not be described in detail here.

[0052] Although an embodiment of the utility model has been shown and described, this specific embodiment is only an explanation of the utility model and is not a limitation of the utility model. The specific features, structures, materials or characteristics described may be combined in a suitable manner in any one or more embodiments or examples. After reading this specification, those skilled in the art may make modifications, substitutions and variations to the embodiments without creative contribution as needed without departing from the principles and purpose of the utility model. However, as long as they are within the scope of the claims of the utility model, they are protected by patent law.

Claims

1. A compressive support structure for an underground pipe gallery, characterized in that: It comprises a transverse pipe gallery (1), a thickened plate (8) is arranged on the top of the transverse pipe gallery (1), a support mechanism (9) is arranged on the outer sides of the transverse pipe gallery (1) and the thickened plate (8), the support mechanism (9) comprises a mounting frame (901), a plurality of the mounting frames (901) are provided, the plurality of the mounting frames (901) are arranged equidistantly in a linear array, and the plurality of the mounting frames (901) are fixedly connected via connecting columns (907); A sleeve (903) is arranged on the top of the thickened plate (8), a spring (904) is arranged inside the sleeve (903), and a pressure bearing rod (902) is slidably engaged inside the sleeve (903); A plurality of the connecting columns (907) are provided, and the plurality of the connecting columns (907) are arranged in a rectangular array along the four corners of the mounting frame (901), and a first keel (905) and a second keel (906) are welded to the plurality of the connecting columns (907).

2. The compressive support structure of the underground pipe gallery according to claim 1 is characterized in that: The first keel (905) and the second keel (906) are arranged in an arc-shaped structure, and the entire material of the supporting mechanism (9) is aluminum alloy.

3. The compressive support structure of the underground pipe gallery according to claim 1 is characterized in that: A plurality of the first keels (905) and the second keels (906) are provided, and the plurality of the first keels (905) and the second keels (906) are arranged in a linear array.

4. The compressive support structure of the underground pipe gallery according to claim 1 is characterized in that: The thickened plate (8) is arranged in a body-shaped structure, and the material of the thickened plate (8) is prestressed concrete.

5. The compression support structure of the underground pipe gallery according to claim 1 is characterized in that: Vertical pipe galleries (2) are arranged on both sides of the transverse pipe gallery (1), a first corridor (4) is arranged inside the transverse pipe gallery (1), and the vertical pipe gallery (2) is arranged in a mirror image along the length center line of the transverse pipe gallery (1).

6. The compression support structure of the underground pipe gallery according to claim 5 is characterized in that: A second corridor (10) is provided inside the vertical pipe gallery (2), and the first corridor (4) and the second corridor (10) are interconnected.

7. The compressive support structure of the underground pipe gallery according to claim 6 is characterized in that: A ladder (3) is arranged inside the second corridor (10), and the ladder (3) is made of stainless steel.

8. The compression support structure of the underground pipe gallery according to claim 6 is characterized in that: The inner wall of the first corridor (4) is detachably connected to a placement rack (5) through a mounting hole (11); the placement rack (5) is provided with multiple layers, and each layer is respectively installed with an air pipeline (6) and an electrical pipeline (7).

9. The compression support structure of the underground pipe gallery according to claim 1 is characterized in that: The transverse pipe gallery (1) and the vertical pipe gallery (2) are both arranged in a rectangular structure.

10. The compression support structure of the underground pipe gallery according to claim 8, characterized in that: A plurality of the mounting holes (11) are provided, and the plurality of mounting holes (11) are evenly arranged at equal distances.