Waterborne photovoltaic project cable cross-channel crossing laying structure
By setting up pipe piles and cable trays in water photovoltaic projects and combining cable protection pipes, cable cross-channel lamination is realized, which solves the problems of construction difficulty and road damage, simplifies construction procedures, improves efficiency and reduces construction costs.
Patent Information
- Application Number
- CN202420492250.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-14
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2034-03-14
AI Technical Summary
The cable laying paths in water photovoltaic projects are complex, especially when crossing waterways and roads, the construction is difficult, high cost, extended construction period, and it is easy to damage the road surface, resulting in increased construction costs.
The cross-road pipe pulling scheme is adopted. By installing pipe piles on both sides of the waterway, cable trays and cable protection pipes are installed. The cable trays include the first and second sections of bridges. The cable protection pipe is inserted into the end of the second section of bridges and closed. The pile height is 8m to 10m, and a bracket is installed to support the bridge frame and protect the pipe to realize the cable cross-channel lamination.
Effectively reduce construction difficulty, reduce the impact on the road, simplify construction procedures, improve construction efficiency, minimize road damage, and ensure that there is no substantial impact on cable laying.
Smart Images

Figure CN221961586U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of cable laying, in particular to a cable crossing channel laying structure for a water photovoltaic project. Background Art
[0002] Due to the complex construction environment of large-scale water photovoltaic projects, water photovoltaic power stations will face many problems during the construction process. Among them, the transmission of electric energy involves a large number of cables and the laying paths are complicated. In particular, when laying cables across waterways, roads, and pond embankments, due to the ownership of roads and transportation restrictions, there will be many problems with damage to the road surface or crossing roads during construction. In addition to the various coordination and cooperation involved in the construction, the solutions to these problems have increased the construction costs to a certain extent and easily led to extended construction periods. Utility Model Content
[0003] The technical problem to be solved by the utility model is to provide a cable crossing channel laying structure for a water photovoltaic project. The cross-road pipe pulling scheme is adopted to effectively reduce the construction difficulty, minimize the impact on the road, simplify the construction procedure, and improve the construction efficiency. At the same time, this optimization scheme has no substantial impact on the cable laying.
[0004] In order to solve the above technical problems, the technical solution adopted by the utility model is:
[0005] A cable crossing channel laying structure for a water photovoltaic project, comprising a pipe pile, a cable bridge and a cable protection pipe;
[0006] The pipe piles are arranged on both sides of the waterway;
[0007] The cable bridge comprises a first section of bridge laid from the photovoltaic support area to the pipe pile and a second section of bridge laid between two pipe piles; a photovoltaic cable protection pipe is arranged between the second sections of bridges on adjacent waterways;
[0008] The photovoltaic cable protection tube is arranged below the road surface between the two waterways.
[0009] A further improvement of the technical solution of the utility model is that a photovoltaic cable protection tube is inserted into the end of the second section of the bridge frame and is sealed by a waterproof sealing plate.
[0010] A further improvement of the technical solution of the utility model is that the pipe pile is a PHC pipe pile.
[0011] A further improvement of the technical solution of the utility model is that the height of the corresponding pipe pile is 8m to 10m.
[0012] A further improvement of the technical solution of the utility model is that two cable bridge brackets are arranged on the top of the pipe pile.
[0013] A further improvement of the technical solution of the utility model is that: a first bracket for supporting the connection between the first section bridge and the second section bridge or a second bracket for supporting the connection between the second section bridge and the photovoltaic cable protection tube is arranged on the side of the pipe pile.
[0014] A further improvement of the technical solution of the utility model is that: the first bracket includes a crossbeam horizontally arranged outward from the pipe pile and an inclined beam inclined from the crossbeam toward the pipe pile; the crossbeam and the inclined beam are fixed on the pipe pile by a clamp.
[0015] A further improvement of the technical solution of the utility model is that the second bracket includes a first pipe clamp arranged between the pipe pile and the end of the second section of the cable tray and a second pipe clamp arranged between the pipe pile and the photovoltaic cable protection pipe; the second bracket is arranged on the pipe pile at a distance of 500 mm from the water surface.
[0016] A further improvement of the technical solution of the utility model is that the distance between the upper wall of the cable protection tube and the ground is not less than 1m.
[0017] Due to the adoption of the above technical solution, the technical progress achieved by the utility model is:
[0018] 1. The utility model realizes the laying of cables across the waterway by setting pipe piles and erecting the cable bridge on the waterway through the pipe piles.
[0019] 2. The utility model solves the problems caused by the overhead laying of cables across roads occupying the upper space of the road, affecting road transportation, and the direct burial laying through pipes requiring destruction of the road surface and subgrade, by laying cable protection pipes under the road. It reduces the construction difficulty and construction progress and avoids the adverse impact on the road to the greatest extent. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is a schematic diagram of the cross section of the cable across the waterway and road in the utility model;
[0021] Figure 2 It is a side view of the pipe pile in the utility model;
[0022] Figure 3 This is the AA cross-sectional view of the pipe pile in the utility model;
[0023] Figure 4 This is a cross-sectional view of the middle pipe pile BB of the utility model;
[0024] Figure 5 It is a schematic diagram of the cable crossing the waterway and road in the utility model;
[0025] Among them, 1. Photovoltaic support, 2. Pipe piles, 3. Cable tray, 4. First cable support, 5. Second cable support, 6. Cable tray support, 7. Cable protection pipe, 8. Road, 9. Waterway. DETAILED DESCRIPTION
[0026] The present invention is further described in detail below with reference to the accompanying drawings and embodiments:
[0027] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" ... etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0028] In addition, the terms "first", "second", etc. are used for descriptive purposes only and cannot be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first", "second", etc. may explicitly or implicitly include at least one of the features. In the description of the present utility model, the meaning of "several" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.
[0029] like Figure 1 As shown, a cable laying structure across a waterway 9 for a water photovoltaic project includes a pipe pile 2, a cable bridge 3 and a cable protection pipe 7;
[0030] The pipe piles 2 are arranged on both sides of the waterway 9;
[0031] The cable bridge 3 includes a first bridge section laid from the photovoltaic support 1 area to the pipe pile 2 and a second bridge section laid between two pipe piles 2; the span of the second bridge section is greater than the width of the waterway 9, and a photovoltaic cable protection tube 7 is arranged between the second bridge sections on adjacent waterways 9; after the photovoltaic cable protection tube 7 is inserted into the end of the second bridge section, it is closed by a waterproof sealing plate;
[0032] The photovoltaic cable protection tube 7 is arranged below the ground of the road 8 between the two waterways 9, and can be constructed by trenchless pipe pulling, and the distance between the upper wall of the cable protection tube 7 and the ground is not less than 1m;
[0033] The cable is laid across the waterway 9 through the cable bridge 3 and the cable protection tube 7 .
[0034] like Figure 2 , 3As shown in 4, the pipe pile 2 is a PHC pipe pile, and the height of the pipe pile 2 is greater than the height of the ship, usually 8m to 10m; two cable bridge brackets 6 are arranged on the top of the pipe pile 2; a first bracket 4 for supporting the connection between the first section bridge and the second section bridge or a second bracket 5 for supporting the connection between the second section bridge and the photovoltaic cable protection tube is arranged on the side of the pipe pile 2;
[0035] The first bracket 4 includes a horizontal beam arranged outward from the pipe pile 2 and an inclined beam arranged obliquely from the horizontal beam to the pipe pile 2; the horizontal beam and the inclined beam are fixed to the pipe pile 2 by a clamp;
[0036] The second bracket 5 includes a first pipe clamp arranged between the pipe pile 2 and the end of the second section of the cable bridge 3 and a second pipe clamp arranged between the pipe pile 2 and the photovoltaic cable protection tube 7; the second bracket 5 is arranged on the pipe pile 2 at a distance of 500 mm from the water surface. Example
[0037] like Figure 5 As shown, the figure takes the waterway 9 with a span of 6m as an example. The waterway 9 is set on both sides of the road 8 and the pond stalk, and a large-span cable bridge 3 is used. The maximum span of the cable bridge 3 is selected according to the width requirement of the waterway 9, which is required to be no less than 6m. Piles are driven between the photovoltaic bracket 1 and the waterway 9, and pipe piles 2 are set on both sides of the waterway 9. Pipe piles 2 are set 2 to 3m from the water area to the edge of the roadbed of the road 8. According to the installation requirements of the cable bridge 3, a cable bridge bracket 6 is set on the top of the pipe pile 2, and a first bracket 4 and a second bracket 5 are set on the side as support and installation points for the laying of the cable bridge 3.
[0038] The cable tray 3 is horizontally laid along the side brackets of the pipe pile 2 from the photovoltaic support 1 area to the pipe piles 2 on both sides of the channel 9, and then vertically laid upward to the top of the pipe pile 2, and then laid across the channel 9 to the top of the opposite side pipe pile, and then vertically laid downward to the second bracket 5 500mm away from the water surface. The end of the cable tray 3 is fireproofed and sealed with a waterproof sealing plate. After the cable is laid out of the cable tray 3, it passes through the cable protection pipe 7 and is led out of the cable tray 3. The entire cable protection pipe 7 is passed through the road 8 to the vertical cable tray 3 on the opposite side of the road 8 by the pipe pulling construction method. The cable protection pipe 7 is made of high-strength, waterproof, and salt water corrosion-resistant pipes, and the outer wall of the cable protection pipe 7 is not less than 1m away from the ground.
[0039] In summary, the utility model effectively reduces the construction difficulty, minimizes the impact on the road, simplifies the construction procedures, and improves the construction efficiency. At the same time, this optimization scheme has no substantial impact on cable laying.
Claims
1. A cable laying structure across a waterway for a photovoltaic project on water. Features: It comprises a pipe pile (2), a cable bridge (3) and a cable protection pipe (7); The pipe piles (2) are arranged on both sides of the waterway (9); The cable bridge (3) comprises a first bridge section laid from the photovoltaic support (1) area to the pipe pile (2) and a second bridge section laid between two pipe piles (2); a photovoltaic cable protection tube (7) is arranged between the second bridge sections on adjacent waterways (9); The photovoltaic cable protection tube (7) is arranged below the ground of the road (8) between the two waterways (9).
2. The cable laying structure across the waterway for a water photovoltaic project according to claim 1, Features: A photovoltaic cable protection tube (7) is inserted into the end of the second bridge frame and is sealed by a waterproof sealing plate.
3. The cable laying structure across the waterway for a water photovoltaic project according to claim 1, Features: The pipe pile (2) is a PHC pipe pile.
4. The cable cross-channel laying structure for a water photovoltaic project according to claim 1, Features: The height of the pipe pile (2) is 8m to 10m.
5. The cable cross-channel laying structure for a water photovoltaic project according to claim 1, Features: Two cable bridge brackets (6) are arranged on the top of the pipe pile (2).
6. The cable laying structure across the waterway for a water photovoltaic project according to claim 1, Features: The side of the pipe pile (2) is provided with a first bracket (4) for supporting the connection between the first section bridge frame and the second section bridge frame, or a second bracket (5) for supporting the connection between the second section bridge frame and the photovoltaic cable protection tube.
7. The cable laying structure across the waterway for a water photovoltaic project according to claim 6, Features: The first bracket (4) comprises a crossbeam horizontally arranged outward from the pipe pile (2) and an inclined beam inclined from the crossbeam toward the pipe pile (2); the crossbeam and the inclined beam are fixed to the pipe pile (2) by means of a clamp.
8. The cable laying structure across the waterway for a water photovoltaic project according to claim 6, Features: The second bracket (5) comprises a first pipe clamp arranged between the pipe pile (2) and the end of the second section of the cable bridge (3), and a second pipe clamp arranged between the pipe pile (2) and the photovoltaic cable protection pipe (7); the second bracket (5) is arranged on the pipe pile (2) at a distance of 500 mm from the water surface.
9. The cable laying structure across the waterway for a water photovoltaic project according to claim 1, Features: The distance between the upper wall of the cable protection tube (7) and the ground is not less than 1 m.
