Engineering construction pay-off tool

By introducing telescopic rods and brushes into the construction wiring tool, the problems of insufficient contamination and insufficient adaptability of wire laying ropes in the construction site environment are solved, the height adjustable tool and the cleaning and maintenance of wire laying ropes are realized, and the use is improved Convenience and lifespan.

CN221970971UActive Publication Date: 2024-11-08泰安市河湖管理保护服务中心
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420120543.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-17
Publication Date
2024-11-08
Estimated Expiration
2034-01-17

AI Technical Summary

Technical Problem

The existing construction wire laying devices are easily contaminated by dust and gravel in the construction site environment, resulting in wear of wire laying ropes, and it is difficult to meet the needs of different heights, making it inconvenient to use.

Method used

Designed a construction wire laying tool including telescopic rods, horizontal plates, vertical plates and brushes. The height is adjusted by telescopic rods, the horizontal plates move up and down, and the vertical plates and brushes clean the wire ropes to ensure the cleanliness of the wire ropes. and durability.

Benefits of technology

The height adjustment of the wiring tool is achieved, ensuring the convenience of use under different height environments, and the service life of the wiring rope is extended through brush cleaning, maintaining the clean state of the wiring rope.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221970971U_ABST
    Figure CN221970971U_ABST
Patent Text Reader

Abstract

The utility model provides an engineering construction pay-off tool, and mainly relates to the field of engineering construction pay-off equipment. An engineering construction pay-off tool comprises a bottom plate, telescopic rods are installed at the four corners of the top face of the bottom plate, the top ends of the four telescopic rods are connected through a transverse plate, a wire box is installed on one side of the top face of the transverse plate, a pay-off rope is wound in the wire box, a vertical plate is installed on the other side of the top face of the transverse plate, and a through hole is formed in the vertical plate. A brush is installed on the inner wall of the through hole, and one end of the pay-off rope penetrates through the through hole. The device has the advantages that the device is simple in structure and convenient to use, the transverse plate can be driven to move up and down through stretching and contracting of the telescopic rod, then the height of the device is adjusted so as to meet the use requirements of different heights, meanwhile, the periphery of a pay-off rope can be cleaned through cooperation of the vertical plate and the brush, and the use effect is good. Therefore, neatness of the pay-off rope is guaranteed, and convenience is brought to next use.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model mainly relates to the field of engineering construction setting-out equipment, in particular to an engineering construction setting-out tool. Background Art

[0002] Construction layout is a preliminary inspection of the positioning of the construction project to ensure that the construction project is carried out safely and smoothly in accordance with the requirements of planning approval. During the construction process, layout tools are needed to measure the building to determine the verticality of the building and prevent the building from tilting during the construction process.

[0003] At present, the existing construction line-laying devices are used in a relatively dirty environment on the construction site. Dust, gravel and other garbage are easily adhered to the line during recycling. If they are used in this environment for a long time without cleaning, the line-laying rope will be worn and the service life will be affected. At the same time, during use, it cannot meet the use requirements at different heights well, which brings inconvenience to use. Utility Model Content

[0004] In order to address the deficiencies in the prior art, the utility model provides a construction line-laying tool. The utility model has a simple structure and is easy to use. The extension and contraction of the telescopic rod can drive the horizontal plate to move up and down, thereby adjusting the height of the device to meet the use requirements at different heights. At the same time, the cooperation of the vertical plate and the brush can clean the periphery of the line-laying rope, thereby ensuring the cleanliness of the line-laying rope and bringing convenience to the next use.

[0005] In order to achieve the above purpose, the utility model is implemented through the following technical solutions:

[0006] A construction line-laying tool comprises a base plate, telescopic rods are installed at the four corners of the top surface of the base plate, the top ends of the four telescopic rods are connected by a horizontal plate, a wire box is installed on one side of the top surface of the horizontal plate, a line-laying rope is wound in the wire box, a vertical plate is installed on the other side of the top surface of the horizontal plate, a through hole is provided on the vertical plate, a brush is installed on the inner wall of the through hole, and one end of the line-laying rope passes through the through hole.

[0007] Furthermore, rollers are installed at the four corners of the bottom surface of the base plate, and the rollers have a braking function.

[0008] Furthermore, a first push rod is installed on one side of the top surface of the transverse plate, and a second push rod is installed on the top end of the first push rod.

[0009] Furthermore, an elastic protective sleeve is mounted on the outer periphery of the second push rod.

[0010] Furthermore, a limit rod is installed on the other side of the top surface of the horizontal plate, and the limit rod is in contact with and cooperates with the pay-out rope.

[0011] Compared with the prior art, the beneficial effects of the utility model are:

[0012] The utility model has a simple structure and is easy to use. The extension and contraction of the telescopic rod can drive the horizontal board to move up and down, thereby adjusting the height of the device to meet the use requirements at different heights. At the same time, the cooperation of the vertical board and the brush can clean the periphery of the line-releasing rope, thereby ensuring the cleanliness of the line-releasing rope and bringing convenience to the next use. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Attached Figure 1 It is a schematic diagram of the structure of the utility model;

[0014] Attached Figure 2 It is a structural diagram of the vertical board;

[0015] The numbers shown in the accompanying drawings are: 1, bottom plate; 2, telescopic rod; 3, horizontal plate; 4, wire box; 5, wire rope; 6, vertical plate; 7, through hole; 8, brush; 9, roller; 10, first push rod; 11, second push rod; 12, limit rod. DETAILED DESCRIPTION

[0016] The utility model is further described in conjunction with the accompanying drawings and specific embodiments. It should be understood that these embodiments are only used to illustrate the utility model and are not used to limit the scope of the utility model. In addition, it should be understood that after reading the content taught by the utility model, those skilled in the art can make various changes or modifications to the utility model, and these equivalent forms also fall within the scope defined by this application.

[0017] like Figure 1-2 As shown, the utility model relates to a construction line-laying tool, comprising a base plate 1, telescopic rods 2 are installed at four corners of the top surface of the base plate 1, the top ends of the four telescopic rods 2 are connected by a horizontal plate 3, a wire box 4 is installed on one side of the top surface of the horizontal plate 3, a wire-laying rope 5 is wound in the wire box 4, a vertical plate 6 is installed on the other side of the top surface of the horizontal plate 3, a through hole 7 is provided on the vertical plate 6, a brush 8 is installed on the inner wall of the through hole 7, and one end of the wire-laying rope 5 passes through the through hole 7.

[0018] Specifically, rollers 9 are installed at the four corners of the bottom surface of the bottom plate 1, and the rollers 9 have a braking function. The rolling of the rollers 9 can drive the device to move, thereby improving the flexibility of the device.

[0019] Specifically, a first push rod 10 is installed on one side of the top surface of the horizontal plate 3, and a second push rod 11 is installed on the top of the first push rod 10. Through the cooperation of the first push rod 10 and the second push rod 11, the device can be pushed to move.

[0020] Specifically, an elastic protective sleeve is mounted on the outer periphery of the second push rod 11. The elastic protective sleeve can prevent the operator's hand from directly contacting the second push rod 11, thereby improving the comfort of the operator's hand.

[0021] Specifically, a limit rod 12 is installed on the other side of the top surface of the horizontal plate 3, and the limit rod 12 contacts and cooperates with the line-releasing rope 5. By observing the direct contact between the line-releasing rope 5 and the limit rod 12, it is possible to determine whether the position of the line-releasing rope 5 is in the correct line-releasing position, thereby avoiding bending of the line-releasing rope 5 and ensuring the accuracy of the line-releasing.

[0022] Example:

[0023] When using the device, first move the device to the use position by rolling the roller 9, then extend (contract) the telescopic rod 2 to drive the cross plate 3 to move, and then adjust the height of the device to meet the usage requirements at different heights, then pull the pay-out rope 5 to move and fix it in the defense line position, then carry out construction according to the pay-out rope 5, and then recycle the pay-out rope 5 through the wire box 4. When reclaiming the defense line rope 5, the brush 8 cleans the surface of the pay-out rope 5, and then cleans off the dust, impurities, etc. on the pay-out rope 5, thereby avoiding the influence of dust, etc. on the pay-out rope 5, which brings convenience to use.

[0024] The utility model has a simple structure and is easy to use. The extension and contraction of the telescopic rod can drive the horizontal board to move up and down, thereby adjusting the height of the device to meet the use requirements at different heights. At the same time, the cooperation of the vertical board and the brush can clean the periphery of the line-releasing rope, thereby ensuring the cleanliness of the line-releasing rope and bringing convenience to the next use.

[0025] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the utility model, rather than to limit it. Although the utility model has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the various embodiments of the utility model.

Claims

1. A construction laying-out tool, comprising a base plate (1), characterized in that: Telescopic rods (2) are installed at four corners of the top surface of the bottom plate (1), and the top ends of the four telescopic rods (2) are connected by a horizontal plate (3). A wire box (4) is installed on one side of the top surface of the horizontal plate (3), and a wire-releasing rope (5) is wound inside the wire box (4). A vertical plate (6) is installed on the other side of the top surface of the horizontal plate (3), and a through hole (7) is provided on the vertical plate (6). A brush (8) is installed on the inner wall of the through hole (7), and one end of the wire-releasing rope (5) passes through the through hole (7).

2. The engineering construction setting-out tool according to claim 1, characterized in that: Rollers (9) are installed at the four corners of the bottom surface of the base plate (1), and the rollers (9) have a braking function.

3. A construction laying-out tool according to claim 2, characterized in that: A first push rod (10) is installed on one side of the top surface of the transverse plate (3), and a second push rod (11) is installed on the top end of the first push rod (10).

4. The engineering construction setting-out tool according to claim 3, characterized in that: An elastic protective sleeve is sleeved on the outer periphery of the second push rod (11).

5. The engineering construction setting-out tool according to claim 1, characterized in that: A limiting rod (12) is installed on the other side of the top surface of the transverse plate (3), and the limiting rod (12) is in contact with the line-releasing rope (5).