Green prefabricated concrete member wall structure
By setting up foam plastic insulation board and third steel bar skeleton in precast concrete walls and providing prestress with steel rope ropes, the hollowing problem in the integrated manufacturing of wall insulation and structure is solved, and the insulation performance of the wall is improved and support strength, a lightweight and efficient precast concrete wall structure is achieved.
Patent Information
- Application Number
- CN202420346659.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-26
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2034-02-26
AI Technical Summary
When the existing precast concrete wall panels improve the energy-saving and insulation performance of the wall, the thickness of the plates on both sides of the insulation mezzanine is reduced, which makes it easy to get hollow during the production process, which brings inconvenience to the integrated manufacturing of insulation and structural structure, and the wall weight is relatively large, which affects the Construction efficiency.
Design a wall structure of green precast concrete member, and form a sandwich insulation board by setting a foam plastic insulation board between the first wall panel and the second wall panel, and laying a third steel bar frame and cast concrete layer between the insulation boards to form a sandwich insulation board. Structure, adding the overall shape of the wall and connecting bridge, built-in insulation mezzanine and using wire ropes to provide prestressing to increase support strength.
It realizes efficient thermal insulation, heat insulation and sound insulation performance of the wall, while reducing the weight of the wall, improving the overall shape and quality of the wall, reducing deformation and hollowing caused by temperature changes, and meeting the needs of the wall. .
Smart Images

Figure CN221972733U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of precast concrete wall panels, in particular to a green precast concrete component wall structure. Background Art
[0002] The use of prefabricated concrete wall panels to construct prefabricated buildings can improve the degree of factory-based and mechanized construction, reduce on-site wet operations, save on-site labor, overcome seasonal influences, and shorten the construction period. The prior art discloses a leveling device for prefabricated components and an energy-saving wall containing the same, with the announcement number CN218323307U. The prefabricated components include a concrete wall and an insulation layer, the insulation layer is connected to the outer side of the concrete wall, and the leveling device for the prefabricated components includes an embedded component and a leveling component, the leveling component is connected to one end of the embedded component, and the leveling component and the embedded component are perpendicular to each other, the embedded component fits against the side of the prefabricated component, and the other end of the embedded component is connected to the concrete wall. The energy-saving wall includes a cast-in-place wall without dismantling formwork, two prefabricated components arranged at intervals, and a plurality of leveling devices for prefabricated components. Improve the overall flatness of the facade of the prefabricated building, thereby minimizing the construction volume and thickness of the outer leveling layer, reducing the workload of on-site wet work and reducing the shedding caused by the excessive thickness of the leveling layer.
[0003] In order to improve the energy-saving and thermal insulation performance of the wall itself, an insulation interlayer is set inside the wall to eliminate the external insulation board. This will reduce the thickness of the boards on both sides of the interlayer, and hollowing is likely to occur during the manufacturing process, which brings inconvenience to the integrated manufacturing of insulation and structure, and needs further improvement. Utility Model Content
[0004] The purpose of the utility model is to provide a green precast concrete component wall structure to solve the problems raised in the above background technology.
[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a green precast concrete component wall structure, comprising a first wall panel and a second wall panel, the first wall panel comprising a first steel frame and a first concrete layer, the second wall panel comprising a second steel frame and a second concrete layer, an insulation board is arranged between the first wall panel and the second wall panel, a casting window is opened on the surface of the insulation board, and a third steel frame is laid in the casting window, the bottom end of the third steel frame extends into the first wall panel, and the top end of the third steel frame extends into the second wall panel, a third concrete layer is cast in the casting window, the third concrete layer is wrapped around the third steel frame, the first wall panel, the insulation board and the second wall panel constitute an integrated wall, and a fourth concrete layer is cast around the integrated wall.
[0006] Preferably, the first steel skeleton includes two steel cages, which are respectively arranged at two ends of the first wall panel, and a plurality of steel cables are laid between the two steel cages. After both ends of the steel cables are tensioned, a steel grid is laid on the surface of the steel cables.
[0007] Preferably, the second steel reinforcement skeleton has the same structure as the first steel reinforcement skeleton.
[0008] Preferably, before pouring the first concrete layer of the first wall panel, the third steel skeleton is laid, and after pouring the first concrete layer, the insulation board is laid on the upper surface of the first wall panel so that the third steel skeleton is placed in the pouring window, and then the second steel skeleton is laid and the second concrete layer is poured.
[0009] Preferably, the insulation board is foam plastic, and the insulation board is composed of multiple unit boards assembled flatly, and multiple fixing ribs are fixedly installed inside each insulation board. The two ends of the fixing ribs extend from the upper and lower surfaces of the insulation board to the outside respectively, and expansion heads are fixedly provided at both ends of the fixing ribs.
[0010] Preferably, the first concrete layer, the second concrete layer, the third concrete layer and the fourth concrete layer are cast in one step.
[0011] Beneficial Effects
[0012] The utility model provides a green prefabricated concrete component wall structure, which has the following beneficial effects:
[0013] 1. The precast concrete component wall structure forms a sandwich insulation structure by arranging an insulation layer between the first wall panel and the second wall panel, thereby improving the thermal insulation, heat insulation and sound insulation performance of the wall. At the same time, a third steel frame is arranged between the first wall panel and the second wall panel and concrete is poured to form a connecting bridge between the two, thereby increasing the overall shape of the wall panel, reducing deformation and hollowing caused by temperature changes, and improving the quality of the precast concrete wall.
[0014] 2. The precast concrete component wall structure has a built-in thermal insulation interlayer, which reduces the weight of the wall and makes installation easier. By arranging steel cables in the first wall panel and the second wall panel, during the manufacturing process of this type of wall, prestress is provided to the wall by tensioning the steel cables, thereby improving the supporting strength and rigidity of the wall and meeting the use requirements of the wall. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 This is a schematic diagram of the front section structure of the utility model;
[0016] Figure 2 For this utility model Figure 1 The enlarged structural diagram at A in the middle;
[0017] Figure 3This is a schematic diagram of the top view of the steel bar grid structure of the utility model;
[0018] Figure 4 It is a schematic diagram of the top view of the structure of the insulation board of the utility model.
[0019] In the figure: 1 first wall panel, 2 second wall panel, 3 first steel frame, 4 first concrete layer, 5 second steel frame, 6 second concrete layer, 7 insulation board, 8 pouring window, 9 third steel frame, 10 third concrete layer, 11 fourth concrete layer, 12 steel cage, 13 steel rope, 14 steel mesh, 15 fixing bar, 16 expansion head. DETAILED DESCRIPTION
[0020] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0021] See also Figure 1-4 The utility model provides a technical solution: a green precast concrete component wall structure, including a first wall panel 1 and a second wall panel 2, the first wall panel 1 includes a first steel skeleton 3 and a first concrete layer 4, the first steel skeleton 3 includes two steel cages 12, the two steel cages 12 are respectively arranged at the two ends of the first wall panel 1, and a plurality of steel cables 13 are laid between the two steel cages 12. After the two ends of the steel cables 13 are tensioned, a steel grid 14 is laid on the surface of the steel cables 13.
[0022] The second wall panel 2 includes a second steel skeleton 5 and a second concrete layer 6 . The second steel skeleton 5 has the same structure as the first steel skeleton 3 . The second steel skeleton 5 also includes a steel cage 12 , steel cables 13 and a steel mesh 14 .
[0023] An insulation board 7 is arranged between the first wall panel 1 and the second wall panel 2, a casting window 8 is opened on the surface of the insulation board 7, and a third steel frame 9 is laid in the casting window 8, the bottom end of the third steel frame 9 extends into the first wall panel 1, and the top end of the third steel frame 9 extends into the second wall panel 2, a third concrete layer 10 is cast in the casting window 8, and the third concrete layer 10 is wrapped around the third steel frame 9. The first wall panel 1, the insulation board 7 and the second wall panel 2 constitute an integrated wall body, and a fourth concrete layer 11 is cast around the integrated wall.
[0024] Before pouring the first concrete layer 4 of the first wall panel 1, the third steel skeleton 9 is laid. After pouring the first concrete layer 4, the insulation board 7 is laid on the upper surface of the first wall panel 1 so that the third steel skeleton 9 is placed in the pouring window 8. Then the second steel skeleton 5 is laid and the second concrete layer 6 is poured. It should be noted that the first concrete layer 4, the second concrete layer 6, the third concrete layer 10 and the fourth concrete layer 11 are cast and formed at one time.
[0025] By arranging steel cables 13 in the first wall panel 1 and the second wall panel 2, during the manufacturing process of this type of wall, prestress is provided to the wall by tensioning the steel cables 13, thereby improving the supporting strength and rigidity of the wall and meeting the use requirements of the wall.
[0026] The insulation board 7 is foam plastic, and the insulation board 7 is composed of a plurality of unit boards laid flat and assembled. A plurality of fixing ribs 15 are fixedly installed inside each insulation board 7. The two ends of the fixing rib 15 extend from the upper and lower surfaces of the insulation board 7 to the outside respectively, and expansion heads 16 are fixedly provided at both ends of the fixing rib 15. The expansion heads 16 are embedded in the first wall panel 1 and the second wall panel 2. The wall structure has a built-in insulation interlayer, which reduces the weight of the wall and is easier to manufacture and install.
[0027] The precast concrete component wall structure forms a sandwich insulation structure by arranging an insulation board 7 between the first wall panel 1 and the second wall panel 2, thereby improving the thermal insulation, heat insulation and sound insulation performance of the wall. At the same time, a third steel skeleton 9 is arranged between the first wall panel 1 and the second wall panel 2 and concrete is poured to form a connecting bridge therebetween, thereby increasing the overall shape of the wall panel, reducing deformation and hollowing caused by temperature changes, and improving the quality of the precast concrete wall.
[0028] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A green precast concrete component wall structure, comprising a first wall panel (1) and a second wall panel (2), characterized in that: The first wall panel (1) comprises a first steel frame (3) and a first concrete layer (4), the second wall panel (2) comprises a second steel frame (5) and a second concrete layer (6), an insulation board (7) is arranged between the first wall panel (1) and the second wall panel (2), a casting window (8) is provided on the surface of the insulation board (7), a third steel frame (9) is laid in the casting window (8), the bottom end of the third steel frame (9) extends into the first wall panel (1), the top end of the third steel frame (9) extends into the second wall panel (2), a third concrete layer (10) is cast in the casting window (8), the third concrete layer (10) is wrapped around the third steel frame (9), the first wall panel (1), the insulation board (7) and the second wall panel (2) form an integrated wall body, and a fourth concrete layer (11) is cast around the integrated wall body.
2. The green precast concrete component wall structure according to claim 1, characterized in that: The first steel frame (3) comprises two steel cages (12), the two steel cages (12) are respectively arranged at the two ends of the first wall panel (1), a plurality of steel cables (13) are laid between the two steel cages (12), and after the two ends of the steel cables (13) are tensioned, a steel mesh (14) is laid on the surface of the steel cables (13).
3. The green precast concrete component wall structure according to claim 2, characterized in that: The second steel reinforcement skeleton (5) has the same structure as the first steel reinforcement skeleton (3).
4. The green precast concrete component wall structure according to claim 3 is characterized by: Before the first concrete layer (4) is poured on the first wall panel (1), a third steel frame (9) is laid. After the first concrete layer (4) is poured, an insulation board (7) is laid on the upper surface of the first wall panel (1) so that the third steel frame (9) is placed in the pouring window (8). Then, a second steel frame (5) is laid and a second concrete layer (6) is poured.
5. The green precast concrete component wall structure according to claim 4, characterized in that: The insulation board (7) is made of foam plastic. The insulation board (7) is composed of a plurality of unit boards laid flat and assembled. A plurality of fixing ribs (15) are fixedly installed inside each insulation board (7). The two ends of the fixing ribs (15) extend from the upper and lower surfaces of the insulation board (7) to the outside, respectively. Expansion heads (16) are fixedly arranged at the two ends of the fixing ribs (15).
6. A green precast concrete component wall structure according to any one of claims 1 to 5, characterized in that: The first concrete layer (4), the second concrete layer (6), the third concrete layer (10) and the fourth concrete layer (11) are cast in one step.