Reinforcing steel bar mounting and positioning block in reinforcing steel bar preformed hole of concrete prefabricated part

By using a combined structure of steel bar clamps and wire-tipping slots in the reserved hole of the bridge prefabricated parts, the steel bars are completely centered in the reserved holes, which solves the problem of difficult steel bar alignment and improves the connection efficiency between the prefabricated parts and strength.

CN221972825UActive Publication Date: 2024-11-08ROAD & BRIDGE INT CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420559178.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-21
Publication Date
2024-11-08
Estimated Expiration
2034-03-21

AI Technical Summary

Technical Problem

In the prefabricated bridge assembly construction, due to the large weight of the steel bars, it is difficult to completely center in the reserved holes, affecting the connection between the main bars between the prefabricated blocks and causing the connection to fail.

Method used

Two steel bar clamps of equal structure and size are adopted. Each clamp has a semi-circular steel bar clamping groove and wire cleavage groove on one side to form a positioning block to ensure that the steel bar is completely centered in the reserved hole and is tidied through Wire fixation.

Benefits of technology

It effectively solves the problem of difficulty in aligning steel bars in reserved holes, improves the smooth docking and construction efficiency of the main bars between prefabricated parts, and provides space for grouting, enhancing the bonding strength between the steel bars and concrete.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221972825U_ABST
    Figure CN221972825U_ABST
Patent Text Reader

Abstract

The utility model relates to a reinforcing steel bar installation positioning block in a reinforcing steel bar preformed hole of a concrete prefabricated part, which comprises two reinforcing steel bar clamping blocks with the same structure and size, a semicircular reinforcing steel bar clamping groove is arranged in the middle of one side of each reinforcing steel bar clamping block, and the diameter of the reinforcing steel bar clamping groove is equal to that of a reinforcing steel bar installed in the reinforcing steel bar preformed hole. A binding wire clamping groove is formed in the outer wall of each reinforcing steel bar clamping block in the direction perpendicular to the axial direction of the reinforcing steel bar clamping groove; the sides, provided with the reinforcing steel bar clamping grooves, of the two reinforcing steel bar clamping blocks are buckled to form the positioning block, the cross section, perpendicular to the axial direction of the reinforcing steel bar clamping grooves, of the positioning block is rectangular, and the length of the diagonal line of the rectangle is equal to the diameter of a concrete prefabricated part reinforcing steel bar preformed hole. The device is sleeved on a precast block and then inserted into a main reinforcement, so that the reinforcement can be completely centered after being inserted into a reinforcement preformed hole of the precast block, thereby ensuring smooth butt joint of the main reinforcements among the precast members, and improving the mounting and construction efficiency of the precast members.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of bridge construction, relates to the construction of prefabricated assembled concrete structures of bridges, and specifically relates to a positioning block used for installing steel bars in reserved steel bar holes of prefabricated concrete parts. Background Art

[0002] Prefabricated and assembled building technology has many advantages such as fast construction speed, high degree of standardization, controllable quality, energy saving and environmental protection. It is currently widely used in bridge construction. Some bridge structures, such as segment beams, cap beams, tower columns, piers, and abutments, are increasingly using prefabricated and assembled structures.

[0003] The prefabricated assembly structure of a bridge is usually assembled from multiple prefabricated blocks, which are connected by steel bars. The specific construction method is that when processing each prefabricated block, the corresponding main reinforcement reserved holes are set in the prefabricated block according to the layout of the main reinforcement of the structure; when assembling the prefabricated structure, after a prefabricated block is installed in place, the main reinforcement is inserted into its main reinforcement reserved hole, and grouting is injected into the hole to ensure that the steel bar and the prefabricated block concrete are firmly combined into one; a straight threaded sleeve is set at the front end of each main reinforcement, and when the next prefabricated block is installed, the main reinforcement inserted behind it is connected to the main reinforcement of the previous prefabricated block through the threaded sleeve, so that the main reinforcement of multiple prefabricated blocks is connected into a full-length structure, which is consistent with the main reinforcement connection method of the cast-in-place structure.

[0004] In order to ensure the bonding strength between the post-inserted main reinforcement and the precast block concrete, there must be sufficient grouting thickness between the post-inserted main reinforcement and the inner wall of the reserved hole. Therefore, the diameter of the main reinforcement reserved hole is usually much larger than the main reinforcement diameter. In this way, when installing the main reinforcement in the reserved hole, it is necessary to ensure that the main reinforcement is completely centered in the reserved hole to achieve smooth connection of the main reinforcement between precast blocks. Generally, the length of the precast block segment is 3 to 6m, and the post-inserted main reinforcement uses 22mm to 40mm large diameter steel bars. Due to the large deadweight of the steel bars and the prominent vertical effect, it is difficult to center the steel bars. After the butt ends of the two precast segments are aligned, the post-inserted main reinforcement of the rear segment can only be connected to the threaded sleeve at the front end of the steel bar of the front segment by blind screwing. If the steel bar cannot be aligned in the center, it will directly lead to failure of the steel bar connection. Therefore, it is urgent to take certain measures to solve this problem. Summary of the invention

[0005] The utility model aims to solve the above problems and provides a steel bar installation positioning block in a steel bar reserved hole of a concrete prefabricated part, so that the steel bar can be completely centered when installed in the reserved hole, ensuring that the steel bars between the prefabricated blocks can be smoothly butted.

[0006] The technical solution of the utility model is as follows:

[0007] A positioning block for installing steel bars in a reserved steel bar hole of a prefabricated concrete part, characterized in that it comprises two steel bar clamping blocks of equal structure and size, a semicircular steel bar clamping groove is provided in the middle of one side of each steel bar clamping block, the diameter of the steel bar clamping groove is equal to the diameter of the steel bar installed in the reserved steel bar hole, and a wire binding groove is provided on the upper edge of the outer wall of each steel bar clamping block in a direction perpendicular to the axial direction of the steel bar clamping groove; the two steel bar clamping blocks are provided with one side of the steel bar clamping groove to form the positioning block, the cross section of the positioning block along the direction perpendicular to the axial direction of the steel bar clamping groove is rectangular, and the diagonal length of the rectangle is equal to the diameter of the reserved steel bar hole of the prefabricated concrete part.

[0008] The utility model is sleeved on the main reinforcement after the prefabricated block is inserted, so that the reinforcement can be completely centered when inserted into the reinforcement reserved hole of the prefabricated block, thereby ensuring smooth docking of the main reinforcement between the prefabricated parts and improving the installation and construction efficiency of the prefabricated parts; the positioning block is rectangular, and there is a certain gap between its outer wall and the inner wall of the reinforcement reserved hole, which is convenient for grouting into the reserved hole. BRIEF DESCRIPTION OF THE DRAWINGS

[0009] Figure 1 It is a schematic diagram of the split structure of the utility model;

[0010] Figure 2 It is a schematic diagram of the overall structure of the utility model;

[0011] Figure 3 It is a schematic diagram of the installation method of the utility model on the steel bar;

[0012] Figure 4 It is a side view structural schematic diagram of the utility model when used for butt joint between prefabricated blocks;

[0013] Figure 5 yes Figure 4 Schematic diagram of the cross-sectional structure. DETAILED DESCRIPTION

[0014] like Figure 1 , Figure 2 As shown, the utility model comprises two steel bar clamps 1 of equal structure and size, a semicircular steel bar slot 2 is provided in the middle of one side of each steel bar clamp 1, the diameter of the steel bar slot 2 is equal to the diameter of the steel bar installed in the steel bar reserved hole, and a wire binding slot 3 is provided on the outer wall of each steel bar clamp 1 in a direction perpendicular to the axial direction of the steel bar slot 2; one side of the two steel bar clamps 1 provided with the steel bar slot 2 is buckled to form the positioning block, and the cross-section of the positioning block along the direction perpendicular to the axial direction of the steel bar slot is rectangular, and the length of the diagonal of the rectangle is equal to the diameter of the steel bar reserved hole of the concrete prefabricated part.

[0015] In the above structure, after the two steel bar clamps 1 are buckled, the steel bar slots 2 of the two steel bar clamps form a circular through hole in the center of the positioning block for fixing the steel bars; the wire binding slots 3 on the two steel bar clamps 1 form an annular groove surrounding the positioning block for winding the wire to bind and fix the two steel bar clamps.

[0016] During the specific implementation of the utility model, since a large number of steel bars need to be inserted later, the steel bar clamping blocks can be prefabricated with concrete to achieve standardized production and reduce material costs.

[0017] Figure 1 , Figure 2 In the embodiment shown, the cross-section of the positioning block is a rectangle. This makes it easy to divide the positioning block into two symmetrical steel bar clamps for processing, and also maximizes the gap between the positioning block and the inner wall of the steel bar reserved hole, which is convenient for grouting into the hole later. In specific implementation, the cross-section of the positioning block can also be set to other polygons, as long as it can be ensured that the length of at least one diagonal of the polygon is equal to the diameter of the steel bar reserved hole.

[0018] like Figure 3 As shown, before installing the steel bars in the reserved holes of the main bars of the prefabricated parts, a positioning block is installed near the front end and the rear end of the steel bar 4, and the two steel bar clamping blocks 1 of each positioning block are buckled on the steel bar 4, and the steel bar 4 is clamped in the steel bar clamping groove, and the two steel bar clamping blocks are tied by winding the wire 5 in the wire clamping groove 3 of the two steel bar clamping blocks, so that the two steel bar clamping blocks 1 clamp the steel bar 4. After the positioning block is installed, the steel bar 4 is located at the center of the positioning block.

[0019] like Figure 4 , Figure 5 As shown, when assembling the prefabricated assembled structure, after the first prefabricated block 6 is installed in place, the steel bar 4 with the positioning block installed is inserted into the steel bar reserved hole 7. Since the length of the diagonal of the cross section of the positioning block is equal to the diameter of the reserved hole, the four edges of the positioning block parallel to the axial direction of the steel bar are supported on the inner wall of the steel bar reserved hole 7, and the steel bar 4 is located at the center of the positioning block, so it can be ensured that the steel bar 4 is located at the center of the reserved hole 7. After the steel bar is installed in place, a threaded sleeve 8 is installed at its front end, and half of the length of the threaded sleeve is reserved for screw connection with the steel bar of the subsequent prefabricated block; cement slurry 9 is injected into the reserved hole 7 to ensure that the steel bar 4 is firmly combined with the prefabricated block.

[0020] Align the second prefabricated block 10 with the butt end of the first prefabricated block 6; insert the steel bar 4 with the positioning block installed into the steel bar reserved hole 7 of the second prefabricated block. Also due to the role of the positioning block, the steel bar 4 in the second prefabricated block is also located at the center of the reserved hole 7, so the rear end of the steel bar in the second prefabricated block will face the threaded sleeve 8 at the front end of the steel bar in the first prefabricated block; use a torque wrench to rotate the steel bar 4 in the second prefabricated block 10, and the rear end of the steel bar can be smoothly screwed with the threaded sleeve 8; inject cement slurry into the steel bar reserved hole of the second prefabricated block, and install the threaded sleeve 8 at the front end of the steel bar for connection with the steel bars of the subsequent prefabricated blocks. Use the same method to install the subsequent prefabricated blocks and the steel bars in the reserved holes of the prefabricated blocks in sequence.

Claims

1. A steel bar installation positioning block in a steel bar reserved hole of a prefabricated concrete part, characterized in that: It comprises two steel bar clamps with equal structures and sizes, a semicircular steel bar slot is provided in the middle of one side of each steel bar clamp, the diameter of the steel bar slot is equal to the diameter of the steel bar installed in the steel bar reserved hole, and a wire binding slot is provided on the outer wall of each steel bar clamp in a direction perpendicular to the axial direction of the steel bar slot; one side of the steel bar slot of the two steel bar clamps is buckled to form the positioning block, the cross section of the positioning block along the direction perpendicular to the axial direction of the steel bar slot is rectangular, and the diagonal length of the rectangle is equal to the diameter of the steel bar reserved hole of the concrete prefabricated part.