Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

93results about How to "Improve installation and construction efficiency" patented technology

Plug-in installation type casing head for petroleum drilling

The invention relates to the technical field of casing heads, in particular to a plug-in mounting type casing head for petroleum drilling, which comprises a casing head main body and a calibration sealing assembly, matched calibration sealing assemblies are arranged between a casing head and a well mouth and between the casing head and a butt-joint pipe body to ensure that when bolts are used for fixing, installation insertion holes in a connecting disc body can be aligned, namely, the connecting and fixing convenience of a first installation bolt is improved; the positive influence on the improvement of the overall installation and construction efficiency is achieved; furthermore, the arranged sealing ring body is clamped with the sealing butt joint groove, and the auxiliary assembly is arranged on the auxiliary insertion block, so that the connection sealing performance of the casing head can be improved on the basis of providing checking for the installation work of the casing head, and the actual use requirement can be better met.
Owner:YANCHENG BAOTONG MASCH TECH CO LTD

Drilling and mounting separated anchor rod mounting trolley and method

The invention relates to the technical field of tunnel engineering, in particular to a drilling and mounting separated anchor rod mounting trolley and method. The left anchor rod mounting arm assembly comprises a first moving mechanism, an anchor rod pushing mechanism, an anchor rod library and an anchor rod manipulator, and the first moving mechanism is used for adjusting the axial position, the pitching angle, the horizontal angle and the rotation angle of the anchor rod pushing mechanism; the structure of the right anchor rod mounting arm assembly is the same as that of the left anchor rod mounting arm assembly, and the positions of the right anchor rod mounting arm assembly and the left anchor rod mounting arm assembly are symmetrical; and the middle drill arm is positioned between the left anchor rod mounting arm assembly and the right anchor rod mounting arm assembly. The technical problems that in the prior art, due to excessive integration of functions of anchor rod mechanical construction equipment, on-site equipment operation difficulty is large, and large-section tunnel vehicle moving construction efficiency is low are solved.
Owner:CHINA RAILWAY CONSTR HEAVY IND

Prefabricated wallboard component, preparation method and construction method

The invention relates to the technical field of fabricated buildings, in particular to a prefabricated wallboard component, a preparation method and a construction method, and the prefabricated wallboard component comprises a light wallboard and a concrete frame which surrounds the light wallboard, is attached to the edge of the light wallboard and is connected with the light wallboard; the light wallboard is formed by splicing at least two light battens; the concrete frame comprises two constructional columns located on the left side and the right side of the light wallboard and two ring beams located on the upper side and the lower side of the light wallboard, the positions, corresponding to the constructional columns, of the light wallboard are connected with the constructional columns through first connecting pieces, and the positions, corresponding to the ring beams, of the light wallboard are connected with the ring beams through second connecting pieces. The concrete frame and the batten are integrally prefabricated in a factory, so that the wallboard component is better in integrality, one wall body only needs to be mounted once, the problems that an existing light batten needs to be spliced for multiple times, and the mounting efficiency is low are solved, and construction procedures are reduced. Meanwhile, the number of the battens and the width of the constructional column can be adjusted according to design requirements, and material waste caused by cutting is avoided.
Owner:安徽海龙建筑工业有限公司 +1

Folding house with aluminum alloy frame structure

The invention relates to a folding house with an aluminum alloy frame structure, and belongs to the technical field of buildings. The invention relates to a multi-functional greenhouse which comprises a supporting mechanism, a bottom mechanism, a roof mechanism, a side face mechanism, a gable mechanism and a connecting mechanism, the supporting mechanism comprises a bottom supporting piece, a stand column piece and a top supporting piece, the lower end of the stand column piece is connected with the bottom supporting piece, and the upper end of the stand column piece is connected with the top supporting piece; the upper end of the side face mechanism is slidably connected with the roof mechanism, the lower end of the side face mechanism is slidably connected with the bottom mechanism, the two gable wall mechanisms are connected and hinged to the two ends of the stand column piece respectively, and the bottom mechanism and the bottom supporting piece, the roof mechanism and the top supporting piece and the gable wall mechanisms and the stand column piece are hinged through connecting mechanisms. The container house has the effect that the problems that a container house is heavy and not easy to disassemble and assemble are solved.
Owner:BBMG RESIDENTIAL INDUSTRIALIZATION (TANGSHAN) CO LTD +2

Pipeline lifting device for building installation

ActiveCN222118790Ueasy to moveConvenient for elevated installationLifting devicesArchitectural engineeringElectric machinery
The utility model discloses a pipeline lifting device for building installation. The pipeline lifting device comprises a base, a lifting assembly located at the upper end of the base and a clamping assembly. The lifting assembly comprises a supporting frame, a lifting frame, a first threaded rod and a lifting motor, the lifting motor controls the first threaded rod to rotate, then the lifting frame is driven to move up and down along the supporting column, and a pipeline which is placed at the upper end of the lifting frame and needs to be installed is driven to be lifted; a pipeline needing to be installed is clamped and fixed through a clamping assembly arranged at the upper end of the lifting frame; the clamping assembly comprises a first clamping jaw, a cross beam, a second clamping jaw, a second threaded rod and a clamping motor, the second threaded rod is driven by the clamping motor to rotate, then the cross beam is controlled to move towards the first clamping jaw on the inner side, the second clamping jaw and the first clamping jaw draw close to each other to form a clamping action, and a pipeline is clamped and fixed; a large amount of manual operation is reduced, safety risks are reduced, the construction progress is accelerated, and the overall installation quality of a building is improved.
Owner:江苏启安建设集团有限公司

Special platform for construction operation of distributed breeze power generation cone type steel frame

The utility model discloses a distributed breeze power generation cone type steel frame construction operation special platform which comprises a platform frame body, and the platform frame body comprises a fixed pedal, a movable pedal and a supporting mechanism. The fixed pedal is in a square plate shape, an avoiding notch used for avoiding the power generation tower is formed in the center of the fixed pedal, and the avoiding notch is in a square shape. The number of the supporting mechanisms is four, the four supporting mechanisms are fixedly connected to the bottom ends of the four end corner positions of the fixed pedal correspondingly, the length direction of the supporting mechanisms is consistent with the length direction of the diagonal lines of the fixed pedal, and the supporting mechanisms can conduct telescopic extrusion action in the direction of the receding notch. The movable pedals are arranged between the adjacent supporting mechanisms and detachably connected with the adjacent supporting mechanisms. Standing construction operation of different outer diameter areas of the power generation tower can be achieved only through one platform frame body structure, time and labor are saved, and meanwhile the installation and construction efficiency of the power generation tower is improved.
Owner:CCFEB CIVIL ENG

Highway tunnel disease inverted arch treatment construction method

The invention discloses a highway tunnel disease inverted arch treatment construction method, and relates to the technical field of highway tunnel inverted arch construction. The problems that in the prior art, road tunnel disease inverted arch treatment is low in construction efficiency and poor in construction quality are solved. The method includes the following steps. S2, cutting and cleaning a diseased inverted arch area; S3, mounting a supporting and leveling device; S4, assembling and debugging a prefabricated inverted arch laying platform; S5, transporting a prefabricated inverted arch by using a flat car special for inverted arch transfer; S6, hoisting the prefabricated inverted arch laying platform by using the prefabricated inverted arch, and transporting a next prefabricated inverted arch by using the flat car special for inverted arch transfer; and (S9) carrying out inverted arch bottom layer gap grouting; and (S9) carrying out pavement leveling treatment. The highway tunnel disease inverted arch treatment construction method is used for tunnel disease inverted arch treatment, continuous cross operation is conducted in cooperation between procedures, and the disease inverted arch treatment construction efficiency is improved; the supporting and leveling device enables the prefabricated inverted arch to be kept at the same horizontal height, the construction quality is improved, meanwhile, the prefabricated inverted arch is supported, and traffic jam points are reduced.
Owner:SICHUAN TONGCHUAN GEOTECHNICAL ENG RES & DEV CO LTD +2

Large-size cofferdam ring beam structure and installation and construction method thereof

PendingCN119145442AThe installation connection is firmPlug and play smoothlyBulkheads/pilesCofferdamSheet pile
The invention discloses a large-size cofferdam ring beam structure and an installation and construction method thereof. The large-size cofferdam ring beam structure comprises a first ring beam structure, a second ring beam structure, a third ring beam structure and a fourth ring beam structure which are sequentially arranged on the inner side of a cofferdam steel sheet pile from top to bottom. The ring beam structure is composed of inner ring beams, short inclined struts, long inclined struts and inner straight struts, the inner ring beams are sequentially connected end to end to form a rectangular ring beam, the short inclined struts are arranged at the four corners of the rectangular ring beam, the long inclined struts are arranged on the rear sides of the short inclined struts, and the two ends of the short inclined struts and the two ends of the long inclined struts are connected with the adjacent long edges and short edges of the rectangular ring beam respectively. The inner straight support is transversely arranged in the middle of the rectangular ring beam and connected with the long edge of the rectangular ring beam. The ring beam structure is suitable for cofferdam construction of large-size steel sheet piles under the large depth, and sufficient fixing and supporting acting force can be provided for the large-size steel sheet piles through the multiple layers of ring beam structures so as to meet the requirements for strength, rigidity and stability of the cofferdam; and the steel sheet pile inserting and driving construction quality is guaranteed through guiding of the lowered ring beam structure.
Owner:POLY CHANGDA ENGINEERING CO LTD

I-shaped beam connecting structure of assembly type photovoltaic support

According to the I-shaped beam connecting structure of the assembly type photovoltaic support, a groove is formed in the top of a stand column, an I-shaped beam can penetrate through the groove, a plurality of column heads are arranged on the I-shaped beam in a sliding mode and are symmetrical to the stand column, the column heads can limit the I-shaped beam on the stand column, the two ends of a purline are located at the upper end of the I-shaped beam respectively, and the two ends of the purline are located at the lower end of the I-shaped beam respectively. The I-shaped beams can be assembled on the stand columns, the purlins can be assembled on the I-shaped beams, welding installation is not needed, installation time is short, efficiency is high, disassembly is facilitated, the workload of ceiling installation can be reduced, the structural design is reasonable, the structure is novel, practicability is high, and popularization is easy. And the installation and construction efficiency is effectively improved.
Owner:FUJIAN YONGFU GREEN ENERGY TECH CO LTD

Construction pipeline transportation and installation auxiliary equipment

This utility model discloses an auxiliary equipment for the transportation and installation of building pipelines, relating to the field of pipeline construction technology. It solves the problems of inconvenient transportation and installation of building pipelines in existing technologies. It includes at least two towing trolleys, each trolley comprising self-locking casters, two movable wheels, a pipeline placement groove, and fastening structures opposite each other on both sides of the groove. The fastening structures include support rods, screws, a top plate, and an arc-shaped clamping plate. The support rods are mounted on the trolley frames and have screw holes. The arc-shaped clamping plate has a receiving chamber with a through hole, the size of which is smaller than the size of the top plate. The fixed end of the screw spirally passes through the screw hole and slides through the through hole, and is fixedly connected to the top plate. This auxiliary equipment for the transportation and installation of building pipelines is used for the transportation and auxiliary installation of building pipelines, enabling convenient and safe transportation of pipelines with low labor intensity, while providing support and assistance for pipeline installation, thus improving pipeline installation efficiency.
Owner:CHINA 19TH METALLURGICAL CORP

Temporary support and construction method for sea-crossing cable-stayed bridge

The present invention discloses a temporary support and construction method for a cross-sea cable-stayed bridge. The cross-sea cable-stayed bridge comprises piers and steel-concrete composite beams, wherein the piers comprise main tower piers, auxiliary piers and side piers, wherein the main tower piers, the auxiliary piers and the side piers are distributed along the bridge direction, and the temporary support of the cross-sea cable-stayed bridge comprises: a pier-side support group, wherein the pier-side support group is arranged along the outer edge of the main tower pier; an auxiliary support, wherein the auxiliary support is arranged on the auxiliary pier; a temporary pier group, wherein the temporary pier group is arranged on the outer side of the pier-side support group; and a slideway assembly, wherein the slideway assembly is arranged on the pier-side support group, and the slideway assembly is used to drag the steel beam of the cable-free beam section of the tower area. The present invention utilizes the pier-side support group, the auxiliary support and the temporary pier group to ensure the stability of the steel beam during the installation process, thereby reducing the difficulty of the steel beam construction of the cross-sea cable-stayed bridge, and while ensuring the construction quality of the steel beam, the installation and construction efficiency of the steel beam is higher, thereby ensuring the construction period.
Owner:中铁二十局集团第三工程有限公司 +1

Construction method of steel structure net rack

The invention discloses a construction method of a steel structure net rack, and relates to the technical field of constructional engineering. According to the construction method, a large number of all-round scaffolds do not need to be erected to serve as supports, other procedures can be operated alternately in the net rack installation process, the construction difficulty can be reduced, and the installation efficiency and the installation safety of the steel structure net rack can be improved; the construction method comprises the steps of setting a block hoisting area, an assembling area, a material stacking area, a truck crane and a tower crane; the steel net rack is divided into a plurality of block net racks, and each block net rack is assembled; a fixed hinged support is mounted at the top of the concrete structural column; hoisting in blocks; high-altitude assembling installation or block hoisting of the steel net rack is carried out between the adjacent block net racks; and welding the partitioned net rack and the fixed hinged support, and performing detection and inspection.
Owner:CCCC FOURTH HARBOR ENG CO LTD +1

River channel restoration wave pile first pile limiting device

ActiveCN224620603Uprevent rotationImprove installation verticality
This utility model relates to the technical field of wave pile installation, and in particular to a wave pile first pile limiting device for river restoration; it can limit the installation of the first wave pile, improve the verticality of the wave pile body installation, reduce positioning deviation, and improve installation efficiency; it includes a wave pile body and a positioning mechanism for straightening and installing the wave pile body. The positioning mechanism includes a positioning frame, multiple positioning cones installed at the bottom of the positioning frame, and two support positioning rods installed inside the positioning frame. The wave pile body has two arc-shaped concave portions facing opposite directions. The edge of the wave pile body is tangent to the inner wall of the positioning frame. The ends of the support positioning rods extend into the corresponding arc-shaped concave portions and slide in contact with the inside of the arc-shaped concave portions. Both sides of the wave pile body are provided with axially extending grooves, and the inner wall of the positioning frame is provided with positioning blocks that fit into the grooves. A first roller is rotatably installed at the end of the support positioning rod.
Owner:SHANDONG HUIYOU MUNICIPAL GARDEN GRP CO LTD +2

Efficient installation structure of photovoltaic module

ActiveCN222356295UEfficient and convenient installation effectImprove the efficiency of on-site installation and constructionSolar heating energyPhotovoltaic supportsStructural engineeringMechanical engineering
The utility model discloses an efficient installation structure of a photovoltaic assembly, which comprises a base surface and a photovoltaic packaging composite part laid on the base surface, the photovoltaic packaging composite part comprises a tensioning layer, and the base surface bears and / or is provided with a tensioning structure; wherein the tensioning layer is mounted and connected with the tensioning structure, and at least one group of acting force and counter-acting force in at least one opposite direction is formed on the tensioning layer through the tensioning structure, so that the tensioning layer is in a tensioned and flattened state on the base plane to realize an efficient mounting effect on the photovoltaic packaging composite part; according to the utility model, the on-site installation construction efficiency of the photovoltaic module is obviously improved, and the device is especially suitable for large-size photovoltaic modules so as to realize an efficient and convenient installation effect.
Owner:BILA SOLAR ENERGY CO LTD +3

Assembly type glass curtain wall unit plate mounting structure and construction method

The invention discloses an assembly type glass curtain wall unit plate installation structure and a construction method, the assembly type glass curtain wall unit plate installation structure is arranged on a main body structure and comprises a plurality of curtain wall unit plates, curtain wall adapters are arranged on the outer vertical face of the main body structure, and the curtain wall unit plates are fixed to the outer vertical face of the main body structure through the curtain wall adapters; aluminum alloy stand column assemblies are arranged on the curtain wall unit plates, every two curtain wall unit plates which are adjacent left and right are connected through the corresponding aluminum alloy stand column assembly, the aluminum alloy stand column assemblies are connected with the curtain wall adapting pieces, aluminum alloy cross beam assemblies are arranged on the curtain wall unit plates, every two curtain wall unit plates which are adjacent up and down are connected through the corresponding aluminum alloy cross beam assemblies, and the aluminum alloy cross beam assemblies are connected with the curtain wall adapting pieces. The aluminum alloy cross beam assemblies are fixed between the two aluminum alloy stand column assemblies which are adjacent left and right, and the multiple curtain wall unit plate bodies jointly form the glass curtain wall. The connecting difficulty of the two adjacent curtain wall unit plates is reduced, the efficiency of installation and construction is improved, the sealing performance is guaranteed, and the installation quality of the curtain wall unit plates is improved.
Owner:CHINA CONSTR SECOND BUREAU DECORATION ENG CO

Building facade earthenware brick decoration structure

The utility model discloses a building facade earthenware brick decoration structure which comprises a plurality of pull rods and a plurality of connectors, the pull rods and the connectors are mutually connected to form a latticed structure, a plurality of earthenware bricks are arranged in each gridding hole of the latticed structure, and the earthenware bricks are consistent with the gridding holes in shape after being sequentially spliced end to end. A groove is formed in the surface, facing the pull rod and the connector, of the earthenware brick, the groove is used for containing the pull rod and the connector, and the groove is filled with adhesive mortar. The overall framework adopts a transverse and vertical bidirectional double-pull-rod scheme, so that the bidirectional stability of the framework is ensured, and meanwhile, the strength, durability and safety of the connecting structure are ensured; the earthenware bricks are formed at a time through mold opening, secondary machining is not needed on a construction site, and the installation and construction efficiency is effectively improved; after the earthenware bricks are installed, the appearance modeling is good, the gradation is clear, and the splicing effect is further improved.
Owner:NANJING YANGTZE RIVER URBAN AGCHITECTURAL DESIGN

Sound insulation ventilating duct of central air conditioner

The utility model relates to a sound insulation ventilating duct of a central air conditioner. According to the technical scheme, the system comprises one or more sets of main ventilation pipelines and branch ventilation pipelines, the main ventilation pipelines longitudinally penetrate through one or more floors, the main ventilation pipelines are connected through quick connecting pieces, the bottoms of the main ventilation pipelines are connected to an air duct machine evaporator through conveying pipes, and one or more sets of indoor split machines are installed on each set of branch ventilation pipelines; the main ventilation pipeline and the branch ventilation pipeline are respectively composed of an inner pipe body, a sound absorption plate, a sound insulation plate and a heat preservation plate, the sound absorption plate is arranged outside the inner pipe body, the sound insulation plate is arranged on the periphery of the sound absorption plate, and the heat preservation plate is fixed on the outer wall of the sound insulation plate. The heat preservation effect and the noise reduction effect of the ventilating duct are improved by additionally arranging the heat preservation plate and the sound insulation plate, the energy consumption of an air conditioner is reduced, the use feeling of people on a high-quality house is improved, in addition, the multiple sets of main ventilating ducts are connected through the quick connecting pieces, the installation and construction efficiency can be greatly improved, and the installation and construction cost is reduced.
Owner:SHANDONG CHENGSHUANG ENVIRONMENTAL TECH CO LTD

Temporary reinforcing system for large tube push bench outlet beam plate in space limited area

The utility model relates to a temporary reinforcing system for a large pipe jacking machine outlet beam plate in a space limited area. The temporary reinforcing system comprises a pipe jacking machine, a lifting receiving platform, a supporting steel pipe column, a steel stand column, a height adjusting movable head, a supporting steel platform, a pipe jacking machine receiving foundation pit, a pipe jacking machine lifting outlet and a translation platform. The pipe jacking machine has the advantages that the supporting steel pipe columns, the steel stand columns, the height adjusting movable heads and the supporting steel platform are adopted for reinforcing the middle plate, and the safety of receiving construction of the pipe jacking machine is improved; the steel pipe column is hoisted by adopting an H-shaped steel hoisting track, a stand column type electric crane and a steel pipe column positioning bracket, so that the installation and construction efficiency of the middle plate reinforcing structure is improved; the lifting receiving platform is in butt joint with the middle plate, the position of the pipe jacking machine is adjusted, the translation platform is arranged on the lifting receiving platform and the middle plate for translation of the pipe jacking machine, and the receiving construction efficiency of the pipe jacking machine is improved.
Owner:ANHUI HIGHWAY ENG CORP

Construction structure for adjusting flatness of metal net suspended ceiling

The utility model discloses a construction structure for adjusting the flatness of a metal net suspended ceiling. Comprising a suspended ceiling base layer, the metal net suspended ceiling is arranged below the suspended ceiling base layer, a plurality of keels are arranged below the suspended ceiling base layer, the keels are sequentially arranged below the suspended ceiling base layer, every two adjacent keels are parallel to each other and arranged at intervals, and a hanging rod is arranged between each keel and the suspended ceiling base layer. The keels are connected with the suspended ceiling base layer through the suspenders, the metal mesh suspended ceilings are arranged on the two adjacent keels, adjusting assemblies are jointly connected between the keels and the metal mesh suspended ceilings, and the adjusting assemblies and the keels are jointly matched to adjust the flatness of the metal mesh suspended ceilings. The flatness of the metal net suspended ceiling can be adjusted through the cooperation of the adjusting assembly and the keel while the metal net suspended ceiling is installed; the leveling operation of the metal net suspended ceiling is simpler and more convenient, and the defect that when a traditional metal net suspended ceiling is subjected to leveling operation, the metal net suspended ceiling needs to be dismantled, and the height of the keel needs to be adjusted again is overcome.
Owner:BEIJING URBAN CONSTRUCTION GROUP DECORATION ENGINEERING CO LTD

Steel platform under arch for dismantling two-way curved arch bridge

The utility model provides an under-arch steel platform for dismantling a two-way curved arch bridge. The under-arch steel platform comprises a construction guide platform on a steel pipe pile bridge, a space-limited bailey beam mounting device and a unit bailey beam support frame, the construction guiding platform on the steel pipe pile bridge is mainly used for installing a steel pipe pile guiding beam, a supporting frame body and a bailey beam. The space-limited bailey beam mounting devices are arranged on the two sides of the top of a construction guide platform on the steel pipe pile bridge. The unit bailey beam supporting frames are used for supporting arch ribs during dismantling. By adopting the construction guide platform and the steel pipe pile guide beam on the steel pipe pile bridge, the installation and construction efficiency of the Bailey beam support frame and the steel pipe pile is greatly improved, the construction precision of the steel pipe pile is improved, and the problem of limited installation and construction space of the Bailey beam is solved.
Owner:HUBEI ROAD & BRIDGE GRP CO LTD

Fused zirconia corundum tongue arch brick

The utility model discloses an electric smelting zirconia corundum tongue arch brick which comprises a tongue arch brick body, the tongue arch brick body is installed on a kiln body, a pouring channel is formed in the tongue arch brick body, a pouring groove corresponding to the pouring channel is formed in the kiln body, the discharging end of the pouring channel is matched with the feeding end of the pouring groove, and pouring materials are filled in the pouring channel and the pouring groove. The tongue arch brick has the beneficial effects that the connection strength between the tongue arch brick body and the kiln body can be improved by matching the pouring groove, the pouring channel and the castable, and the tongue arch brick body and the kiln body are relatively fixed through the castable, so that the tongue arch brick body is effectively prevented from sinking, the service life of the kiln is prolonged, the production efficiency is ensured, and the production cost is reduced. The tongue arch brick body is arranged to be in an arc shape, the feeding end of the pouring channel is formed in the middle of the upper surface of the tongue arch brick body, so that pouring materials can rapidly flow in the pouring channel to fill the pouring groove and the pouring channel, and the construction and installation efficiency is improved.
Owner:HENAN PROVINCE YU HUA ELECTRIC SMELTING SCI & TECH CO LTD

Adjustable pipe network supporting device

The utility model discloses an adjustable pipe network supporting device which comprises a mounting plate and a pipeline body, an isosceles trapezoid mounting block is connected to the top of the mounting plate in an up-down sliding mode, a middle roller is rotatably connected to the top of the isosceles trapezoid mounting block, and supporting columns are welded to the left side and the right side of the top of the mounting plate; and rotating rods are rotationally connected to the opposite sides of the two supporting columns correspondingly, the bottoms of the rotating rods slide on the left side and the right side of the isosceles trapezoid mounting block, and upper rollers are rotationally connected to the tops of the rotating rods. The pipeline body is placed between the two rotating rods from top to bottom, then the isosceles trapezoid installation block slides upwards to drive the middle roller and the upper roller to slide towards the pipeline body, the pipeline body is clamped, and therefore construction of the pipeline body is facilitated, and the construction and installation efficiency is improved; and the supporting device can clamp pipeline bodies with different diameters.
Owner:INNER MONGOLIA ZHAOLONG CONSTR ENG CO LTD

Modularized decorative heat exchange device

The utility model relates to a modularized decoration heat exchange device which comprises a decoration frame and a plurality of capillary heat exchangers located in the decoration frame, a transmission shaft is installed in the decoration frame, small transmission belt wheels are fixed to the two ends of the transmission shaft respectively, a large transmission belt wheel is fixed to one end of the transmission shaft, and a gear motor is installed on the decoration frame. A driving belt wheel is fixed to an output shaft of the gear motor, a driving belt is arranged between the driving belt wheel and the large transmission belt wheel in a sleeving mode, the capillary heat exchangers are arranged in parallel at intervals, and adapters are clamped to the two ends of each capillary heat exchanger respectively and hinged to the decoration frame through rotating shafts. The adapters at the two ends of all the capillary heat exchangers are sequentially connected through linkage ropes, driven belt wheels corresponding to the small transmission belt wheels are fixed to rotary shafts of the adapters at the two ends of one capillary heat exchanger, and transmission belts are arranged between the corresponding driven belt wheels and the corresponding small transmission belt wheels in a sleeving mode. The device has the advantages of being compact in structure, convenient to disassemble and assemble, high in adaptability and capable of effectively improving installation and construction efficiency.
Owner:JIGAOJIANYE CO LTD

A nine-square grid patterned facade terrace joint and construction method

The application discloses a nine-square-pattern modeling decorative ceiling node, which comprises a main structure, a modeling frame, a decorative assembly and a capping assembly. The main structure comprises a left roof structure and a right roof structure. A plurality of left vertical columns are arranged at the edges of the left roof structure, and a plurality of right vertical columns are arranged at the edges of the right roof structure. A space region formed between two left vertical columns and two right vertical columns is a ceiling. The modeling frame is arranged above the ceiling. The decorative assembly is arranged on the four walls above the ceiling. The ceiling top is sealed by the capping assembly. The construction method comprises the following steps: step one, measurement and line laying; step two, horizontal beam installation; step three, batten frame installation; step four, modeling frame installation; step five, base steel frame installation; step six, decorative plate processing; step seven, decorative plate installation; and step eight, light-transmitting plate installation. The ceiling node has the advantages of seamless, assembly and size and style diversification.
Owner:北京市建筑工程装饰集团有限公司

Narrow space steel beam auxiliary mounting structure

The utility model relates to the technical field of building steel beams, and discloses a narrow space steel beam auxiliary installation structure which comprises a first supporting beam, a lower layer floor slab arranged at the top of the first supporting beam, an upper layer floor slab arranged at the top of the lower layer floor slab at intervals, and a second supporting beam arranged at the bottom of the upper layer floor slab. An electric forklift is arranged at the top of the lower-layer floor slab and provided with reinforcing steel beams, hoisting holes are formed in the thickness direction of the upper-layer floor slab, and a hoisting mechanism is arranged at the top of the upper-layer floor slab and comprises two channel steel bases fixed to the top of the upper-layer floor slab and vertical rods fixed to the tops of the two channel steel bases. The transverse rods are arranged between the vertical rods, the inclined struts are arranged between the vertical rods and the transverse rods, electric hoists are arranged on the transverse rods, chains of the electric hoists extend into the lifting holes, lifting hooks are arranged at the bottoms of the chains, lifting pieces are arranged in the centers of the top faces of the reinforcing steel beams, and the lifting hooks are connected to the lifting pieces.
Owner:BEIJING FOURTH CONSTR & ENG

A subway station pipeline rapid installation device

ActiveCN224665506UArranged in an orderly mannereffective installation
The utility model provides a kind of subway station pipeline fast installation device, including the comprehensive support hanger of the integration of various pipelines and end equipment and the lifting mechanism for lifting pipe comprehensive integrated section, and the comprehensive support hanger includes the U-shaped support of a plurality of connection for installing air pipe and the upper layer support crossbeam of setting in U-shaped support upper portion;Bridge is equipped on the upper layer support crossbeam;The top of U-shaped support is connected with support fixed seat.The utility model sets up comprehensive support hanger, and comprehensive support hanger is divided into upper and lower layers, respectively for supporting bridge and end equipment, so that each part can be orderly installed and set, form pipe comprehensive integrated section, avoid the occurrence of pipeline elevation conflict, trend overlap and other problems;And the modular design of pipe comprehensive integrated section, realizes the orderly arrangement and efficient installation of pipeline, improves installation construction efficiency.
Owner:CHINA CONSTR SEVENTH ENG DIVISION CORP LTD +1