Integrated vertical operation surface suitable for ancient building construction technology construction practical training

By designing a collective vertical operation surface, integrating the brick, stone and wood construction technology of ancient buildings, the lack of ancient building construction teaching tools is solved, and a safe and effective training platform is provided to improve the Students' hands-on ability and cultural awareness.

CN221977505UActive Publication Date: 2024-11-08LIMING VOCATIONAL UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323505226.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-21
Publication Date
2024-11-08
Estimated Expiration
2033-12-21

AI Technical Summary

Technical Problem

The existing architectural construction teaching model is mainly applicable to modern architectural design, lacks teaching tools for ancient building engineering technology, and cannot effectively impart and practice the construction skills of Chinese ancient buildings.

Method used

A collective vertical operating surface was designed, including stone pillar foundation, stone underside, columns, beams and large wooden components. Through the fixed connection and structural design of these components, the brick, stone and wooden construction of ancient buildings were simulated. craftsmanship, providing an integrated training platform.

Benefits of technology

The design allows beginners to conduct practical training in ancient building construction under safe conditions, master various construction skills, improve students' hands-on ability and understanding of Chinese culture, and solve the dispersed and dangerous operation surfaces of traditional crafts. The problem of high and large consumables has achieved the effective inheritance of ancient architectural skills.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221977505U_ABST
    Figure CN221977505U_ABST
Patent Text Reader

Abstract

The utility model discloses an integrated vertical operation surface suitable for ancient building construction technology construction practical training. The integrated vertical operation surface comprises a first stone column foundation, a stone lower ridge, a second stone column foundation, a first stand column, a second stand column and a cross beam. One end of the lower stone sill is fixedly connected to the first stone column foundation, the second stone column foundation is fixedly connected to the other end of the lower stone sill, the lower end of the first stand column is fixedly connected to the first stone column foundation, the first stand column is provided with a first through hole, and the upper end of the first stand column is provided with a first groove. The second stand column is parallel to the first stand column and provided with a second through hole, the upper end of the second stand column is provided with a second groove, and the beam penetrates through the first through hole and the second through hole to be arranged on the first stand column and the second stand column. According to the utility model, ancient building construction technologies are integrated on the same operation surface for practical operation and teaching, so that beginners can quickly master, learn and master various construction technologies of ancient buildings.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building construction teaching, in particular to a collective vertical operating surface suitable for construction training of ancient building construction skills. Background Art

[0002] At present, when teaching in the field of construction, providing intuitive and perceptible teaching can improve the teaching effect. Therefore, teaching models are now more and more widely used in teaching activities and production practice. Through the disassembly and assembly of the model, the internal structure of the model can be displayed intuitively, which is convenient for more vivid learning and understanding, and the learning experience is more profound.

[0003] Some construction teaching models in the construction field are disclosed in the prior art. For example, application number 202121855489.2 discloses an intelligent prefabricated building shear wall node connection teaching model, which selects the height through a mobile component and adjusts the extension distance of the protruding reserved connection parts through the mobile component, thereby changing the connection and fixing position of the vertical steel bars. After the operation, the position measurement and evaluation are carried out through the distance measuring component to feedback the operation effect.

[0004] The construction teaching models in the prior art are usually only suitable for architectural interior design and landscape architecture, and do not have construction operation surfaces related to ancient architectural engineering technology that can operate the intangible cultural heritage skills of ancient Chinese architecture. In view of this, the inventor conducted in-depth research on the above-mentioned defects in the prior art, and thus this case was created. Utility Model Content

[0005] The utility model aims to solve at least one of the technical problems in the above-mentioned technology to a certain extent. To this end, the purpose of the utility model is to propose a collective vertical operation surface suitable for the construction training of ancient building construction skills, which combines the ancient building construction technology on the same operation surface for practical operation and teaching, so that beginners can quickly get started, learn and master various ancient building construction skills.

[0006] To achieve the above purpose, the utility model proposes a collective vertical operation surface suitable for construction training of ancient building construction skills, including a first stone column base, a stone lower sill, a second stone column base, a first column, a second column and a crossbeam;

[0007] One end of the stone step is fixedly connected to the first stone column base, the second stone column base is fixedly connected to the other end of the stone step, the lower end of the first column is fixedly connected to the first stone column base, the first column is provided with a first through hole, the upper end of the first column is provided with a first groove, the lower end of the second column is fixedly connected to the second stone column base, the second column is parallel to the first column, the second column is provided with a second through hole, the upper end of the second column is provided with a second groove, and the crossbeam passes through the first through hole and the second through hole and is provided on the first column and the second column.

[0008] Furthermore, a first connecting vertical plate is arranged on the side of the first column close to the second column, a second connecting vertical plate is arranged on the side of the second column close to the first column, and a connecting horizontal plate is arranged at the bottom of the beam, one end of the connecting horizontal plate abuts against the upper end of the first connecting vertical plate, and the other end of the connecting horizontal plate abuts against the upper end of the second connecting vertical plate.

[0009] Furthermore, it also includes a large woodworking component, one end of the large woodworking component is arranged on the first column through a first groove, the other end of the large woodworking component is arranged on the second column through a second groove, and the bottom of the large woodworking component is arranged on the crossbeam.

[0010] Furthermore, the large woodworking assembly includes a first short tube, a first flat bundle, a second short tube, a second flat bundle and a curved beam, the first short tube is arranged on the crossbeam, one end of the first flat bundle is arranged on the first short tube, and the other end of the first flat bundle is arranged in a first groove, the second short tube is arranged on the crossbeam, one end of the second flat bundle is arranged on the second short tube, and the other end of the second flat bundle is arranged in a second groove, one end of the curved beam is arranged on the first short tube, and the other end of the curved beam is arranged on the second short tube.

[0011] Furthermore, a first slot for inserting the crossbeam is provided at the bottom of the first short tube.

[0012] Furthermore, a second slot for inserting the crossbeam is provided at the bottom of the second short tube.

[0013] Furthermore, a first wooden bucket is formed at the upper end of the first short tube, a first connecting groove is arranged on the first wooden bucket, and the first connecting groove is connected to one end of the curved beam.

[0014] Furthermore, a second wooden bucket is formed at the upper end of the second short tube, a second connecting groove is arranged on the second wooden bucket, and the second connecting groove is connected to the other end of the curved beam.

[0015] After adopting the above structure, the utility model relates to a collective vertical operating surface suitable for construction training of ancient building construction skills, which has at least the following beneficial effects:

[0016] 1. When in use, you can build walls and red brick paths between the first and second columns, above the stone sill, and under the beam, and reserve corresponding window holes, door holes, and areas for cutting and pasting clay sculptures according to the size to complete the construction training of brickwork. Stone carving, stone paving, etc. can be carried out at the window holes to complete the construction training of stonework.

[0017] Second, by setting the first stone column base, the stone lower sill and the second stone column base, since the first stone column base, the stone lower sill and the second stone column base are made of concrete, the overall strength is large. After the first column is fixed on the first stone column base and the second column is fixed on the second stone column base, the beam, the first column and the second column are not easy to collapse.

[0018] Third, by setting a crossbeam, and the crossbeam passes through the first through hole and the second through hole and is set on the first column and the second column, after the crossbeam is set on the first column and the second column, the crossbeam is not easy to separate from the first column and the second column. By setting the first through hole and the second through hole, the installation of the crossbeam is facilitated. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a structural schematic diagram of a collective vertical operating surface suitable for construction training of ancient building construction skills;

[0020] Figure 2 This is an exploded view of a collective vertical operating surface suitable for construction training of ancient building construction techniques.

[0021] Description of symbols

[0022] The first stone column base 1, the stone lower sill 2, the second stone column base 3, the first column 4, the first groove 41, the first connecting vertical plate 42, the second column 5, the second groove 51, the second connecting vertical plate 52, the crossbeam 6, the connecting cross plate 61, the large woodworking component 7, the first short tube 71, the first slot 711, the first flat beam 72, the second short tube 73, the second slot 731, the second flat beam 74, the curved beam 75, the first wooden bucket 76, the first connecting groove 761, the second wooden bucket 77, the second connecting groove 771. DETAILED DESCRIPTION

[0023] The embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present invention, and should not be construed as limiting the present invention.

[0024] like Figure 1 and Figure 2 As shown, the utility model is a collective vertical operating surface suitable for construction training of ancient building construction skills, including a first stone column base 1, a stone lower sill 2, a second stone column base 3, a first column 4, a second column 5 and a crossbeam 6; one end of the stone lower sill 2 is fixedly connected to the first stone column base 1, the second stone column base 3 is fixedly connected to the other end of the stone lower sill 2, the lower end of the first column 4 is fixedly connected to the first stone column base 1, a first through hole is arranged on the first column 4, a first groove 41 is arranged on the upper end of the first column 4, the lower end of the second column 5 is fixedly connected to the second stone column base 3, the second column 5 is parallel to the first column 4, a second through hole is arranged on the second column 5, a second groove 51 is arranged on the upper end of the second column 5, and the crossbeam 6 passes through the first through hole and the second through hole and is arranged on the first column 4 and the second column 5.

[0025] In this way, the utility model relates to a collective vertical operation surface suitable for construction training of ancient building construction skills. When in use, walls and red brick paths can be built between the first column 4 and the second column 5, above the stone sill 2, and below the crossbeam 6, and corresponding window holes, door holes, and areas for cutting and pasting clay sculptures can be reserved according to the size to complete the construction training of brickwork. Stone carving, stone paving, etc. can be carried out at the window holes to complete the construction training of stonework.

[0026] By setting the first stone column base 1, the stone lower sill 2 and the second stone column base 3, since the first stone column base 1, the stone lower sill 2 and the second stone column base 3 are made of concrete, the overall strength is large. After the first column 4 is fixed on the first stone column base 1 and the second column 5 is fixed on the second stone column base 3, the crossbeam 6, the first column 4 and the second column 5 are not easy to collapse and are basically not damaged. Even if they are damaged, they can be repaired by new students through traditional skills. By setting the crossbeam 6, and the crossbeam 6 passes through the first perforation and the second perforation and is set on the first column 4 and the second column 5, after the crossbeam 6 is set on the first column 4 and the second column 5, the crossbeam 6 is not easy to separate from the first column 4 and the second column 5. By setting the first perforation and the second perforation, the installation of the crossbeam 6 is facilitated.

[0027] Optionally, a first connecting vertical plate 42 is arranged on the side of the first column 4 close to the second column 5, a second connecting vertical plate 52 is arranged on the side of the second column 5 close to the first column 4, and a connecting horizontal plate 61 is arranged at the bottom of the crossbeam 6, one end of the connecting horizontal plate 61 abuts against the upper end of the first connecting vertical plate 42, and the other end of the connecting horizontal plate 61 abuts against the upper end of the second connecting vertical plate 52.

[0028] By providing the first connecting vertical plate 42, the second connecting vertical plate 52 and the connecting horizontal plate 61, after the training is completed, the first batch of training result consumables can be quickly removed, and the first connecting vertical plate 42, the second connecting vertical plate 52 and the cross beam 6 can be removed simultaneously to prevent the bricks from being directly fixed on the first column 4, the second column 5 and the cross beam 6 during brickwork, thereby increasing the difficulty of removal.

[0029] In this example, a large carpentry component 7 is also included, one end of which is arranged on the first column 4 through a first groove 41, the other end of which is arranged on the second column 5 through a second groove 51, and the bottom of the large carpentry component 7 is arranged on the crossbeam 6. By arranging the large carpentry component 7, during training, the large carpentry component 7 can be made on the crossbeam 6 according to the dimensions of the pole and the construction task book.

[0030] Specifically, the large carpentry assembly 7 includes a first short tube 71, a first flat bundle 72, a second short tube 73, a second flat bundle 74 and a curved beam 75. The first short tube 71 is arranged on the crossbeam 6, one end of the first flat bundle 72 is arranged on the first short tube 71, and the other end of the first flat bundle 72 is arranged in the first groove 41, the second short tube 73 is arranged on the crossbeam 6, one end of the second flat bundle 74 is arranged on the second short tube 73, and the other end of the second flat bundle 74 is arranged in the second groove 51, one end of the curved beam 75 is arranged on the first short tube 71, and the other end of the curved beam 75 is arranged on the second short tube 73.

[0031] On the beam 6, two short tubes, two flat beams, two wooden buckets, and one curved beam can be made according to the dimensions in the pole ruler and the construction task book, so as to complete the construction training of large carpentry. The pattern line draft can be drawn and colored on the prepared large carpentry frame to complete the construction training of color painting. The line draft can be drawn and carved on the prepared large carpentry frame, and the door and window flower wood carvings can also be made using the brick wall door and window openings to complete the construction training of carving.

[0032] In this example, a first slot 711 inserted into the cross beam 6 is provided at the bottom of the first short tube 71. The first slot 711 is provided to facilitate the first short tube 71 to be quickly fixed on the cross beam 6. A second slot 731 inserted into the cross beam 6 is provided at the bottom of the second short tube 73. The second slot 731 is provided to facilitate the second short tube 73 to be quickly fixed on the cross beam 6.

[0033] Further, a first wooden bucket 76 is formed at the upper end of the first short tube 71, and a first connecting groove 761 is provided on the first wooden bucket 76, and the first connecting groove 761 is connected to one end of the curved beam 75. By providing the first connecting groove 761 on the first wooden bucket 76, the curved beam 75 can be quickly fixed on the first wooden bucket 76. A second wooden bucket 77 is formed at the upper end of the second short tube 73, and a second connecting groove 771 is provided on the second wooden bucket 77, and the second connecting groove 771 is connected to the other end of the curved beam 75. By providing the second connecting groove 771 on the second wooden bucket 77, the curved beam 75 can be quickly fixed on the second wooden bucket 77.

[0034] Carpentry is the core skill of traditional Chinese architecture. Carpentry is the process of processing wood with tools such as pens, ink lines, chisels, saws, etc. to form load-bearing structures such as columns, beams, squares, and purlins. It is also an important determinant of the scale, shape, and appearance of wooden buildings.

[0035] Brickwork refers to the profession of using bricks to build buildings, structures or parts of them in ancient Chinese architecture. Brickwork refers to the profession of using bricks to build buildings, structures or parts of them in ancient Chinese architecture. It includes: using bricks to build bases, pedestals, steps, walls, archways, waterways, stoves, wells, and paving floors, roads, ramps and other projects.

[0036] This utility model combines the construction training contents of the crafts of pole, carpentry, brick, stone, shearing, painting and carving in the ancient buildings of southern Fujian on a vertical operation surface for practical teaching, so as to achieve the teaching mode of "learning by doing" and "learning by doing", so that students can master and learn the core technology of the construction skills of the ancient buildings of southern Fujian, so as to connect the knowledge connection of the post-high-grade courses: ancient building construction drawing, ancient building design, etc. At the same time, it also implants the excellent Chinese culture into the link of teaching and educating people from the perspective of ideological and political education.

[0037] The traditional method of using actual construction sites for construction process training will lead to defects such as long teaching cycles and high construction difficulty. The actual construction site is used for construction process training, and the operation surface is large, which is dangerous. The size of the utility model is controlled within 3400mm in length and 2400mm in height, which can meet the needs of students to work at low altitude within a safe height, feel the safety issues of actual projects, and ensure that students will not be injured when working at low altitude.

[0038] The utility model adopts a method of combining the ancient building construction technology on the same operation surface for practical operation and teaching. It solves the technical problems of scattered operation surfaces, high risk, large amount of consumables, and non-renewable utilization in the teaching of ancient building construction skills, so that beginners can quickly get started, learn and master various construction skills of ancient buildings. At the same time, the excellent traditional Chinese culture is introduced in the form of practical courses, which improves students' self-confidence and creativity in Chinese culture and improves students' hands-on ability. Through the method of "learning by doing", the traditional skills of ancient buildings are more directly inherited and developed.

[0039] The above embodiments and drawings do not limit the product form and style of the present utility model. Any appropriate changes or modifications made by ordinary technicians in the relevant technical field should be deemed to be within the patent scope of the present utility model.

Claims

1. A collective vertical operating surface suitable for construction training of ancient building construction skills, characterized by: It includes the first stone column base, the stone lower sill, the second stone column base, the first column, the second column and the crossbeam; One end of the stone step is fixedly connected to the first stone column base, the second stone column base is fixedly connected to the other end of the stone step, the lower end of the first column is fixedly connected to the first stone column base, the first column is provided with a first through hole, the upper end of the first column is provided with a first groove, the lower end of the second column is fixedly connected to the second stone column base, the second column is parallel to the first column, the second column is provided with a second through hole, the upper end of the second column is provided with a second groove, and the crossbeam passes through the first through hole and the second through hole and is provided on the first column and the second column.

2. The integrated vertical operating surface suitable for construction training of ancient building construction skills as claimed in claim 1, characterized in that: A first connecting vertical plate is arranged on the side of the first column close to the second column, a second connecting vertical plate is arranged on the side of the second column close to the first column, a connecting horizontal plate is arranged at the bottom of the crossbeam, one end of the connecting horizontal plate abuts against the upper end of the first connecting vertical plate, and the other end of the connecting horizontal plate abuts against the upper end of the second connecting vertical plate.

3. The integrated vertical operating surface suitable for construction training of ancient building construction skills as claimed in claim 1 is characterized by: It also includes a large woodworking component, one end of which is arranged on the first column through a first groove, the other end of which is arranged on the second column through a second groove, and the bottom of the large woodworking component is arranged on the crossbeam.

4. The integrated vertical operating surface suitable for construction training of ancient building construction skills as claimed in claim 3 is characterized by: The large woodworking assembly includes a first short tube, a first flat bundle, a second short tube, a second flat bundle and a curved beam. The first short tube is arranged on the crossbeam, one end of the first flat bundle is arranged on the first short tube, and the other end of the first flat bundle is arranged in a first groove. The second short tube is arranged on the crossbeam, one end of the second flat bundle is arranged on the second short tube, and the other end of the second flat bundle is arranged in a second groove. One end of the curved beam is arranged on the first short tube, and the other end of the curved beam is arranged on the second short tube.

5. The integrated vertical operating surface suitable for construction training of ancient building construction skills as claimed in claim 4 is characterized by: A first slot for inserting the crossbeam is arranged at the bottom of the first short tube.

6. The integrated vertical operating surface suitable for construction training of ancient building construction skills as claimed in claim 5, characterized in that: A second slot for inserting the crossbeam is arranged at the bottom of the second short tube.

7. The integrated vertical operating surface suitable for construction training of ancient building construction skills according to claim 4, characterized in that: A first wooden bucket is formed at the upper end of the first short tube. A first connecting groove is arranged on the first wooden bucket. The first connecting groove is connected to one end of the curved beam.

8. The integrated vertical operating surface suitable for construction training of ancient building construction skills as claimed in claim 7, characterized in that: A second wooden bucket is formed at the upper end of the second short tube, a second connecting groove is arranged on the second wooden bucket, and the second connecting groove is connected to the other end of the curved beam.