Electric power engineering pipeline installation equipment
By introducing components such as slide chutes, threaded rods and cleaning bristles into the power engineering pipeline installation equipment, the problem that existing equipment cannot clean the pipe joints is solved, effective cleaning and height adjustment of the joint parts are achieved, and the installation is improved. Sealing.
Patent Information
- Application Number
- CN202420129953.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-18
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2034-01-18
AI Technical Summary
The existing power engineering pipeline installation equipment cannot effectively clean the pipe joints, which affects the firmness and sealing of the installation.
A power engineering pipeline installation equipment is designed, including slide grooves, threaded rods, side plates, cleaning bristles and other components. Through the cooperation of threaded rods and sliders, the inner and outer sides of the pipe joints are cleaned, and the bidirectional screws and The connecting rod adjusts the height of the mount.
It realizes effective cleaning of the pipe joints during the installation process, facilitates subsequent installation, and can adjust the height of the pipe according to needs, improving the firmness and sealing of the installation.
Smart Images

Figure CN221995016U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of auxiliary installation of electric power engineering pipelines, in particular to electric power engineering pipeline installation equipment. Background Art
[0002] With the continuous development of urbanization, the construction of power facilities and the laying of power lines have become an indispensable and important project. Nowadays, there are fewer and fewer lines laid on the ground. Most of the lines are laid underground. When laying underground lines, pipes are required to extend the laying of cables.
[0003] At present, when existing power engineering pipelines are connected, the connecting parts of the pipelines need to be cleaned to ensure the firmness and sealing after installation. However, the existing power engineering pipeline installation equipment can only lift the pipelines and has no function for cleaning the pipeline joints. Therefore, we propose a power engineering pipeline installation equipment. Utility Model Content
[0004] In view of the deficiencies in the prior art, the utility model provides a power engineering pipeline installation device, which solves the problems raised in the above-mentioned background technology.
[0005] To achieve the above objectives, the utility model is implemented through the following technical solutions: an electric power engineering pipeline installation equipment, comprising a base, a lifting groove is provided inside the base, a mounting seat is movably installed inside the lifting groove, a receiving seat is fixedly installed on the top of the mounting seat, an arc groove is provided inside the top of the receiving seat, a sliding groove is provided inside the mounting seat, a threaded rod is rotatably installed inside the sliding groove, one end of the threaded rod extends to the outside of the mounting seat and a third handle turntable is fixedly installed, a first slider is threadedly installed on the outer side of the threaded rod, a side plate is fixedly installed on one side of the first slider, a through groove is provided inside one side of the mounting seat, the side plate is slidably connected with the through groove, a mounting plate is fixedly installed on the top of the side plate, a rotating shaft is rotatably installed inside the mounting plate, a disc is fixedly installed on one end of the rotating shaft, a cleaning brush is fixedly installed on one side of the disc, and a first handle turntable is fixedly installed on the other end of the rotating shaft.
[0006] Preferably, a bidirectional screw is rotatably installed at the bottom of the lifting groove, two second sliding blocks are installed on the outer thread of the bidirectional screw, a connecting rod is rotatably installed on the top of the second sliding block, one end of the connecting rod is rotatably connected to the bottom of the mounting seat, and one end of the bidirectional screw extends to the outside of the base and is fixedly installed with a second handle turntable.
[0007] Preferably, first guide blocks are fixedly mounted on the bottom of both sides of the mounting seat, first guide grooves are opened inside the base and on both sides of the lifting groove, and the first guide blocks are slidably connected to the first guide grooves.
[0008] Preferably, a second guide block is fixedly mounted on the bottom of the second sliding block, a second guide groove is provided inside the bottom of the base, and the second guide block is slidably connected to the second guide groove.
[0009] Preferably, a limit block is fixedly installed in the middle of the bidirectional screw rod, and the second sliding block cooperates with the limit block.
[0010] Preferably, the first handle turntable, the second handle turntable and the third handle turntable are all provided with plug pins therein, and the mounting plate, the base and one side of the mounting seat are all provided with sockets therein, and the plug pins cooperate with the sockets.
[0011] The utility model provides a power engineering pipeline installation device, which has the following beneficial effects:
[0012] 1. The power engineering pipeline installation equipment cooperates with a slide groove, a threaded rod, a first slider, a side plate, a through groove, a mounting plate, a rotating shaft, a disc, cleaning bristles, a first handle turntable and a third handle turntable. During the installation of the power engineering pipeline, the pipeline is supported by a receiving seat, and a joint at one end of the pipeline is located on one side of the receiving seat. Then, the threaded rod is rotated by the third handle turntable to drive the first slider to move through the thread. When the first slider moves, it drives the side plate and the cleaning bristles to move to the outside of one end of the pipeline. Finally, only the first handle turntable needs to be rotated to drive the disc and the cleaning bristles to rotate. When the cleaning bristles rotate, the inside and outside of one end of the pipeline can be cleaned, which is convenient for subsequent installation.
[0013] 2. The power engineering pipeline installation equipment cooperates with a bidirectional screw rod, a second slider, a connecting rod, a second guide block, a second guide groove and a second handle turntable. During use, according to the height required for pipeline installation, the bidirectional screw rod can be rotated by the second handle turntable to drive the two second sliders to move toward the middle through the thread, and then the mounting seat can be pushed up through the connecting rod, so as to facilitate the adjustment of the height of the pipeline to be installed according to the installation requirements. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is a schematic diagram of the structure of the utility model;
[0015] Figure 2 It is a cross-sectional view of the utility model;
[0016] Figure 3 It is a side partial cross-sectional view of the utility model;
[0017] Figure 4 For this utility model Figure 2Enlarged view of point A in .
[0018] In the figure: 1. base; 2. lifting groove; 3. mounting seat; 4. receiving seat; 5. arc groove; 6. slide groove; 7. threaded rod; 8. first slider; 9. side plate; 10. through groove; 11. mounting plate; 12. rotating shaft; 13. disc; 14. cleaning brush; 15. first handle turntable; 16. two-way screw rod; 17. second slider; 18. connecting rod; 19. first guide block; 20. first guide groove; 21. second guide block; 22. second guide groove; 23. limit block; 24. second handle turntable; 25. third handle turntable. DETAILED DESCRIPTION
[0019] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.
[0020] See also Figures 1 to 4 The utility model provides a technical solution: a power engineering pipeline installation device, including a base 1, a lifting groove 2 is provided inside the base 1, a mounting seat 3 is movably installed inside the lifting groove 2, first guide blocks 19 are fixedly installed at the bottom of both sides of the mounting seat 3, first guide grooves 20 are provided inside the base 1 and on both sides of the lifting groove 2, the first guide blocks 19 are slidably connected with the first guide grooves 20, a receiving seat 4 is fixedly installed on the top of the mounting seat 3, an arc groove 5 is provided inside the top of the receiving seat 4, a slide groove 6 is provided inside the mounting seat 3, and a thread is rotatably installed inside the slide groove 6 Rod 7, one end of the threaded rod 7 extends to the outside of the mounting seat 3 and is fixedly installed with a third handle turntable 25, the outer side of the threaded rod 7 is threadedly installed with a first slider 8, one side of the first slider 8 is fixedly installed with a side plate 9, one side of the mounting seat 3 is provided with a through groove 10, the side plate 9 is slidably connected with the through groove 10, a mounting plate 11 is fixedly installed on the top of the side plate 9, a rotating shaft 12 is rotatably installed inside the mounting plate 11, a disc 13 is fixedly installed on one end of the rotating shaft 12, a cleaning brush bristle 14 is fixedly installed on one side of the disc 13, and the other end of the rotating shaft 12 is fixedly installed with a first handle turntable 15.
[0021] A hole matching with the threaded rod 7 is provided inside the first sliding block 8 , and the first sliding block 8 is slidably connected with the slide groove 6 , and a hole matching with the threaded rod 7 is provided inside one side of the mounting seat 3 .
[0022] A bidirectional screw rod 16 is rotatably installed at the bottom of the lifting groove 2, and two second sliders 17 are installed on the outer thread of the bidirectional screw rod 16. A connecting rod 18 is rotatably installed on the top of the second slider 17, and a second guide block 21 is fixedly installed on the bottom of the second slider 17. A second guide groove 22 is opened inside the bottom of the base 1, and the second guide block 21 is slidably connected to the second guide groove 22. One end of the connecting rod 18 is rotatably connected to the bottom of the mounting seat 3, and one end of the bidirectional screw rod 16 extends to the outside of the base 1 and is fixedly installed with a second handle turntable 24.
[0023] A limit block 23 is fixedly installed in the middle of the bidirectional screw rod 16, and the second slider 17 cooperates with the limit block 23. The first handle turntable 15, the second handle turntable 24 and the third handle turntable 25 are all plugged with pins. The inside of the mounting plate 11, the base 1 and one side of the mounting seat 3 are all provided with sockets, and the pins cooperate with the sockets. The main function of the limit block 23 is to limit the second slider 17, and the main function of the pin is to fix and limit the first handle turntable 15, the second handle turntable 24 and the third handle turntable 25 respectively to avoid rotation and displacement of the first handle turntable 15, the second handle turntable 24 and the third handle turntable 25 when the power engineering pipeline is installed.
[0024] In summary, when using the power engineering pipeline installation equipment, it is only necessary to place the power engineering pipeline to be installed on the inner side of the arc groove 5 on the receiving seat 4, with the joint part of one end thereof located on one side of the receiving seat 4, and then it is only necessary to pull the internal pin on one side of the third handle turntable 25 out of the socket, and then the threaded rod 7 is rotated by the third handle turntable 25 to drive the first slider 8 to move through the thread, and when the first slider 8 moves, it drives the side plate 9 and the cleaning bristles 14 to move to the outside of one end of the pipeline, and then the internal pin of the first handle turntable 15 is pulled out of the socket, and then the first handle turntable 15 is rotated to drive the disc 13 and the cleaning bristles 14 to rotate, and when the cleaning bristles 14 rotate, the inside and outside of one end of the pipeline can be cleaned. For cleaning, it is convenient for subsequent installation. After the pipe joint is cleaned, the third handle turntable 25 is reversed to move the cleaning bristles 14 to one side of the receiving seat 4, and then the pin is inserted into the socket inside the third handle turntable 25, and the other pin is also inserted into the socket in the first handle turntable 15. Finally, when the pipe installation height needs to be adjusted according to the pipe installation requirements, only the pin inside the second handle turntable 24 needs to be pulled out from the socket, and the second handle turntable 24 can be rotated. By rotating the two-way screw rod 16 by the second handle turntable 24, the two second sliders 17 can be driven to move toward the middle through the thread, and then the mounting seat 3 can be pushed up through the connecting rod 18, which is convenient for adjusting the height of the pipe to be installed according to the installation requirements.
[0025] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A power engineering pipeline installation device, comprising a base (1), characterized in that: The base (1) is provided with a lifting groove (2) inside, a mounting seat (3) is movably installed inside the lifting groove (2), a receiving seat (4) is fixedly installed on the top of the mounting seat (3), an arc groove (5) is provided inside the top of the receiving seat (4), a sliding groove (6) is provided inside the mounting seat (3), a threaded rod (7) is rotatably installed inside the sliding groove (6), one end of the threaded rod (7) extends to the outside of the mounting seat (3) and a third handle turntable (25) is fixedly installed thereon, and a first slider (25) is threadedly installed on the outside of the threaded rod (7) 8), a side plate (9) is fixedly mounted on one side of the first slider (8), a through groove (10) is provided inside one side of the mounting seat (3), the side plate (9) is slidably connected to the through groove (10), a mounting plate (11) is fixedly mounted on the top of the side plate (9), a rotating shaft (12) is rotatably mounted inside the mounting plate (11), a disc (13) is fixedly mounted on one end of the rotating shaft (12), cleaning bristles (14) are fixedly mounted on one side of the disc (13), and a first handle rotating disc (15) is fixedly mounted on the other end of the rotating shaft (12).
2. The power engineering pipeline installation equipment according to claim 1, characterized in that: A bidirectional screw rod (16) is rotatably mounted at the bottom of the lifting groove (2), two second sliders (17) are threadedly mounted on the outer side of the bidirectional screw rod (16), a connecting rod (18) is rotatably mounted on the top of the second slider (17), one end of the connecting rod (18) is rotatably connected to the bottom of the mounting seat (3), and one end of the bidirectional screw rod (16) extends to the outer side of the base (1) where a second handle turntable (24) is fixedly mounted.
3. The power engineering pipeline installation equipment according to claim 1, characterized in that: First guide blocks (19) are fixedly mounted on the bottom of both sides of the mounting seat (3), first guide grooves (20) are provided inside the base (1) and on both sides of the lifting groove (2), and the first guide blocks (19) are slidably connected to the first guide grooves (20).
4. The power engineering pipeline installation equipment according to claim 2, characterized in that: A second guide block (21) is fixedly mounted on the bottom of the second sliding block (17), a second guide groove (22) is provided inside the bottom of the base (1), and the second guide block (21) is slidably connected to the second guide groove (22).
5. The power engineering pipeline installation equipment according to claim 2, characterized in that: A limit block (23) is fixedly installed in the middle of the bidirectional screw rod (16), and the second sliding block (17) cooperates with the limit block (23).
6. The power engineering pipeline installation equipment according to claim 1, characterized in that: The first handle turntable (15), the second handle turntable (24) and the third handle turntable (25) are all provided with plug pins, and the mounting plate (11), the base (1) and one side of the mounting seat (3) are all provided with plug holes, and the plug pins cooperate with the plug holes.
