Local piping emergency treatment structure for long-strip-shaped tunnel foundation pit through open excavation method
By using a combined structure of water collection pit, retaining wall, pump and pressure relief well in open excavation long tunnel foundation pit, the construction shutdown and safety risks caused by pipe surge phenomenon are solved, and rapid and effective treatment is achieved and recovery.
Patent Information
- Application Number
- CN202420531359.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-19
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2034-03-19
AI Technical Summary
During the construction of open-cut tunnel foundation pits, sudden changes in local geological conditions lead to pipe surges. The existing treatment methods take a long time, resulting in increased safety risks of foundation pits and economic losses, and often lead to the shutdown of the entire foundation pit.
The combined structure of water collection pit, retaining wall, pump and pressure relief well is adopted. The water collection pit and foundation pit are installed in the fence wall, and the water pump drainage pipe is combined to quickly control the water inflow and reduce the water level. Avoid foundation pit shutdown.
It has achieved rapid elimination of pipe surge dangers, convenient construction, low cost, high sealing efficiency and high success rate. After processing, the foundation pit construction has been quickly restored, reducing safety risks and economic losses.
Smart Images

Figure CN222008972U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of pipe burst treatment, and in particular relates to a local pipe burst emergency treatment structure for a long strip tunnel foundation pit using an open-cut method. Background Art
[0002] During the construction of the open-cut tunnel foundation pit, the working surface is usually narrow and long, so the excavation has a large impact on the surrounding environment. Under geological conditions rich in confined water, during the excavation of the foundation pit, local water inrush often occurs in the foundation pit due to factors such as sudden changes in local geological conditions, defects in the sealing quality of exploration drilling holes, drilling holes after the failure of the dewatering well, and insufficient requirements for the anti-surge design of the foundation pit dewatering. Due to the operation of the foundation pit dewatering well, the sudden head of the water inrush is usually not high at the beginning of this pipe burst phenomenon, and the water volume is not large. However, as the surge time increases, the sudden surge channel will become larger, the water volume will increase accordingly, and sand will appear, bringing danger to the foundation pit. At present, there is little experience in the treatment of pipe bursts under this specific engineering condition. In the treatment process, grouting plugging is often considered first, and when grouting plugging does not achieve the effect, additional dewatering wells outside the pit are considered. The usual treatment method is time-consuming, resulting in an increase in the safety risk of the foundation pit; as the amount of water inrush increases, the water level in the foundation pit rises, which in turn causes all working surfaces in the entire foundation pit construction to stop working, resulting in very large economic losses. Summary of the invention
[0003] In order to solve the above problems, the utility model discloses a local pipe burst emergency treatment structure for a long strip tunnel foundation pit using an open-cut method. The structure is convenient to construct and has low cost. The local treatment avoids the entire foundation pit from being shut down. The sealing efficiency and success rate are high. After the treatment is completed, the structure can be dismantled and the foundation pit construction can be resumed quickly.
[0004] In order to achieve the above object, the technical solution of the utility model is as follows:
[0005] A local pipe burst emergency treatment structure for an open-cut long tunnel foundation pit comprises a sump, a retaining wall, a water pump and a pressure relief well. The retaining walls are arranged on both sides of the water bursting point, the sump is arranged inside the retaining walls, the water pump is arranged inside the sump, the pressure relief well is arranged outside the foundation pit, and the drainage pipe of the water pump is connected to the pressure relief well.
[0006] As an improvement of the utility model, the retaining wall is a gabion mesh placed side by side.
[0007] As an improvement of the utility model, a waterproof geotextile is laid on the inner side of the gabion mesh.
[0008] As an improvement of the utility model, the number of the sump and the pressure relief well is ≥1.
[0009] The beneficial effects of the utility model are:
[0010] The utility model discloses a structure for emergency treatment of local pipe burst in a long strip tunnel foundation pit using open-cut method, which adopts internal water retaining and pressure relief well outside the foundation pit, and the cooperation and coordination of the two can eliminate the pipe burst danger in the shortest time. The construction is convenient and the cost is low. The local treatment avoids the shutdown of the entire foundation pit, and the sealing efficiency and success rate are high. After the treatment is completed, the demolition and restoration of the foundation pit construction are fast, so as to create a safe and good working surface for the subsequent construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] Figure 1 It is a plan view of the utility model.
[0012] Figure 2 It is a cross-sectional view of the utility model. DETAILED DESCRIPTION
[0013] The present invention will be further described below in conjunction with the accompanying drawings and specific implementations. It should be understood that the following specific implementations are only used to illustrate the present invention and are not used to limit the scope of the present invention.
[0014] As shown in the figure, the utility model is a local pipe burst emergency treatment structure for a long strip tunnel foundation pit using an open-cut method, and the specific steps and principles are as follows:
[0015] (1) When water gushing points appear during foundation pit excavation, the water is first drained into the sump by drainage and water collection methods, and then discharged out of the foundation pit to control the scope and depth of water accumulation in the foundation pit and create a working surface for local pipe burst rescue work.
[0016] (2) Based on the amount of water gushing out from the gushing point and the speed of emergency rescue construction, and with the water level rising by no more than 1 m during the emergency rescue construction period as the standard, determine the treatment range along the length of the foundation pit.
[0017] (3) After determining the boundary line of the treatment range, level the base 2 to 3 meters outside the boundary line.
[0018] (4) Construct a water retaining structure system (retaining wall + foundation pit side wall)
[0019] Retaining walls are set up on both sides of the water gushing point. The retaining walls are composed of foldable square gabions lined with waterproof geotextile.
[0020] The foldable gabion mesh lined with waterproof geotextile has the advantages of high strength, good appearance size after opening the fill soil or sand and gravel, and easy hoisting and stacking. The height of each gabion mesh is 2-3m. The height of the gabion mesh and the number of stacking layers are determined according to the water flow and the height of the water head. The waterproof geotextile plays a role in preventing the leakage of water.
[0021] Functions of water retaining system: ① Raise the water head within the local pipe burst treatment range, reduce the water head pressure difference until it is balanced and no more water bursts. ② The hoisting and stacking of gabions and the raising of water level can increase the pressure in the passive area of the foundation pit and reduce the risk of the foundation pit. ③ Control the water within the treatment range to avoid the shutdown of all working surfaces of the foundation pit. ④ Create time conditions for the construction of the pressure relief well outside the pit.
[0022] (5) Since the construction of the pressure relief well outside the pit takes longer than the construction of the water retaining system, the construction of the pressure relief well outside the pit is started at the same time as step (1) is implemented. The time the bottom of the foundation pit is soaked in water cannot be too long. The construction time of the pressure relief well outside the foundation pit should be as short as possible. Well construction can be carried out simultaneously on both sides of the foundation pit.
[0023] (6) After the pressure relief wells are completed one by one, water is pumped out to reduce the pressure. The number of pressure relief wells can be determined based on calculations and the actual situation during the rescue process.
[0024] (7) Pump out the water within the water retaining structure and observe whether the water gushing phenomenon disappears. Combined with the water level conditions inside and outside the foundation pit, a comprehensive assessment is made to completely eliminate the danger of pipe gushing when the foundation pit is excavated to the design elevation.
[0025] (8) Dismantle the water retaining structure system.
[0026] (9) After the rescue work is completed, the subsequent construction work will continue.
[0027] The utility model discloses a local pipe burst emergency treatment structure for a long strip tunnel foundation pit using an open-cut method, which is convenient to construct, low in cost, avoids the entire foundation pit from being shut down for local treatment, and is quick to dismantle and resume construction of the foundation pit after the treatment is completed. Through the coordinated work of the built-in water retaining structure system and the pressure relief well outside the foundation pit, the purpose of eliminating the pipe burst danger in the shortest time and creating a safe and good working surface for subsequent construction is achieved.
[0028] It should be noted that the above content only illustrates the technical idea of the utility model and cannot be used to limit the protection scope of the utility model. For ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the utility model. These improvements and modifications all fall within the protection scope of the claims of the utility model.
Claims
1. A local pipe burst emergency treatment structure for a long open-cut tunnel foundation pit, characterized in that: It includes a sump, a retaining wall, a water pump and a pressure relief well. The retaining walls are arranged on both sides of the water gushing point, the sump is arranged inside the retaining walls, the water pump is arranged inside the sump, the pressure relief well is arranged outside the foundation pit, and the drainage pipe of the water pump is connected to the pressure relief well.
2. According to claim 1, a local pipe burst emergency treatment structure for a long open-cut tunnel foundation pit, characterized in that: The retaining wall is a pair of gabions placed side by side.
3. The local pipe burst emergency treatment structure for a long open-cut tunnel foundation pit according to claim 2 is characterized by: A waterproof geotextile is laid on the inner side of the gabion mesh.
4. The local pipe burst emergency treatment structure for a long open-cut tunnel foundation pit according to claim 1 is characterized by: The number of the sump and pressure relief well is ≥1.