HDPE (high-density polyethylene) double-corrugated steel belt pipe
Through the design of HDPE double corrugated steel strip pipe, the cavity and abutment protrusions are used to increase the bearing area, combined with the design of zigzag overlap and bonding parts, the existing HDPE pipe ring is solved by low stiffness and unsolid connection of the board and belt. The problem of improving the stability and service life of the pipeline.
Patent Information
- Application Number
- CN202420640999.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-30
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2034-03-30
AI Technical Summary
The existing HDPE structural wall pipe has low ring stiffness, large unit meter, and the board and strip connections are not firm and easy to layer, making it difficult to meet the needs of municipal engineering requirements of high working conditions and long life.
The HDPE double corrugated steel strip tube design is designed with a long strip body, a steel frame and a cover layer spiral winding and overlap bonding. By setting the cavity and abutting protrusions, the bearing area is increased, the amount of steel frame is reduced, and the zigzag is used to use zigzag-shaped straps. The joint and the adhesive portion achieve a snap-fit connection to prevent delamination and disengagement.
It improves the ring stiffness and stability of the pipeline, extends the service life, saves costs and weight, enhances the pressure resistance of the pipeline, and prevents landslides.
Smart Images

Figure CN222009114U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of drainage pipes, in particular to a HDPE double-corrugated steel belt pipe. Background Art
[0002] At present, most of the pipes used in urban drainage and sewage facilities are HDPE (high-density polyethylene) structural wall pipes. HDPE (high-density polyethylene) guarantees the product molding process and product quality due to its excellent melting and welding properties. Large-diameter winding pipes are generally made of HDPE (high-density polyethylene) as raw materials to prepare strip profiles, and then the strip profiles are wound and welded to form a kind of pipe. Due to its unique molding process, small plastic extruders can produce pipes with a diameter of up to 3 meters, which is difficult to achieve with other production processes. This kind of pipe has a smooth inner wall and has the advantages of corrosion resistance, light weight, easy installation, large flow rate, and long life (50 years). It is an environmentally friendly green product. It can replace pipes made of high-energy consumption materials (cement, cast iron, fiberglass pipes, ceramics, etc.). It is an environmentally friendly green product and is mainly used for buried drainage pipes. This pipe has the advantages of corrosion resistance, low friction resistance and wear resistance.
[0003] However, the ring stiffness of HDPE structural wall pipes is low, the weight per unit meter is relatively large, and the production efficiency is low. In addition, the plate-strip joints of the structural wall pipes are thin, low in strength, poor in ring flexibility, and delamination occurs, and the plate-strip joints are very likely to become detached. There are also some pipe walls that are made of plastic and steel bonded together and wound together. The technical defect is that the expansion and contraction ratios of plastic and steel are different. As a result, such pipes are greatly affected by climate change during use. When the weather gets cold or hot, plastic and steel are easy to separate from each other, which seriously damages the ring stiffness of the pipes. In addition, sealing problems are prone to occur at the overlap between two adjacent plates, which makes it difficult to adapt to municipal projects with high working conditions and long service life requirements. The installed pipelines may also collapse as a result. Utility Model Content
[0004] The utility model aims to provide a HDPE double corrugated steel belt pipe, aiming to solve the technical problems of low ring stiffness, heavy weight per unit meter, loose plate and belt joints and easy delamination in the prior art drainage pipes.
[0005] In order to solve the above technical problems, the technical solution adopted by the utility model is: a HDPE double corrugated steel belt pipe, which is formed by spirally winding, overlapping and bonding a long strip body, a steel frame and a covering layer. The body includes two abutment cavities, two abutment protrusions, two cavities, two arc-shaped portions and a bottom plate. The first arc-shaped portion and the second arc-shaped portion are respectively enclosed with the bottom plate to form a first cavity and a second cavity. The left side of the first cavity extends outward to form a first abutment protrusion, and a first abutment cavity is formed between the first abutment protrusion and the bottom plate. The right side of the second cavity extends outward to form a second abutment protrusion, and a second abutment cavity is formed between the second abutment protrusion and the bottom plate. The two ends of the steel frame are respectively placed in the two abutment cavities, and the covering layer is overlapped and bonded with adjacent abutment protrusions to form a third cavity. The steel frame is placed in the third cavity.
[0006] Furthermore, both ends of the bottom plate extend to form a first overlap portion and a second overlap portion, and the first overlap portion and the second overlap portion are respectively sawtooth-shaped. When the main body is spirally wound, the sawtooth portions of the adjacent first overlap portion and the second overlap portion are hot-melt-bonded and overlapped.
[0007] Furthermore, two clamping parts are respectively provided at both ends of the steel frame, and the two clamping parts are tilted outward from the long side edges on the opposite sides of the steel frame. The two clamping parts are respectively accommodated in the two abutting cavities and are respectively engaged with the two abutting protrusions.
[0008] Furthermore, the covering layer is in an "Ω" shape, and adhesive portions are respectively provided at both ends thereof, and the adhesive portions are bonded to the abutting protrusions by hot-melt bonding.
[0009] Furthermore, the covering layer is provided with a third arc-shaped portion, and the curvature of the third arc-shaped portion is the same as the curvature of the top of the steel frame.
[0010] Furthermore, the curvature of the first arc-shaped portion is the same as the curvature of the second arc-shaped portion, and the curvature of the third arc-shaped portion is smaller than the curvature of the first arc-shaped portion.
[0011] Furthermore, the main body is integrally formed by injection molding of high-density polyethylene.
[0012] Furthermore, the covering layer is integrally formed by injection molding of high-density polyethylene.
[0013] The beneficial effects of the utility model are as follows: the HDPE double corrugated steel belt pipe provided by the utility model is formed by spirally winding, overlapping and bonding a long strip body, a steel skeleton and a covering layer. Two cavities, abutting cavities and abutting protrusions are arranged in the body. The covering layer and the adjacent abutting protrusions are overlapped and bonded to form a third cavity. The steel skeleton is placed in the third cavity. The first cavity and the second cavity are arranged in the body to increase the bearing area, and reduce the amount of steel skeleton, save cost and reduce weight. Therefore, the pressure exerted by the outside on the drainage pipe is borne by the first cavity, the second cavity of the body and the steel skeleton placed in the third cavity, which greatly increases the stress area bearing the pressure and improves the ring stiffness of the pipe. Moreover, the two ends of the steel skeleton are respectively placed in the two abutting cavities to prevent the steel skeleton from shaking in the third cavity. The structure is more firm and stable, and the service life of the drainage pipe is effectively improved. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0015] Figure 1 This is a partial longitudinal section diagram of a HDPE double corrugated steel belt pipe of the utility model;
[0016] Figure 2 This is a schematic diagram of the main structure of a HDPE double corrugated steel belt pipe of the utility model;
[0017] Figure 3 This is a schematic diagram of the front cross-sectional structure of a HDPE double-corrugated steel belt pipe of the utility model.
[0018] Description of labels:
[0019] 10. Main body; 11. First abutting cavity; 11'. Second abutting cavity;
[0020] 12. first abutting protrusion; 13. second abutting protrusion; 14. first arc-shaped portion;
[0021] 14', second arc-shaped portion; 15, first cavity; 16, bottom plate;
[0022] 17. second cavity; 18. first overlapping portion; 19. second overlapping portion;
[0023] 20. Steel frame; 21. First clamping portion; 22. Second clamping portion;
[0024] 30. Covering layer; 31. Adhesive portion; 32. Third cavity;
[0025] 33. The third arc portion. DETAILED DESCRIPTION
[0026] The embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present invention, and should not be construed as limiting the present invention.
[0027] In the description of the present invention, it should be understood that the terms "length", "width", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship, are based on the orientation or position relationship shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0028] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present utility model, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.
[0029] In the present invention, unless otherwise clearly specified and limited, the terms "install", "connect", "connect", "fix" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0030] like Figures 1 to 3As shown, an embodiment of the utility model provides a HDPE double corrugated steel belt pipe with a pipe hole in the middle, which is used for drainage, sewage discharge and the like during use. The main body 10, the steel frame 20 and the covering layer 30 are spirally wound, overlapped and bonded. The main body 10 includes two abutting cavities, two abutting protrusions, two cavities, two arc-shaped portions and a bottom plate 16. The first arc-shaped portion 14 and the second arc-shaped portion 14' are respectively enclosed with the bottom plate 16 to form a first cavity 15 and a second cavity 17. The left side of the first cavity 15 extends outward to form a first abutting protrusion 12, and a first abutting cavity 11 is formed between the first abutting protrusion 12 and the bottom plate 16. The right side of the second cavity 17 extends outward to form a second abutting protrusion 13, and a second abutting cavity 11' is formed between the second abutting protrusion 13 and the bottom plate 16. The two ends of the steel frame 20 are respectively placed in the first abutting cavity 11 and the second abutting cavity 11'. The covering layer 30 is overlapped and bonded with adjacent abutting protrusions to form a third cavity 32, and the steel frame 20 is placed in the third cavity 32. Therefore, the pressure exerted by the outside on the drainage pipe is borne by the first cavity, the second cavity and the steel frame placed in the third cavity of the main body, which greatly increases the stress-bearing area that bears the pressure and improves the ring stiffness of the pipe. The first cavity and the second cavity are provided to increase the bearing area and reduce the amount of steel frame, saving costs and reducing weight. Ring stiffness is the internal pressure and external pressure of the load borne by the pressure pipe, and is an important indicator of the buried drainage pipe. The two ends of the steel frame are respectively placed in two abutting cavities to prevent the steel frame from shaking in the third cavity. The structure is more solid and stable, which increases the service life of the drainage pipe.
[0031] like Figure 2 As shown, the two ends of the bottom plate 16 extend to form a first overlap portion 18 and a second overlap portion 19, respectively, and the first overlap portion 18 and the second overlap portion 19 are serrated. When the body 10 is spirally wound, the serrated portions of the adjacent first overlap portion 18 and the second overlap portion 19 are hot-melt-bonded and overlapped. The serrated portions of the first overlap portion and the second overlap portion cooperate with each other to achieve the buckling connection of the body, thereby preventing delamination and the phenomenon that the connection of the body is easily disengaged.
[0032] like Figure 1 , Figure 3 As shown, the first clamping part 21 and the second clamping part 22 are respectively provided at both ends of the steel frame 20. The first clamping part 21 and the second clamping part 22 are tilted outward from the long side edges of the steel frame 20 on both sides. The steel frame is similar to a "W" shape. The two clamping parts are respectively accommodated in the two abutting cavities and abut against the two abutting protrusions. With this structure, the steel frame is effectively fixed in the third cavity, further preventing the steel frame from moving in the third cavity, and improving the stability and ring stiffness of the pipeline.
[0033] like Figure 1 , Figure 3As shown, the covering layer is in an "Ω" shape, and a bonding portion 31 is provided at each end thereof, and the bonding portion 31 is respectively bonded to the two abutting protrusions by hot melt bonding. The covering layer and the body are spirally wound and overlapped by the bonding portion to prevent the pipeline from being delaminated and improve the connection stability and firmness.
[0034] like Figure 1 , Figure 3 As shown, the covering layer is provided with a third arc portion 33, and the arc of the third arc portion 33 is the same as the arc of the top of the steel frame 20. The same arc improves the fit between the two, further improves the stability of the pipeline structure, and increases the service life of the pipeline.
[0035] like Figure 1 , Figure 3 As shown, the curvature of the first arc portion is the same as that of the second arc portion. The curvature of the third arc portion is smaller than that of the first arc portion. This structure is conducive to uniformly dispersing the pressure borne by the pipeline. The curvature of the first arc portion and the second arc portion on the main body is large, so the force-bearing area is large, so the pressure borne will increase. The curvature of the third arc portion on the covering layer is small, but the third cavity formed by it is provided with a steel skeleton, which can withstand considerable pressure. Therefore, the pressure borne by the pipeline can be evenly distributed on the pipeline, thereby improving the stability of the pipeline and preventing collapse.
[0036] Preferably, the main body is formed by high-density polyethylene (HDPE) injection molding. High-density polyethylene has strong plasticity and can be injection molded into drainage pipes of different diameters according to the mold, which is convenient for transportation and has a wider range of uses.
[0037] Preferably, the covering layer is formed by injection molding of high-density polyethylene (HDPE), which has good economic efficiency, and is stable, reliable, impact-resistant, crack-resistant, aging-resistant, and corrosion-resistant.
[0038] In summary, the utility model provides a HDPE double corrugated steel belt pipe, which is formed by spirally winding and overlapping the long strip body, the steel skeleton and the covering layer. Two cavities, abutment cavities and abutment protrusions are provided in the body. The covering layer and the adjacent abutment protrusions are overlapped and bonded to form a third cavity. The steel skeleton is placed in the third cavity. The first cavity and the second cavity are provided in the body to increase the bearing area, and reduce the amount of steel skeleton, save cost and reduce weight. Therefore, the pressure exerted on the drainage pipe by the outside world is borne by the first cavity, the second cavity and the steel skeleton placed in the third cavity of the body, which greatly increases the stress area bearing the pressure and improves the ring stiffness of the pipe. The two ends of the steel skeleton are respectively placed in the two abutment cavities to prevent the steel skeleton from shaking in the third cavity. The structure is more firm and stable, which effectively improves the service life of the drainage pipe. When the body is spirally wound, the adjacent first overlap part and the serrated part of the second overlap part are hot-melt-bonded and overlapped. The first overlapped part and the second overlapped part serrations cooperate with each other to realize the buckling connection of the main body, thereby preventing delamination and the body connection from being easily disengaged, further improving the stability of the pipeline structure and increasing the service life of the pipeline.
[0039] The above are only embodiments of the present invention, and are not intended to limit the patent scope of the present invention. Any equivalent transformations made using the contents of the specification and drawings of the present invention, or directly or indirectly applied in related technical fields, are also included in the patent protection scope of the present invention.
Claims
1. A HDPE double corrugated steel belt pipe, It is characterized in that It is formed by spirally winding, overlapping and bonding a long strip body, a steel frame and a covering layer. The body includes two abutment cavities, two abutment protrusions, two cavities, two arc-shaped portions and a bottom plate. The first arc-shaped portion and the second arc-shaped portion are respectively enclosed with the bottom plate to form a first cavity and a second cavity. The left side of the first cavity extends outward to form a first abutment protrusion, and a first abutment cavity is formed between the first abutment protrusion and the bottom plate. The right side of the second cavity extends outward to form a second abutment protrusion, and a second abutment cavity is formed between the second abutment protrusion and the bottom plate. The two ends of the steel frame are respectively placed in the two abutment cavities, and the covering layer and adjacent abutment protrusions are overlapped and bonded to form a third cavity. The steel frame is placed in the third cavity.
2. The HDPE double corrugated steel belt pipe according to claim 1, It is characterized in that The two ends of the bottom plate extend to form a first overlap portion and a second overlap portion, respectively, the first overlap portion and the second overlap portion are sawtooth-shaped, and when the main body is spirally wound, the sawtooth portions of the adjacent first overlap portion and the second overlap portion are hot-melt-bonded and overlapped.
3. The HDPE double corrugated steel strip pipe according to claim 1, It is characterized in that Two clamping parts are respectively arranged at both ends of the steel frame, and the two clamping parts are tilted outwards from the long side edges of the steel frame on both sides opposite to each other. The two clamping parts are respectively accommodated in the two abutting cavities and are respectively clamped and abutted with the two abutting protrusions.
4. The HDPE double corrugated steel strip pipe according to claim 1, It is characterized in that The covering layer is in an "Ω" shape, and bonding parts are respectively provided at two ends thereof, and the bonding parts are bonded to the abutting protrusions by hot-melt bonding.
5. The HDPE double corrugated steel belt pipe according to claim 1, It is characterized in that The covering layer is provided with a third arc-shaped portion, and the curvature of the third arc-shaped portion is the same as the curvature of the top of the steel frame.
6. The HDPE double corrugated steel belt pipe according to claim 5, It is characterized in that The curvature of the first arc-shaped portion is the same as the curvature of the second arc-shaped portion, and the curvature of the third arc-shaped portion is smaller than the curvature of the first arc-shaped portion.
7. The HDPE double corrugated steel belt pipe according to claim 1, It is characterized in that The body is made of high-density polyethylene injection molding.
8. The HDPE double corrugated steel belt pipe according to claim 1, It is characterized in that The cover is made of high-density polyethylene injection molded in one piece.