Gas-fired boiler smoke exhaust waste heat recovery series coupling heat exchange system mainly combusting blast furnace gas
By splitting the gas heater into two parts in the blast furnace gas boiler, and using different temperature differences to improve heat exchange efficiency, the problem of low smoke exhaust waste heat recovery efficiency of blast furnace gas boiler is solved, and more efficient energy recovery and fuel saving is achieved , while reducing security risks.
Patent Information
- Application Number
- CN202323084435.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-11-15
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2033-11-15
AI Technical Summary
Existing blast furnace gas boilers are inefficient in smoke exhaust waste heat recovery, resulting in high energy consumption and low energy efficiency. When increasing the heat exchange area to improve efficiency, the cost is high and the marginal benefits are poor, and there are safety risks.
Design a series-coupled heat exchange system for exhaust exhaust waste heat recovery of gas boilers mainly for blast furnace gas. By splitting the entire gas heater into two smaller heat exchangers, it is arranged at the front and rear ends of the air preheater. Use different heat transfer temperature differences to improve heat transfer efficiency, and realize the hierarchical heating of gas and air to improve combustion efficiency.
Without increasing equipment input and operating costs, the final smoke exhaust temperature of the boiler is reduced, significantly improving boiler efficiency and fuel utilization, reducing fuel consumption, and reducing safety risks.
Smart Images

Figure CN222011959U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of metallurgical thermal energy, and relates to a blast furnace gas boiler, in particular to a series coupled heat exchange system for recovering exhaust heat of a gas boiler mainly burning blast furnace gas. Background Art
[0002] During the smelting process of blast furnace ironmaking in steel enterprises, a large amount of low calorific value blast furnace gas (BFG) is produced as a byproduct, which needs to be comprehensively utilized, mainly by burning low calorific value blast furnace gas boilers to produce steam, heat or power generation. The calorific value of blast furnace gas is quite low, about 800kcal / Nm3, and it is a gas fuel that is difficult to ignite and burn. In the industry, a device called a (blast furnace) gas heater is generally installed at the rear of such boilers, which uses the waste heat from boiler exhaust to heat the blast furnace gas to increase the gas temperature, thereby improving the ignition and combustion performance to improve the combustion efficiency, while reducing the final exhaust temperature, thereby comprehensively improving the boiler efficiency and saving fuel.
[0003] There are two main types of gas heaters 20 currently installed, namely, a tubular heat exchanger and a heat pipe heat exchanger; the arrangement positions are also divided into two places, namely, before the boiler air preheater 10 and after the boiler air preheater 10; the gas heater installed before the boiler air preheater is called a (whole) front gas heater, and the gas heater installed after the boiler air preheater is called a (whole) rear gas heater, see Figure 1 , Figure 2 . From the actual use effect, there is no obvious difference in heat exchange performance between tubular and heat pipe types or front or rear arrangement, but there is a common feature or problem that the final exhaust gas temperature can only be reduced to 140℃ or above, resulting in the efficiency of blast furnace gas boilers being about 1% lower than that of conventional coal-fired or oil-fired boilers. If you want to continue to improve the efficiency of the boiler, you must greatly expand the heat exchange area of the heater to increase the recovery of exhaust gas waste heat, which will cause a significant increase in the cost of heat exchanger equipment. At the same time, the increase in heat exchange area will also greatly increase the flue gas flow resistance, thereby greatly increasing the power consumption of the exhaust gas fan. It can be seen that the marginal benefit of increasing the recovery of exhaust gas waste heat by increasing the heat exchange area is very poor. If it is increased too much, it will even be negative, that is, the recovered energy is not enough to offset the increased power consumption of the exhaust gas fan. Since the equipment purchase investment and operation production costs are relatively high, it is very uneconomical to increase the heat exchange area. Therefore, the final exhaust gas temperature of this type of blast furnace gas boiler can only be maintained at 140℃ or above, with high energy consumption and low energy efficiency.
[0004] In view of this, there is an urgent need to design a new boiler exhaust waste heat recovery method to overcome at least some of the above-mentioned defects of the existing boiler exhaust waste heat recovery method. Utility Model Content
[0005] The utility model provides a series coupled heat exchange system for recovering exhaust heat from gas-fired boilers mainly using blast furnace gas, which can significantly improve boiler energy efficiency and save fuel consumption.
[0006] In order to solve the above technical problems, according to one aspect of the utility model, the following technical solution is adopted:
[0007] A series coupled heat exchange system for recovering exhaust heat from a gas boiler mainly fueled by blast furnace gas, the exhaust heat recovery system comprising a boiler, an exhaust channel, a first gas heat exchanger, an air preheater and a second gas heat exchanger;
[0008] The boiler is connected to a smoke exhaust channel, and the smoke exhausted from the boiler is output through the smoke exhaust channel; the smoke exhaust channel is provided with a first gas heat exchanger, an air preheater and a second gas heat exchanger in sequence, and the smoke is output through the first gas heat exchanger, the air preheater and the second gas heat exchanger in sequence;
[0009] The gas to be heated enters the first gas heat exchanger after passing through the second gas heat exchanger, and enters the boiler after being heated again by the first gas heat exchanger; the air enters the boiler after being preheated by the air preheater, and can be mixed with the gas entering the boiler for combustion.
[0010] As an implementation mode of the utility model, the first gas heat exchanger is provided with a first flue gas delivery pipeline and a second gas delivery pipeline, the first flue gas delivery pipeline is provided with a first flue gas inlet and a first flue gas outlet, the second gas delivery pipeline is provided with a second gas inlet and a second gas outlet; the first flue gas delivery pipeline is arranged close to the second gas delivery pipeline;
[0011] The air preheater is provided with a second smoke conveying pipeline and an air conveying pipeline, the second smoke conveying pipeline is provided with a second smoke inlet and a second smoke outlet, the air conveying pipeline is provided with an air inlet and an air outlet; the second smoke conveying pipeline is provided close to the air conveying pipeline;
[0012] The second gas heat exchanger is provided with a third flue gas delivery pipeline and a first gas delivery pipeline, the third flue gas delivery pipeline is provided with a third flue gas inlet and a third flue gas outlet, the first gas delivery pipeline is provided with a first gas inlet and a first gas outlet; the third flue gas delivery pipeline is provided close to the first gas delivery pipeline;
[0013] The first smoke outlet is connected to the second smoke inlet, and the second smoke outlet is connected to the third smoke inlet; the smoke discharged from the smoke exhaust channel enters the first smoke delivery pipeline through the first smoke inlet, is output from the first smoke outlet to the second smoke delivery pipeline, and is further transported to the third smoke delivery pipeline through the second smoke outlet; the smoke after heat exchange is output from the third smoke outlet;
[0014] External air enters the air delivery pipeline through the air inlet and is input into the boiler through the air outlet; the first gas outlet is connected to the second gas inlet, and the gas to be heated enters the first gas delivery pipeline through the first gas inlet and is input into the boiler through the first gas outlet; during the transportation of gas, air and flue gas, the gas / air and the flue gas exchange heat.
[0015] As an implementation manner of the present utility model, the first gas heat exchanger is a tubular heat exchanger.
[0016] As an implementation mode of the utility model, the air preheater is determined according to the size of the boiler unit; when the boiler unit is greater than or equal to 200MW, the air preheater adopts a rotary regenerative air preheater; when the boiler unit is less than 200MW, the air preheater adopts a tubular heat exchanger.
[0017] As an implementation manner of the present utility model, the second gas heat exchanger is a heat pipe heat exchanger.
[0018] As an embodiment of the utility model, the exhaust waste heat recovery series coupled heat exchange system is suitable for gas boilers that fully burn blast furnace gas, and is suitable for gas boilers that use blast furnace gas as main fuel and can also burn coke oven gas and / or converter gas and / or natural gas and / or other gas fuels.
[0019] The beneficial effect of the utility model is that the exhaust waste heat recovery series coupled heat exchange system of a gas boiler mainly burning blast furnace gas proposed by the utility model can significantly improve the boiler energy efficiency and save fuel consumption.
[0020] The utility model, without increasing the equipment investment and operation cost of the blast furnace gas heater, utilizes the heat transfer principle that the heat transfer efficiency is different when the heat exchanger is arranged at different positions, that is, the larger the heat transfer temperature difference, the higher the corresponding heat transfer efficiency. The utility model cleverly divides the original integral gas heater into two, that is, splits it into two smaller heat exchangers and arranges them at the front and rear ends of the air preheater respectively. The inlet gas flows through the rear and front gas heaters in turn, and after being heated in stages, it enters the boiler furnace and is mixed with the hot air flowing through the air preheater for combustion. Without increasing the total heat exchange area, the final exhaust gas temperature of the boiler is reduced to 120°C or even below under the same working condition, which can significantly improve the boiler energy efficiency and save fuel consumption.
[0021] In one use scenario of the utility model, the advantages of the utility model include:
[0022] (1) With almost no increase in equipment investment and operating costs, the final flue gas temperature can be reduced by 20°C or more year-on-year, and the boiler efficiency can be improved by about 1%.
[0023] (2) It is recommended to use a tubular heat exchanger in the front. First, under the same heat exchange conditions, the cost of tubular heat exchange equipment is lower than that of other types of heat exchange equipment. Secondly, it can take advantage of the favorable conditions of high gas and flue gas temperatures at the front. The metal wall temperature of the heat exchange tube is much higher than the acid dew point of flue gas or coal gas. Therefore, it can be made entirely of ordinary carbon steel materials to reduce the cost.
[0024] (3) The air preheater is determined according to the size of the boiler unit. For units with a capacity of more than 200MW (inclusive), a rotary regenerative type is used, and for units with a capacity of less than 200MW, a tubular heat exchanger is used.
[0025] (4) It is recommended to use a heat pipe heat exchanger at the rear. First, the low temperature difference characteristic of heat pipe heat transfer can be fully utilized, that is, the flue gas and coal gas can exchange heat even if the temperature difference is only a few degrees. Secondly, in the heat pipe heat exchanger, the coal gas and flue gas are exchanged in separate channels, that is, the two media can be completely isolated. The temperature of the coal gas and flue gas at the rear is relatively low, so corrosion is inevitable. Even if the heat pipe corrodes and perforates during production operation, it will not cause leakage between the media, thereby minimizing the safety risks that may be caused by coal gas leakage. Therefore, the machine can continue to operate until it is shut down for maintenance.
[0026] (5) The front and rear gas heaters are arranged in series with the air preheater and work in coordination with each other, so that the gas and air involved in the combustion are heated to the same high temperature, thereby ensuring the relatively optimal combustion efficiency and improving the boiler efficiency.
[0027] (6) The total heat exchange area of the series arrangement has hardly changed, the total flue gas flow resistance is unchanged, and the power consumption of the related flue gas extraction fan has basically remained unchanged, that is, the related energy consumption has not increased. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 It is a structural diagram of the existing boiler exhaust waste heat recovery system (pre-gas heater).
[0029] Figure 2 It is a structural diagram of the existing boiler exhaust waste heat recovery system (post-gas heater).
[0030] Figure 3 It is a structural schematic diagram of a series coupled heat exchange system for recovering waste heat from exhaust gas from a gas boiler in one embodiment of the utility model. DETAILED DESCRIPTION
[0031] The preferred embodiments of the present utility model are described in detail below with reference to the accompanying drawings.
[0032] In order to further understand the present invention, preferred embodiments of the present invention are described below in conjunction with examples. However, it should be understood that these descriptions are only for further illustrating the features and advantages of the present invention, rather than limiting the claims of the present invention.
[0033] The description in this section is only for several typical embodiments, and the present invention is not limited to the scope of the embodiments. The same or similar prior art means and some technical features in the embodiments are mutually replaced and are also within the scope of the present invention.
[0034] The term “connection” in the specification includes both direct connection and indirect connection.
[0035] The utility model discloses a series coupled heat exchange system for recovering waste heat from exhaust gas of a gas boiler mainly using blast furnace gas. Figure 3 This is a schematic diagram of the structure of the waste heat recovery of exhaust gas from a blast furnace gas boiler in one embodiment of the utility model; please refer to Figure 3 The waste heat recovery system includes a boiler 1, a smoke exhaust channel 2, a first gas heat exchanger 3, an air preheater 4 and a second gas heat exchanger 5.
[0036] The boiler 1 is connected to the smoke exhaust channel 2, and the smoke exhausted from the boiler 1 is output through the smoke exhaust channel 2; the output end of the smoke exhaust channel 2 can be connected to a chimney. The smoke exhaust channel 2 is provided with a first gas heat exchanger 3, an air preheater 4 and a second gas heat exchanger 5 in sequence, and the smoke is output through the first gas heat exchanger 3, the air preheater 4 and the second gas heat exchanger 5 in sequence.
[0037] In one embodiment of the utility model, the first gas heat exchanger is provided with a first flue gas delivery pipeline and a second gas delivery pipeline, the first flue gas delivery pipeline is provided with a first flue gas inlet and a first flue gas outlet, the second gas delivery pipeline is provided with a second gas inlet and a second gas outlet; the first flue gas delivery pipeline is arranged close to the second gas delivery pipeline.
[0038] The air preheater is provided with a second smoke conveying pipeline and an air conveying pipeline. The second smoke conveying pipeline is provided with a second smoke inlet and a second smoke outlet. The air conveying pipeline is provided with an air inlet and an air outlet. The second smoke conveying pipeline is arranged close to the air conveying pipeline.
[0039] The second gas heat exchanger is provided with a third flue gas delivery pipeline and a first gas delivery pipeline. The third flue gas delivery pipeline is provided with a third flue gas inlet and a third flue gas outlet. The first gas delivery pipeline is provided with a first gas inlet and a first gas outlet. The third flue gas delivery pipeline is arranged close to the first gas delivery pipeline.
[0040] The first smoke outlet is connected to the second smoke inlet, and the second smoke outlet is connected to the third smoke inlet; the smoke discharged from the smoke exhaust channel enters the first smoke delivery pipeline through the first smoke inlet, is output from the first smoke outlet to the second smoke delivery pipeline, and is further transported to the third smoke delivery pipeline through the second smoke outlet; the smoke after heat exchange is output from the third smoke outlet.
[0041] External air enters the air delivery pipeline through the air inlet and is input into the boiler through the air outlet; the first gas outlet is connected to the second gas inlet, and the gas to be heated enters the first gas delivery pipeline through the first gas inlet and is input into the boiler through the first gas outlet; during the transportation of gas, air and flue gas, the gas / air and the flue gas exchange heat.
[0042] In one embodiment, the first gas heat exchanger 3 and the second gas heat exchanger 5 can correspond to the total heat exchange area of the existing integral gas heat exchanger. However, since the utility model utilizes the different heat transfer temperature differences between flue gas and gas when the heat exchanger is arranged at different positions, the heat transfer efficiency is also different, that is, the larger the heat transfer temperature difference, the higher the corresponding heat transfer efficiency. The original integral gas heater is cleverly divided into two, that is, split into two smaller heat exchangers and arranged at the front and rear ends of the air preheater. The inlet gas flows through the rear and front gas heaters in turn, and after being heated in stages, it enters the boiler furnace and is mixed with the hot air flowing through the air preheater for combustion. Without increasing the total heat exchange area, the final exhaust gas temperature of the boiler under the same working condition is reduced to 120°C or even below, which can significantly improve the boiler energy efficiency and save fuel consumption.
[0043] The gas to be heated enters the first gas heat exchanger 3 after passing through the second gas heat exchanger 5, and enters the boiler 1 after being heated again by the first gas heat exchanger 3; the air enters the boiler 1 after being preheated by the air preheater 4, and can be mixed with the gas entering the boiler 1 for combustion.
[0044] In one usage scenario of the utility model, the smoke exhaust channel is provided with a first gas heat exchanger, an air preheater and a second gas heat exchanger in sequence along the flow of smoke. These three heat exchangers arranged in series in the flow of smoke constitute a simple combination of a gas heat exchanger and an air preheater that is different from a traditional design. Each of them has an optimal configuration of mixed combustion and waste heat recovery in its heat exchange surface layout design, that is, there is a close coupling relationship that influences each other.
[0045] The first gas heat exchanger, air preheater and second gas heat exchanger designed and arranged in sequence in the determined flue gas passage space at the rear of the gas boiler can be regarded as an integral heat exchange system, from which it can be determined that the flue gas condition before the heat exchange system, i.e., the flue gas volume Q fg and flue gas temperature t fgin(Boiler exhaust input value) and the expected flue gas condition after heat exchange, flue gas volume Q fg and flue gas temperature t fgout (expected output value), and air volume Q air And gas volume Q air , where the entire flue gas channel can be considered fully sealed without leakage, that is, the flue gas volume Q fg remain unchanged;
[0046] The optimal constraint condition for the combustion efficiency of gas and air mixture should be the gas outlet temperature t gasout ≤Air outlet temperature t airout , the extreme value, that is, the optimal value, is t gasout =t airout , where the gas and air inlet temperatures are t gasin =t airin is the known ambient temperature; the flue gas flow resistance of the three heat exchangers arranged in series should be the smallest, and the power consumption of the flue gas suction fan is the lowest at this time;
[0047] Under the above constraints, trial calculations are performed and iterative calculations are repeated. The specific examples are as follows:
[0048] According to experience, under this heat exchange condition, the air outlet temperature t airout It is expected to be around 250℃, so we first try to calculate the first assumption t airout =250℃, according to one of the above constraints: t gasout ≤250℃, the extreme value is 250℃, generally 30℃ heat exchange end difference is better and reasonable, thus determining the flue gas temperature t after heat exchange in the first gas heat exchanger and before heat exchange in the air preheater fg1 =280℃, from the known t fg1 ,t airout ,t airin According to the heat transfer principle, the heat transfer area S of the air preheater can be calculated. air And the smoke flow resistance R air and the flue gas temperature after the air preheater t fg2 , from the known t fg2 ,t fgout ,t gasin The heat exchange area S of the second gas heat exchanger can be calculated gas2 And the smoke flow resistance R gas2 and outlet gas temperature t gasout2 , from the known t gasout2 ,t gasout ,t fgin The heat exchange area S of the first gas heat exchanger can be calculated gas1 And the smoke flow resistance R gas1 and the flue gas temperature after the first gas heat exchanger t fg1’, thus completing the first trial calculation and obtaining a complete set of first trial calculation values of all inlet and outlet parameters of the first gas heat exchanger, air preheater and second gas heat exchanger, including heat exchange area, flue gas flow resistance, flue gas, air and gas inlet and outlet temperatures;
[0049] Please note that the assumption made in the first trial is t airout =250℃ and t airout Add 30℃ to get t fg1 =280℃ and the first trial calculation results in t fg1’ For comparison (Note: These two values refer to the flue gas temperature after the first gas heat exchanger and before the air preheater, where t fg1 is the assumed value and t fg1’ is the calculated value obtained by closed-loop calculation of the overall heat exchange system based on the previous assumptions). If t fg1’ >t fg1 Then, at the first air outlet temperature assumed value t airo =250℃, and then take a larger value such as 255℃; fg1’ <t fg1 Then take a smaller temperature such as 245℃, and then calculate a complete set of inlet and outlet parameters of the first gas heat exchanger, air preheater and second gas heat exchanger according to the above trial calculation process, including heat exchange area, flue gas flow resistance, flue gas air gas temperature;
[0050] The two sets of trial values were compared and analyzed, mainly comparing t fg1” With t fg1’ If the deviation is ≤5℃, the trial calculation ends. If the deviation is >5℃, a third trial calculation is performed according to the above calculation process. The iterative calculation is repeated continuously until the deviation between the assumed value of the flue gas temperature after the first gas heat exchanger and before the air preheater and the closed-loop trial calculation value is ≤5℃. It is considered that the most reasonable heat exchange area of the first gas heat exchanger, the air preheater and the second gas heat exchanger can be determined, and this combination is the best, that is, the optimal coupling relationship of this system is established.
[0051] The first coal gas heat exchanger 3 can be a tubular heat exchanger. The air preheater 4 can be determined according to the size of the boiler unit; when the boiler unit is greater than or equal to 200MW, the air preheater adopts a rotary regenerative air preheater; when the boiler unit is less than 200MW, the air preheater adopts a tubular heat exchanger. The second coal gas heat exchanger 5 can be a heat pipe heat exchanger; the second coal gas heat exchanger is provided with two groups of staggered contact heat exchange tubes; one end of the first group of heat exchange tubes is provided with a flue gas input port, and the other end is provided with a flue gas outlet; one side of the second group of heat exchange tubes is provided with a coal gas output port, and the other side is provided with a coal gas output port; the two groups of heat exchange tubes are staggered in contact, so that the coal gas and the flue gas exchange heat.
[0052] In one usage scenario of the utility model, the front gas heater, the middle air preheater and the rear gas heater constitute a flue gas waste heat recovery coupled heat exchanger system. The heat exchange design of these three heat exchangers is based on the determination of the target final flue gas temperature through iterative calculation to achieve the highest system efficiency by making the gas and air temperatures consistent after heating. This is the coupling principle of the three heat exchangers arranged in series and working in coordination in the utility model. The flue gas waste heat recovery coupled heat exchanger system of the utility model replaces the original large gas heater (with basically the same total heat exchange area) with two smaller gas heaters arranged in parallel. The heat exchange with the original air preheater can greatly recover the flue gas waste heat, thereby improving the boiler efficiency and reflecting significant energy-saving benefits.
[0053] In summary, the utility model proposes a series coupled heat exchange system for recovering waste heat from exhaust gas of a gas boiler mainly using blast furnace gas, which can significantly improve boiler energy efficiency and save fuel consumption.
[0054] The utility model, without increasing the equipment investment and operation cost of the blast furnace gas heater, utilizes the heat transfer principle that the heat transfer efficiency is different when the heat exchanger is arranged at different positions, that is, the larger the heat transfer temperature difference, the higher the corresponding heat transfer efficiency. The utility model cleverly divides the original integral gas heater into two parts, that is, splits it into two smaller heat exchangers and arranges them at the front and rear ends of the air preheater respectively. The inlet gas flows through the rear and front gas heaters in turn, and after being heated in stages, it enters the boiler furnace and is mixed with the hot air flowing through the air preheater for combustion. Without increasing the total heat exchange area, the final exhaust gas temperature of the boiler under the same working condition is reduced to 120°C or even below, which can significantly improve the boiler energy efficiency and save fuel consumption.
[0055] The technical features of the above-described embodiments may be arbitrarily combined. To make the description concise, not all possible combinations of the technical features in the above-described embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0056] The description and application of the utility model here are illustrative, and it is not intended to limit the scope of the utility model to the above-mentioned embodiments. The effects or advantages involved in the embodiments may not be embodied in the embodiments due to interference from various factors, and the description of the effects or advantages is not used to limit the embodiments. The deformation and changes of the embodiments disclosed here are possible, and the replacement of the embodiments and the various equivalent components are well known to those of ordinary skill in the art. It should be clear to those skilled in the art that the utility model can be implemented in other forms, structures, arrangements, proportions, and with other components, materials and parts without departing from the spirit or essential features of the utility model. Other deformations and changes can be made to the embodiments disclosed here without departing from the scope and spirit of the utility model.
Claims
1. A series coupled heat exchange system for recovering waste heat from exhaust gas of a gas boiler mainly using blast furnace gas. It is characterized in that The coupled heat exchange system includes a boiler, a smoke exhaust channel, a first gas heat exchanger, an air preheater and a second gas heat exchanger; The boiler is connected to a smoke exhaust channel, and smoke exhausted from the boiler is output through the smoke exhaust channel; the smoke exhaust channel includes a first gas heat exchanger, an air preheater and a second gas heat exchanger, and the air preheater is arranged between the first gas heat exchanger and the second gas heat exchanger; the smoke passes through the first gas heat exchanger, the air preheater and the second gas heat exchanger in sequence and is output; The gas to be heated enters the first gas heat exchanger after passing through the second gas heat exchanger, and enters the boiler after being heated again by the first gas heat exchanger; the air enters the boiler after being preheated by the air preheater, and can be mixed with the gas entering the boiler for combustion; The first gas heat exchanger is provided with a first flue gas delivery pipeline and a second gas delivery pipeline, the first flue gas delivery pipeline is provided with a first flue gas inlet and a first flue gas outlet, the second gas delivery pipeline is provided with a second gas inlet and a second gas outlet; the first flue gas delivery pipeline is arranged close to the second gas delivery pipeline; The air preheater is provided with a second smoke conveying pipeline and an air conveying pipeline, the second smoke conveying pipeline is provided with a second smoke inlet and a second smoke outlet, the air conveying pipeline is provided with an air inlet and an air outlet; the second smoke conveying pipeline is provided close to the air conveying pipeline; The second gas heat exchanger is provided with a third flue gas delivery pipeline and a first gas delivery pipeline, the third flue gas delivery pipeline is provided with a third flue gas inlet and a third flue gas outlet, the first gas delivery pipeline is provided with a first gas inlet and a first gas outlet; the third flue gas delivery pipeline is provided close to the first gas delivery pipeline; The first smoke outlet is connected to the second smoke inlet, and the second smoke outlet is connected to the third smoke inlet; the smoke discharged from the smoke exhaust channel enters the first smoke delivery pipeline through the first smoke inlet, is output from the first smoke outlet to the second smoke delivery pipeline, and is further transported to the third smoke delivery pipeline through the second smoke outlet; the smoke after heat exchange is output from the third smoke outlet; External air enters the air delivery pipeline through the air inlet and is input into the boiler through the air outlet; the first gas outlet is connected to the second gas inlet, and the gas to be heated enters the first gas delivery pipeline through the first gas inlet and is input into the boiler through the first gas outlet; during the transportation of gas, air and flue gas, the gas / air and the flue gas exchange heat; The air preheater is determined according to the size of the boiler unit; when the boiler unit is greater than or equal to 200MW, the air preheater adopts a rotary regenerative air preheater; when the boiler unit is less than 200MW, the air preheater adopts a tubular heat exchanger.
2. According to claim 1, the series coupled heat exchange system for recovering waste heat from exhaust gas of a gas boiler mainly using blast furnace gas, Features: The first coal gas heat exchanger is a tubular heat exchanger.
3. According to claim 1, the series coupled heat exchange system for recovering waste heat from exhaust gas of a gas boiler mainly using blast furnace gas, Features: The second coal gas heat exchanger is a heat pipe heat exchanger.
4. According to claim 1, the series coupled heat exchange system for recovering waste heat from exhaust gas of a gas boiler mainly using blast furnace gas, Features: The exhaust waste heat recovery series coupled heat exchange system is suitable for gas boilers that fully burn blast furnace gas, and is also suitable for gas boilers that use blast furnace gas as main fuel and can also burn coke oven gas and / or converter gas and / or natural gas and / or other gas fuels.