Integrated mid-partition construction trolley
Through the design of the integrated middle partition wall construction trolley, the driving components and sliding mold drive parts are used to form a closed cast cavity, which solves the problem of slurry running caused by the difficulty of fitting the inner wall of the middle guide hole, and improves the construction Quality and safety.
Patent Information
- Application Number
- CN202420829280.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-19
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2034-04-19
AI Technical Summary
In the construction of the intermediate guide hole method, it is difficult for the middle partition wall formwork to effectively fit the inner wall of the intermediate guide hole, resulting in the concrete being easily slurry during the pouring process, affecting the construction quality.
An integrated middle partition wall construction trolley was designed, using the driving component to drive the middle partition wall formwork and the sliding mold drive member to form a closed cast cavity, and the formwork is tightly connected to the inner wall of the middle guide hole through the sliding groove and sealing gasket. Contact to reduce slurry run.
Effectively prevent concrete from leaking during pouring, ensure that the middle partition wall formwork is not easy to slurry, and improve the safety and quality of construction.
Smart Images

Figure CN222025793U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of tunnel construction equipment, and in particular to an integrated middle partition wall construction trolley. Background Art
[0002] For the joint arch tunnel excavated in the soft soil layer, the middle guide tunnel method is generally used for construction. In general, the middle guide tunnel method is to first excavate a middle guide tunnel with a smaller inner diameter cross-sectional area, then cast the middle partition wall in the middle guide tunnel, and finally excavate the main tunnel with a larger cross-sectional area on both sides of the middle partition wall. On the one hand, this construction plan can understand the actual situation of the soil layer in advance through the middle guide tunnel, providing a reference for the construction of the main tunnel. On the other hand, the constructed middle partition wall serves as the main stress point during the construction of the main tunnel, ensuring the safety of the main tunnel construction.
[0003] In the existing related technologies, for the construction of the middle partition wall, a formwork trolley is generally used to assist the pouring of the middle partition wall. Specifically, the formwork trolley includes a trolley frame, a left formwork and a right formwork. The left formwork and the right formwork are both installed on the trolley frame, and the left formwork and the right formwork are respectively located on both sides of the middle partition wall, and the left formwork and the right formwork are respectively arranged corresponding to the surface shapes on both sides of the middle partition wall. A left pouring port is opened through the left formwork, and a right pouring port is opened through the right formwork. The trolley frame is equipped with a left cylinder and a right cylinder, the left cylinder is used to drive the left formwork to move in a direction close to the right formwork, and the right cylinder is used to drive the right formwork to move in a direction close to the left formwork.
[0004] When constructing the middle partition wall, it is necessary to first tie the steel cage at the location of the middle partition wall, then make the left formwork and the right formwork close to the location of the outer wall of the middle partition wall and install wooden formwork at the ends of the left formwork and the right formwork according to actual needs to form a casting cavity, and finally pour concrete into the casting cavity through the left casting port and the right casting port to complete the construction of the middle partition wall.
[0005] In view of the above-mentioned related technologies, the cross-sectional shape of the middle guide hole needs to be calculated and designed according to the actual situation of the soil layer to ensure that the inner wall of the middle guide hole is evenly stressed. In the actual construction process, the left and right templates are difficult to effectively fit the inner wall of the middle guide hole, making it easy for concrete to seep out of the pouring cavity and cause slurry leakage. Summary of the invention
[0006] In order to prevent the slurry from leaking out of the template of the middle partition wall, the present application provides an integrated middle partition wall construction trolley.
[0007] The integrated partition wall construction trolley provided in this application adopts the following technical solution:
[0008] An integrated middle partition wall construction trolley, comprising a trolley frame, a middle partition wall template and a driving assembly, wherein the middle partition wall templates are provided in plurality, the plurality of the middle partition wall templates are all mounted on the trolley frame, the plurality of the middle partition wall templates are divided into two groups, the two groups of the middle partition wall templates are respectively arranged corresponding to the surface shapes of both sides of the middle partition wall, and the driving assembly is used to drive the two groups of the middle partition wall templates to move in a direction of approaching or moving away from each other;
[0009] The middle partition wall template is slidably matched with a first sliding template, and the trolley frame is installed with a first sliding template driving component, and the sliding template driving component is used to drive the first sliding template to move towards or away from the middle partition wall template.
[0010] By adopting the above technical solution, when constructing the middle partition wall, the driving component drives the two groups of middle partition wall formworks to move toward the position of the outer wall of the middle partition wall, and then the first sliding formwork driving component drives the first sliding formwork to slide, so that the middle partition wall formwork and the first sliding formwork are tightly fitted against the inner wall of the middle guide hole, thereby forming a closed casting cavity, making it difficult for the formwork of the middle partition wall to leak slurry.
[0011] Optionally, the middle partition wall template is provided with a first sliding groove, and the first sliding template is slidably engaged with the first sliding groove.
[0012] By adopting the above technical solution, when the driving component drives the middle partition wall template to move toward the position of the outer wall of the middle partition wall, the first sliding template slides along the first sliding groove, which is conducive to ensuring the stability of the first sliding template during sliding movement.
[0013] Optionally, the first sliding template is installed with a first sealing gasket, and the first sealing gasket is located at an end away from the middle partition wall template.
[0014] By adopting the above technical solution, after the driving component drives the middle partition wall template to move toward the position of the outer wall of the middle guide hole, the first sealing gasket is tightly fitted against the inner wall of the middle guide hole, making it difficult for concrete to seep out of the casting cavity, thereby making the template of the middle partition wall less likely to leak slurry.
[0015] Optionally, the middle partition wall formwork is slidably cooperated with a second sliding formwork, the first sliding formwork and the second sliding formwork are respectively located at the top and bottom of the middle partition wall, and the trolley frame is installed with a second sliding formwork driving component, and the second sliding formwork driving component is used to drive the second sliding formwork to move toward or away from the middle partition wall formwork.
[0016] By adopting the above technical solution, the first sliding formwork and the second sliding formwork are simultaneously tightly fitted against the inner wall of the middle guide hole, making the formwork of the middle partition wall less likely to leak slurry, and also reducing the slip amount of the first sliding formwork and the second sliding formwork, thereby reducing the occurrence of structural instability caused by excessive single slip amount of the first sliding formwork or the second sliding formwork.
[0017] Optionally, the second sliding template is installed with a second sealing gasket, and the second sealing gasket is located at an end away from the middle partition wall template.
[0018] By adopting the above technical solution, after the driving component drives the middle partition wall template to move toward the position of the outer wall of the middle guide hole, the second sealing gasket is tightly fitted against the inner wall of the middle guide hole, making it difficult for concrete to seep out of the casting cavity, thereby making the template of the middle partition wall less likely to leak slurry.
[0019] Optionally, a tightening elastic member is provided between the middle partition wall template and the second sliding template, and two ends of the tightening elastic member are respectively installed on the middle partition wall template and the second sliding template.
[0020] By adopting the above technical solution, the elastic member is pressed so that the second sliding template is always pressed against the inner wall of the middle guide hole, so that the second sliding template is not easily loosened due to the bottom side pressure of concrete, thereby making the template of the middle partition wall less likely to leak slurry.
[0021] Optionally, the trolley frame is provided with a support assembly, the support assembly includes a support seat and a support driving member, the support seat is mounted on the trolley frame, and the support driving member is used to drive the support seat to move towards or away from the trolley frame.
[0022] By adopting the above technical solution, the support driving member drives the support seat to fit tightly against the inner wall of the middle guide hole, so that the trolley frame uses the inner wall of the middle guide hole as a fulcrum, thereby making the trolley frame less likely to tip over due to the lateral pressure of concrete.
[0023] Optionally, the support assembly further includes a support wheel, and the support wheel is rotatably engaged with the support seat.
[0024] By adopting the above technical solution, when the trolley frame is moved, the supporting wheel rolls on the inner wall of the middle guide hole, so that the trolley frame moves stably.
[0025] In summary, the present application includes at least one of the following beneficial technical effects:
[0026] 1. When constructing the middle partition wall, the driving assembly drives the two sets of middle partition wall formwork to move toward the location of the outer wall of the middle partition wall, and then the first sliding formwork driving member drives the first sliding formwork to slide, so that the middle partition wall formwork and the first sliding formwork are tightly fitted against the inner wall of the middle guide hole, thereby forming a closed casting cavity, making it difficult for the formwork of the middle partition wall to leak slurry.
[0027] 2. The elastic member is pressed tightly so that the second sliding template is always pressed tightly against the inner wall of the middle guide hole, so that the second sliding template is not easy to loosen due to the bottom side pressure of the concrete, thereby making the template of the middle partition wall less likely to leak slurry.
[0028] 3. When the trolley frame is moved, the supporting wheel rolls on the inner wall of the middle guide hole, so that the trolley frame moves stably. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] Figure 1 It is an overall schematic diagram of the overall structure of the embodiment of the present application.
[0030] Figure 2 It is a schematic diagram of casting the partition wall formwork in the embodiment of the present application.
[0031] Figure 3 yes Figure 2 An enlarged schematic diagram of part A.
[0032] Figure 4 yes Figure 2 An enlarged schematic diagram of part B.
[0033] Explanation of the reference numerals in the accompanying drawings: 1. trolley frame; 11. driving jack; 12. first sliding form driving member; 13. second sliding form driving member; 14. supporting seat; 15. supporting driving member; 16. supporting rotating wheel; 2. middle partition wall formwork; 201. first slide groove; 202. second slide groove; 21. casting interface; 22. first sliding formwork; 221. first sealing gasket; 23. second sliding formwork; 231. second sealing gasket; 24. tightening elastic member; 3. trolley sliding assembly; 31. lifting jack; 32. sliding wheel seat; 33. track wheel. DETAILED DESCRIPTION
[0034] The following is combined with Figure 1-4 This application is described in further detail.
[0035] The embodiment of the present application discloses an integrated partition wall construction trolley. Figure 1 The integrated middle partition wall construction trolley includes a slide rail, a trolley frame 1, a middle partition wall template 2 and a driving component.
[0036] Reference Figure 1 , there are two slide rails, and the two slide rails are distributed in the horizontal direction. The slide rails extend along the extension direction of the middle guide hole, and the slide rails are fixedly installed on the inner wall of the middle guide hole. Specifically, the slide rails are fixedly installed on the ground. The trolley frame 1 is provided with a plurality of trolley sliding assemblies 3, and each slide rail corresponds to at least two trolley sliding assemblies 3;
[0037] The trolley sliding assembly 3 includes a lifting jack 31, a sliding wheel seat 32 and a track wheel 33. The lifting jack 31 is arranged in the vertical direction, the top rod of the lifting jack 31 is fixedly installed on the trolley frame 1, the sliding wheel seat 32 is fixedly installed on the cylinder of the lifting jack 31, and the track wheel 33 is rotationally matched with the sliding wheel seat 32 and rollingly matched with the slide rail, so that the trolley frame 1 can slide stably along the slide rail.
[0038] Reference Figure 1 , there are several middle partition wall formworks 2, and the several middle partition wall formworks 2 are divided into two groups, and the two groups of middle partition wall formworks 2 are respectively arranged corresponding to the surface shapes on both sides of the middle partition wall. Specifically, in the embodiment of the present application, there are two middle partition wall formworks 2, and the two middle partition wall formworks 2 are distributed in the horizontal direction, and the cross-sections of the two middle partition wall formworks 2 are nearly arc-shaped. In addition, the middle partition wall formwork 2 is installed with several casting interfaces 21, so that the construction personnel can connect the concrete casting pipe to the casting interface 21, so as to cast the concrete into the casting cavity between the two middle partition wall formworks 2 through the casting interface 21. The casting interface 21 can be any one or more structures known to those skilled in the art, which will not be described in detail here.
[0039] Reference Figure 1 The driving assembly is used to drive the two middle partition wall templates 2 to move toward or away from each other. Specifically, in the embodiment of the present application, the driving assembly includes a plurality of driving jacks 11, and the plurality of driving jacks 11 are divided into two groups, and the two groups of driving jacks 11 are respectively arranged in a one-to-one correspondence with the two middle partition wall templates 2. The cylinder of the driving jack 11 is hingedly matched with the trolley frame 1, and the rod of the driving jack 11 is hingedly matched with the middle partition wall template 2, so that the two middle partition wall templates 2 can move toward or away from each other by extending or retracting the rod of the driving jack 11.
[0040] Reference Figure 2 and Figure 3 , the middle partition wall formwork 2 is provided with a first slide groove 201, the first slide groove 201 is located at the top of the middle partition wall formwork 2, and the first slide groove 201 is extended in an arc shape. A first sliding template 22 is provided in the first slide groove 201, one end of the first sliding template 22 is slidably fitted in the first slide groove 201, and the other end of the first sliding template 22 is fixedly installed with a first sealing gasket 221, so that the first sealing gasket 221 can be tightly fitted to the inner wall of the middle guide hole, thereby reducing the occurrence of slurry leakage. In addition, the trolley frame 1 is equipped with a first sliding template drive 12, and the first sliding template drive 12 is located at the top of the trolley frame 1. Specifically, in the embodiment of the present application, the type of the first sliding template drive 12 is a cylinder. The cylinder body of the first sliding form driving member 12 is hingedly matched to the trolley frame 1, and the rod body of the first sliding form driving member 12 is hingedly matched to the first sliding form plate 22, so that the first sliding form plate 22 can slide along the first sliding groove 201 by extending or retracting the rod body of the first sliding form driving member 12.
[0041] Reference Figure 2 and Figure 4, the middle partition wall formwork 2 is provided with a second slide groove 202, the second slide groove 202 is located at the bottom of the middle partition wall formwork 2, and the second slide groove 202 is extended in an arc shape. A second sliding template 23 is provided in the second slide groove 202, one end of the second sliding template 23 is slidably fitted in the second slide groove 202, and the other end of the second sliding template 23 is fixedly installed with a second sealing gasket 231, so that the second sealing gasket 231 can be tightly fitted to the inner wall of the middle guide hole, thereby reducing the occurrence of slurry leakage. In addition, the trolley frame 1 is equipped with a second sliding template drive 13, and the second sliding template drive 13 is located at the bottom of the trolley frame 1. Specifically, in the embodiment of the present application, the type of the second sliding template drive 13 is a cylinder. The cylinder body of the second sliding form driving member 13 is hingedly matched to the trolley frame 1, and the rod body of the second sliding form driving member 13 is hingedly matched to the second sliding form plate 23, so that the second sliding form plate 23 can slide along the second sliding groove 202 by extending or retracting the rod body of the second sliding form driving member 13.
[0042] Reference Figure 4 , a pressing elastic member 24 is provided in the second slide groove 202. Specifically, in the embodiment of the present application, the pressing elastic member 24 is a spring. One end of the pressing elastic member 24 is fixedly mounted on the inner wall of the second slide groove 202, and the other end of the pressing elastic member 24 is fixedly mounted on the second sliding template 23, so that the second sliding template 23 always has a tendency to move toward the inner wall of the middle guide hole, so that concrete is not easy to seep out from the gap between the second sliding template 23 and the middle guide hole.
[0043] Reference Figure 1 The trolley frame 1 is provided with a plurality of supporting components, and the plurality of supporting components are divided into two groups, and the two groups of supporting components are respectively arranged in one-to-one correspondence with the two middle partition wall templates 2;
[0044] The support assembly includes a support seat 14, a support drive 15 and a support wheel 16. In the embodiment of the present application, the type of the support drive 15 is a jack. The support drive 15 is arranged in the horizontal direction, the cylinder of the support drive 15 is fixedly installed on the trolley frame 1, and the support seat 14 is fixedly installed on the top rod of the support drive 15. The support wheel 16 is rotatably matched with the support seat 14, and the axis of the support wheel 16 is arranged in the vertical direction, and the support wheel 16 is elastic, so that when the trolley frame 1 slides along the slide rail, the support wheel 16 rolls on the inner wall of the middle guide hole, so that the trolley frame 1 moves stably.
[0045] The implementation principle of an integrated middle partition wall construction trolley in the embodiment of the present application is:
[0046] S1, tie the steel cage of the middle partition wall;
[0047] S2, the support driving member 15 makes the support rotating wheel 16 fit tightly against the inner wall of the middle guide hole, and the trolley frame 1 moves along the slide rail to the position of the steel cage of the middle partition wall;
[0048] S3, driving the jack 11 to drive the two middle partition wall templates 2 to move towards or away from each other, and then fixing the wooden templates at both ends of the middle partition wall template 2 according to the actual working conditions;
[0049] S4, the first sliding form driving member 12 drives the first sliding form plate 22 to move along the first sliding groove 201 until the first sealing gasket 221 is tightly fitted against the inner wall of the middle guide hole, and the second sliding form driving member 13 drives the second sliding form plate 23 to move along the second sliding groove 202 until the second sealing gasket 231 is tightly fitted against the inner wall of the middle guide hole, thereby forming a closed casting cavity;
[0050] S5. Pour concrete into the pouring cavity through the pouring interface 21.
[0051] Therefore, through the first sealing gasket 221 of the first sliding formwork 22 and the second sealing gasket 231 of the second sliding formwork 23, the concrete in the casting cavity is not easy to seep out from the casting cavity, so that the formwork of the middle partition wall is not easy to leak slurry.
[0052] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. An integrated partition wall construction trolley, characterized by: It comprises a trolley frame (1), a middle partition wall template (2) and a driving assembly, wherein the middle partition wall template (2) is provided with a plurality of them, and the plurality of the middle partition wall templates (2) are all mounted on the trolley frame (1), and the plurality of the middle partition wall templates (2) are divided into two groups, and the two groups of the middle partition wall templates (2) are respectively arranged corresponding to the surface shapes of the two sides of the middle partition wall, and the driving assembly is used to drive the two groups of the middle partition wall templates (2) to move in a direction of approaching or moving away from each other; The middle partition wall template (2) is slidably matched with a first sliding template (22), and the trolley frame (1) is installed with a first sliding template driving component (12), and the sliding template driving component is used to drive the first sliding template (22) to move in a direction close to or away from the middle partition wall template (2).
2. The integrated middle partition wall construction trolley according to claim 1, characterized in that: The middle partition wall template (2) is provided with a first sliding groove (201), and the first sliding template (22) is slidably matched in the first sliding groove (201).
3. The integrated middle partition wall construction trolley according to claim 1, characterized in that: The first sliding template (22) is installed with a first sealing gasket (221), and the first sealing gasket (221) is located at an end away from the middle partition wall template (2).
4. The integrated middle partition wall construction trolley according to claim 1, characterized in that: The middle partition wall template (2) is slidably matched with a second sliding template (23); the first sliding template (22) and the second sliding template (23) are respectively located at the top and bottom of the middle partition wall; the trolley frame (1) is installed with a second sliding template driving component (13); the second sliding template driving component (13) is used to drive the second sliding template (23) to move in a direction close to or away from the middle partition wall template (2).
5. The integrated middle partition wall construction trolley according to claim 4, characterized in that: The second sliding template (23) is installed with a second sealing gasket (231), and the second sealing gasket (231) is located at an end away from the middle partition wall template (2).
6. The integrated middle partition wall construction trolley according to claim 4, characterized in that: A tightening elastic member (24) is provided between the middle partition wall template (2) and the second sliding template (23), and two ends of the tightening elastic member (24) are respectively mounted on the middle partition wall template (2) and the second sliding template (23).
7. The integrated middle partition wall construction trolley according to claim 1, characterized in that: The trolley frame (1) is provided with a support assembly, the support assembly comprising a support seat (14) and a support driving member (15), the support seat (14) is mounted on the trolley frame (1), and the support driving member (15) is used to drive the support seat (14) to move in a direction approaching or away from the trolley frame (1).
8. The integrated middle partition wall construction trolley according to claim 7, characterized in that: The support assembly further comprises a support rotating wheel (16), and the support rotating wheel (16) is rotatably matched with the support seat (14).
Citation Information
Cited By
Construction system suitable for mid-partition wall of double-arch tunnel
CN121497428A
Middle partition wall construction method suitable for double-arch tunnel
CN121611508A