Concrete pouring equipment in limited space
By designing a concrete pouring equipment that is easy to move, combined with heating insulation and uniform vibration technology, the problem of uneven pouring in confined space is solved, and the firmness and pouring efficiency of the structure are improved.
Patent Information
- Application Number
- CN202420671618.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-02
- Publication Date
- 2024-11-22
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The prior art cannot realize casting work at different heights in confined spaces, and the chute structure is not convenient for movement and installation, resulting in poor uniform oscillation of mud, easy to cause casting leakage, and reduce structural firmness.
A concrete pouring equipment is designed, using a frame and universal wheel to facilitate movement, the mud tank is continuously heated and heated, and the U-shaped groove plate is adjusted through the electric cylinder piston rod and the vibrating motor, combining the steel rope and the vibrating rod to achieve uniform casting. Manually turn the pull plate to adjust the casting assembly to ensure even mud delivery.
It realizes convenient movement of equipment and uniform pouring of mud, ensuring the normal use of mud in cold weather, and improving the firmness of the structure and pouring efficiency.
Smart Images

Figure CN222045084U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of concrete pouring equipment, and more specifically, to a concrete pouring equipment in a confined space. Background Art
[0002] In building construction, due to narrow site, delayed drawings or process adjustments, such as the locations where equipment foundations, pump foundations, cable trenches, pipe trenches, etc. under the water pump room, electrical room or rolling line platform need to be poured, if the construction sequence is disordered, after the main construction of the construction structure is completed, there will be confined spaces in the subsequent construction process that need to be poured. However, the pouring work in these confined space locations cannot be carried out on site by concrete pouring equipment. At the same time, manual filling and pouring work is slow in efficiency. Therefore, towed mud pumps are often used. Towed mud pumps still need to be connected back and forth and need to be used in conjunction with mud tanker equipment. Therefore, their use is still limited. The existing announcement number is CN212249246U. A spatial concrete pouring guiding device adopts a chute to complete the transfer and pouring of concrete in a confined space, solving the problem that the pump pipe cannot be extended into the lower part of the completed structure to reach the pouring position. In view of the above-mentioned related technologies, the utility model inventor believes that the following defects still exist: although the pouring device in the comparative literature can realize some confined space pouring work by adopting a chute, it cannot realize confined space pouring work at different heights, and the overall structure of the chute is not convenient for movement and installation and is limited to the confined space. At the same time, it cannot achieve the effect of oscillating and uniforming the poured slurry during the pouring process, and it is easy to have a leaky pouring phenomenon, that is, a hollowing phenomenon, which leads to a reduction in the firmness of the structure. In view of this, we propose a concrete pouring equipment in a confined space. Utility Model Content
[0003] 1. Technical problems to be solved
[0004] The purpose of the present application is to provide a confined space concrete pouring equipment, which solves the problem that the pouring device in the comparative literature in the above-mentioned background technology can realize some confined space pouring work by adopting a chute, but cannot realize confined space pouring work at different heights, and the overall structure of the chute is not convenient to move and install and is limited to the confined space. At the same time, it cannot achieve the technical problem of oscillating and uniforming the poured mud during the pouring process, and leaking pouring, that is, hollowing phenomenon, is prone to occur, resulting in reduced structural firmness. The overall equipment is conveniently moved to the vicinity of the pouring area, and the mud tank is filled with mud, which can realize continuous heating and insulation treatment, and continuous stirring and uniform treatment, so that the mud can be used normally in cold weather. The piston rod of the electric cylinder drives the U-shaped groove plate to rise and fall, and the steel rope vibration motor and the mud pipe output end are adjusted vertically together. At the same time, the pull plate is manually rotated to rotate and adjust the U-shaped groove plate along the top of the piston rod of the electric cylinder, so that the grouting in the confined space is uniform, and the technical effect of uniform treatment is achieved by vibrating the vibrating rod.
[0005] 2. Technical solution
[0006] The technical solution of the present application provides a concrete pouring equipment in a confined space, comprising: a frame, four universal wheels are rotatably mounted on the frame, a mud tank, a water tank and a bracket are fixedly mounted on the frame, a power supply device is detachably mounted on the bracket, a control cabinet and a heating device are detachably mounted on the water tank and the bracket, the heating device is electrically connected to two heating rods, the heating rods extend into the water tank, a lifting mechanism is mounted on the frame, the lifting mechanism comprises an electric cylinder, the electric cylinder is fixedly mounted on the upper surface of the frame, the piston rod of the electric cylinder is rotatably connected to a U-shaped groove plate and a hinge ring, the hinge ring is connected to A pulling plate is rotatably connected between the U-shaped groove plates, and a casting assembly is installed on the U-shaped groove plate. The casting assembly includes a steel rope and a mud pump. The upper end of the steel rope is fixedly connected to the U-shaped groove plate, and the bottom end of the steel rope is fixedly connected to the upper plate. Two sliding rods and two screw rods are slidably connected to the upper plate. The screw rods are located on the upper surface of the upper plate and are threaded with nuts. The mud pump is fixedly connected to two mud pipes, one of which is fixedly connected to the bottom of the mud tank, and the other mud pipe is connected along the U-shaped groove plate and passes through the upper plate and the lower plate in sequence. A vibration motor is fixedly installed on the lower plate, and the vibration motor is transmission-connected to a vibration rod.
[0007] By adopting the above technical scheme, the frame can be conveniently moved to a position near the area where pouring is required through four universal wheels, the mud tank can be filled with mud, a water tank is fixedly installed on the frame, and the water tank is filled with water. The heating device heats the water in the water tank through two heating rods, and heats the gas in the water tank above the water surface. The heated gas can be transported to the mud tank to heat and insulate the mud. The mud pump draws mud from the mud tank through the mud pipe, and transports it to the confined space through another mud pipe. In order to realize the confined space pouring work, the piston rod of the electric cylinder drives the U-shaped groove plate to rise and fall, and the upper plate, the lower plate and the vibration motor can be driven by the steel rope to adjust vertically together, and the discharge end of the other mud pipe can be lifted and lowered together. At the same time, by manually rotating the pull plate, the U-shaped groove plate can be rotated and adjusted along the top position of the piston rod of the electric cylinder, so that the grouting in the confined space is uniform, and it can be vibrated uniformly by the vibrating rod.
[0008] Optionally, a feeding pipe and a first motor are fixedly provided on the mud tank, and a plurality of stirring rods are drivingly connected to an output end of the first motor, and the stirring rods are rotatably arranged in the mud tank.
[0009] By adopting the above technical solution, the pre-produced mud can be fed into the mud tank through the feeding pipe by the conveying equipment, and the first motor can be started to achieve shaking processing through multiple stirring rods.
[0010] Optionally, an air suction pump is fixedly installed on the upper surface of the water tank, and the air suction pump is fixedly connected to two connecting pipes, one connecting pipe is connected to the water tank, and the other connecting pipe is fixedly connected to an aeration pipe, and the aeration pipe is fixedly arranged in the mud tank.
[0011] By adopting the above technical solution, the suction pump extracts high-temperature gas from the inside of the water tank through the connecting pipe, and evenly transports it to the mud tank through the aeration pipe to heat the mud. The water tank is provided with a ventilation device, so that new external gas can be added when extracting high-temperature gas.
[0012] Optionally, the mud pump is fixed on the upper surface of the frame, the sliding rod and the screw rod are respectively arranged at the four corners of the upper plate, and the sliding rod and the screw rod are staggered.
[0013] By adopting the above technical solution, the distance between the lower plate and the upper plate can be adjusted by rotating the nut, thereby adjusting the lowest position of the vibrating rod, so as to adapt to different confined space casting operations.
[0014] Optionally, the power supply device is electrically connected to the first motor, the electric cylinder, the vibration motor, the heating device and the control cabinet respectively.
[0015] By adopting the above technical solution, the power supply device can provide power support for the first motor, the electric cylinder, the vibration motor, the heating device and the control cabinet.
[0016] 3. Beneficial effects
[0017] One or more technical solutions provided in the technical solution of the present application have at least the following technical effects or advantages: the overall equipment can be easily moved to the vicinity of the pouring area, the mud tank is filled with mud, and continuous heating and insulation treatment can be achieved, and continuous stirring and uniform treatment can be achieved, so that the mud can be used normally in cold weather, the piston rod of the electric cylinder drives the U-shaped groove plate to rise and fall, and the steel rope vibration motor and the mud pipe output end are adjusted vertically together, and the pull plate is manually rotated at the same time to rotate and adjust the U-shaped groove plate along the top of the piston rod of the electric cylinder, so that the grouting in the confined space is uniform, and the uniform treatment is achieved through vibration by the vibrating rod. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 This is a schematic diagram of the overall structure of a concrete pouring device in a confined space disclosed in a preferred embodiment of the present application;
[0019] Figure 2 A schematic diagram of the structure of a slurry tank, a water tank, a lifting mechanism and a pouring assembly of a concrete pouring equipment in a confined space disclosed in a preferred embodiment of the present application;
[0020] Figure 3 A concrete pouring device in a confined space disclosed in a preferred embodiment of the present application Figure 2 The enlarged structural diagram at A in the middle;
[0021] Explanation of the numbers in the figure: 1. Frame; 11. Universal wheel; 2. Mud tank; 21. Feeding pipe; 22. First motor; 23. Stirring rod; 3. Water tank; 31. Suction pump; 32. Connecting pipe; 33. Aeration pipe; 4. Power supply device; 41. Bracket; 5. Lifting mechanism; 51. Electric cylinder; 52. U-shaped groove plate; 53. Hinge ring; 54. Pull plate; 6. Casting assembly; 61. Mud pump; 62. Mud pipe; 63. Steel rope; 64. Upper plate; 65. Lower plate; 66. Sliding rod; 67. Screw rod; 671. Nut; 68. Vibration motor; 69. Vibration rod; 7. Heating device; 71. Heating rod; 8. Control cabinet. DETAILED DESCRIPTION
[0022] The present application is further described in detail below in conjunction with the accompanying drawings.
[0023] Reference Figures 1 to 3The embodiment of the present application provides a concrete pouring device in a confined space, comprising: a frame 1, four universal wheels 11 are rotatably mounted on the frame 1, a mud tank 2, a water tank 3 and a bracket 41 are fixedly mounted on the frame 1, a power supply device 4 is detachably mounted on the bracket 41, a control cabinet 8 and a heating device 7 are detachably mounted on the water tank 3 and the bracket 41, the heating device 7 is electrically connected to two heating rods 71, the heating rod 71 extends into the water tank 3, a lifting mechanism 5 is mounted on the frame 1, the lifting mechanism 5 includes an electric cylinder 51, the electric cylinder 51 is fixedly arranged on the upper surface of the frame 1, and the piston of the electric cylinder 51 The rod is rotatably connected with a U-shaped groove plate 52 and a hinge ring 53, and a pull plate 54 is rotatably connected between the hinge ring 53 and the U-shaped groove plate 52. A casting assembly 6 is installed on the U-shaped groove plate 52, and the casting assembly 6 includes a steel rope 63 and a mud pump 61. The upper end of the steel rope 63 is fixedly connected to the U-shaped groove plate 52, and the lower end of the steel rope 63 is fixedly connected to an upper plate 64. Two sliding rods 66 and two screw rods 67 are slidably connected to the upper plate 64. The screw rod 67 is located on the upper surface of the upper plate 64 and is threadedly sleeved with a nut 671. The mud pump 61 is fixedly connected with two mud pipes 62, one mud pipe 62 is fixedly connected to the bottom of the mud tank 2, and the other mud pipe 62 is fixedly connected to the bottom of the mud tank 2. The slurry pipe 62 is connected along the U-shaped groove plate 52, and passes through the upper plate 64 and the lower plate 65 in sequence. A vibration motor 68 is fixedly installed on the lower plate 65, and the vibration motor 68 is transmission-connected to a vibration rod 69. The frame 1 can be conveniently moved to a position near the area where pouring is required through four universal wheels 11. The mud tank 2 can be filled with mud. A water tank 3 is fixedly installed on the frame 1, and the water tank 3 is filled with water. The heating device 7 heats the water in the water tank 3 through two heating rods 71, so that the gas in the water tank 3 above the water surface is heated, and the heated gas can be transported to the mud tank 2 to heat and keep the mud warm. In principle, the mud pump 61 draws mud from the mud tank 2 through the mud pipe 62, and transports it to the confined space through another mud pipe 62. In order to realize the confined space pouring work, the piston rod of the electric cylinder 51 drives the U-shaped groove plate 52 to rise and fall, and the upper plate 64, the lower plate 65 and the vibration motor 68 can be driven by the steel rope 63 to adjust vertically, and the discharge end of the other mud pipe 62 can be lifted and lowered together. At the same time, by manually rotating the pull plate 54, the U-shaped groove plate 52 can be rotated and adjusted along the top position of the piston rod of the electric cylinder 51, so that the grouting in the confined space is uniform, and it can be vibrated evenly by the vibrating rod 69.
[0024] Reference Figure 1 and Figure 2 A feeding pipe 21 and a first motor 22 are fixedly provided on the mud tank 2. The output end of the first motor 22 is transmission-connected to a plurality of stirring rods 23. The stirring rods 23 are rotatably arranged in the mud tank 2. The pre-produced mud can be fed into the mud tank 2 through the feeding pipe 21 via a conveying device. The first motor 22 is started, and the plurality of stirring rods 23 can be used to achieve a shaking process.
[0025] Reference Figure 1 and Figure 2 An air pump 31 is fixedly installed on the upper surface of the water tank 3. The air pump 31 is fixedly connected with two connecting pipes 32. One connecting pipe 32 is connected to the water tank 3, and the other connecting pipe 32 is fixedly connected with an aeration pipe 33. The aeration pipe 33 is fixedly arranged in the mud tank 2. The air pump 31 extracts high-temperature gas from the inside of the water tank 3 through the connecting pipe 32, and evenly transports it to the mud tank 2 through the aeration pipe 33 to heat the mud. A ventilation device is provided on the water tank 3, so that new external gas can be supplemented when extracting high-temperature gas.
[0026] Reference Figure 2 and Figure 3 The mud pump 61 is fixed on the upper surface of the frame 1, and the slide rod 66 and the screw rod 67 are respectively arranged at the four corners of the upper plate 64, and the slide rod 66 and the screw rod 67 are staggered. By rotating the nut 671, the distance between the lower plate 65 and the upper plate 64 can be adjusted, thereby adjusting the lowest position of the vibrating rod 69, which is convenient for adapting to different confined space casting work.
[0027] Reference Figure 2 and Figure 3 The power supply device 4 is electrically connected to the first motor 22, the electric cylinder 51, the vibration motor 68, the heating device 7 and the control cabinet 8 respectively, and the power supply device 4 can provide power support for the first motor 22, the electric cylinder 51, the vibration motor 68, the heating device 7 and the control cabinet 8.
[0028] Working principle: The frame 1 can be conveniently moved to a position near the area where casting is required through four universal wheels 11. The pre-produced mud can be fed into the mud tank 2 through the feeding pipe 21 through the conveying equipment. The first motor 22 is started, and the shaking process can be achieved through multiple stirring rods 23. The water tank 3 is fixedly installed on the frame 1. The heating device 7 heats the water in the water tank 3 through two heating rods 71, and the gas in the water tank 3 above the water surface is heated. The suction pump 31 extracts high-temperature gas from the water tank 3 through the connecting pipe 32, and evenly transports it to the mud tank 2 through the aeration pipe 33, so that the mud is heated. The mud pump 61 extracts mud from the mud tank 2 through the mud pipe 62, and transports it to the confined space through another mud pipe 62. In order to realize the confined space pouring work, the piston rod of the electric cylinder 51 drives the U-shaped groove plate 52 to rise and fall, and the upper plate 64, the lower plate 65 and the vibration motor 68 can be driven by the steel rope 63 to adjust vertically, and the discharge end of the other mud pipe 62 can be lifted and lowered together. At the same time, by manually rotating the pull plate 54, the U-shaped groove plate 52 can be rotated and adjusted along the top position of the piston rod of the electric cylinder 51, so that the grouting in the confined space is uniform, and it can be vibrated evenly by the vibrating rod 69.
Claims
1. A concrete pouring device in a confined space, characterized in that: The invention comprises: a vehicle frame (1), four universal wheels (11) are rotatably mounted on the vehicle frame (1), a mud tank (2), a water tank (3) and a bracket (41) are fixedly mounted on the vehicle frame (1), a power supply device (4) is detachably mounted on the bracket (41), a control cabinet (8) and a heating device (7) are detachably mounted on the water tank (3) and the bracket (41), and the heating device (7) is electrically connected to two heating rods (7 1), the heating rod (71) extends into the interior of the water tank (3), a lifting mechanism (5) is installed on the frame (1), the lifting mechanism (5) comprises an electric cylinder (51), the electric cylinder (51) is fixedly arranged on the upper surface of the frame (1), the piston rod of the electric cylinder (51) is rotatably connected to a U-shaped groove plate (52) and a hinge ring (53), a pull plate (54) is rotatably connected between the hinge ring (53) and the U-shaped groove plate (52), the A casting assembly (6) is installed on the U-shaped groove plate (52), and the casting assembly (6) includes a steel rope (63) and a mud pump (61). The upper end of the steel rope (63) is fixedly connected to the U-shaped groove plate (52), and the lower end of the steel rope (63) is fixedly connected to an upper plate (64). Two sliding rods (66) and two screw rods (67) are slidably connected to the upper plate (64). The screw rods (67) are threaded on the upper surface of the upper plate (64). A nut (671) is sleeved thereon. The mud pump (61) is fixedly connected to two mud pipes (62). One of the mud pipes (62) is fixedly connected to the bottom of the mud tank (2). The other mud pipe (62) is connected along the U-shaped groove plate (52) and passes through the upper plate (64) and the lower plate (65) in sequence. A vibration motor (68) is fixedly mounted on the lower plate (65). The vibration motor (68) is transmission-connected to a vibration rod (69).
2. The confined space concrete pouring equipment according to claim 1, characterized in that: A feeding pipe (21) and a first motor (22) are fixedly provided on the mud tank (2); the output end of the first motor (22) is drivingly connected to a plurality of stirring rods (23); and the stirring rods (23) are rotatably arranged in the mud tank (2).
3. The confined space concrete pouring equipment according to claim 1, characterized in that: An air suction pump (31) is fixedly mounted on the upper surface of the water tank (3). The air suction pump (31) is fixedly connected to two connecting pipes (32), one of the connecting pipes (32) is connected to the water tank (3), and the other connecting pipe (32) is fixedly connected to an aeration pipe (33), and the aeration pipe (33) is fixedly arranged in the mud tank (2).
4. The confined space concrete pouring equipment according to claim 1, characterized in that: The mud pump (61) is fixedly arranged on the upper surface of the vehicle frame (1), the sliding rod (66) and the screw rod (67) are respectively arranged at the four corners of the upper plate (64), and the sliding rod (66) and the screw rod (67) are arranged in an alternating manner.
5. The confined space concrete pouring equipment according to claim 1, characterized in that: The power supply device (4) is electrically connected to the first motor (22), the electric cylinder (51), the vibration motor (68), the heating device (7) and the control cabinet (8) respectively.