High-pressure micro-mist dust removal humidifier

By using high-pressure micro-fog dust removal humidifier during the recycling and reuse of construction waste, and using heating devices and check valve design, the problem of dust reduction humidifier freezing under low temperature conditions is solved, ensuring the safety and normal operation of the equipment. Achieve effective dust removal effect.

CN222048076UActive Publication Date: 2024-11-22北京嵘威环保科技有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420356383.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-26
Publication Date
2024-11-22
Estimated Expiration
2034-02-26

AI Technical Summary

Technical Problem

During the recycling and reuse of existing construction waste, dust-reducing humidifiers are prone to icing in the spray head and water pipes, resulting in blockage or damage to the device under low temperature conditions, which fails to effectively solve this problem.

Method used

A high-pressure micro-fog dust removal humidifier is designed, and the water in the water tank is heated by heating the heating device. The design of the check valve and insulation layer is combined to prevent the water pipe and spray head from freezing due to the temperature drop, and the water in the water pipe is blown out through the air pump. , prevent water accumulation.

Benefits of technology

It effectively prevents blockage and damage caused by icing of the spray head and water pipes, ensures the safety and normal operation of the equipment, delays heat loss, and improves the reliability and efficiency of the equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222048076U_ABST
    Figure CN222048076U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of environmental protection and dust removal, in particular to a high-pressure micro-mist dust removal humidifier which comprises a water tank, a water inlet pipe and a water outlet pipe are arranged on the water tank, a heating device for heating water is arranged on the water tank, a water pump is installed on the water outlet pipe, and a water outlet of the water pump is connected with a water conveying pipe. And an atomizing nozzle is mounted at the end part of the water conveying pipe. The dust removal humidifier has the effect that the problem that the dust removal humidifier is frozen due to the low temperature is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of environmentally friendly dust removal, and in particular to a high-pressure micro-mist dust removal humidifier. Background Art

[0002] The construction industry is an industry with high energy consumption and serious environmental pollution. Strengthening the recycling and reuse of construction waste is an important part of realizing the circular economy in the construction industry. A large amount of waste will be generated during the construction, renovation, expansion and demolition process, and many of the materials have great utilization value. The recycling of construction waste can not only improve the utilization rate of resources, but also protect the ecological environment and achieve sustainable development. In the process of recycling and reusing construction waste, dust will inevitably occur.

[0003] Although most of the existing technologies are equipped with dust reduction humidifiers, such dust reduction humidifiers generally ignore the protection of the sprinkler head, especially in some northern regions. When the temperature drops below 0°C, the water pipes connected to the sprinkler head and the nozzles of the sprinkler head are prone to ice, causing blockage of the device and even damage to the sprinkler head. Utility Model Content

[0004] In order to improve the problem of icing of the dust removal humidifier due to low temperature, the present application provides a high-pressure micro-mist dust removal humidifier.

[0005] The high-pressure micro-mist dust removal humidifier provided in this application adopts the following technical solution:

[0006] A high-pressure fine mist dust removal humidifier comprises a water tank, wherein the water tank is provided with a water inlet pipe and a water outlet pipe, the water tank is provided with a heating device for heating water, the water outlet pipe is installed with a water pump, the water outlet of the water pump is connected with a water pipe, and an atomizing nozzle is installed at the end of the water pipe.

[0007] By adopting the above technical solution, the heating device heats the water in the water tank, thereby improving the problem of temperature reduction in the water pipe and the atomizing nozzle, thereby ensuring the safety of the water pipe and the atomizing nozzle.

[0008] Optionally, the heating device includes an electric heating tube arranged in the water tank.

[0009] By adopting the above technical solution, the water in the water tank can be heated by the electric heating pipe.

[0010] Optionally, the heating device includes a hot air pipe arranged in the water tank.

[0011] By adopting the above technical solution, high-temperature exhaust gas can be introduced into the hot air pipe, and waste heat can be used for heating to reduce costs.

[0012] Optionally, a branched air pipe is provided on the water pipe, an air pump is installed at the end of the air pipe, a first check valve is installed on the water pipe upstream of the branch, and a second check valve is installed on the air pipe.

[0013] By adopting the above technical solution, when spraying is required, due to the action of the second check valve, the water in the water pipe will not flow into the air pipe, preventing water from entering the air pump and causing damage to the instrument; when the spraying is completed, the water pump is turned off to stop the water supply, and then the air pump is turned on. At this time, due to the action of the first check valve, the water will not flow back, preventing the water pump from reversing, while the gas enters the water pipe through the air pipe, blowing the water in the water pipe out through the atomizing nozzle, thereby ensuring that water will not accumulate in the water pipe and the atomizing nozzle, improving the freezing situation.

[0014] Optionally, a filter is installed on the water outlet pipe.

[0015] By adopting the above technical solution, water is filtered, thereby reducing the problem of pipeline blockage.

[0016] Optionally, a pressure gauge is installed on the water pipe.

[0017] By adopting the above technical solution, workers can detect pipeline pressure changes through a pressure gauge.

[0018] Optionally, the water outlet pipe is wrapped with a first thermal insulation layer, and the water delivery pipe is wrapped with a second thermal insulation layer.

[0019] By adopting the above technical solution, the provision of the first thermal insulation layer and the second thermal insulation layer delays the loss of heat in the water.

[0020] Optionally, the electric heating tubes are arranged in a serpentine shape.

[0021] By adopting the above technical solution, the serpentine-shaped electric heating tubes facilitate heat conduction and improve heating efficiency.

[0022] Optionally, the hot air pipe is arranged in a serpentine shape.

[0023] By adopting the above technical solution, the serpentine-shaped hot air pipes facilitate heat conduction and improve heating efficiency.

[0024] In summary, the present application includes at least one of the following beneficial technical effects:

[0025] 1. The heating device heats the water in the water tank, improving the problem of temperature drop in the water pipe and the atomizing nozzle, thereby ensuring the safety of the water pipe and the atomizing nozzle;

[0026] 2. When spraying is required, due to the effect of the second check valve, the water in the water pipe will not flow into the air pipe, preventing water from entering the air pump and causing damage to the instrument; when the spraying is completed, turn off the water pump to stop the water supply, and then turn on the air pump. At this time, due to the effect of the first check valve, the water will not flow back, preventing the water pump from reversing, and the gas will enter the water pipe through the air pipe, blowing the water in the water pipe out through the atomizing nozzle, thereby ensuring that no water will accumulate in the water pipe and the atomizing nozzle, improving the freezing situation;

[0027] 3. The setting of the first insulation layer and the second insulation layer delays the loss of heat in the water. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 It is a structural schematic diagram of a high-pressure micro-mist dust removal humidifier according to an embodiment of the present application.

[0029] Explanation of the reference numerals: 1. water tank; 10. water inlet pipe; 11. water outlet pipe; 110. first insulation layer; 2. heating device; 20. distribution box; 21. electric heating pipe; 22. hot air pipe; 3. water pump; 4. water pipe; 40. first check valve; 41. second insulation layer; 5. atomizing nozzle; 6. air pipe; 60. second check valve; 7. air pump; 8. filter; 9. pressure gauge. DETAILED DESCRIPTION

[0030] The following is combined with Figure 1 This application is described in further detail.

[0031] The present application embodiment discloses a high-pressure micro-mist dust removal humidifier. Figure 1 A high-pressure micro-mist dust removal humidifier includes a water tank 1, and a water inlet pipe 10 and a water outlet pipe 11 are connected to the water tank 1. The water inlet pipe 10 is located at the top of the water tank 1, and the water outlet pipe 11 is located at the bottom of the water tank 1. A heating device 2 is arranged on the water tank 1, and the heating device 2 is used to heat the water in the water tank 1. The heating device 2 includes a distribution box 20 installed on the outside of the water tank 1, and an electric heating pipe 21 connected to the distribution box 20 is fixedly connected to the inner wall of the water tank 1. The electric heating pipe 21 is serpentine, and a hot air pipe 22 is also fixedly connected to the inner wall of the water tank 1. The hot air pipe 22 is serpentine, and the hot air pipe 22 and the electric heating pipe 21 are arranged alternately. When working, only one heating method can be used, or both can be used at the same time. The hot air pipe 22 can be passed into the high-temperature exhaust gas generated by the factory heat generation.

[0032] Reference Figure 1A water pump 3 is installed at the end of the water outlet pipe 11, a water pipe 4 is connected to the water outlet of the water pump 3, an atomizing nozzle 5 is installed at the end of the water pipe 4, the water pump 3 pumps the water in the water tank 1 to the atomizing nozzle 5 through the water outlet pipe 11 and the water pipe 4, and finally the atomizing nozzle 5 forms a spray for spraying. A branched air pipe 6 is provided on the water pipe 4, an air pump 7 is installed at the end of the air pipe 6, a first check valve 40 is installed on the water pipe 4 and upstream of the branch, and a second check valve 60 is installed on the air pipe 6.

[0033] When spraying is needed, due to the action of the second check valve 60, the water in the water pipe 4 will not flow into the air pipe 6, preventing water from entering the air pump 7 and causing damage to the instrument; when the spraying is completed, the water pump 3 is turned off to stop the water supply, and then the air pump 7 is turned on. At this time, due to the action of the first check valve 40, the water will not flow back, preventing the water pump 3 from reversing, and the gas will enter the water pipe 4 through the air pipe 6, and the water in the water pipe 4 will be blown out through the atomizing nozzle 5, thereby ensuring that water will not accumulate in the water pipe 4 and the atomizing nozzle 5, thereby improving the freezing situation.

[0034] Reference Figure 1 A filter 8 is also installed on the water outlet pipe 11 to filter the water and reduce the occurrence of blockage. A pressure gauge 9 is installed on the water delivery pipe 4 to monitor the pressure change in the water delivery pipe 4. In order to keep the hot water warm, a first insulation layer 110 is wrapped around the water outlet pipe 11, and a second insulation layer 41 is wrapped around the water delivery pipe 4.

[0035] The implementation principle of a high-pressure fine mist dust removal humidifier in the embodiment of the present application is as follows: after the water in the water tank 1 is heated by the heating device 2, it is pumped to the atomizing nozzle 5 by the water pump 3, and the first insulation layer 110 and the second insulation layer 41 can delay the loss of water temperature. When the spraying is stopped, the air pump 7 blows air to the water pipe 4 and the atomizing nozzle 5, thereby drying the water pipe 4 and the atomizing nozzle 5, improving the freezing situation, and thus effectively preventing the humidifier from being blocked or damaged by frostbite.

[0036] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A high-pressure micro-mist dust removal humidifier, characterized in that: The invention comprises a water tank (1), wherein the water tank (1) is provided with a water inlet pipe (10) and a water outlet pipe (11), wherein the water tank (1) is provided with a heating device (2) for heating water, wherein the water outlet pipe (11) is provided with a water pump (3), wherein the water outlet of the water pump (3) is connected to a water delivery pipe (4), wherein an atomizing nozzle (5) is provided at the end of the water delivery pipe (4), wherein the heating device (2) comprises an electric heating pipe (21) provided in the water tank (1), wherein the heating device (2) comprises a hot air pipe (22) provided in the water tank (1), wherein a branched air delivery pipe (6) is provided on the water delivery pipe (4), wherein an air pump (7) is provided at the end of the air delivery pipe (6), wherein a first check valve (40) is provided on the water delivery pipe (4) at the upstream of the branch, and wherein a second check valve (60) is provided on the air delivery pipe (6).

2. A high-pressure fine mist dust removal humidifier according to claim 1, characterized in that: A filter (8) is installed on the water outlet pipe (11).

3. The high-pressure fine mist dust removal humidifier according to claim 1, characterized in that: A pressure gauge (9) is installed on the water delivery pipe (4).

4. The high-pressure fine mist dust removal humidifier according to claim 1, characterized in that: The water outlet pipe (11) is wrapped with a first thermal insulation layer (110), and the water delivery pipe (4) is wrapped with a second thermal insulation layer (41).

5. The high-pressure fine mist dust removal humidifier according to claim 1, characterized in that: The electric heating tube (21) is arranged in a serpentine shape.

6. The high-pressure fine mist dust removal humidifier according to claim 1, characterized in that: The hot air pipe (22) is arranged in a serpentine shape.