System for improving yield of industrial cracked C9 first-grade product
By optimizing the connection between the C9 de-heavy tower and the reboiler in the dimerization reactor through vacuum staged control and hot water heating in the dimer reactor, the yield of the first grade of cracked C9 was improved, solving the problem of low yield in the existing technology and enhancing the economic benefits of the unit.
Patent Information
- Application Number
- CN202421036580.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-14
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2034-05-14
AI Technical Summary
How to more effectively improve the yield of industrial-grade cracked C91 products to ensure the economical operation of the C9 system and the overall efficiency of the ethylene plant.
A vacuum staged control system is adopted. By adding a Roots vacuum pump between the first and second condensers and combining it with hot water heating for secondary polymerization in the dimer reactor, the connection method of the deweighting tower and the reboiler is optimized to achieve the recovery and polymerization of light hydrocarbon components.
It improved the yield of industrial-grade pyrolysis C91, reduced system losses and tower bottom steam consumption, and enhanced the economic benefits of the unit.
Smart Images

Figure CN222064434U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of chemical equipment systems, and specifically relates to a system for improving the yield of first-class products of industrial cracked carbon nine. Background Art
[0002] As one of the important raw materials in the industrial field, ethylene is a symbol of the development level of a country's petrochemical industry. With the continuous improvement of social level, my country's ethylene industry has shown a leap-forward development, and ethylene production has also increased year by year. The by-product carbon nine aromatic fraction (also known as industrial cracking carbon nine) brought by ethylene has also attracted more and more attention.
[0003] The C9 aromatic fraction accounts for about 10% to 20% of the total ethylene production. For an ethylene plant with an annual output of 1 million tons, the by-product C9 raw material reaches (100,000 to 150,000 tons / year). How to make full and reasonable use of this part of resources to produce the best economic benefits will have a significant impact on the overall benefits of the ethylene plant and the deep processing development of ethylene by-product resources. How to more effectively improve the yield of industrial cracking C9 first-class products is the key to ensuring the economic operation of the C9 system. Utility Model Content
[0004] The utility model aims at the above-mentioned problems, makes up for the deficiencies of the prior art, and provides a system for improving the yield of first-class industrial cracked carbon nine products; the utility model can improve the yield of first-class industrial cracked carbon nine products as a whole.
[0005] To achieve the above purpose, the utility model adopts the following technical solutions.
[0006] The utility model provides a system for improving the yield of industrial cracked carbon nine first-class products, comprising a de-weighting tower, characterized in that: a feed port A of the de-weighting tower is connected to an industrial cracked carbon nine inlet, a gas phase port B of the de-weighting tower is connected to a gas phase inlet C of a first condenser, a gas phase outlet E of the first condenser is connected to an inlet of a Roots vacuum pump, an outlet of the Roots vacuum pump is connected to a gas phase inlet A of a second condenser, and a gas phase outlet B of the second condenser is connected to a vacuum pumping unit; a liquid phase outlet D of the first condenser is connected to a liquid phase inlet A of a reflux tank, a liquid phase outlet C of the second condenser is connected to a liquid phase inlet A of a light component liquid collecting tank, a liquid phase outlet B of the reflux tank is connected to an inlet of a reflux external production pump, a part of the outlet of the reflux external production pump is connected to a liquid phase port E of a tower top of the de-weighting tower, and the other part enters a tank area as an industrial cracked carbon nine first-class product; a liquid phase outlet B of the light component liquid collecting tank is connected to an inlet of a light component extraction pump, a light component extraction pump outlet is connected to a liquid phase inlet B of a dimerization reactor, and a liquid phase outlet A of the dimerization reactor enters a tank area as an industrial cracked carbon nine first-class product;
[0007] The liquid phase outlet O of the tower kettle of the de-weighting tower is connected to the inlet of the tower kettle circulating pump; the outlet of the tower kettle circulating pump is connected to the liquid phase inlet D of the tower kettle reboiler; the gas phase outlet C of the tower kettle reboiler is connected to the gas phase inlet Q of the de-weighting tower;
[0008] The liquid phase outlet P of the tower kettle of the deweighting tower is connected to the inlet of the tower kettle extraction pump; the tower kettle extraction pump outlet enters the tank area as an industrial cracking carbon nine qualified product;
[0009] The circulating water inlet port B of the first condenser is connected to the circulating water supply, and the circulating water outlet port A of the first condenser is connected to the circulating water return; the low-temperature water inlet port E of the second condenser is connected to the low-temperature water supply, and the low-temperature water outlet port D of the second condenser is connected to the low-temperature water return; the hot water inlet port D of the dimerization reactor is connected to the hot water supply, and the hot blow outlet port C of the dimerization reactor is connected to the hot water return; the steam inlet A of the tower kettle reboiler is connected to the high-pressure steam, and the condensate outlet B of the tower kettle reboiler is connected to the steam condensate.
[0010] Furthermore, the C port of the deweighting tower is connected to the remote pressure gauge PI, the D port of the deweighting tower is connected to the remote thermometer TI, the F port of the deweighting tower is connected to another remote pressure gauge PI, the G port of the deweighting tower is connected to another remote thermometer TI, the H port of the deweighting tower is connected to another remote thermometer TI, the I port of the deweighting tower is connected to the on-site pressure gauge PG, the J port of the deweighting tower is connected to yet another remote pressure gauge PI, the K port of the deweighting tower is connected to the upper port of the on-site liquid level gauge LG, the L port of the deweighting tower is connected to the lower port of the same on-site liquid level gauge LG, the M port of the deweighting tower is connected to the upper port of the remote liquid level gauge LI, the N port of the deweighting tower is connected to the lower port of the same remote liquid level gauge LI, all the remote pressure gauges PI and the remote liquid level gauge LI detection signal output ports are connected to the output port of the central control room, and the on-site pressure gauge PG and the on-site liquid level gauge LG perform on-site indexing.
[0011] Furthermore, a second valve is provided on the pipeline connecting the feed port A of the de-weighting tower and the inlet of industrial cracking carbon nine, a sixth valve is provided at the steam inlet A of the tower kettle reboiler, a twenty-second valve is provided at the liquid phase port E of the de-weighting tower, a twenty-sixth valve is provided at the outlet of the tower kettle external production pump, a thirty-fourth valve is provided at the outlet line of the reflux external production pump, a thirty-eighth valve is provided at the gas phase outlet B of the second condenser, and a forty-seventh valve is provided at the outlet of the light component production pump.
[0012] Furthermore, the second valve, the sixth valve, the twenty-second valve, the twenty-sixth valve, the thirty-fourth valve, the thirty-eighth valve and the forty-seventh valve are all regulating valves.
[0013] Furthermore, a first valve is arranged on the pipeline in front of the second valve, and a third valve is arranged on the pipeline in the rear of the second valve; the pipeline in front of the first valve and the pipeline in the rear of the third valve are connected to a bypass pipeline, and a fourth valve is arranged on the bypass pipeline;
[0014] A fifth valve is arranged on the pipeline in front of the sixth valve, and a seventh valve is arranged on the pipeline in the rear of the sixth valve; the pipeline in front of the fifth valve and the pipeline in the rear of the seventh valve are connected to a bypass pipeline, and an eighth valve is arranged on the bypass pipeline;
[0015] A 21st valve is arranged on the pipeline in front of the 22nd valve, and a 23rd valve is arranged on the pipeline behind the 22nd valve; the pipeline in front of the 21st valve and the pipeline behind the 23rd valve are connected to a bypass pipeline, and a 24th valve is arranged on the bypass pipeline;
[0016] A 25th valve is arranged on the pipeline in front of the 26th valve, and a 27th valve is arranged on the pipeline behind the 26th valve; the pipeline in front of the 25th valve and the pipeline behind the 27th valve are connected to a bypass pipeline, and a 28th valve is arranged on the bypass pipeline;
[0017] A 33rd valve is arranged on the pipeline in front of the 34th valve, and a 35th valve is arranged on the pipeline behind the 34th valve; the pipeline in front of the 33rd valve and the pipeline behind the 35th valve are connected to a bypass pipeline, and a 36th valve is arranged on the bypass pipeline;
[0018] A 37th valve is arranged on the pipeline in front of the 38th valve, and a 39th valve is arranged on the pipeline behind the 38th valve; the pipeline in front of the 37th valve and the pipeline behind the 39th valve are connected to a bypass pipeline, and a 40th valve is arranged on the bypass pipeline;
[0019] A 46th valve is arranged on the pipeline in front of the 47th valve, and a 48th valve is arranged on the pipeline behind the 47th valve; the pipeline in front of the 46th valve and the pipeline behind the 48th valve are connected to a bypass pipeline, and a 49th valve is arranged on the bypass pipeline.
[0020] Furthermore, a thirteenth valve is provided on the pipeline connecting the C port of the deweighting tower and the remote pressure gauge PI, a fourteenth valve is provided on the pipeline connecting the F port of the deweighting tower and the remote pressure gauge PI, a fifteenth valve is provided on the pipeline connecting the I port of the deweighting tower and the on-site pressure gauge PG, a sixteenth valve is provided on the pipeline connecting the J port of the deweighting tower and the remote pressure gauge PI, a seventeenth valve is provided on the pipeline connecting the K port of the deweighting tower and the upper port of the on-site liquid level gauge LG, an eighteenth valve is provided on the pipeline connecting the L port of the deweighting tower and the lower port of the on-site liquid level gauge LG, a nineteenth valve is provided on the pipeline connecting the M port of the deweighting tower and the upper port of the remote liquid level gauge LI, and a twentieth valve is provided on the pipeline connecting the N port of the deweighting tower and the lower port of the remote liquid level gauge LI.
[0021] Furthermore, the remote pressure gauge port E of the reflux tank is connected to the on-site pressure gauge PI through the 30th valve; the on-site liquid level gauge upper port C of the reflux tank is connected to the on-site liquid level gauge lower port D of the reflux tank through the 28th valve, the on-site liquid level gauge LG, and the 29th valve in sequence; the remote liquid level gauge upper port F of the reflux tank is connected to the remote liquid level gauge lower port G of the reflux tank through the 31st valve, the remote liquid level gauge LI, and the 32nd valve in sequence. The detection signal output ports of the remote pressure gauge PI and the remote liquid level gauge LI are connected to the detection signal input port of the central control room.
[0022] Furthermore, the remote pressure gauge port E of the light component collecting tank is connected to the on-site pressure gauge PI through the forty-first valve; the upper port F of the on-site liquid level gauge of the light component collecting tank is connected to the lower port G of the on-site liquid level gauge of the light component collecting tank through the forty-second valve, the on-site liquid level gauge LG and the forty-third valve in sequence; the upper port C of the remote liquid level gauge of the light component collecting tank is connected to the lower port D of the remote liquid level gauge of the light component collecting tank through the forty-fourth valve, the remote liquid level gauge LI and the forty-fifth valve in sequence, and the detection signal output ports of the remote pressure gauge PI and the remote liquid level gauge LI are connected to the detection signal input port of the central control room.
[0023] Furthermore, a flowmeter FIC is arranged in front of the first valve, a flowmeter FIC is arranged in front of the fifth valve, a flowmeter FIC is arranged in front of the twenty-third valve, a flowmeter FIC is arranged in front of the thirty-third valve, and a flowmeter FIC is arranged in front of the forty-sixth valve, and the detection signal output ports of all the flowmeters FIC are connected to the detection signal input ports of the central control room.
[0024] Furthermore, a ninth valve and an eleventh valve are provided at the condensate outlet B of the tower bottom reboiler, and a steam trap is provided between the ninth valve and the eleventh valve; the front pipeline of the ninth valve and the rear pipeline of the eleventh valve are connected to a bypass pipeline, and a twelfth valve is provided on the bypass pipeline.
[0025] The beneficial effects of the utility model.
[0026] The utility model adopts vacuum classification control to produce industrial cracked carbon nine first-class products by industrial cracked carbon nine, so that the yield of industrial cracked carbon nine first-class products is increased and the economic benefit of device operation is improved.
[0027] In addition, by adding a Roots vacuum pump between the first condenser and the second condenser, and controlling it in cascade with the vacuum system of the gas phase outlet of the second condenser, the first condenser can be operated in a high vacuum state and the second condenser in a low vacuum state, and the non-condensable gas in the system can be further recovered, thereby reducing system losses, improving the comprehensive utilization rate of products, and further reducing the steam consumption in the tower bottom.
[0028] In addition, by setting up a dimerization reactor for hot water heating secondary polymerization, the light hydrocarbon components in the light component collecting tank are polymerized to prevent the light hydrocarbon components from affecting the downstream system control. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] In order to make the technical problems, technical solutions and beneficial effects solved by the utility model more clear, the utility model is further described in detail below in conjunction with the accompanying drawings and specific implementation methods. It should be understood that the specific implementation methods described here are only used to explain the utility model and are not used to limit the utility model.
[0030] Figure 1 It is a schematic diagram of the complete system connection structure of the utility model.
[0031] Markings in the figure: 1 is the first valve, 2 is the second valve, 3 is the third valve, 4 is the fourth valve, 5 is the fifth valve, 6 is the sixth valve, 7 is the seventh valve, 8 is the eighth valve, 9 is the ninth valve, 10 is the steam trap, 11 is the eleventh valve, 12 is the twelfth valve, 13 is the thirteenth valve, 14 is the fourteenth valve, 15 is the fifteenth valve, 16 is the sixteenth valve, 17 is the seventeenth valve, 18 is the eighteenth valve, 19 is the nineteenth valve, 20 is the twentieth valve, 21 is the twenty-first valve, 22 is the second 12th valve, 23 is the 23rd valve, 24 is the 24th valve, 25 is the 25th valve, 26 is the 26th valve, 27 is the 27th valve, 28 is the 28th valve, 29 is the 29th valve, 30 is the 30th valve, 31 is the 31st valve, 32 is the 32nd valve, 33 is the 33rd valve, 34 is the 34th valve, 35 is the 35th valve, 36 is the 36th valve, 37 is the 37th valve, 38 is the 38th valve, 39 is the 39th valve, 40 is the 40th valve, 41 is the 41st valve, 42 is the 42nd valve, 43 is the 43rd valve, 44 is the 44th valve, 45 is the 45th valve, 46 is the 46th valve, 47 is the 47th valve, 48 is the 48th valve, 49 is the 49th valve, 50 is the deweighting tower, 51 is the industrial cracking carbon nine, 52 is the first condenser, 53 is the Roots vacuum pump, 54 is the second condenser gas, 55 is the vacuum unit, 56 is the reflux tank, 57 is the light group The collecting liquid tank, 58 is the reflux external production pump, 59 is the light component production pump, 60 is the dimerization reactor, 61 is the first-class industrial cracking carbon nine product, 62 is the tower bottom circulation pump, 63 is the tower bottom reboiler, 64 is the tower bottom production pump, 65 is the industrial cracking carbon nine qualified product, 66 is the circulating water supply, 67 is the circulating water return, 68 is the low-temperature water supply, 69 is the low-temperature water return, 70 is the hot water supply, 71 is the hot water return, 72 is the high-pressure steam, and 73 is the steam condensate. DETAILED DESCRIPTION
[0032] As shown in the accompanying drawings, the present embodiment provides a system for improving the yield of the first-class product of industrial cracked carbon nine, including a deweighting tower 50, wherein the feed port A of the deweighting tower 50 is connected to the inlet of the industrial cracked carbon nine 51, the gas phase port B of the deweighting tower 50 is connected to the gas phase inlet C of the first condenser 52, the gas phase outlet E of the first condenser 52 is connected to the inlet of a Roots vacuum pump 53, the outlet of the Roots vacuum pump 53 is connected to the gas phase inlet A of the second condenser 54, the gas phase outlet B of the second condenser 54 is connected to the vacuum unit 55; the liquid phase outlet D of the first condenser 52 is connected to the liquid phase inlet of the reflux tank 56 A is connected, the liquid phase outlet C of the second condenser is connected to the liquid phase inlet A of the light component liquid collecting tank 57, the liquid phase outlet B of the reflux tank 56 is connected to the inlet of the reflux external sampling pump 58, a part of the outlet of the reflux external sampling pump 58 is connected to the liquid phase port E at the top of the deweighting tower 50, and the other part enters the tank area as the industrial cracking carbon nine first-class product 61; the liquid phase outlet B of the light component liquid collecting tank 57 is connected to the inlet of the light component extraction pump 59, and the outlet of the light component extraction pump 59 is connected to the liquid phase inlet B of the dimerization reactor 60, and the liquid phase outlet A of the dimerization reactor 60 enters the tank area as the industrial cracking carbon nine first-class product 61;
[0033] The liquid phase outlet O of the kettle of the de-weighting tower 50 is connected to the inlet of the kettle circulation pump 62; the outlet of the kettle circulation pump 62 is connected to the liquid phase inlet D of the kettle reboiler 63; the gas phase outlet C of the kettle reboiler 63 is connected to the gas phase inlet Q of the de-weighting tower 50;
[0034] The liquid phase outlet P of the tower bottom of the deweighting tower 50 is connected to the inlet of the tower bottom extraction pump 64; the outlet of the tower bottom extraction pump 64 enters the tank area as the industrial cracking carbon nine qualified product 65;
[0035] The circulating water inlet port B of the first condenser 52 is connected to the circulating water supply 66, and the circulating water outlet port A of the first condenser 52 is connected to the circulating water return 67; the low-temperature water inlet port E of the second condenser is connected to the low-temperature water supply 68, and the low-temperature water outlet port D of the second condenser is connected to the low-temperature water return 69; the hot water inlet port D of the dimerization reactor 60 is connected to the hot water supply 70, and the hot blow outlet port C of the dimerization reactor 60 is connected to the hot water return 71; the steam inlet A of the tower kettle reboiler 63 is connected to the high-pressure steam 72, and the condensate outlet B of the tower kettle reboiler 63 is connected to the steam condensate 73.
[0036] The port 50C of the deweighting tower is connected to the remote pressure gauge PI, the port 50D of the deweighting tower is connected to the remote thermometer TI, the port 50F of the deweighting tower is connected to another remote pressure gauge PI, the port 50G of the deweighting tower is connected to another remote thermometer TI, the port 50H of the deweighting tower is connected to another remote thermometer TI, the port 50I of the deweighting tower is connected to the on-site pressure gauge PG, the port 50J of the deweighting tower is connected to yet another remote pressure gauge PI, the port 50K of the deweighting tower is connected to the upper port of the on-site liquid level gauge LG, the port 50L of the deweighting tower is connected to the lower port of the same on-site liquid level gauge LG, the port 50M of the deweighting tower is connected to the upper port of the remote liquid level gauge LI, the port 50N of the deweighting tower is connected to the lower port of the same remote liquid level gauge LI, and all the remote pressure gauges PI and the detection signal output ports of the remote liquid level gauge LI are connected to the output port of the central control room.
[0037] The temperature remote transmitter TI is used to monitor the internal temperature of the de-weighting tower 50 and feed the temperature back to the central control room; the pressure remote transmitter PI is used to monitor the internal pressure of the de-weighting tower 50 and feed the pressure back to the central control room. The temperature and pressure represent the operating status of the de-weighting tower 50. Observation at multiple positions is convenient for controlling the degree of separation; the liquid level remote transmitter LI is used to monitor the liquid level at the bottom of the de-weighting tower 50 and feed the liquid level back to the central control room to ensure that the tower system operates at an appropriate liquid level, so that the tower system can obtain heat intact, thereby ensuring that the product meets the standards.
[0038] The field pressure gauge PG and the field level gauge LG perform field indexing.
[0039] A second valve 2 is provided on the pipeline connecting the feed port A of the de-weighting tower 50 and the inlet of the industrial cracking carbon nine 51, a sixth valve 6 is provided at the steam inlet A of the tower bottom reboiler 63, a twenty-second valve 22 is provided at the liquid phase port E of the de-weighting tower 50, a twenty-sixth valve 26 is provided at the outlet of the tower bottom external production pump, a thirty-fourth valve 34 is provided at the outlet production line of the reflux external production pump 58, a thirty-eighth valve 38 is provided at the gas phase outlet B of the second condenser 54, and a forty-seventh valve 47 is provided at the outlet of the light component production pump 59.
[0040] The second valve 2, the sixth valve 6, the twenty-second valve 22, the twenty-sixth valve 26, the thirty-fourth valve 34, the thirty-eighth valve 38, and the forty-seventh valve 47 are all regulating valves, and the remaining valves are all gate valves.
[0041] The first valve 1 is arranged on the pipeline in front of the second valve 2, and the third valve 3 is arranged on the pipeline in the rear of the second valve 2; the pipeline in front of the first valve 1 and the pipeline in the rear of the third valve 3 are connected to the bypass pipeline, and the fourth valve 4 is arranged on the bypass pipeline. When the system is running, the first valve 1 and the third valve 3 are in the open state, and the fourth valve 4 is closed, and the second valve 2 is used for regulation; when the second valve 2 is abnormal, the first valve 1 and the third valve 3 are closed, and the fourth valve 4 is opened for control.
[0042] The fifth valve 5 is arranged on the pipeline in front of the sixth valve 6, and the seventh valve 7 is arranged on the pipeline in the rear of the sixth valve 6; the pipeline in front of the fifth valve 5 and the pipeline in the rear of the seventh valve 7 are connected to the bypass pipeline, and the eighth valve 8 is arranged on the bypass pipeline. When the system is running, the fifth valve 5 and the seventh valve 7 are in the open state, and the eighth valve 8 is closed, and the sixth valve 6 is used for regulation; when the sixth valve 6 is abnormal, the fifth valve 5 and the seventh valve 7 are closed, and the eighth valve 8 is opened for control.
[0043] The pipeline in front of the 22nd valve 22 is provided with a 21st valve 21, and the pipeline in the rear of the 22nd valve 22 is provided with a 23rd valve 23; the pipeline in front of the 21st valve 21 and the pipeline in the rear of the 23rd valve 23 are connected to a bypass pipeline, and the bypass pipeline is provided with a 24th valve 24. When the system is running, the 21st valve 21 and the 23rd valve 23 are in an open state, and the 24th valve 24 is closed, and the 22nd valve 22 is used for regulation; when the 22nd valve 22 is abnormal, the 21st valve and the 23rd valve 23 are closed, and the 24th valve 24 is opened for control.
[0044] The pipeline in front of the 26th valve 26 is provided with the 25th valve 25, and the pipeline in the rear of the 26th valve 26 is provided with the 27th valve 27; the pipeline in front of the 25th valve 25 and the pipeline in the rear of the 27th valve 27 are connected to the bypass pipeline, and the bypass pipeline is provided with the 28th valve 28. When the system is running, the 25th valve 25 and the 27th valve 27 are in the open state, the 28th valve 28 is closed, and the 26th valve 26 is used for regulation; when the 26th valve 26 is abnormal, the 25th valve 25 and the 27th valve 27 are closed, and the 28th valve 28 is opened for control.
[0045] The thirty-third valve 33 is arranged on the pipeline in front of the thirty-fourth valve 34, and the thirty-fifth valve 35 is arranged on the pipeline in the rear of the thirty-fourth valve 34; the pipeline in front of the thirty-third valve 33 and the pipeline in the rear of the thirty-fifth valve 35 are connected to the bypass pipeline, and the thirty-sixth valve 36 is arranged on the bypass pipeline. When the system is running, the thirty-third valve 33 and the thirty-fifth valve 35 are in the open state, and the thirty-sixth valve 36 is closed, and the thirty-fourth valve 34 is used for regulation; when the thirty-fourth valve 34 is abnormal, the thirty-third valve 33 and the thirty-fifth valve 35 are closed, and the thirty-sixth valve 36 is opened for control.
[0046] The thirty-seventh valve 37 is arranged on the pipeline in front of the thirty-eighth valve 38, and the thirty-ninth valve 39 is arranged on the pipeline in the rear of the thirty-eighth valve 38; the pipeline in front of the thirty-seventh valve 37 and the pipeline in the rear of the thirty-ninth valve 39 are connected to the bypass pipeline, and the fortieth valve 40 is arranged on the bypass pipeline. When the system is running, the thirty-seventh valve 37 and the thirty-ninth valve 39 are in the open state, the fortieth valve 40 is closed, and the thirty-eighth valve 38 is used for regulation; when the thirty-eighth valve 38 is abnormal, the thirty-seventh valve 37 and the thirty-ninth valve 39 are closed, and the fortieth valve 40 is opened for control.
[0047] The forty-sixth valve 46 is arranged on the pipeline in front of the forty-seventh valve 47, and the forty-eighth valve 48 is arranged on the pipeline in the rear of the forty-seventh valve; the pipeline in front of the forty-sixth valve 46 and the pipeline in the rear of the forty-eighth valve 48 are connected to the bypass pipeline, and the forty-ninth valve 49 is arranged on the bypass pipeline. When the system is running, the forty-sixth valve 46 and the forty-eighth valve 48 are in the open state, the forty-ninth valve 49 is closed, and the forty-seventh valve 47 is used for regulation; when the forty-seventh valve 47 is abnormal, the forty-sixth valve 46 and the forty-eighth valve 48 are closed, and the forty-ninth valve 49 is opened for control.
[0048] A thirteenth valve 13 is provided on the pipeline connecting the deweighting tower 50C port and the remote pressure gauge PI, a fourteenth valve 14 is provided on the pipeline connecting the deweighting tower 50F port and the remote pressure gauge PI, a fifteenth valve 15 is provided on the pipeline connecting the deweighting tower 50I port and the on-site pressure gauge PG, a sixteenth valve 16 is provided on the pipeline connecting the deweighting tower 50J port and the remote pressure gauge PI, a seventeenth valve 17 is provided on the pipeline connecting the deweighting tower 50K port and the upper port of the on-site liquid level gauge LG, an eighteenth valve 18 is provided on the pipeline connecting the deweighting tower 50L port and the lower port of the on-site liquid level gauge LG, a nineteenth valve 19 is provided on the pipeline connecting the deweighting tower 50M port and the upper port of the remote liquid level gauge LI, and a twentieth valve 20 is provided on the pipeline connecting the deweighting tower 50N port and the lower port of the remote liquid level gauge LI.
[0049] The remote pressure gauge port E of the reflux tank 56 is connected to the on-site pressure gauge PI through the 30th valve 30; the upper port C of the on-site liquid level gauge of the reflux tank 56 is connected to the lower port D of the on-site liquid level gauge of the reflux tank 56 through the 28th valve 28, the on-site liquid level gauge LG, and the 29th valve 29 in sequence; the upper port F of the remote liquid level gauge of the reflux tank 56 is connected to the lower port G of the remote liquid level gauge of the reflux tank 56 through the 31st valve 31, the remote liquid level gauge LI, and the 32nd valve 32 in sequence.
[0050] The detection signal output ports of the remote pressure gauge PI and the remote level gauge LI are connected to the detection signal input port of the central control room. The remote level gauge LI is used to observe the liquid level of the reflux tank 56, and controls the liquid level of the reflux tank 56 through the thirty-fourth valve 34 to ensure that the liquid level of the reflux tank 56 is stable.
[0051] The remote pressure gauge port E of the light component collecting tank 57 is connected to the on-site pressure gauge PI through the forty-first valve 41; the upper port F of the on-site liquid level gauge of the light component collecting tank 57 is connected to the lower port G of the on-site liquid level gauge of the light component collecting tank 57 through the forty-second valve 42, the on-site liquid level gauge LG and the forty-third valve 43 in sequence; the upper port C of the remote liquid level gauge of the light component collecting tank 57 is connected to the lower port D of the remote liquid level gauge of the light component collecting tank 57 through the forty-fourth valve 44, the remote liquid level gauge LI and the forty-fifth valve 45 in sequence, and the detection signal output ports of the remote pressure gauge PI and the remote liquid level gauge LI are connected to the detection signal input port of the central control room.
[0052] A flowmeter FIC is arranged in front of the first valve 1, a flowmeter FIC is arranged in front of the fifth valve 5, a flowmeter FIC is arranged in front of the twenty-third valve 23, a flowmeter FIC is arranged in front of the thirty-third valve 33, and a flowmeter FIC is arranged in front of the forty-sixth valve 46. The detection signal output ports of all the flowmeters FIC are connected to the detection signal input ports of the central control room.
[0053] A ninth valve 9 and an eleventh valve 11 are provided at the condensate outlet B of the tower bottom reboiler 63, and a steam trap 10 is provided between the ninth valve 9 and the eleventh valve 11; the front pipeline of the ninth valve 9 and the rear pipeline of the eleventh valve 11 are connected to a bypass pipeline, and a twelfth valve 12 is provided on the bypass pipeline.
[0054] The first condenser 52, the second condenser and the tower bottom reboiler 63 may adopt fixed tube plate heat exchangers. The heat exchange medium used by the first condenser 52 may be circulating water, the heat exchange medium used by the second condenser may be low-temperature water, the heat exchange medium used by the tower bottom reboiler 63 may be steam, and the heat exchange medium of the dimerization reactor 60 may be hot water.
[0055] When in use, the industrial cracked carbon nine 51 enters the de-weighting tower 50, and is sent to the tower bottom reboiler 63 for heating through the tower bottom circulation pump 62. The heated industrial cracked carbon nine 51 forms a gas phase and rises to the top of the tower. The condensate after condensation in the first condenser 52 enters the reflux tank 56; the condensed gas after condensation in the first condenser 52 enters the second condenser through the Roots vacuum pump 53. Through the frequency conversion regulation of the Roots vacuum pump 53 and the cascade regulation of the inlet regulating valve of the vacuum pumping system, the vacuum degree of the second condenser is reduced while ensuring a high vacuum degree of the de-weighting tower 50 and the first condenser 52, thereby increasing the vacuum degree of the non-condensable gas. The light hydrocarbon component yield in the second condenser enters the light component collecting tank 57, and the remaining non-condensable gas enters the vacuum unit through the liquid ring vacuum pump; the liquid phase of the reflux tank 56 enters the reflux external sampling pump 58, a part of it returns to the de-weighting tower 50 as the tower system reflux, and the other part enters the tank area as the industrial cracking carbon nine first-class product 61; the liquid phase of the light component collecting tank 57 enters the light component extraction pump 59, and the light hydrocarbon component is polymerized into carbon nine component through the dimerization reactor 60, and enters the tank area as the industrial cracking carbon nine first-class product 61; the bottom material of the de-weighting tower 50 enters the tower kettle external sampling pump and is sent to the tank area as the industrial cracking carbon nine qualified product 65.
[0056] By adopting the vacuum system graded control on the carbon nine deweighting tower 50, the yield of the first-class industrial cracked carbon nine product is improved, and the economic operation of the carbon nine device is further increased.
[0057] It can be understood that the above specific description of the utility model is only used to illustrate the utility model and is not limited to the technical solution described in the implementation mode of the utility model. Ordinary technicians in the field should understand that the utility model can still be modified or replaced by equivalents to achieve the same technical effect; as long as the use requirements are met, they are within the protection scope of the utility model.
Claims
1. A system for improving the yield of first-class industrial cracked carbon nine, comprising a deweighting tower (50), characterized in that: The feed port A of the de-weighting tower (50) is connected to the inlet of industrial cracking carbon nine (51), the gas phase port B of the de-weighting tower (50) is connected to the gas phase inlet C of the first condenser (52), the gas phase outlet E of the first condenser (52) is connected to the inlet of a Roots vacuum pump (53), the outlet of the Roots vacuum pump (53) is connected to the gas phase inlet A of the second condenser (54), and the gas phase outlet B of the second condenser (54) is connected to the vacuum unit (55); The liquid phase outlet D of the first condenser (52) is connected to the liquid phase inlet A of the reflux tank (56), the liquid phase outlet C of the second condenser is connected to the liquid phase inlet A of the light component liquid collecting tank (57), the liquid phase outlet B of the reflux tank (56) is connected to the inlet of the reflux external sampling pump (58), a part of the outlet of the reflux external sampling pump (58) is connected to the liquid phase port E at the top of the deweighting tower (50), and the other part enters the tank area as the industrial cracking carbon nine first-class product (61); the liquid phase outlet B of the light component liquid collecting tank (57) is connected to the inlet of the light component extraction pump (59), the outlet of the light component extraction pump (59) is connected to the liquid phase inlet B of the dimerization reactor (60), and the liquid phase outlet A of the dimerization reactor (60) enters the tank area as the industrial cracking carbon nine first-class product (61); The liquid phase outlet O of the tower bottom of the de-weighting tower (50) is connected to the inlet of the tower bottom circulation pump (62); the outlet of the tower bottom circulation pump (62) is connected to the liquid phase inlet D of the tower bottom reboiler (63); the gas phase outlet C of the tower bottom reboiler (63) is connected to the gas phase inlet Q of the de-weighting tower (50); The liquid phase outlet P of the bottom of the deweighting tower (50) is connected to the inlet of the bottom extraction pump (64); the outlet of the bottom extraction pump (64) enters the tank area as an industrial cracking carbon nine qualified product (65); The circulating water inlet port B of the first condenser (52) is connected to the circulating water supply (66), and the circulating water outlet port A of the first condenser (52) is connected to the circulating water return (67); the low-temperature water inlet port E of the second condenser is connected to the low-temperature water supply (68), and the low-temperature water outlet port D of the second condenser is connected to the low-temperature water return (69); the hot water inlet port D of the dimerization reactor (60) is connected to the hot water supply (70), and the hot blow outlet port C of the dimerization reactor (60) is connected to the hot water return (71); the steam inlet port A of the tower kettle reboiler (63) is connected to the high-pressure steam (72), and the condensate outlet B of the tower kettle reboiler (63) is connected to the steam condensate (73).
2. The system for improving the yield of first-class industrial cracked carbon nine according to claim 1, characterized in that: The C port of the deweighting tower (50) is connected to the remote pressure gauge PI, the D port of the deweighting tower (50) is connected to the remote thermometer TI, the F port of the deweighting tower (50) is connected to another remote pressure gauge PI, the G port of the deweighting tower (50) is connected to another remote thermometer TI, the H port of the deweighting tower (50) is connected to another remote thermometer TI, the I port of the deweighting tower (50) is connected to the on-site pressure gauge PG, the J port of the deweighting tower (50) is connected to another remote pressure gauge PI, the K port of the deweighting tower (50) is connected to the upper port of the on-site liquid level gauge LG, the L port of the deweighting tower (50) is connected to the lower port of the same on-site liquid level gauge LG, the M port of the deweighting tower (50) is connected to the upper port of the remote liquid level gauge LI, the N port of the deweighting tower (50) is connected to the lower port of the same remote liquid level gauge LI, all the remote pressure gauges PI and the remote liquid level gauge LI detection signal output ports are connected to the output port of the central control room, and the on-site pressure gauge PG and the on-site liquid level gauge LG perform on-site indexing.
3. The system for improving the yield of first-class industrial cracked carbon nine according to claim 1, characterized in that: A second valve (2) is provided on the pipeline connecting the feed port A of the de-weighting tower (50) and the inlet of industrial cracked carbon nine (51), a sixth valve (6) is provided at the steam inlet A of the tower bottom reboiler (63), a twenty-second valve (22) is provided at the liquid phase port E of the de-weighting tower (50), a twenty-sixth valve (26) is provided at the outlet of the tower bottom external sampling pump, a thirty-fourth valve (34) is provided at the outlet production line of the reflux external sampling pump (58), a thirty-eighth valve (38) is provided at the gas phase outlet B of the second condenser (54), and a forty-seventh valve (47) is provided at the outlet of the light component sampling pump (59).
4. The system for improving the yield of first-class industrial cracked carbon nine according to claim 3, characterized in that: The second valve (2), the sixth valve (6), the twenty-second valve (22), the twenty-sixth valve (26), the thirty-fourth valve (34), the thirty-eighth valve (38), and the forty-seventh valve (47) are all regulating valves.
5. The system for improving the yield of first-class industrial cracked carbon nine according to claim 4, characterized in that: A first valve (1) is arranged on the pipeline in front of the second valve (2), and a third valve (3) is arranged on the pipeline in the rear of the second valve (2); the pipeline in front of the first valve (1) and the pipeline in the rear of the third valve (3) are connected to a bypass pipeline, and a fourth valve (4) is arranged on the bypass pipeline; A fifth valve (5) is arranged on the pipeline in front of the sixth valve (6), and a seventh valve (7) is arranged on the pipeline in the rear of the sixth valve (6); the pipeline in front of the fifth valve (5) and the pipeline in the rear of the seventh valve (7) are connected to a bypass pipeline, and an eighth valve (8) is arranged on the bypass pipeline; A twenty-first valve (21) is arranged on the pipeline in front of the twenty-second valve (22), and a twenty-third valve (23) is arranged on the pipeline in the rear of the twenty-second valve (22); the pipeline in front of the twenty-first valve (21) and the pipeline in the rear of the twenty-third valve (23) are connected to a bypass pipeline, and a twenty-fourth valve (24) is arranged on the bypass pipeline; A twenty-fifth valve (25) is provided on the pipeline in front of the twenty-sixth valve (26), and a twenty-seventh valve (27) is provided on the pipeline in the rear of the twenty-sixth valve (26); a bypass pipeline is connected to the pipeline in front of the twenty-fifth valve (25) and the pipeline in the rear of the twenty-seventh valve (27), and a twenty-eighth valve (28) is provided on the bypass pipeline; A thirty-third valve (33) is provided on the pipeline in front of the thirty-fourth valve (34), and a thirty-fifth valve (35) is provided on the pipeline behind the thirty-fourth valve (34); the pipeline in front of the thirty-third valve (33) and the pipeline behind the thirty-fifth valve (35) are connected to a bypass pipeline, and a thirty-sixth valve (36) is provided on the bypass pipeline; A thirty-seventh valve (37) is provided on the pipeline in front of the thirty-eighth valve (38), and a thirty-ninth valve (39) is provided on the pipeline in the rear of the thirty-eighth valve (38); the pipeline in front of the thirty-seventh valve (37) and the pipeline in the rear of the thirty-ninth valve (39) are connected to a bypass pipeline, and a fortieth valve (40) is provided on the bypass pipeline; A forty-sixth valve (46) is arranged on the pipeline in front of the forty-seventh valve (47), and a forty-eighth valve (48) is arranged on the pipeline in the rear of the forty-seventh valve; the pipeline in front of the forty-sixth valve (46) and the pipeline in the rear of the forty-eighth valve (48) are connected to a bypass pipeline, and a forty-ninth valve (49) is arranged on the bypass pipeline.
6. The system for improving the yield of first-class industrial cracked carbon nine according to claim 1, characterized in that: A thirteenth valve (13) is provided on the pipeline connecting the C port of the de-weighting tower (50) and the remote pressure gauge PI, a fourteenth valve (14) is provided on the pipeline connecting the F port of the de-weighting tower (50) and the remote pressure gauge PI, a fifteenth valve (15) is provided on the pipeline connecting the I port of the de-weighting tower (50) and the on-site pressure gauge PG, a sixteenth valve (16) is provided on the pipeline connecting the J port of the de-weighting tower (50) and the remote pressure gauge PI, a seventeenth valve (17) is provided on the pipeline connecting the K port of the de-weighting tower (50) and the upper port of the on-site liquid level gauge LG, an eighteenth valve (18) is provided on the pipeline connecting the L port of the de-weighting tower (50) and the lower port of the on-site liquid level gauge LG, a nineteenth valve (19) is provided on the pipeline connecting the M port of the de-weighting tower (50) and the upper port of the remote liquid level gauge LI, and a twentieth valve (20) is provided on the pipeline connecting the N port of the de-weighting tower (50) and the lower port of the remote liquid level gauge LI.
7. The system for improving the yield of first-class industrial cracked carbon nine according to claim 1, characterized in that: The remote pressure gauge port E of the reflux tank (56) is connected to the on-site pressure gauge PI via the 30th valve (30); the on-site liquid level gauge upper port C of the reflux tank (56) is connected to the on-site liquid level gauge lower port D of the reflux tank (56) via the 28th valve (28), the on-site liquid level gauge LG, and the 29th valve (29); the remote liquid level gauge upper port F of the reflux tank (56) is connected to the remote liquid level gauge lower port G of the reflux tank (56) via the 31st valve (31), the remote liquid level gauge LI, and the 32nd valve (32). The detection signal output ports of the remote pressure gauge PI and the remote liquid level gauge LI are connected to the detection signal input port of the central control room.
8. The system for improving the yield of first-class industrial cracked carbon nine according to claim 1, characterized in that: The remote pressure gauge port E of the light component collecting tank (57) is connected to the on-site pressure gauge PI via the forty-first valve (41); the upper port F of the on-site liquid level gauge of the light component collecting tank (57) is connected to the lower port G of the on-site liquid level gauge of the light component collecting tank (57) via the forty-second valve (42), the on-site liquid level gauge LG, and the forty-third valve (43) in sequence; the upper port C of the remote liquid level gauge of the light component collecting tank (57) is connected to the lower port D of the remote liquid level gauge of the light component collecting tank (57) via the forty-fourth valve (44), the remote liquid level gauge LI, and the forty-fifth valve (45) in sequence, and the detection signal output ports of the remote pressure gauge PI and the remote liquid level gauge LI are connected to the detection signal input port of the central control room.
9. The system for improving the yield of first-class industrial cracked carbon nine according to claim 1, characterized in that: A flow meter FIC is provided in front of the first valve (1), a flow meter FIC is provided in front of the fifth valve (5), a flow meter FIC is provided in front of the twenty-third valve (23), a flow meter FIC is provided in front of the thirty-third valve (33), and a flow meter FIC is provided in front of the forty-sixth valve (46). The detection signal output ports of all the flow meters FIC are connected to the detection signal input ports of the central control room.
10. The system for improving the yield of first-class industrial cracked carbon nine according to claim 1, characterized in that: A ninth valve (9) and an eleventh valve (11) are provided at the condensate outlet B of the tower bottom reboiler (63), and a steam trap (74) is provided between the ninth valve (9) and the eleventh valve (11); a pipeline in front of the ninth valve (9) and a pipeline in rear of the eleventh valve (11) are connected to a bypass pipeline, and a twelfth valve (12) is provided on the bypass pipeline.