Multi-combined supporting structure for roadway construction

By adopting a joint support structure of steel frame, long anchor cable, anchor anchor net and concrete layer in flat lane construction, the instability problem of single rigid support in broken weak water-rich formation is solved, and the tunnel is realized Stable support and low-cost maintenance reduce production impact.

CN222066756UActive Publication Date: 2024-11-26YILIANG CHIHONG MINING IND
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421361968.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-14
Publication Date
2024-11-26
Estimated Expiration
2034-06-14

AI Technical Summary

Technical Problem

The existing single rigid support is easily crushed by the expansion pressure when crossing long, broken and weak water-rich formations, resulting in high maintenance costs and a great impact on production, and requires frequent replacement of support.

Method used

Adopt joint support of various supporting structures such as steel frames, long anchor cables, anchor anchor nets, concrete layers, etc., through the combination of anchor rods, anchor cables and anchor nets, combining multi-layer support of concrete layer and arch frame , form full-section support and enhance the bearing capacity of the support structure.

Benefits of technology

Effectively control ground pressure, reduce tunnel maintenance costs, reduce production impact, extend support cycle, and reduce maintenance and repair operations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222066756U_ABST
    Figure CN222066756U_ABST
Patent Text Reader

Abstract

The utility model relates to a gate construction multi-combined supporting structure which comprises anchor rods, anchor nets, a concrete layer, anchor cables, arch frames and connecting ribs, the anchor rods and the anchor cables are connected with the anchor nets in a pressing mode, the anchor rods are evenly distributed on a top plate and side portions of a roadway, the anchor cables are distributed at intervals, the anchor cables are in full-section supporting, and the anchor rods are arranged on the top plate, the side portions and ground beams of the roadway. The anchor rods, the anchor cables and the anchor nets form a first-layer support based on the concrete layer after being erected, the arches are in filling connection with the first-layer support based on the concrete layer to form a second-layer support, the number of the arches is multiple, and the adjacent arches are connected through connecting ribs in a multi-point mode. Multiple supporting structures including the steel frame, the long anchor cable, the anchor rod and the anchor net and the concrete are used in a combined mode, the bearing capacity of the supporting structure is effectively improved, the supporting structure can effectively control ground pressure and successfully penetrate through a broken soft and weak water-rich stratum, stable supporting of a roadway is ensured, the roadway maintenance cost is reduced, and meanwhile due to the fact that maintenance and repair work is not generated, the maintenance cost is reduced. And the influence on production is greatly reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of shaft and tunnel engineering, and in particular to a multiple combined support structure for horizontal tunnel construction. Background Art

[0002] During underground mining operations, a large number of tunnels need to be excavated underground. The use of tunnel support to keep the tunnels unobstructed and the surrounding rock stable is of great significance to coal mine construction and production. The basic purpose of tunnel support is to ease and reduce the movement of the surrounding rock so that the tunnel section does not shrink excessively, and at the same time prevent the scattered and damaged surrounding rock from falling. The effect of tunnel support depends not only on the support force of the support itself, but also on a series of factors such as the surrounding rock properties, the mechanical properties of the support (support force and shrinkability), and the quality of support installation.

[0003] The existing horizontal tunnel construction method that passes through long, broken, soft and water-rich strata mostly adopts single rigid support. When encountering water-rich, broken rock strata, it is easily crushed by the pressure of water expansion. Usually, it needs to be re-supported after one to two years. The tunnel maintenance cost is high and it has a great impact on production. Utility Model Content

[0004] In order to solve or partially solve the problems existing in the related technology, the present application provides a variety of combined support structures for level tunnel construction, which adopts steel frames, long anchor cables, anchor rods and anchor nets, and concrete multiple support structures for combined support, which can effectively control ground pressure.

[0005] The first aspect of the present application provides a variety of combined support structures for horizontal tunnel construction, including: anchor rods, anchor nets, concrete layers, anchor cables, arch frames and connecting bars. The anchor rods and anchor cables are crimped with anchor nets. The anchor rods are evenly arranged on the roof and sides of the tunnel. The anchor cables are arranged at intervals, and the anchor cables are full-section supports, which are arranged on the roof, sides and ground beams of the tunnel. After the anchor rods, anchor cables and anchor nets are erected, they form a layer of support based on the concrete layer. The arch frame is connected to the concrete layer and the first layer of support to form a second layer of support. A number of arch frames are provided, and adjacent arch frames are connected at multiple points through connecting bars.

[0006] Furthermore, the arch frame is a closed connected structure, including an arch top, a straight side and a bottom plate, the arch top and the straight side are connected and fixed by a clamping plate, and the bottom plate is an arc-shaped structure.

[0007] Furthermore, the vault is a three-center vault.

[0008] Furthermore, the bottom excavation shape of the ground beam is an arc shape, and the maximum bottom excavation depth in the middle of the ground beam is not less than 650mm below the floor.

[0009] Furthermore, in one layer of support, the anchor rods, anchor nets and concrete layer are the first support, and the anchor cables, anchor nets and concrete layer are the second support.

[0010] The technical solution provided by this application may have the following beneficial effects:

[0011] The present application provides a variety of combined support structures for horizontal tunnel construction, which adopts the combined use of steel frame + long anchor cable + anchor rod anchor net + concrete multiple support structures, effectively increasing the bearing capacity of the support structure, enabling it to effectively control the ground pressure, successfully pass through broken soft water-rich strata, ensure the stable support of the tunnel and reduce the maintenance cost of the tunnel. At the same time, since no maintenance and repair work is generated, the impact on production is greatly reduced.

[0012] It should be understood that the foregoing general description and the following detailed description are exemplary and explanatory only and are not restrictive of the present application. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] The above and other objects, features and advantages of the present application will become more apparent by describing the exemplary implementation structure of the present application in more detail in conjunction with the accompanying drawings, wherein the same reference numerals generally represent the same components in the exemplary implementation structure of the present application.

[0014] Figure 1 is a schematic diagram of a support structure shown in an embodiment of the present application;

[0015] Figure 2 It is a structural schematic diagram of an arch frame clamp shown in an embodiment of the present application;

[0016] Figure 3 is a schematic diagram of the connection of the arch frame shown in the embodiment of the present application;

[0017] Reference numerals:

[0018] In the figure, 1 is ground beam, 2 is arch frame, 3 is anchor rod, 4 is anchor cable, 5 is clamp plate, and 6 is connecting reinforcement. DETAILED DESCRIPTION

[0019] The implementation structure of the present application will be described in more detail below with reference to the accompanying drawings. Although the implementation structure of the present application is shown in the accompanying drawings, it should be understood that the present application can be implemented in various forms and should not be limited by the implementation structure described here. On the contrary, these implementation structures are provided to make the present application more thorough and complete, and to fully convey the scope of the present application to those skilled in the art.

[0020] It should be understood that although the terms "first", "second", "third", etc. may be used in this application to describe various information, this information should not be limited to these terms. These terms are only used to distinguish the same type of information from each other. For example, without departing from the scope of this application, the first information may also be referred to as the second information, and similarly, the second information may also be referred to as the first information. Thus, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of this application, the meaning of "multiple" is two or more, unless otherwise clearly and specifically defined.

[0021] In the description of the present application, it should be understood that the terms "length", "width", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship, are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.

[0022] Unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0023] The technical solution of the embodiments of the present application is described in detail below with reference to the accompanying drawings.

[0024] As shown in the figure, a variety of joint support structures are constructed in the horizontal tunnel, including: anchor rods 3, anchor nets, concrete layers, anchor cables 4, arch frames 2 and connecting bars 6. The concrete layer is C20 shotcrete. After the anchor rods 3, anchor cables 4 and anchor nets are erected, a layer of support is formed based on the concrete layer. In the first layer of support, the anchor rods 3, anchor nets and concrete layers are the first support, and the anchor cables 4, anchor nets and concrete layers are the second support. The arch frame 2 is connected with the first layer of support based on the concrete layer to form a second layer of support. There are multiple arch frames 2, and adjacent arch frames 2 are connected at multiple points through connecting bars 6.

[0025] The tunnel roof and side parts use φ22mm left-handed unreinforced threaded steel anchor rods 3 with a length of 2.2m. The spacing between resin anchor rods 3 is 0.8m and the row spacing is 0.8m. The anchoring length of resin anchor rods 3 is 0.8m. One K2335 anchoring agent is used with a length of 800mm. A preload of 6t is applied. The tray size of anchor rod 3 is 120mm×120mm×8mm.

[0026] The tunnel roof, ground beam and two sides all use φ21.8mm enlarged head anchor cable 4, the length of anchor cable 4 is 9.5m, and the diameter of the enlarged head is 40mm; the anchor cable 4 is evenly arranged and staggered with the anchor rod 3, the row spacing between the anchor cables 4 on the roof and two sides is 1.6m, and the spacing between the anchor cables 4 on the ground beam is 1.0m. The length of the anchor end is 2.0m, the length of the free end is 7.5m, and the free end is wrapped with a PVC pipe to prevent slurry from entering. The hole diameter of anchor cable 4 is 50mm, and the anchor rod 3 drilling rig is used to drill the rock. The grouting slurry is cement slurry with a water-cement ratio of 0.5:1, and the grouting pressure must reach more than 3MPa. The size of the anchor cable 4 tray is 250mm×250mm×20mm, and it is equipped with corresponding locks. The design value of the tension of anchor cable 4 is 300kN, and the locking value is 1.1 times the design value.

[0027] When the anchor rod 3 is constructed, a layer of mesh is pressed together with the anchor rod 3 . When the anchor cable 4 is constructed, a layer of mesh is pressed together with the anchor cable 4 . The mesh is a double-layer mesh of φ6mm steel mesh and a mesh size of 100mm×100mm.

[0028] The arch frame 2 is a closed joint structure, including an arch, a straight side and a bottom plate. The arch is a three-center arch. The arch and the straight side are connected and fixed by a clamp 5. The bottom plate is an arc structure that matches the ground beam. The arch frame 2 is made of 14# I-beam and installed. The distance between adjacent arch frames 2 does not exceed 0.8m, and they are connected at multiple points through connecting ribs 6. The connecting ribs 6 are angle steel triangles or bidirectional hook steel bars with a diameter of 22mm or more. The distance between adjacent connections is not more than 500mm.

[0029] The tunnel beam bottom excavation shape is arc-shaped, and the maximum bottom excavation depth in the middle of the beam is not less than 650mm below the designed floor. C15 concrete is used to backfill the arch frame bottom plate to the designed elevation to the designed floor height. The installation of sleepers and the design and construction of water ditches are subject to on-site confirmation by Maoping technicians.

[0030] Construction process:

[0031] 1. Carry out anchor bolt 3 + first layer of mesh + first shotcrete support for the tunnel roof and side. Each construction cycle shall not exceed 2m of footage. After the tunnel is expanded, anchor bolt 3, mesh hanging and shotcrete operation shall be carried out immediately until the C11 stratum is supported;

[0032] 2. Carry out ground beam excavation + second layer of mesh hanging + second shotcrete spraying + second full-section anchor cable 4 support;

[0033] 3. Install the arch frame 2 and spray C20 concrete to fully fill the arch frame 2 and the existing spray anchor net to achieve close contact between the arch frame 2 and the spray layer.

[0034] During the construction process, minimize the collection of water into the construction area, especially onto the base plate.

[0035] Finally, it should be noted that, in this article, relationships such as first and second, etc. are used only to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms include, include or any other variations are intended to cover non-exclusive inclusion, so that a process, method, article or device that includes a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0036] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0037] The embodiments of the present application have been described above, and the above description is exemplary, not exhaustive, and is not limited to the disclosed embodiments. Many modifications and changes will be apparent to those of ordinary skill in the art without departing from the scope and spirit of the described embodiments. The selection of terms used herein is intended to best explain the principles of the embodiments, practical applications, or improvements to the technology in the market, or to enable other persons of ordinary skill in the art to understand the embodiments disclosed herein.

Claims

1. A multi-joint support structure for tunnel construction, characterized in that: include: Anchor rods, anchor nets, concrete layers, anchor cables, arch frames and connecting bars, the anchor rods and anchor cables are crimped with the anchor nets, the anchor rods are evenly arranged on the roof and sides of the tunnel, the anchor cables are arranged at intervals from the anchor rods, and the anchor cables are full-section supports, which are arranged on the roof, sides and ground beams of the tunnel. After the anchor rods, anchor cables and anchor nets are erected, they form a layer of support based on the concrete layer, and the arch frames form a second layer of support based on the concrete layer and the first layer of support filled and connected. There are a number of arch frames, and adjacent arch frames are connected at multiple points through the connecting bars.

2. The multiple combined support structure for tunnel construction according to claim 1 is characterized in that: The arch frame is a closed connected structure, including an arch top, a straight edge and a bottom plate. The arch top and the straight edge are connected and fixed by a clamping plate, and the bottom plate is an arc-shaped structure.

3. The multiple combined support structure for tunnel construction according to claim 2 is characterized in that: The arch is a three-center arch.

4. The multiple combined support structure for tunnel construction according to claim 1 is characterized in that: The bottom excavation shape of the ground beam is an arc shape, and the maximum bottom excavation depth in the middle of the ground beam is not less than 650mm below the floor.

5. The multiple combined support structure for tunnel construction according to claim 1 is characterized in that: In the one-layer support, the anchor rod, the anchor net and the concrete layer are the first support, and the anchor cable, the anchor net and the concrete layer are the second support.