Anti-settling well lid system with stable connecting structure

By using stainless steel T-bolts and rotary limit blocks in the manhole cover system, combined with the design of lap welding and concrete base, the problem of manhole cover settlement is solved, the stable connection between manhole cover and roadbed is achieved, and the anti-settlement performance is improved and service life ensures traffic safety.

CN222083615UActive Publication Date: 2024-11-29范志铭 +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420713657.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-09
Publication Date
2024-11-29
Estimated Expiration
2034-04-09

AI Technical Summary

Technical Problem

Municipal road inspection manhole covers have settled and collapsed due to poor quality of the wellbore, unqualified backfill soil, heavy pressure of engineering vehicles, etc., causing traffic safety hazards, which are difficult to effectively solve in the existing technology.

Method used

Design an anti-settlement manhole cover system with a stable connection structure, including manhole cover, base and concrete base. The manhole cover and base are fixed by stainless steel T-bolts and rotary limit blocks. The base is fixed with concrete base through overlap welding to form a solid The overall structure ensures a stable connection between the manhole cover and the roadbed.

Benefits of technology

Effectively prevent the manhole cover from settlement, enhance the compressive resistance and service life of the manhole cover, eliminate the relative displacement between the manhole cover and the base, ensure that the vehicle pressure is completely transmitted to the roadbed, reduce the settlement risk, and improve traffic safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222083615U_ABST
    Figure CN222083615U_ABST
Patent Text Reader

Abstract

An anti-sedimentation well lid system with a stable connecting structure belongs to the technical field of municipal road inspection wells and comprises a well lid, a base and a concrete base, the well lid is fixedly mounted in the inner edge of the base, the surface of the well lid is flush with the upper end of the base, and a plurality of bolt counter bores are evenly formed in the periphery of the well lid. Bolt holes corresponding to the bolt counter bores in number are formed in the positions, corresponding to the bolt counter bores, in the inner edge of the base below the bolt counter bores, bolt rotation limiting blocks are arranged on the two sides of the bottoms of the bolt holes, the well lid and the base are fixed through bolts, bolt heads are clamped between the spiral limiting blocks, and the base is fixedly installed on a concrete base. According to the technical scheme, the structure is simple, and the manufacturing cost is low. According to the scheme, the well lid and the combined parts are connected into a firm and rigid whole, the possibility of any relative displacement of all the parts is permanently eradicated, pressure generated by passing vehicles is completely and thoroughly transmitted to a roadbed in a large area, the service life is long, and the anti-settling performance is good.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of municipal road inspection wells, in particular to an anti-sinking well cover system with a stable connection structure. Background Art

[0002] At present, the main reasons for the settlement and collapse of manhole covers are: poor quality of shaft masonry or due to construction period, the next process is carried out before the strength is reached, the backfill soil around the shaft is unqualified or not compacted enough to cause collapse, poor quality of manhole covers, low strength, many engineering projects, many heavy engineering vehicles, frequent heavy pressure, inadequate construction management, lack of unified, scientific and reasonable standard installation process for inspection wells, etc. The most easily overlooked important factors are the influence of various unpredictable situations, and the factors of the quality of some engineering construction, which lead to the micro-dynamic "two-layer skin" phenomenon between the manhole cover and its base, and then to the roadbed due to vehicle rolling, and the manhole cover itself is unstable. After forming a "seesaw" state, any weight rolling will produce a "hammer effect". The "hammer effect" is not only a noise problem, but also an important cause of manhole cover settlement. From the momentum and impulse formula Ft=mv, we can get the impact force F=mv / t. The rapid passing of the vehicle causes the impact force F to become very large, just like a hammer. After a long time, the manhole cover has been "hammered" countless times, which has damaged the foundation below, accelerated the collapse, and the settlement has become more and more serious. Even if it is repaired, it will settle again after a few years. Although the quality of manhole covers has improved in recent years, and there are few incidents of manhole covers breaking and flying to injure people, the problem of manhole cover settlement still causes many troubles to drivers, and even traffic accidents caused by avoiding collapsed manhole covers often occur. Therefore, solving the problem of manhole cover settlement is an urban problem that needs to be solved urgently. Utility Model Content

[0003] In order to solve the problems existing in the prior art, the utility model provides an anti-sinking manhole cover system with a stable connection structure, which has a simple structure, high strength, low cost, and long service life, and can effectively solve the problem of manhole cover sinking.

[0004] In order to achieve the above purpose, the technical solution of the utility model is:

[0005] The invention discloses an anti-sinking manhole cover system with a stable connection structure, comprising a manhole cover, a base and a concrete base. The manhole cover is fixedly installed in the inner edge of the base, the surface of the manhole cover is flush with the upper end of the base, a number of bolt countersunk holes are evenly provided around the manhole cover, a corresponding number of bolt holes are provided in the inner edge of the base below the bolt countersunk holes at the positions corresponding to the bolt countersunk holes, bolt rotation limit blocks are provided on both sides of the bottom of the bolt holes, the manhole cover and the base are fixed by bolts, the bolt heads are clamped between the bolt rotation limit blocks, the limiting function of the bolts is realized by the bolt rotation limit blocks, so that the bolts are better fixed, and the base is fixedly installed on the concrete base.

[0006] Furthermore, the number of bolt countersunk holes evenly arranged around the manhole cover is 4-8.

[0007] Furthermore, the bolt is a T-bolt, the bolt material is stainless steel, and the nut matched with the bolt is a loose nut.

[0008] Furthermore, manhole cover reinforcement ribs are arranged crisscrossed under the manhole cover.

[0009] Furthermore, the base is fixed to the main steel bars in the concrete base by lap welding, the lap length is not less than 100 mm, and the concrete grade used in the concrete base is not less than C30.

[0010] Furthermore, the base and the bolt rotation limit block are cast as one piece.

[0011] Furthermore, the concrete base is rectangular, and the long side of the concrete base is parallel to the traveling direction of the vehicle.

[0012] Beneficial effects of the utility model:

[0013] The technical solution in the utility model has a simple structure and low cost. The connection method through stainless steel bolts is extremely strong, and only the manhole cover needs to be opened for maintenance. The solution of the utility model changes the previous way that the pressure is borne by the wellbore and the surrounding roadbed in a small area, and the pressure generated by the vehicle driving is transmitted step by step and micro-dynamically by the manhole cover and other components. The manhole cover and the combined components are connected into a solid and rigid whole, and any relative displacement of the components is permanently eliminated, so that the pressure generated by the passing vehicle is completely, thoroughly and widely transmitted to the roadbed, with a long service life and good anti-settling performance. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 This is a schematic diagram of the structure of an anti-sinking manhole cover system with a stable connection structure provided by the utility model;

[0015] Figure 2 It is a schematic diagram of the base structure provided by the utility model;

[0016] Figure 3 It is a schematic diagram of the installation structure of the manhole cover system provided by the utility model;

[0017] Figure 4 It is a detailed enlarged view of point A provided by the utility model;

[0018] Figure 5 The utility model is a schematic diagram of the structure of a stainless steel T-shaped connecting bolt.

[0019] The reference numerals in the drawings of the specification include:

[0020] 1-manhole cover, 2-base, 3-concrete base, 4-bolt countersunk hole, 5-rebar, 6-rebar lap weld, 7-inner edge of base, 8-bolt hole, 9-stainless steel T-type connecting bolt, 10-bolt rotation limit block, 11-manhole cover reinforcement rib, 12-hook, 13-wellbore, 14-roadbed. DETAILED DESCRIPTION

[0021] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.

[0022] like Figures 1 to 5 As shown, an anti-sinking manhole cover system with a stable connection structure includes a manhole cover 1, a base 2 and a concrete base 3. The manhole cover 1 is fixedly installed in the inner edge 7 of the base, and the manhole cover reinforcement ribs are arranged crisscross below the manhole cover 1. The surface of the manhole cover 1 is flush with the upper end of the base 2. A number of bolt countersunk holes 4 are evenly opened around the manhole cover 1, and the number of bolt countersunk holes is 4-8. A corresponding number of bolt holes 8 are opened in the inner edge of the base below the bolt countersunk holes 4 at the positions corresponding to the bolt countersunk holes 4. Bolt rotation limit blocks 10 are set on both sides of the bottom of the bolt holes 8. The manhole cover 1 and the base 2 are fixed by bolts. The bolts in this embodiment are stainless steel T-shaped connecting bolts 9. The bolt heads are stuck between the bolt rotation limit blocks 10. The base 2 is fixedly installed on the concrete base 3. The concrete base 3 is rectangular, and the long side direction of the concrete base 3 is parallel to the direction of vehicle travel. Compared with the round shape, the square shape is easier to make and tie steel bars. Moreover, when a vehicle drives over, in the initial stage of rolling over the concrete base 3, the area of ​​the rectangular base 3 that transmits pressure to the roadbed will be larger than that of the circular and square bases, and the pressure borne by the roadbed will be smaller.

[0023] The base 2 is fixed to the main steel bars in the concrete base 3 by lap welding. During the production process of the concrete base 3, after the steel bars 5 are tied, the base 2 is welded to the main steel bars at the corresponding position by lap welding. The steel bar lap welding points 6 are distributed at the intersection of the base 2 and the steel bars 5. The lap length is not less than 100 mm. After pouring concrete with a grade of not less than C30, a rigid whole is formed.

[0024] The one-time installation process of an anti-sinking manhole cover system with a stable connection structure is:

[0025] Step 1: Use stainless steel T-shaped connecting bolts 9 to install the manhole cover 1 in the base 2. Configure 4-8 bolts according to the diameter of the manhole cover 1 and distribute them evenly. Before installing the stainless steel T-shaped connecting bolts 9, remove the sand or other debris on the inner edge of the base 7. After cleaning and covering the manhole cover 1, install and tighten the bolts to ensure a good connection. Tighten them according to the standard torque to ensure uniform force and avoid deformation. The surface of the manhole cover 1 must be flat and without curvature. The top surface of the manhole cover 1 is flush with the upper edge of the base 2. The nuts of the stainless steel T-shaped connecting bolts 9 must not extend beyond the surface of the manhole cover 1 to ensure the flatness of the upper surface.

[0026] Step 2: Make the concrete base 3 according to the standard drawings. During the process of binding the steel bars 5 of the concrete base 3, use lap welding to fix the base 2 and the concrete base 3. The lap length should be no less than 100mm. Adjust the horizontality of the top surface of the manhole cover 1. The concrete grade of the concrete base 3 should be no less than C30. According to the diameter of the manhole cover 1, 8-12 lap welding points of the steel bars of the base 2 and the concrete base 3 are set to ensure the firm connection between the base 2 and the concrete base 3 after pouring. The surface of the concrete base 3 is roughened to ensure the adhesion to the asphalt surface layer in the future.

[0027] Step 3: After the concrete base 3 is cured, it can be transported to the construction site.

[0028] Step 4: Dig the road where the manhole cover is to be installed according to the size of the concrete base 3, check and clean the roadbed 14 according to the design requirements, and repair the shaft 13.

[0029] Step 5: Check and compact the backfill soil around the shaft 13, and calibrate the level to meet the specification requirements and design elevation before installation.

[0030] Step 6: Add a layer of quick-setting concrete on the roadbed 14 to fill the gap between the concrete base 3 and the roadbed 14 .

[0031] Step 7: Place the anti-sinking manhole cover system that has been installed after maintenance in step 3, pave the asphalt surface layer, and ensure that the surface layer is flush with the top surface of the manhole cover 1, and the installation is completed.

Claims

1. An anti-sinking manhole cover system with a stable connection structure, characterized in that: It includes a manhole cover, a base and a concrete base. The manhole cover is fixedly installed in the inner edge of the base. The surface of the manhole cover is flush with the upper end of the base. A number of bolt countersunk holes are evenly arranged around the manhole cover. A corresponding number of bolt holes are arranged in the inner edge of the base below the bolt countersunk holes at the positions of the bolt countersunk holes. Bolt rotation limit blocks are arranged on both sides of the bottom of the bolt holes. The manhole cover and the base are fixed by bolts. The bolt heads are clamped between the bolt rotation limit blocks. The limiting function of the bolts is realized by the bolt rotation limit blocks, so that the bolts are better fixed. The base is fixedly installed on the concrete base.

2. The anti-sinking manhole cover system with a stable connection structure according to claim 1, characterized in that: The number of bolt countersunk holes evenly arranged around the manhole cover is 4-8.

3. The anti-sinking manhole cover system with a stable connection structure according to claim 1, characterized in that: The bolt is a T-bolt, the bolt material is stainless steel, and the nut matched with the bolt is a loose nut.

4. The anti-sinking manhole cover system with a stable connection structure according to claim 1, characterized in that: Manhole cover reinforcing ribs are arranged crisscrossly under the manhole cover.

5. The anti-sinking manhole cover system with a stable connection structure according to claim 1, characterized in that: The base is fixed to the main steel bars in the concrete base by lap welding, the lap length is not less than 100 mm, and the concrete grade used in the concrete base is not less than C30.

6. The anti-sinking manhole cover system with a stable connection structure according to claim 1, characterized in that: The base and the bolt rotation limiting block are cast as one piece.

7. The anti-sinking manhole cover system with a stable connection structure according to claim 1, characterized in that: The concrete base is rectangular, and the long side of the concrete base is parallel to the traveling direction of the vehicle.