The utility model belongs to the technical field of
solid waste resources, and particularly relates to
solid waste resourceful treatment integrated equipment based on
pyrolysis gasification, which comprises a
pyrolysis gasification furnace, a feeding port is arranged on one side of the
pyrolysis gasification furnace, and a control box is arranged on the outer wall of the other side of the feeding port. Two inserting plates are symmetrically welded on one side, facing the outer wall of the pyrolysis gasification furnace, of the control box; according to the utility model, the control box is mounted, and the two
insertion plates on one side of the control box penetrate through the corresponding rectangular grooves in the heat insulation plate, so that the two notches in the
insertion plates can be clamped with the corresponding stop levers and are positioned. In addition, when the inserting plate penetrates through the heat insulation plate, the arc-shaped outer wall of the inserting plate can extrude the clamping tongue into the inner cavity, when the inserting plate is installed in place, the spring can push the clamping tongue to reset at the moment, and therefore the clamping tongue can be in
butt joint with the inserting opening. As the heat insulation plate is in
butt joint with the pyrolysis gasification furnace through the fixing strips on the two sides of the heat insulation plate, the control box can be in
butt joint with the pyrolysis gasification furnace conveniently through the structure.